The better way to build TM. Installation Manual ROOF SIPs

Similar documents
Sections & Details VOCABULARY

Installation Instructions

Installation Instructions

Installation Instructions

12x12 Shed Plans and Building Guide

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

Asphalt Shingle Installation at Roof Edges, Intersections and Valleys

Materials. Description Quantity/Size Material Foundation Drainage material. 1.4 cu. yd. Compactible gravel

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

8x8 Shed Plans and Building Guide

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Installation Instructions

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.

HOW TO BUILD A 12X8 SHED

Installation Guide - Evolution Series Wood Siding

10x10 Shed Plans and Building Guide

Installation Instructions

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

eco-shake INSTALLATION INSTRUCTION

Shapes Siding. Perfection Shingles. Chalk Line

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

ROOFING APPLICATION STANDARD (RAS) No. 130

Material List for Log Complete Packages

DIRECTIONS FOR APPLICATION

Installation Instructions for Panel Siding and Soffit

The City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No.

DIRECTIONS FOR APPLICATION

PRIMED STRAND REVERSIBLE SHAKE

Appendix C: Cheat Sheets Construction Manual

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

Garage Design Guide. October 2018

ASPHALT T E C H N O L O G I E S

FASTENERS BUILDING DEPARTMENT

Turada Hardwood Shingles and Shakes Installation instructions

Installation and Finishing Manual for Polyurethane (PUR) Core Structural Insulating Panels

Construction details: Master-C type profiles and joints:

Ekoroof LiteTile Dimensions

A P P L I C A T I O N I N S T R U C T I O N S

DIRECTIONS FOR APPLICATION

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

6x6 Shed Plans and Building Guide

Roof 50% REDUCE STORM DAMAGE

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

CFDTT-01. Control Joint Study (General)

Technical Note No. 028

SECTION ROUGH CARPENTRY

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

Installation Guide for Timber Framed Homes

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

4. Metal roof jacks at penetrations and attachments

SmartVent Eave Edge Installation Instructions

CERACLAD.

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

BARDOLINE INSTALLATION INSTRUCTIONS

AIA Specification. Section Slate Shingles PART 1 GENERAL

DIVISION 6 WOOD AND PLASTICS

MAXIMUM PANEL ATTACHMENT FASTENER SPACING IS 24" O.C. ALL FASTENERS TO PENETRATE WOOD 3/4" MIN. AND METAL FRAMING 1/2" MIN.

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

Exterior Wall Fastener Schedule

3.1 General Provisions

Building An Outdoor Playhouse

Installation Guide Classic Series Wood Siding

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

Santa Fe Cover INSTALLATION GUIDE. Alumawood TM Newport with MAXX Panel TM Installation Guide

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

Installation and Finishing Manual for PUR Structural Insulating Panels

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'

Best Barns USA Assembly Book

Appendix A. Additional Information ATTACHING JAMES HARDIE PRODUCTS TO INSULATED CONCRETE FORMS (ICF)

Best Barns USA Assembly Book

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

VENTED GABLE DETAIL ROOF PANEL GABLE FLASHING 24" C/C MAX. BUTYL SEALANT TAPE ROOF PURLIN FLASH AB-1, AB-2, AB-3, OR AB-4

Best Barns USA Assembly Book

SECTION WOOD SHINGLES

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

Chapter 51: Sidewall Overhang(s) Only - Enclosed

Installation Manual for Thermo Panel

Best Barns USA Assembly Book

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING

DW HORIZONTAL INSTALLATION

Best Barns USA Assembly Book

Construction Manual. 1. Delivery Day

Best Barns USA Assembly Book

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

PROJECT INSTRUCTIONS Roofing

SLATE & SHINGLE INSTALLATION

Tapersawn Shake Installation Instructions

Best Barns USA Assembly Book

Best Barns USA Assembly Book

UL Construction No. 254

Best Barns USA Assembly Book

IRONWOOD SHAKE & FLASHING SPECIFICATIONS

Best Barns USA Assembly Book

Transcription:

