SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

Similar documents
Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

Section Meetings Section Material and Equipment. None Required

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Submittal Packages Detailed with Items and Reviewers

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

SUBMITTAL REVIEW COVERSHEET

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

LETTER OF TRANSMITTAL

SECTION SUBMITTAL PROCEDURES

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

SECTION SUBMITTAL PROCEDURES

LETTER OF TRANSMITTAL

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

Submittal Transmittal

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

LETTER OF TRANSMITTAL

East Central College

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Answer: Qualification statement should be provided with the bid.

Submittal Transmittal

What Are Submittals?

SECTION PROJECT MANAGEMENT AND COORDINATION

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SUBMITTAL PROCEDURES

January, 2014 Page 1 of 5

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS

Working Drawing Manual

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

DESIGN REVIEW PROCESS AND APPLICATION

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

Working Drawing Procedure

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

submittals 1s e c t i o n

Chapter 1 General Design Information

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

SECTION ADMINISTRATIVE REQUIREMENTS

Letter of Transmittal

REQUEST FOR INFORMATION

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS:

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

Construction Phase Project Management and Documentation

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

Windmill Village Homeowners Association

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

1. Land survey Work. 2. Civil and Structural engineering services.

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

MTJ Outdoor Baggage Claim

SECTION 2 GENERAL REQUIREMENTS

PROCEDURE FOR PROCESSING WORKING DRAWINGS

Submittal Review Form

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

TAB B-9 RECORD DRAWINGS

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

Jacksonville District Master

00-General Drawings. Doc. no.: NA-00-STS002

SECTION PROJECT COORDINATION VIA BIM

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

Promontory Architectural Review Committee

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

Submittal Transmittal

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

Procedure to Petition for Plat Review and Site Plan Review

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

A. Section includes administrative and procedural requirements for project record documents, including the following:

FAST TRACK WORKSHOP OBJECTIVES

APPLICATION FOR SITE PLAN REVIEW

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

Transcription:

SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03 Copy to: File, Owner This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component. Submittal review comments have been made within this format and not on the submittal sheets according to the following: NEN No Exceptions Noted GCAN Generally Conforms as Noted RAN Rejected for Reason as Noted IAS Incomplete as Submitted 1. 14 2010 1.05 B Passenger Elevators Shop Drawings GCAN Notes: 1. See Architect s comments. 2. Per review comments by Scott Elders (Associated Construction Engineering): The electrical voltage on the shop drawings needs to CHANGE: FROM: 208V, 3 Phase TO: 480V, 3 Phase END OF REVIEW

EMAIL TRANSMITTAL PROJECT: TO: ADDRESS: New Belgrade Elementary School Comma-Q Architecture 109 N. Rouse Ave., #1 Bozeman, MT. 59715 DATE: JOB# SUBMITTAL# 5/17/2012 11011 NM05172012-1 ATTENTION: PHONE: FAX: Laura Landon (406) 585-1112 (406) 585-5518 TRANSMITTED: Proposal Shop Drawings Field Report Other Prints RFI Response Specifications Letter Calculations Sketches These are Transmitted as Checked Below: No Exceptions Taken Make Corrections Noted Revise As Noted And Resubmit Rejected/Resubmit As Specified Reviewed For Load To Structure Only Submitted Previously For Your File For Your Use As Requested ITEM DATE COPIES 1 1 DESCRIPTION PDF - Submittal #8 Passenger Elevators Shop Dwgs TRANSMIT Via: Email No. Page: 1 REMARKS: COPY TO: file TRANSMITTED BY: Matt Miller 108 West Babcock Street, Bozeman, MT. 59715 Phone: (406) 582-9901 FAX: (406) 582-9992

TRANSMITTAL May 14, 2012 To: Nishkian Monks Attention: Matt Miller From: Tripp Lewton Project: BPS Belgrade Elementary School Location: Bozeman, MT Job Number: 11-03 Copy to: File we are sending you : Attached Under separate cover the following: Shop drawings: Copy of letter: Specification: Prints: Samples: Drawings: Other: these are transmitted as checked below: Approved: Approved as corrected: Revise and resubmit: Rejected: For your signature: For return : For review & comment: date qty description 5/14/2012 1 (elec) Submittal 008 14 2010 1.05 Passenger Elevators Remarks: Matt, please review the attached submittal, please return an electronic version to our office with your comments. Thanks

