Deep Panuke. 01U 27 Feb 08 Issued for Use C. Hewitt N. Coonan D. Riffe R. MacQueen Rev Date Reason for Issue Prepared Checked Checked Approved Title

Similar documents
Encana Corporation Expression of Interest (EOI)

Deep Panuke Project Update CORE 2009 Dave Kopperson, Vice President, Atlantic Canada

INDONESIA DEEPWATER INVESTMENT

Reliance Industries Limited

Reliance Industries Limited

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Scotian Basin Exploration Drilling Project: Timeline

MARISSUBSEA.com. Core Values. People. Integrity. Quality. Contents. 02/03 What we do. 04/05 Representatives. 06/07 ROV personnel

RELIANCE INDUSTRIES LIMITED

Deep Panuke Supplier and Infrastructure Assessment Update (March 2011)

SECTION SUBMITTAL PROCEDURES

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Reliance Industries Limited. Notice Inviting Expression of Interest

NO. ONGC/EOA/KG-DWN-98/2 Cluster 2/ONSHORE/EOI/2016/ Date: EXPRESSION OF INTEREST (EOI)

WHITE ROSE OILFIELD DEVELOPMENT APPLICATION

GLOBAL EXPRESSION OF INTEREST (EoI) FOR INTEGRATED DEVELOPMENT SERVICES FOR MANGALA, BHAGYAM & AISHWARIYA (MBA) FIELDS WITHIN THE RJ-ON-90/1 BLOCK

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

SECTION SUBMITTAL PROCEDURES

East Central College

GENERAL DESCRIPTION OF THE CMC SERVICES

Oil & Gas Activity in the Canadian Arctic and Eastern Canada Activity

OIL INDIA LIMITED DULIAJAN

Analyst Day Real change starts here. Doug Pferdehirt, Chief Executive Officer

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Husky Energy - Development Plan Amendment Application. White Rose Extension Project. Public Review. Noia s Submission

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

QUARTERLY UPDATE. Summary

Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012

Deep Panuke Offshore Gas Development Project Summary

OFFSHORE FABRICATION

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION - II BID DATA SHEET

SPOOLBASE & MULTIJOINT SERVICES

Committee on Standardization of Oilfield Equipment & Materials (CSOEM) New Member Orientation

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Managing Ageing Infrastructure

ENGINEERING SOLUTIONS FOR THE OIL & GAS INDUSTRY

CAPETANO OIL LIMITED (+233) (+233)

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Subsea 7 Norway. Monica Th. Bjørkmann Sales and Marketing Director

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

This specification describes the general requirements for Engineering Services provided to Vale.

SPECIFICATION FOR RUBBER INSULATING GLOVES FOR LOW VOLTAGE 500V

Supply of Paint for FEA s Administration Building, Training Center & Guard House in Navutu, Lautoka

ONG CONSULTANTS PROFILE

BROOKINGS municipal utilities

OFFSHORE SERVICES PIPELINE CONSTRUCTION

DE-PRIME GLOBAL SERVICES LTD DE-PRIME GLOBAL SERVICES LTD. ADDRESS: 1 Echendu Chinwo Close, Chukwuodara Rumoudara, Port Harcourt, Rivers State.

TECHNOLOGY QUALIFICATION MANAGEMENT

Offshore Construction Management Services. Capability & Experience

DNV GL approval of service supplier scheme

Optime Subsea AS. Web: BIC/SWIFT: SPTRN022 IBAN: NO

pill Los Angeles World Airports

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

QUARTERLY UPDATE Q2 FY13

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

IMCA Competence Assessment Portfolio May 2012

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package

New York Bar admission (or eligibility to obtain admission promptly) is required.

For crossing under a railroad, contact the specific railroad company's engineering department.

Overview of the C-NLOPB and the Can-NL Offshore Oil and Gas Industry. Sean Kelly MA, APR, FCPRS May 15, 2017

For personal use only

Section Meetings Section Material and Equipment. None Required

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Bay du Nord Framework Agreement

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

BRAZIL ENERGY AND POWER CONFERENCE. Americo Oliveira McDermott Brazil General Manager September 20, 2015

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers

REQUEST FOR QUOTATION INVITATION

MARITIME MANAGEMENT MASTER S DEGREE (ONLINE) Train for a leading role in maritime-based organizations.

