Installation Guide. Ceiling Suspended Acoustical Panels

Similar documents
Closet System Installation Manual

Triple Bypass System

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER R H

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

Lunette Series. Home Theater Curved Fixed Frame Projection Screen. User s Guide. Important Safety and Warning Precautions

Lunette Series. Home Theater Curved Fixed Frame Projection Screen. User s Guide. Important Safety and Warning Precautions

southpaw enterprises, inc.

Series 1500 Aluminum Door Canopy

Lunette Series. Home Theater Curved Fixed Frame Projection Screen. User s Guide. Important Safety and Warning Precautions

Series 1100 Aluminum Door Canopy

WAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

Installation Guide Acoustic Wall Panel

SE5a Wing Panels rev 1.0

INFUSIONS and METALWORKS Wings Accent and Acoustical Clouds

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

southpaw enterprises, inc.

Lunette 2 Series. Curved Fixed Frame Projection Screen. User s Guide

Ridgefield Hardware. Step by Step Installation Instructions. Customer Service or visit us online at smithnoble.com

Heavy-Duty Bypass Track System

x2 1/4 (6mm) Floor Anchor

BARN DOOR HARDWARE KIT

METALWORKS Concealed. Installation Instructions

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Installation Manual for Metal Emperor Lockers

METALWORKS TARTAN PANELS General Installation Instructions

A-LOOK ver 1 A-LOOK TM. Installation Manual

x2 1/4 (6mm) Floor Anchor

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

Exterra Installation Guide

WoodWORKS Channeled Plank

Work Space Set-up. Slats will level the pipe during bending and help minimize twisting of the bow.

Installation Instructions

Zenterra TM Installation Guide

Steel Sound Enclosure

Boat Lift Canopy Frame Assembly Instructions

How to Build A Porch Swing

Installation Instructions

Contour Hanger ASSEMBLY INSTRUCTIONS

Industrial Hanger ASSEMBLY INSTRUCTIONS

Installation Manual. Solid Plastic Toilet Partitions. IN CANADA & AREAS OTHER THAN U.S.A.: IN THE U.S.A.:

Transform your space into an extraordinarily inviting home, office or gathering place with the versatile, powerful and elegant Olin Fixture system.

Ripple Hanger ASSEMBLY INSTRUCTIONS

C-180 Builder s Manual

*D-1030* 1 PARTS CHECK 8 REVERSING INSTRUCTIONS F-XX-C & XX-C D Customer Service. Installation Instructions. Exit Devices

Assembly and Installation Guide

Assembly and installation help

How To Measure Your Finished Opening

SINGLE TRACK BYPASS (patent pending) barn door hardware

How to fit an Internal Door

Installation Guide. 84 H and 95 H

Installation Guidelines

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

Balustrade Systems / Installation Instructions

Installing DoorSense August Smart Lock Pro

TWIG Hanger ASSEMBLY INSTRUCTIONS

PORCH-LOC INSTALLATION INSTRUCTIONS

Chapter 19. Interior Finish Work

Cellar Hanger ASSEMBLY INSTRUCTIONS

Laser Safety Curtains Page 1 of 5

How to Install the QuickHang Installation Kit

METALWORKS Linear (Interior & Exterior Applications)

Installation Instructions for. Handrail Component System

INSTALLING YOUR SHUTTERS OUTSIDE MOUNT FULL HEIGHT SHUTTERS

Qwik-Fence Installation Instructions

Pillar Hanger ASSEMBLY INSTRUCTIONS

Dura-Lock Roof System

WOODWORKS Walls. Installation Instructions WALL

woodworkersjournal.com MATERIAL LIST

General Prisoner Transport Install Instructions PT-2-INST

Loft Hanger ASSEMBLY INSTRUCTIONS

Installation Instructions

K9 KIT INSTALLATION INSTRUCTIONS CROWN VIC KK-K9-F7-K

AXIOM Classic Trim. Assembly and Installation Instructions

Clearview Railing System Installation Instructions

How to Install Elite Bayside Beadboard

RESolution V2 Manual

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

Free Standing Frame and Canopy

CABINETRY Assembly Instructions

Agave Standard Series

Mount to the Wall INSTALLATION MANUAL

Canopy Fitting for the Zenith CH 601 Series Aircraft

INSTALLATION INSTRUCTIONS

Owner s Guide. Roller Shades. Clutch Operated Standard Shades

Product must be installed as shown using the screws and brackets provided. Use of incorrect hardware could result in damage to the product.

