Chicago Public Schools 6 Month Asbestos Surveillance Fall

Similar documents
Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation.

SAINT PAUL PUBLIC SCHOOLS Six Month Periodic Surveillance Report for Riverview Elementary 271 Belvidere Street East Saint Paul, MN Key

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

ASBESTOS BUILDING SURVEY REPORT

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

Mammoth Inc. 320 West College Ave. Pleasant Gap PA EIN PA Contractor Licsense - PA PH-(814) Fax- (814)

Collegewide Masterplanning. Downtown Center. April 25 th, 2012 Collegewide Masterplanning. Downtown Center. April 4, 2012

ADDENDUM NO. 1 November 10, 2016

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT. Stantec. Site: 308 Oak Street Slinger, WI. Work Area: Pre-Renovation

Punch List Checklist EXTERIOR LANDSCAPING. COMMON LIVING SPACES and HALLS

Specifications: Other: sign in sheet

PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT. Stantec. Site: 310 Oak Street Slinger, WI. Work Area: Pre-Renovation

How to Install Elite Bayside Beadboard

Area or Perimeter? That is the question! How to find area and perimeter of irregular shapes... How to find area and perimeter of irregular shapes..

November 30, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

squarescrub.com

Active Shooter Procedures Preparing for the Unthinkable

INCEPTIV INSTALLATION GUIDELINES

Tools You Will Need: Pencil Chalk Line Level Rubber J-Roller Miter Saw (either hand saw or electric) Utility Knife Black Dot Stickers (provided)

INCEPTIV INSTALLATION GUIDELINES

Loose Lay Luxury Vinyl Plank

PAR AG presentation. May ROCKVILLE PIKE ELEMENTARY & PRESCHOOL BUILDING

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

ASBESTOS OPERATIONS AND MAINTENANCE PROGRAM. Prepared for: FALMOUTH PUBLIC SCHOOLS FALMOUTH, MASSACHUSETTS. Prepared by:

A Step by Step guide to making and maintaining a Universal Credit claim online

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

Strands & Standards CARPENTRY 2

MINUTES SPECIAL MEETING OF THE BOARD OF REGENTS THE TEXAS A&M UNIVERSITY SYSTEM HELD AT CORPUS CHRISTI, TEXAS JANUARY 19, 1995

A Starter Kit for a Summary of Prior Art Search

BUILDING REGISTER AND SUMMARY OF RESULTS

Address: PENCIL Box to purchase individual backpacks with supplies for students at our selected school(s).

installation manual m y w a l l a r t. c o m

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

UNIQUE KIOSK SITE INSPECTION FORM

Call your Lumber Liquidators Store #233, at (707) to pay for your materials.

ID0.1 PALO VERDE 8000 WEST US HIGHWAY 290 AUSTIN, TX SHEET INDEX: CONTACT INFORMATION: DISCLOSURES: DOCUMENT GENERAL NOTES:

222 Edgewood Crescent (Strata Lot 48) The Sequoia. 226 Edgewood Crescent (Strata Lot 49) The Douglas

Installation Instructions

A. Submit properly identified manufacturer's literature before starting work.

Coming soon: The USDA Farm to School Census Your voice counts!

Request or Schedule an Appointment Health Link

Central Michigan University

LYFT 12 CLEAR WALL SCONCE

March 1, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

SECTION IDENTIFYING DEVICES

E-BOOK - HOW TO NAIL WOOD TOGETHER EBOOK

Advising Appointments

Consultation PTM (Parent s Guide) Consultation Mobile Apps (Parent s guide) Empower People. One Solution

How do I make an appointment to see an INTO USF Tutor?

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

The Mural Project The Neighborhood Personalization Program

Guitar Handbook. Individual Lesson one student - 30 minutes. Shared Lesson two students - 30 minutes

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

Carpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%

Urbani School Health Kit. Games. Urbani School Health Kit. World Health Organization. Western Pacific Region

EDINBURGH COMMUNITY SCHOOL CORPORATION Edinburgh, Indiana January 13, 2014

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

TRESSES INSTALLATION GUIDE

IELTS and other English language exams Present Past Future

HHSRS Report. 3 Hamble Road, Macclesfield, SK10 3RD

Problem 1 Floors by Terrance

Name: Letter: B.E.E. Binder BRING EVERYTHING EVERY DAY. Miss Gillis Room #12

centra falls IN THE CENTER OF EVERYTHING

Construction Trades Foundation

Chapter 22 - Cabinets & Vanities

CHECKLIST FOR CHURCH FACILITY MANAGERS: EVALUATE YOUR CHURCH FACILITIES THROUGH THE EYES OF VISITORS

Table of Contents. Revised: August 30, User Guide... i. Introduction Due Diligence Health & Safety Policy...

PREMIUM BATHS MANUFACTURED IN THE UK BATH PANEL FITTING INSTRUCTIONS FITTING INSTRUCTIONS FOR SHOWER BATHS AFTERCARE INSTRUCTIONS PARTS SUPPLIED

Noyes S.E.D. June 2017 Newsletter

In response, please refer to: R&C #

This is a one-week excerpt from the Starfall Kindergarten Mathematics Teacher s Guide. If you have questions or comments, please contact us.