TRANSMITTAL May 14, 2012 To: Associated Construction Engineering Attention: Scott Elders; Andy Hansen From: Tripp Lewton Project: BPS Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03 Copy to: File we are sending you : Attached Under separate cover the following: Shop drawings: Copy of letter: Specification: Prints: Samples: Drawings: Other: these are transmitted as checked below: Approved: Approved as corrected: Revise and resubmit: Rejected: For your signature: For return : For review & comment: date qty description 5/14/2012 1 (elec) Submittal 008 14 2010 1.05 Passenger Elevators Remarks: Scott, Please review the attached submittal for electrical considerations. Andy, Please review the attached for heat load considerations. Return an electronic version to our office with your comments. If no comments are necessary, please send an email indicating drawings are approved without exception. Thanks

MARTEL CONSTRUCTION, INC. LETTER OF TRANSMITTAL 1203 South Church Avenue Bozeman, MT 59715-5801 Telephone: (406) 586-8585 Facsimile: (406) 586-8646 DATE 05/14/12 JOB NO. 12-001 TRANSMITTAL/SUBMITTAL NO. 8.00 TO: Comma Q Architects RE: 14 2010 Passenger Elevators 109 North Rouse Ave #1 Bozeman, MT 59715 ATTENTION: Laura Landon BELGRADE ELEMENTARY SCHOOL We are hand delivering X We are sending via Email ATTACHED UNDER SEPARATE COVER TheThe following items: X Shop drawings Prints Plans Samples Specifications Copy of letter Change order Product Data COPIES DATE DWG NO. DESCRIPTION 1 14 2010 Passenger Elevators - Shop Drawings THESE ARE TRANSMITTED as checked below: X For approval Approved as Submitted Resubmit Copies for Approval For your use Approved as Noted Submit Copies for Distribution As requested Returned for Corrections Return Corrected Prints For review and comment REMARKS: FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US One review hard copy will be delivered by hand today COPY TO File Matt Miller- Nishkian SIGNED: Mike Wilkinson - Project Engineer If enclosures are not as noted, kindly notify us at once.

Arch to Verify detail 7/A7.2 CQ: 8'-7 1/4" TO FACE OF FRAME CQ RESPONSE: SEE NOTE # 2 ON SUBMITTAL REVIEW FORM CQ RESPONSE: NET VERTICAL DISTANCE FROM LEVEL 2 FINISH FLOOR TO BOTTOM OF SAFTEY BEAM = 12'-6" CQ RESPONSE: OK Arch to Verify Dims CQ: 8'-2 1/2" TO FACE OF FRAME CQ RESPONSE: OK detail 5/A7.2 CQ RESPONSE: OK CQ RESPONSE: 2 NO EXCEPTIONS TAKEN MAKE CORRECTIONS NOTED REVISE AS NOTED AND RESUBMIT REJECTED/RESUBMIT AS SPECIFIED REVIEWED FOR LOAD TO STRUCTURE ONLY SUBMITTED PREVIOUSLY: Not reviewed Reviewed, identified additional data only Notations Do Not Authorize Changes to Contract Sum. Submittal was reviewed for structural design conformity and general conformance to contract documents only. Contractor is responsible for confirming and correlating dimensions at job sites for tolerances, clearances, quantities, fabrication processes and techniques of construction, coordination of his work with other trades and full compliance with contract documents. Date: By: 05/17/2012 MTM REVIEWED MARTEL CONSTRUCTION, Inc. Belgrade Elementary School BY: Mike Wilkinson DATE: 5/14/12 SUBMITTAL # 8.00 NISHKIAN MONKS CONSULTING & STRUCTURAL ENGINEERS

x NO EXCEPTS NOTED GENERALLY CONFORMS AS NOTED Fabrication / installation may be undertaken. Approval does not authorize changes in the Contract Sum or Contract Time unless stated by Change Order of Construction Change Directive. REVISE AND RESUBMIT REJECTED FOR REASON AS NOTED Fabrication / installation MAY NOT. In resubmitting limit corrections to the items marked. Review and approval are only for conformance with the information given and the design concept of the Project as expressed in the Contract Documents. Review and approval of the submittals are not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities or for substantiating instructions for the installation or performace of equipment or systems all of whitch remain the responsibility of the Contractor as required by the Contract Documents. The Architect s review and approval of the Contractor s submittal shall not relieve the contractor from any obligation containted in the Contract Documents. The architect s review and approval shall not constitute approval of any construction means, methods, techniques, sequences or any safety precau- approval of an assembly of which the item is a component. CQ: PROVIDE COLOR SAMPLES FOR VERIFICATION ByTripp Lewton Date 5/17/12 CQ: RESILIENT FLOORING SEE SECTION 14 2010 2.02 A. 2. b. 5.

CQ: VANDAL PROOF PER SECTION 14 2010 2.03 B. 1. CQ: NOTED Arch verify with owner that a new dedicated Phone line will be set up for the elevator phone

CQ: ACTUAL = 6 5/8"