Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy CHIMNEY Brick Chimney - Concrete/ Mortar Liner 4 5 6 GRE 6 74 4 5 6 GRE 6 30 55 7 7 74 SF $2,095 $2,095 85 LF $81,153 $81,153 Assessment Date: 6/18/2013 Page 1 of 19
CORNICE Cornice - Masonry Projecting/Limestone Cornice - Metal Projecting Cornice - Terra Cotta 4 5 6 GRE 6 64 GRE 6 1,992 GRE 6 35 7 64 LF $1,963 1,992 LF $178,605 35 LF $1,074 $181,641 DOORS Exterior FRP Door Exterior Steel Door Side Lite Transom Lite 4 5 6 7 GRE 6 22 14 GRE 6 2 GRE 7 2 GRE 6 21 10 36 EA $12,251 2 EA $661 2 EA 31 EA $5,946 $18,857 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio and Video Power Door Operator and Controls Ramp Handrails Stair Handrails 4 5 6 GRE 6 6 102 GRE 6 24 7 GRE 7 5 GRE 7 2 GRE 7 30 GRE 7 20 108 LF $12,870 24 LF $3,346 5 EA 2 EA 30 LF 20 LF $16,216 FOUNDATION Concrete Foundation Masonry Foundation 4 5 6 GRE 6 508 7 GRE 7 1,007 508 LF $79,109 1,007 SF $79,109 Assessment Date: 6/18/2013 Page 2 of 19
LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 4 5 6 BLU 5 1 4 7 GRE 6 5 8 5 EA $5,720 13 EA $1,073 $6,793 LINTELS Lintels - Brick Lintels - Concrete Lintels - Steel Lintels - Stone Lintels - Terra Cotta PARAPET Coping - Metal Coping - Stone Coping - Terra Cotta Parapet < 16" Height Parapet 16" to 30" Height ROOF SYSTEM 4 5 6 GRE 6 103 GRE 6 370 GRE 6 67 325 GRE 6 243 GRE 6 381 4 5 6 GRE 6 633 GRE 6 267 GRE 6 1,404 GRE 6 1,296 GRE 6 105 903 7 7 103 LF 370 LF 392 LF $31,431 243 LF 381 LF $31,431 633 LF 267 LF 1,404 LF 1,296 LF $201,822 1,008 LF $221,189 $423,011 Asphalt Gravel Ballast Roof EPDM/ Synthetic Rubber Roof Exterior Downspouts Interior Downspouts Metal Roof Modified Bitumen Roof 4 5 6 GRE 6 100 13,721 GRE 6 112 7 GRE 6 12 558 2 GRE 6 60 401 GRE 6 75 GRE 6 20,359 13,821 SF $88,784 112 SF $561 572 LF $10,596 461 LF $6,435 75 SF $566 20,359 SF $144,111 Assessment Date: 6/18/2013 Page 3 of 19
Roof Structure: Heavy Timber Roof Structure: Steel with Clay Tile Arch Roof Structure: Steel/Metal Deck/Concrete Topping GRE 7 16,036 GRE 7 14,462 GRE 7 13,869 16,036 SF 14,462 SF 13,869 SF $251,053 SUPERSTRUCTURE Heavy Timber Metal Deck/Concrete Topping Steel with Clay Tile Arch 4 5 6 7 GRE 7 53,212 GRE 7 35,633 GRE 7 52,744 53,212 SF 35,633 SF 52,744 SF WALLS Brick Precast Panel Wall Stone - Cut Terra Cotta WINDOWS Skylite - Glass Single-Pane Window - Guards perforated Windows - Casement Aluminum Double-pane Windows - Decorative Windows - Sash Aluminum Double-pane EXTERIOR 4 5 6 GRE 6 365 36,481 GRE 6 18,519 GRE 6 20 9,689 GRE 6 1,651 4 YEL 4 75 5 6 GRE 6 4,066 GRE 6 6,274 GRE 6 182 GRE 6 5,226 7 7 36,846 SF $249,283 18,519 SF $122,348 9,709 SF $140,698 1,651 SF $47,219 $559,547 75 SF $21,236 4,066 SF 6,274 SF $35,887 182 SF $1,041 5,226 SF $44,839 $103,003 $1,753,910 Assessment Date: 6/18/2013 Page 4 of 19
ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency generator 60 to 100 KW natural gas - Outdoor Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection 4 5 6 7 GRE 6 1 3 GRE 7 5,885 GRE 7 25,180 GRE 7 10,957 GRE 7 3,829 GRE 7 29 GRE 7 7 GRE 7 1 GRE 7 4 GRE 7 46 GRE 7 8 BLU 5 1 1 GRE 6 136,485 GRE 6 35,633 100,852 GRE 6 136,485 4 EA $8,866 5,885 SF 25,180 SF 10,957 SF 3,829 SF 29 EA 7 EA 1 EA 4 EA 46 EA 8 EA 2 EA $18,590 136,485 SF $81,973 136,485 SF $246,129 136,485 SF $126,863 $482,420 MAIN SERVICE 4 5 6 7 Main Electrical service - Live Front - 1200 A 120/208/3PH YEL 4 1 1 EA $113,256 Main Electrical service - Live Front - 2000 A 120/208/3PH YEL 4 1 1 EA $161,304 $274,560 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp 4 5 6 7 GRE 6 22 13 GRE 6 1 3 GRE 6 1 35 EA $15,730 4 EA $12,155 1 EA $2,145 $30,030 Assessment Date: 6/18/2013 Page 5 of 19
ELECTRICAL $787,010 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller 4 5 6 7 GRE 6 100,852 35,633 GRE 7 88,377 YEL 4 1 136,485 SF $36,055 88,377 SF 1 EA $18,590 $54,645 PUMP ROOM ASSEMBLY 4 5 6 7 Fire Pump less than 25hp YEL 4 1 1 EA $26,598 $26,598 SPRINKLER SYSTEM 4 5 6 7 Dry Sprinkler System BLU 5 52,744 52,744 SF $222,501 Sprinkler Heads BLU 5 52,744 52,744 SF $15,085 $237,585 FIRE PROTECTION $318,828 MECHANICAL AIR CONDITIONING Condensing - Roof Mounted 5 to 10 tons Condensing - Roof Mounted less than 5 tons Window A/C 4 5 6 7 GRE 6 4 3 GRE 7 2 GRE 6 2 2 7 7 EA $9,152 2 EA 11 EA $2,574 $11,726 Assessment Date: 6/18/2013 Page 6 of 19
AIR HANDLING SYSTEMS Air Intake - Built Up Air Handling Fan Coil - Electric Make Up Air - Indoor Mounted - Steam less than 6,000 cfm Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 15,001 to 25,000 cfm Multi Zone Double Delivery Built Up Air Handling - Steam 31,000 to 45,000 cfm Multi Zone Double Delivery Built Up Air Handling Auxiliaries - Steam 30,001 to 45,000 cfm Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft ORA 2 6 4 5 6 7 GRE 7 2 BLU 5 1 YEL 4 2 YEL 4 2 YEL 4 1 YEL 4 1 YEL 4 300 6 EA $157,014 2 EA 1 EA $10,010 2 EA $185,900 2 EA $65,780 1 EA $143,000 1 EA $47,190 300 LF $793,650 $1,402,544 BOILER SYSTEMS Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler 151-200 HP Boiler Auxiliary - Steam Boiler 151-200 HP Chemical Feeder - Steam Boiler Combustion Dampers Feed Water Pumps and Tank - Steam Boilers 4 5 BLU 5 2 YEL 4 2 6 7 GRE 7 2 YEL 4 2 YEL 4 1 2 EA $137,280 2 EA $48,620 2 EA 2 EA $11,154 1 EA $31,460 $228,514 HEATING DEVICES Cabinet Heaters With Electric Coils Fin Tube Hot Water Radiators - Steam Heater - Electric Wall Heater - Electric 4 5 6 GRE 6 4 7 GRE 6 6 10 GRE 6 4 GRE 6 6 3 19 GRE 6 3 16 4 EA $2,002 16 LF $103 4 EA $561 28 EA $19,734 19 EA $309 $22,708 Assessment Date: 6/18/2013 Page 7 of 19
MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Steam - Steel or Galvanized TEMPERATURE CONTROL 4 5 BLU 5 1 YEL 4 500 BLU 5 500 6 7 1 EA $9,438 500 LF $48,978 500 LF $24,739 $83,155 Pneumatic System Thermostats - Direct Digital Control (DDC) Thermostats - Pneumatic Zone Dampers UNIT VENTILATION 4 YEL 4 100,852 5 6 GRE 6 3 BLU 5 28 14 YEL 4 47 7 100,852 SF $721,092 3 EA $429 42 EA $20,420 47 EA $39,654 $781,595 Packaged Terminal Air Conditioner (PTAC) Ventilators - Self Contained Electric Heating and Cooling 4 5 6 7 GRE 6 2 1 GRE 6 4 23 3 EA $14,300 27 EA $73,788 $88,088 VENTILATION Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Type II Exhaust Hood - Warming Kitchen MECHANICAL 4 5 BLU 5 1 6 7 GRE 6 1 6 GRE 7 6 GRE 6 1 1 1 EA $1,502 7 EA $1,287 6 EA 2 EA $930 $3,718 $2,622,048 Assessment Date: 6/18/2013 Page 8 of 19
PLUMBING HOT WATER Hot Water Heater - Gas more than 300,000 BTU/HR PIPING 4 5 BLU 5 1 6 7 1 EA $17,160 $17,160 Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping 4 5 6 7 BLU 5 100,852 35,633 YEL 4 100,852 35,633 BLU 5 100,852 35,633 YEL 4 100,852 35,633 YEL 4 100,852 35,633 YEL 4 100,852 35,633 YEL 4 100,852 35,633 YEL 4 100,852 35,633 BLU 5 100,852 35,633 BLU 5 100,852 35,633 BLU 5 100,852 35,633 136,485 SF $33,170 136,485 SF $76,618 136,485 SF $21,633 136,485 SF $53,793 136,485 SF $63,975 136,485 SF $272,437 136,485 SF $217,875 136,485 SF $134,738 136,485 SF $76,281 136,485 SF $55,235 136,485 SF $41,660 $1,047,415 PUMPS Domestic Booster Pump duplex Sump Pump PLUMBING 4 5 6 7 GRE 7 1 BLU 5 1 1 EA 1 EA $5,148 $5,148 $1,069,723 Assessment Date: 6/18/2013 Page 9 of 19
INTERIOR ADMINISTRATIVE SUITES Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Flooring - Tile/Sheet Flooring - Wood Lighting - Lay-In Lighting - Pendant/Surface Walls - Plaster/Drywall 4 5 6 7 GRE 7 955 GRE 6 236 1,317 1,972 GRE 6 1,050 GRE 6 236 GRE 6 2,039 77 GRE 6 120 958 GRE 7 12 GRE 6 5 8 43 GRE 6 217 1,968 5,543 955 SF 3,525 SF $5,065 1,050 SF $1,502 236 SF $1,114 2,116 SF $2,916 1,078 SF $906 12 SF 56 SF $39 7,728 SF $5,668 $17,209 AUDITORIUM - DEDICATED Balcony Seating Main Floor Seating Stage Curtains Stage Lighting System 4 5 6 GRE 6 237 7 GRE 7 441 GRE 6 9 YEL 4 2 237 EA $8,724 441 EA 9 EA $101,930 2 EA $786,500 $897,154 DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Transom Window 4 5 6 7 GRE 6 33 22 26 GRE 6 18 101 38 GRE 6 560 81 EA $21,802 157 EA $37,091 560 SF $10,410 $69,304 DRINKING FOUNTAINS Single Fountain 4 5 6 7 GRE 6 6 7 13 EA $11,583 Assessment Date: 6/18/2013 Page 10 of 19