The better way to build TM Installation Manual ROOF SIPs

August 2017 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials.............................................. 3 Electrical Wiring......................................... 3 Interior Finish........................................... 4 Exterior Cladding........................................ 4 Materials Estimation...................................... 5 Details Air Barrier Details for Air Barrier Sealants.................. AB-1 Air Barrier Details for Sealing SIP Connections............. AB-2 Vapour Barrier Details for Vapour Sealing SIP Connections.... VB-1 Typical Roof Ridge..................................... R-1 Roof Ridge Details for 12/12 Pitch Roof.................... R-2 Beam Pocket Detail.................................... R-3 Roof Valley & Intermediate Roof Support.................... R-4 Eave Detail and Roof Support at Exterior Wall................ R-5 Typical Sloped Roof Assembly............................ R-6 Sloped Roof Assembly with Ridge Beam.................... R-7 Flat Roof Assembly..................................... R-8 Skylight Opening & Assembly............................ R-9 Typical Roof Connection Sections (Roof to Wall)............. R-10 Roofing Applied to SIPs................................ R-11 Flat Roofing Applied to SIPs............................. R-12 LED Pot Light Installation in Ceiling SIPs.................. R-13 Roof Overhang Eave Details (Timberframe)............... R-TF-1 Roof Overhang & Rake (Timberframe)................... R-TF-2 Roof SIP - Installation Manual 2

August 2017 ROOF SIPs Installation Manual 1. General Requirements 1.1 Scope The basic design and construction requirements for the Thermapan Structural Insulated Panel (SIP) roof system is set forth in this specification. Criteria for materials, environmental control, design loads, and structural design are included. Where requirements are based on internationally recognized standards and specifications, these standards and specifications are referenced without elaboration. Installers shall reference engineering design package for fastening arrangements. 2. Materials 2.1 The Thermapan Roof SIP is composed of an expanded polystyrene (EPS) foam core laminated between two layers of oriented strand board (OSB) with a structural adhesive. 2.2 Framing Lumber shall be DOC PS 20 or NLGA No.2 or better. 2.3 Wire nails, ring nails, spikes and staples shall conform to CSA B111 or ANSI/ASME B11.1. 2.4 Wood screws shall conform to ANSI/ASME B18.6.1.. 2.5 SIP screws shall conform to ICC-AC233. 2.6 Caulking Compounds shall conform to CAN/CGSB 19.13 or ASTM C 920. 2.7 Polyethylene Sheeting shall conform to CAN/CGSB-37.2, CAN/ CGSB-37.16, or ASTM D 4397. 2.8 Low expansion foam seal shall conform to AAMA 812-04. 2.9 Structural adhesive shall conform to CAN/CGSB 71GP26, APA AFG-01 or ASTM D3498. 3. Electrical Wiring 3.1 An optional furring for electrical passage should be fastened to the underside of the roof SIP between the vapour barrier and the interior finish. See details R-1, R-4 and R-5. Roof SIP - Installation Manual 3

August 2017 4. Interior Finish 4.1 The interior of the roof SIP can be finished with any of the common required building code materials. It is recommended that the SIP joints and connections be sealed as per Details AB-1, AB-2 and VB-1. 5. Exterior Roofing 5.1 Consult your local building code and refer to details R-11 and R-12 for roofing applied to SIPs. Roof SIP - Installation Manual 4

August 2017 MATERIALS ESTIMATING Roof (Vaulted Ceiling) Estimation Only Lumber Requirements: Perimeter of roof or fascia length Caulking and Sealant Requirements: Every 1200 sqft (111 m 2 ) of SIP equals 1 case of Expandable Foam Every 2000 sqft (185 m 2 ) of SIP requires 1 case of Sealant Fasteners: Recommend 2 (50mm) Ring nail or 2 (50mm) screws for connection to panel ~ 1.25 times the square footage of SIPs... nailing of spline SIP screws use 40% of Roof square footage Roof SIP - Installation Manual 5

AIR BARRIER RECOMMENDED DETAILS FOR AIR BARRIER SEALANTS All sealants, FOAM (A) or CAULKING (B), should be applied onto the SIP in a continuous rectangular pattern along the outer most edge of the area to be sealed. (A) A low expansion FOAM SEALANT should conform to the AAMA 812-04 standard. Apply a 1/2 inch or a 12.5 mm diameter of a continuous bead of expandable foam sealant onto the SIP: Expandable Foam Sealant Bead EPS (B) A CAULKING SEALANT should conform to ASTM C920-02 and/or CAN/CGSB 19.13-M. Apply a 3/8 inch or a 10 mm diameter continuous bead of caulking onto the lumber spline: CAULKING (CONTINUOUS BEAD) Caulking Bead LUMBER STUD OR SPLINE AIR BARRIER DETAILS FOR AIR BARRIER SEALANTS DWG. No. NOVEMBER 2010 1 AB-1