SUB: EMPANELMENT OF CONSULTANCY AGENCIES FOR BUILDING PROJECTS/WORKS.

INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR , INDIA

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

Overview. One of Canada s largest integrated energy companies. Headquarters in Calgary, Alberta. Permanent Employees: ~5,000

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

REQUEST FOR INFORMATION (RFI) RFI NO: /WJG

OIL INDIA LIMITED DULIAJAN

Brae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0

Before the EPA Trans-Tasman Resources Ltd Ironsands Extraction Project

Answer: Qualification statement should be provided with the bid.

SECTION PROJECT MANAGEMENT AND COORDINATION

MOBILISATION SUPPORT. Joint Competency Statement

LEGAL MEMORANDUM. The SBA Regulations Implementing the NDAA 2013 Amendments

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

MELLITAH OIL & GAS B.V. JOINT PROJECTS TEAM

Husky White Rose Development Project. New Drill Centre Construction & Operations Program. Project Description

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES. March 9, 2010 William T. Welch

Draugen Infill: Optimizing late life production with Subsea Processing

THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2)

Conformity assessment procedures for hip, knee and shoulder total joint replacements

Transcription:

01U 27 Feb 08 Issued for Use C. Hewitt N. Coonan D. Riffe R. MacQueen Rev Date Reason for Issue Prepared Checked Checked Approved Title Design of Subsea Wellhead Protection Structures Prequalification Questionnaire EOI SS05 DM EN PQ SS 0005 01U Project Originator Info. Category Disc Sheet Rev This document is property of EnCana Corporation who will safeguard its rights according to the civil and penal provisions of the law

REVISION LIST REVISION DESCRIPTION OF CHANGES 01U Issued for Use DM-EN-PQ-SS-0005 Rev 01U Page 2 of 9

CONTENTS 1 INTRODUCTION... 4 1.1 DESCRIPTION 4 1.3 SCOPE 4 2 INSTRUCTIONS... 4 3 CORPORATE & FINANCIAL CAPABILITY... 6 3.1 COMPANY NAME AND OFFICES 6 3.2 COMPANY S CORPORATE STATUS 6 3.3 COMPANY S OFFICERS AND DIRECTORS 7 3.4 COMPANY S ULTIMATE PARENT COMPANY OR CONTROLLING SHAREHOLDER 7 3.5 COMPANY S FINANCIAL CAPABILITY 7 4 TECHNICAL CAPABILITY... 8 4.1 METHOD STATEMENTS 8 4.2 CAPABILITY 8 4.3 PREVIOUS EXPERIENCE 8 4.4 SUBCONTRACTORS 8 4.5 AVAILABILITY 8 5. QA/QC QUESTIONNAIRE... 9 DM-EN-PQ-SS-0005 Rev 01U Page 3 of 9

1 INTRODUCTION 1.1 Description EnCana is developing the natural gas project in Nova Scotia's offshore (PROJECT). The PROJECT involves the installation of the facilities required to produce natural gas from the Deep Panuke field, located about 175 kilometres offshore Nova Scotia, approximately 47 kilometres west of Sable Island in a water depth of approximately 44 metres. Produced gas will be transported by subsea pipeline to Goldboro, N.S., where it will be transported via the Maritimes & Northeast Pipeline (M&NP) to markets in Eastern Canada and the northeastern United States. The design capacity of the project is up to 300 MMcf/d of sales-quality gas. Regulatory applications for were filed in 2006, with approvals granted in 2007. Deep Panuke was approved for development by EnCana's Board of Directors in October 2007. First gas from the project is expected in late 2010. 1.2 Business Opportunities In accordance with the commitments made by EnCana, priority will be given to companies who can demonstrate the capability to complete the scope of work in Nova Scotia on a competitive basis, meeting or exceeding EnCana's requirements for safety, quality, technical suitability, reliability, delivery and environmental standards. Pre-qualified companies will be required to complete a Canada-Nova Scotia Benefits questionnaire, and demonstrate their commitment to and compliance with EnCana s requirements regarding Canada-Nova Scotia Benefits, during the tender process. 1.3 Scope EnCana Corporation seeks qualified, experienced parties to provide engineering services for the detailed design of five (5) subsea Wellhead Protection (WHP) Structures, required to protect the Subsea Tree, Flowline Connection, and Umbilical Terminations against dropped objects and fishing gear. The WHP Structure is a steel tubular lattice frame with an estimated 10m x 10m base, 10m overall height, and approximate weight of 50 tonnes. The scope of work is summarized as follows: Full structural analysis (transport, installation, and in-place conditions) including VIV/Fatigue analysis and FE analysis for dropped object loading; Preparation of detail design reports; Preparation of detail material and fabrication specifications; Preparation of detail structural steel CAD drawings. Interested parties must include provision of all necessary personnel and software packages to complete the entire scope of work. 2 INSTRUCTIONS Respondents shall complete and submit this prequalification questionnaire in full. In some cases supplementary information is requested to support the answers. A "Contents List", that clearly details the documents that are included in support of the submission, shall be provided. Any answers, which DM-EN-PQ-SS-0005 Rev 01U Page 4 of 9