Shed Assembly Instructions

AXIOM Classic Trim Installation Instructions

Installation Instructions. Oakmont Folding Doors

19 to 39 TV WALL MOUNT - FULL MOTION

(Build Instructions)

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. International Version

Installation Instructions for Vista Air Vertically Folding Walls

ParkJet Builder s Manual

Cabinet is 90% assembled, all you need to do is to attach the legs, lay the glass top on the cabinet, connect the faucet, drains & ptrap.

BioPrism Solid Surface

Transcription:

Installation Guide Ceiling Suspended Acoustical Panels

Before Getting Started Check Your Panels Make sure you received everything you ordered. Please let us know if you have any questions or concerns by calling 1.800.727.6770 or visiting xorelartform.com. Packaged Components Prep Your Work Area Clear the area of all furniture. If the room where the panels are going to be installed has a hard floor, clean the floor, or cover it in construction paper to protect the panels when laying them face down. Decide on Ceiling Mounting Materials Because ceilings are made of a wide range of materials, you will need to plan how to attach the Artform hanging rods to the ceiling and provide those materials. Additional eye bolts will work for many ceilings, but please take your ceiling material into account when deciding how to hang the rods. Xorel Artform Panels Eye Bolts 1 for each panel Hanging Rods 6' (w) x 1/8" (d) 1 for each panel Stabilizing Glue Bending Tool Aluminum Joiner Strips 2 for each panel Additional Tools Needed Vertical Spot Laser Wide Field Laser Ceiling Mounting Materials Wirecutters Pliers Caulk Gun

Installation Steps 01 02 Set a reference line on the floor. Starting at a corner/one side of the design, place panels face down in the desired final layout. Place panels as close together as possible. 03 04 Place the vertical spot laser on top of the screw hole on the back of one of the panels, and mark the center point on the ceiling. Repeat until the center point of each panel is marked on the ceiling, moving panels off to the side as you go. Attach the ceiling mounting materials of your choosing to each center point on the ceiling.

05 5B 06 5D Insert a hanging rod into the bending tool as far as it will go, and bend the end of the hanging rod approximately 120 degrees (5A) forming a V shape (5B). Install the hanging rod onto the ceiling mount (5C), and close the top bent end with pliers (5D). Repeat until all hanging rods are installed. Use the wide field laser to mark the hanging rods 1" shorter than the finished ceiling height (this takes the panel thickness into account), and cut each hanging rod using the wirecutters. 07 08 Use the bending tool to bend the bottom of each hanging rod approximately 120 degrees, forming a V shape. Screw an eye bolt into the back of each Xorel Artform panel, and hang the panel onto the bent end of the hanging rod (8A). Once the panel is in place, close the bent end with pliers (8B).

09 Tips for Installation In order for the suspended panels to be stable, they must be hung in groups of 3 panels or more, and must not be installed in a single straight line. Failing to do so will result in swinging and/or toggling from the top and/or base of the hanging rod. We recommend having a rendering/layout of the final design on site for reference during installation. After hanging 2 adjacent panels, align them and apply 2 aluminum joiner strips where the panels join. It s recommended that 2 people handle joining panels together. 10 If you will be drilling into the ceiling in order to hang the Artform rods, make sure to move the panels away from the area where you ll be drilling. If there are obstructions on the ceiling (water pipes, electrical boxes, etc), individual hanging rods can be relocated 1/4" to 1/2" off center. To ensure a correct installation, continue to check for alignment as you install each panel. When stacking panels, always stack them face to face/back to back. Keep in mind that each panel is free hanging, and because of this, there may be a slight gap between the panels after installation. If lighting is installed above the panels, light may be visible between the gaps, and if that is not the desired affect, the panel seams can be taped (over the aluminum joiner strips). Using a caulk gun, add a dollop of the stabilizing glue to the joint between the panel and the hanging rod to lessen the amount of movement.

Contact Us Email service@carnegiefabrics.com Phone 1-800-727-6770 All Xorel fabrics are C2C Certified. Visit xorelartform.com for more information. 2017 Carnegie Fabrics, Inc. Printed on recycled paper. Xorel is a registered trademark of Carnegie Fabrics Inc. Xorel registered trademark and license to distribute is granted by permission of Carnegie Fabrics Inc. USA