AIR BARRIER RECOMMENDED DETAILS FOR SEALING SIP CONNECTIONS (1) Foam to Foam: Use a low expansion foam sealant. 1/4 (6 mm) GAP FOAM SEALANT FOAM SEALANT SIP SPLINE JOINT SEE VAPOUR BARRIER DETAIL (VB-1) BUTT JOINT (2) Foam to Wood: Use a low expansion foam sealant. PLATES SECTION LUMBER SPLINES CAP TOP PLATE FOAM SEALANT CAULKING (SEE WOOD TO WOOD) FOAM SEALANT BOTTOM PLATE LUMBER SPLINE, END STUD OR JOIST (3) Wood to Wood: Use caulking and a low expansion foam sealant. CORNER DETAIL PLAN LUMBER SPLINE FOAM SEALANT SEE VAPOUR BARRIER DETAIL (VB-1) FOAM SEALANT FOAM SEALANT CAULKING (SEE AB-1) CAULKING (SEE AB-1) AIR BARRIER DETAILS FOR SEALING SIP CONNECTIONS MAY 2009 DWG. No. AB-2

VAPOUR BARRIER RECOMMENDED DETAILS FOR VAPOUR SEALING SIP CONNECTIONS The function of a vapour barrier is to control the entry of water vapour into the building assembly. Vapour barriers should not be confused with an air barrier. All SIP seams and connections must be VAPOUR SEALED from the INTERIOR. These are recommended vapour barrier methods: OSB EXTERIOR INTERIOR CONTINUOUS 6 MIL POLY OVER ENTIRE SIP ASSEMBLY SEE AIR BARRIER DETAIL (AB-2) 6 MIL POLY STRIP CAULKED TO OSB SEE AIR BARRIER DETAIL (AB-2) CONTINUOUS 6 MIL POLY RECOMMENDED 6 MIL POLY STRIPS & CAULKING EXTERIOR INTERIOR CAULKING SEE AIR BARRIER DETAIL (AB-2) OSB SEE AIR BARRIER DETAIL (AB-2) SIP TAPE CAULKING SIP TAPE VAPOUR BARRIER DETAILS FOR VAPOUR SEALING SIP CONNECTIONS NOVEMBER 2010 DWG. No. 1 VB-1

SIP SCREW ( SEE FASTENING TABLE) FOAM SEALANT VAPOUR SEALED AS PER VB-1 CHAMFER BLOCKING (WEDGE) OPTIONAL FURRING FOR ELECTRICAL PASSAGE INTERIOR FINISH RIDGE SECTION (WITH RIDGE BEAM) STRUCTURAL SUPPORT AS REQUIRED SIP SCREW (SEE FASTENING TABLE) ADJUST FRAMING MEMBER AS REQUIRED FOAM SEALANT VAPOUR SEALED AS PER VB-1 CAULK TO PANEL INTERIOR FINISH OPTIONAL FURRING FOR ELECTRICAL PASSAGE RIDGE SECTION (NO RIDGE BEAM) NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS ROOF RIDGE DETAILS FEBRUARY 2012 5 DWG. No. R-1

SIP SCREWS CAULK TO PANEL 6 MIL POLY VAPOUR BARRIER RIDGE SECTION (TYPICAL RIDGE BEAM) SIP SCREWS CAULK TO PANEL RAFTER & BEAM BY OTHERS FOR RAFTER & BEAMS (DESIGNED BY OTHERS) 6 MIL POLY NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS SECTIONS - ROOF RIDGE DETAILS FOR 12/12 PITCH ROOF FEBRUARY 2012 R-2 DWG. No. R-2

CHAMFER BLOCKING FOAM SEALANT SIP SCREW SIP SCREW VAPOUR SEALED AS PER VB-1 CAULK TO PANEL TOP PLATES RIDGE BEAM AS REQUIRED POST (BUILT-UP OR SOLID) PANEL JOINT WALL P ANEL RIDGE BEAM & POST POCKET NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS BEAM POCKET DETAIL DECEMBER 2010 2 DWG. No. R-3