Matt Morgan Assistant Superintendent of Support Services. Kristine Johnston Director of Purchasing. Date: July 30, 2015

Introduction Home : 0

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:

Completing an online application to extend your Tier 4 visa from inside the UK using The Hub Check and Send Service

Core Curriculum Carpentry 1 Carpentry 2 Carpentry 3

Transcription:

Chicago Public Schools 6 Month Surveillance 2015 - Fall School: UNO Charter School - SPC Daniel Zizumbo Campus Oracle Unit: 66395 Building ID: 3344 Address: 4248 W 47th St. Region: 04 Mail Room: 44 Surveyor: Sales, Mr. Olcher-Prins C. CHECK HERE IF NO CHANGE TO ASBESTOS Survey Date: 11/24/2015 Email Address: ocsales@cps.edu A copy of the 2013/2014 notice to parents and staff regarding the asbestos management plan notifications was distributed via: Each child's backpack Notice printed in school's newsletter Notice printed in school's calendar Other HA No Description Location Change in Assessment 1 Drywall Joint Compound 4500 SF Throughout 1st Floor Surface Yes None YES X NO No change Report filled out by Mark Nagode = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 1

HA No Description Location Change in Assessment 2 Drywall Joint Compound 4500 SF Throughout 1st Floor Surface Yes None YES X NO No change All ACM abated during original construction HA No Description Location Change in Assessment 3 12"X 12" Light Blue Mix Floor Tile 23325 SF 1st Floor - Halls, Classrooms, Teacher Offices, Vestibules, Bathrooms Miscellaneous Yes None YES X NO No change All ACM abated during original construction = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 2

HA No Description Location Change in Assessment 3M 12" X 12" Light Blue Mix Floor Tile Mastic 23325 SF 1st Floor Halls, Classrooms, Teacher Offices, Vestibules, Bathrooms Miscellaneous Yes None YES X NO No change All ACM abated during original construction HA No Description Location Change in Assessment 4 12" X 12" Blue Mix Floor Tile 1250 SF 1st Floor- Halls, Engineer's Office No change All ACM abated during original construction = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 3

HA No Description Location Change in Assessment 4M 12" X 12" Blue Mix Floor Tile Mastic 1250 SF 1st Floor-Halls, Engineer's Office No change All ACM abated during original construction HA No Description Location Change in Assessment 5 12" X 12" Dark Blue Mix Floor Tile 55 SF 1st Floor Halls and Engineer's Office No change All ACM abated during original construction = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 4

HA No Description Location Change in Assessment 5M 12" X 12" Dark Blue Mix Floor Tile Mastic 55 SF 1st Floor Halls and Engineer's Office No change All ACM abated during original construction HA No Description Location Change in Assessment 6 12" X 12" White with Gray Mix Floor Tile 13675 SF 1st Floor Halls, Teacher's offices, Bathrooms, Resource Room No change All ACM abated during original construction = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 5

HA No Description Location Change in Assessment 6M 12" X 12" White with Gray Mix Floor Tile Mastic 13675 SF 1st Floor Halls, Teacher's Offices, Bathrooms, Resource Room No change All ACM abated during original construction HA No Description Location Change in Assessment 7 12" X 12" White with Blue Specks Floor Tile 270 SF 1st Floor Teachers Office 1-50 No change All ACM abated during original construction = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 6

HA No Description Location Change in Assessment 7M 12"X12" White with Blue Specks Floor Tile Mastic 270 SF 1st Floor Teachers Offices 1-50 No change All ACM abated during original construction HA No Description Location Change in Assessment 11 12'' X 12" White with Green Specks Floor Tile 200 SF 1st Floor NW Vestibule No change All ACM abated during original construction = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 7

HA No Description Location Change in Assessment 11M 12'' X 12" White with Green Specks Floor Tile 200 SF 1st Floor NW Vestibule No change All ACM abated during original construction HA No Description Location Change in Assessment 13 Carpet Adhesive for Blue/Black Striped Carpet Tile 275 SF 1st Floor- Small Corner Offices No change All ACM abated during original construction = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 8

HA No Description Location Change in Assessment 15 4" Sky Blue Baseboard 5400 LF Throughout 1st Floor No change All ACM abated during original construction HA No Description Location Change in Assessment 17 Mastic used for 4" Sky Blue Baseboard 5460 LF Throughout 1st Floor No change All ACM abated during original construction = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 9

HA No Description Location Change in Assessment 18 2' X 2' White Ceiling Tiles 14000 SF No change All ACM abated during original construction 1st Floor halls, Vestibule, Teachers office HA No Description Location Change in Assessment 19 2' x 4' Drop Face White with Pin Dots Ceiling Tile 10940 SF 1st Floor Classrooms and Multi-Purpose Room No change All ACM abated during original construction = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 10

HA No Description Location Change in Assessment 20 Sinks 7 Classrooms (Art Room & Science Room) in 1st Floor, and Mult-purpose room Miscellaneous Yes None YES X NO No change All ACM abated during original construction = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 11

ALL LEA Responsibilities, for this school, will be met. Lynn A.Crivello = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 12

NOTICE TO PARENTS AND STAFF REGARDING THE ASBESTOS MANAGEMENT PLAN NOTIFICATION School: Date: 12/4/2015 UNO Charter School - SPC Daniel Zizumbo Campus This is to notify you in accordance with Illinois and Federal Regulations, that a copy of the Management Plan is available at each school during school hours by appointment. Requests to review the Management Plan must be made at least 24 hours in advance. Also please be advised that CPS conducts asbestos inspections of all Schools every three years. The last inspection was completed in 2013. surveillances are conducted every six months. CHECK ONE A copy of this notice was sent home in each child's backpack. A copy of this notice was printed in the school's newsletter and sent home with each child A copy of this notice was printed in the school's calendar and sent home with each child Other. A COPY OF THIS NOTICE MUST BE PLACED IN THE SCHOOL'S ASBESTOS MANAGEMENT PLAN. = Can be crumbled, pulverized, or reduced to powder by hand pressure. Page 13