$11,583 GYMNASIUM / AUDITORIUM Ceiling - Exposed Ceiling - Plaster/Drywall Flooring - Wood Lighting - Pendant/Surface Scoreboards Walls - Plaster/Drywall 4 5 6 GRE 6 2,852 GRE 6 4,265 7 GRE 6 4,265 2,852 GRE 6 35 GRE 7 1 GRE 6 4,072 2,852 SF $21,697 4,265 SF $36,472 7,117 SF $32,202 35 EA $4,254 1 EA 4,072 SF $34,938 $129,563 KITCHEN Ceiling - Lay-In Flooring - Tile Ceramic/Porcelain Lighting - Lay-In Wall - Plaster/Drywall 4 5 6 7 GRE 7 670 GRE 6 670 GRE 7 11 GRE 6 1,050 670 SF 670 SF $1,705 11 SF 1,050 SF $2,477 $4,183 LIBRARY Casework Flooring Carpet Flooring Tile/ Sheet Lighting - Lay-In Lighting - Pendant/ Surface 4 5 6 GRE 6 62 GRE 6 1,990 GRE 6 1,883 7 GRE 7 36 GRE 7 28 62 LF $1,902 1,990 SF $2,846 1,883 SF $2,693 36 SF 28 SF $7,440 LUNCHROOM Ceiling - Lay-In Flooring - Tile/Sheet 4 5 6 7 GRE 6 1,590 3,344 GRE 6 4,934 4,934 SF $3,411 4,934 SF $7,056 Assessment Date: 6/18/2013 Page 11 of 19
Lighting - Lay-In Lighting - Pendant/Surface Serving Line Wall - Plaster/Drywall GRE 7 46 GRE 7 50 GRE 7 14 GRE 6 1,494 594 46 SF 50 SF 14 LF 2,088 SF $3,525 $13,991 MDF/IDF Finishes Ventilation and Cooling 4 5 6 GRE 6 158 7 GRE 6 1 1 158 SF $538 2 EA $1,401 $1,939 MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room 4 5 6 GRE 6 2,929 7 GRE 7 3 BLU 5 2,552 70 BLU 5 1,646 2,804 1,324 1,360 2,929 SF $13,822 3 SF 2,622 SF $29,233 7,134 SF $84,610 $127,665 STAFF RESTROOM Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface 4 5 6 7 GRE 6 258 64 3,812 GRE 7 154 GRE 6 62 221 3,697 GRE 6 1 7 9 BLU 5 114 GRE 7 3,003 GRE 6 144 873 GRE 7 1,131 GRE 6 4 4 30 GRE 7 48 GRE 6 3 3 6 4,134 SF $7,069 154 SF 3,980 SF $977 17 EA $3,604 114 SF $538 3,003 SF 1,017 SF $206 1,131 EA 38 EA $8,923 48 SF 12 SF $15 Assessment Date: 6/18/2013 Page 12 of 19
Partitions Urinals Wall - Plaster/Drywall Wall - Tile Ceramic/ Porcelain Water Closet GRE 6 4 52 GRE 6 1 25 GRE 6 361 1,237 2,802 GRE 6 366 4,889 GRE 6 3 1 59 56 EA $2,288 26 EA $372 4,400 SF $4,622 5,255 SF $932 63 EA $5,949 $35,494 THEATER Ceiling - Plaster/Drywall Flooring - Concrete Flooring - Tile/Sheet Lighting - Pendant/ Surface Stage Wall - Plaster/Drywall 4 5 6 GRE 6 5,885 GRE 6 2,187 7 GRE 7 1,178 GRE 6 12 GRE 6 520 GRE 7 8,110 5,885 SF $50,325 2,187 SF $10,320 1,178 SF 12 SF $20 520 SF $2,208 8,110 SF $62,874 VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic Stage Lift 4 5 6 7 GRE 7 1 GRE 7 1 1 EA 1 EA VOCATIONAL SHOP Work Sink INTERIOR 4 5 6 BLU 5 5 2 10 7 17 EA $27,027 $27,027 $1,405,425 Assessment Date: 6/18/2013 Page 13 of 19
ROOM ADMIN_WALL Administrative Office Walls 4 5 6 GRE 6 1,053 1,957 7 3,010 SF $9,587 $9,587 CASEWORK Casework CEILING 4 5 6 BLU 5 326 243 7 569 LF $66,960 $66,960 Lay-In/Drop Plaster/Drywall 4 5 6 7 GRE 7 17,297 GRE 6 7,223 12,458 4,752 17,297 SF 24,433 SF $76,176 $76,176 CHALK BOARD Chalk Board CORRIDORS 4 5 6 YEL 4 706 20 7 726 LF $86,386 $86,386 Carpet Ceiling Concrete Epoxy/Painted Drinking Fountains Drop/Lay-In Floors Lay-In Metal Panel 4 5 6 GRE 6 21 GRE 6 107 GRE 6 1,493 3,557 7 GRE 7 2 GRE 6 4,887 906 GRE 6 522 GRE 6 3,875 2,553 GRE 6 8,331 21 SF $30 107 SF $303 5,050 SF $23,831 2 EA 5,793 SF $10,483 522 SF $3,941 6,428 EA $2,771 8,331 SF $70,765 Assessment Date: 6/18/2013 Page 14 of 19