FOAM SEALANT SIP SCREW CAULK TO PANEL VAPOUR SEALED AS PER VB-1 CHAMFER BLOCKING INTERIOR FINISH OPTIONAL FURRING FOR ELECTRICAL PASSAGE ROOF VALLEY STRUCTURAL SUPPORT AS REQUIRED SIP SCREWS SIP SCREW FOAM CHAMFER BLOCKING OPTIONAL FURRING FOR ELECTRICAL PASSAGE INTERIOR FINISH PANEL JOINT AT ROOF SUPPORT WEDGE OR BEAM CHAMFERED AT TOP INTERIOR FINISH PANEL CONTINUES OVER ROOF SUPPORT STRUCTURAL SUPPORT AS REQUIRED NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS ROOF VALLEY & INTERMEDIATE ROOF SUPPORT JANUARY 2012 3 DWG. No. R-4

CHAMFER BLOCKING (INSERT AFTER ROOF PANELS ARE IN PLACE) SIP SCREW SEE FASTENING TABLE CAULK TO PANEL FASCIA FOAM SEALANT VAPOUR SEALED AS PER VB-1 INTERIOR FINISH FOAM OPTIONAL FURRING FOR ELECTRICAL PASSAGE CAULK FOAM SEALANT FASCIA CAP & PLATE BLOCKING SOFFIT FRAMING OVERHANG (SEE TABLE R-T-3) WALL PANEL ROOF SUPPORT NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS EAVE DETAIL & ROOF SUPPORT AT EXTERIOR WALL FEBRUARY 2012 5 DWG. N o. R-5

SECTION A-A SEE FASTENING TABLE AND DETAIL BELOW EPS CORE OSB SKIN VAPOUR SEALED AS PER VB-1 A A SEE SECTION B BELOW SPLINE ROOF ASSEMBLY SECTION B SIP SPLINE BLIND FASCIA (SITE) FASCIA WEDGE FOR PLUMB CUT (SITE) NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS. NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS TYPICAL SLOPED ROOF ASSEMBLY FEBRUARY 2012 6 DWG. No. R-6

SEE DETAIL R-1 OR R-2 A A SEE DETAIL R-4 OR R-5 BLIND FASCIA (SITE) FASCIA WEDGE FOR PLUMB CUT (SITE) ROOF ASSEMBLY SECTION A-A SIP SPLINE SIP SPLINE LUMBER SPLINE FOAM SEALANT OR CAULKING (SEE AB-1) NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS. NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS SLOPED ROOF ASSEMBLY WITH RIDGE BEAM FEBRUARY 2012 2 DWG. No. R-7

A A INSTALL FASCIA BOARD ON SITE SPLINE SEE SECTION B BELOW EPS CORE SECTION A-A SEE FASTENING TABLE SECTION B ISOMETRIC ROOF ASSEMBLY GENERIC DETAIL FOR FLAT ROOF FOAM SEAL 3 FOAM CORE SPLINE OSB SKIN CAULK VAPOUR SEALED AS PER VB-1 VAPOUR SEALED AS PER VB-1 NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS. NOTE: FASTENING TABLE ON CONNECTION DESIGN (CD) SHEET OF ENGINEERED SHOP DRAWINGS FLAT ROOF ASSEMBLY FEBRUARY 2012 2 DWG. No. R-8

ROOF JOISTS ATTACHED BY HANGERS OR SIDE NAILING OPTIONAL JOISTS OPTIONAL 1.5 RECESS TYPICAL U.N.O. 1.5 OR 3 RECESS SEE SKYLIGHT MANUFACTURER S DETAIL HANGER OR NAILS DOUBLE SPLINE JOIST SKYLIGHT OPENING & ASSEMBLY FEBRUARY 2012 3 DWG. No. R-9

FLASHING SECURE END PLATE REMOVE FOAM FROM ROOF PANEL AS TO INSTALL NAILER AND LEDGER BOARD TO MATCH WALL BOARD. LEDGER SECURED TO STUDS OPTION 1 FLASHING EMBEDDED MIN. 1" IN MASONRY SECURE TO NEW STUD WALL WITH SIP SCREWS WATER RESISTANT MEMBRANE NEW STUD WALL SECURED TO EXISTING STRUCTURAL WALL EXISTING WALL OPTION 2 NEW ROOF TO EXISTING WALL TYPICAL ROOF CONNECTION SECTIONS (ROOF TO WALL) DWG. No. FEBRUARY 2012 3 R-10