refer to respondents documents that are included to support the questionnaire, should specify the page(s)/section(s) containing the information. The page(s)/section(s) referenced should be marked to indicate the section to which it refers. Separate sheets, as necessary, should be used to provide additional information. Respondents are advised that the information requested in the questionnaire are minimum requirements, sufficient for the EOI. For those companies invited to bid, additional detailed information will be requested by EnCana at the Request for Proposal stage to adequately assess bidder s capability to perform the work. This questionnaire completed by: Type or print name: Signature: Title: Date: DM-EN-PQ-SS-0005 Rev 01U Page 5 of 9

3 CORPORATE & FINANCIAL CAPABILITY 3.1 Company Name and Offices Name: Home Office Address: Telephone: Fax: Email: Website: Office Address: Registered Office Address: (If different than above) Telephone: Fax: 3.2 Company s Corporate Status Autonomous Unit Subsidiary Partnership Joint Venture List Partnership / Joint Venture members related to this EOI Address: Address: Address: DM-EN-PQ-SS-0005 Rev 01U Page 6 of 9

3.3 Company s officers and directors Title: Title: Title: 3.4 Company s ultimate parent company or controlling shareholder Address: 3.5 Company s Financial Capability Respondent shall provide a copy of its audited financial statements for the most recent fiscal year ended. DM-EN-PQ-SS-0005 Rev 01U Page 7 of 9

4 TECHNICAL CAPABILITY 4.1 Method Statements Please provide a method statement describing how your firm intends to execute the design of the Deep Panuke subsea wellhead protections structures. 4.2 Capability Please describe your firm s capability to perform the work scope, including company profile, key personnel, and structural analysis and CAD software packages. 4.3 Previous Experience List previous relevant harsh environment subsea projects, similar to the wellhead protections structures required for EnCana s Project, that have been completed in the last five years. For each project listed, describe the scope of work, name of client, date of award and completion and approximate value. 4.4 Subcontractors Respondents shall identify the aspects of the wellhead protection structure design activities that will be subcontracted. 4.5 Availability Respondents shall confirm their availability to complete the engineering of the wellhead protection structures during the period of April to July of 2008. A list of existing and pending commitments during the period of April to August of 2008 shall be provided. DM-EN-PQ-SS-0005 Rev 01U Page 8 of 9

5. QA/QC QUESTIONNAIRE Please respond to the following questions. A follow-up QA/QC assessment or audit may be conducted as part of the tendering process. Please attach the relevant documentation, where specified. No. Question Yes/No/NA Documentation to be submitted Quality Management System General Requirements 1 Has bidder established, documented, implemented and maintained a quality management system in accordance with the requirements of ISO 9001? Registration certificate for ISO 9001 for Contractor and each subcontractor involved in the work Quality Manual 2 Has a quality manual been established and maintained that includes: a) The scope of the quality management system, including details of, and justification for any exclusions Copy of Quality Manual for Contractor and each subcontractor involved in the work 3 b) Documented procedures established for the quality management system, or reference to them? c) Description of the interaction between the processes of the quality management system? Certification and Affiliations Are there recognized company certifications or affiliations Contractor may have in place? Provide certifications and or list DM-EN-PQ-SS-0005 Rev 01U Page 9 of 9