Pendant/Surface Plaster/Drywall Single Water Cooler Stair Handrails Stairs Tile Ceramic/Porcelain Tile/Sheet Flooring Walls GRE 6 320 3,512 15,118 GRE 6 40,165 252 GRE 7 4 GRE 6 1,060 GRE 6 74 240 80 BLU 5 186 23 GRE 6 12,096 5,487 GRE 6 146 2,945 18,950 EA $5,623 40,417 SF $94,769 4 EA 1,060 LF 394 EA $5,420 209 SF $2,984 17,583 SF $17,297 3,091 SF $7,638 $245,855 CORRIDORS CEILING Plaster/Drywall 4 5 6 7 GRE 6 18,306 21 18,327 SF $51,832 $51,832 FLOOR Tile/Sheet Wood 4 5 6 7 GRE 6 6,865 10,389 2,335 GRE 6 18,171 3,970 19,589 SF $53,731 22,141 SF $137,198 $190,930 GYM_WALL Gymnasia Walls KITCHEN_WALL 4 5 6 GRE 6 4,992 7 4,992 SF $42,831 $42,831 4 5 6 7 Kitchen Walls BLU 5 45 45 SF $708 $708 Assessment Date: 6/18/2013 Page 15 of 19
LIBRARY_CEILING Library Ceiling Plaster/Drywall 4 5 6 7 GRE 7 1,883 GRE 7 1,990 1,883 SF 1,990 SF LIBRARY_WALL Library Walls Mansory 4 5 6 GRE 6 686 GRE 6 611 7 686 SF $1,962 611 SF $7,864 Plaster/Drywall GRE 7 2,336 2,336 LIGHTING $9,826 Lay-In Pendant/Surface 4 5 6 7 GRE 7 290 GRE 6 42 84 298 290 EA 424 EA $22,523 $22,523 LUNCH_WALL Lunchroom Walls MARKER BOARD 4 5 6 GRE 6 1,035 1,682 7 2,717 SF $12,625 $12,625 Marker Board 4 5 6 7 GRE 6 22 1,864 654 2,540 LF $55,985 $55,985 RESTROOM_WALL Restroom Walls 4 5 6 7 GRE 6 2,561 300 2,861 SF $6,519 Assessment Date: 6/18/2013 Page 16 of 19
$6,519 STAIRS Asphalt WALL 4 5 6 GRE 6 36 7 36 SF $257 $257 Masonry Plaster/Drywall Wall ROOM 4 5 6 GRE 6 316 7 GRE 6 848 32,232 6,771 GRE 6 1,394 17,779 316 SF $4,067 39,851 SF $80,053 19,173 SF $48,528 $132,648 $1,011,646 SITE ATHLETIC Basketball - Asphalt CIVIL/DRAINAGE Catch Basin Site Manhole FENCING 4 5 6 GRE 6 3,526 4 5 6 GRE 6 1 3 GRE 6 2 4 7 7 3,526 SF $2,672 $2,672 4 EA $2,846 6 EA $5,348 $8,194 Chain Link Ornamental Iron 4 5 6 7 GRE 6 56 24 244 GRE 6 1,378 324 LF $6,350 1,378 LF $26,011 $32,361 Assessment Date: 6/18/2013 Page 17 of 19
FIELD HOUSE Wood Frame Fieldhouse 4 5 BLU 5 2,760 6 7 2,760 SF LANDSCAPE Asphalt Play Area/Hardscape Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas Trash Receptacles 4 5 6 GRE 6 28,547 7 GRE 7 5,516 GRE 6 350 2,846 GRE 7 31 GRE 7 2,520 GRE 7 1 28,547 SF $24,493 5,516 SF 3,196 SF $11,979 31 EA 2,520 SF 1 EA $36,472 PARKING LOT Asphalt Concrete Trash Enclosure 4 5 6 GRE 6 19,826 GRE 6 300 3,480 7 GRE 7 1,400 19,826 SF $17,011 3,780 SF $5,663 1,400 SF $22,674 PLAYGROUND Playground Equipment - School Age 5-12 Playground Surfacing - Poured Surface SIDEWALKS Perimeter Sidewalks 4 5 6 GRE 6 1 GRE 6 2,600 4 5 6 GRE 6 200 12,441 7 7 1 EA 2,600 SF $6,878 $6,878 12,641 SF $27,259 $27,259 Assessment Date: 6/18/2013 Page 18 of 19
SIGNAGE Flag Pole Marquee - Free Standing Back Lighted w/ LED SITE Campus Need ² ³ 4 5 6 GRE 6 1 GRE 6 1 7 1 EA 1 EA $136,510 $9,105,100 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 6/18/2013 Page 19 of 19