S (TWO SHOWN) ASPHALT SHINGLES NON-ADHERING BREATHABLE ROOFING UNDERLAYMENT INSTALLED AS PER MANUFACTURER S INSTRUCTIONS DRIP EDGE FASCIA COVER 2X_ FASCIA BOARD DRIP EDGE FASCIA BOARD FASCIA COVER FASCIA WEDGE FOR PLUMB CUT 2X_ BLIND FASCIA STARTER SHINGLE INSTALLED AS PER MANUFACTURER S INSTRUCTIONS METAL ROOFING OR CEDAR SHAKES S (TWO SHOWN) NON-ADHERING BREATHABLE ROOFING UNDERLAYMENT INSTALLED AS PER MANUFACTURER S INSTRUCTIONS DRIP EDGE FURRING INSTALLED AS PER MANUFACTURER S INSTRUCTIONS 2X_ FASCIA COVER FASCIA BOARD DRIP EDGE FASCIA BOARD FASCIA COVER FASCIA WEDGE FOR PLUMB CUT 2X_ BLIND FASCIA METAL ROOFING OR SHAKES INSTALLED AS PER MANUFACTURER S INSTRUCTIONS NOTE: VENTILATION OF SIP ROOF NOT REQUIRED. ROOFING APPLIED TO SLOPED SIPS DWG. No. AUGUST 2017 2 R-11

NON-ADHERED MEMBRANE (EPDM, PVC, TPO, ETC.) FASTENERS INTO OSB PROTECTIVE SHEATHING OR MEMBRANE AS REQUIRED OSB EPS ADHERED ROOFING MEMBRANE TORCHED ON OR GLUED ON ROOFING MEMBRANE FASTEN PROTECTIVE SHEATHING LAYER (OSB, PLYWOOD) WITH GLUE, NAILS OR SCREWS OSB EPS NOTES: SIP SURFACE TO BE DRY. INSTALL MEMBRANE ACCORDING TO MEMBRANE MANUFACTURER S DETAILS AND CONFORM TO REQUIREMENTS OF LOCAL BUILDING CODE. FLAT ROOFING APPLIED TO SIPS NOVEMBER 2011 DWG. No. R-12

* DRIVER BOX WIRING LED RECESS CEILING FIXTURE* STRAPPING INTERIOR FINISH * FIXTURE SPECIFICATIONS FIXTURE TO HAVE AMBIENT OPERATING TEMPERATURE +140F(+40C) MAXIMUM INSTALL AS PER MANUFACTURERS SPECIFICATIONS LED POT LIGHT INSTALLATION IN CEILING SIPS JANUARY 2017 DWG. No. R-13

UNFINISHED EAVE DETAIL FOR LEVEL SOFFIT RAFTER RECESS FOR INLAY FOAM SEALANT WALL PANEL VAPOUR SEALED AS PER VB-1 2 NAIL INTO TIMBERFRAME POST 1/2 DRYWALL CAULK TO PANEL FINISHED EAVE DETAIL WITH LEVEL SOFFIT RAFTER TAIL AND INLAY INSTALLED ON GROUND - SCREWED FROM TOP AND BOTTOM RAFTER TAILS @ 16" O/C RAFTER 1/2 " DRY WALL CAULK TO PANEL FINISHED FASCIA KICKER VAPOUR SEALED AS PER VB-1 INSULATION SUGGESTED POST FINISHED SOFFIT LEDGER WALL PANEL NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS. ROOF OVERHANG EAVE DETAILS (TIMBERFRAME) 8020 DWG. No. FEBRUARY 2012 3 R-TF-1

HURRICANE STRAP OSB "TIE" CONVENTIONAL LADDER FOAM SEALANT BEAM / RAFTER VAPOUR SEALED AS PER VB-1 BUILT OUT OPTION POPULAR FOR ROOFS WITH COMMON RAFTER SYSTEMS AND PANEL ORIENTED VERTICALLY WALL PANEL NOTE: SCREW AND GLUE LADDER TO WALL PANEL FOAM HELD BACK FOR RAKE BLOCKING 2X_ INLAY RAKE BLOCKING FOAM SEALANT RAFTER / BEAM VAPOUR SEALED AS PER VB-1 RUN-BY OPTION, POPULAR FOR ROOFS WITH PRINCIPAL RAFTERS AND PURLINS AND PANELS ORIENTED HORIZONTALLY WALL PANEL NOTE: REFER TO AIR BARRIER (AB-2) AND VAPOUR BARRIER (VB-1) DETAILS FOR SEALING SIP CONNECTIONS. ROOF OVERHANG & RAKE (TIMBERFRAME) 8020 DWG. No. MAY 2009 2 R-TF-2