39 Wolcott Ave Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 98 3 83,29 $,2,23 SITE $8,39 Campus Total 83,29 $,8,82 Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video EA $2 Exterior Doors - Exterior Stainless Steel Door EA $,8 Exterior Doors - Exterior Steel Door 8 EA $,3 Exterior Doors - Exterior Steel Door EA $8,9 Exterior Doors - Transom Lite EA $822 Exterior Doors - Transom Lite EA $,88 Exterior Stairs - Concrete LF Fire Escape Foundation Lighting Fire Escape 3 LF $3, Fire Escape LF $9,9 Foundation - Masonry 8 LF Superstructure - Steel with Clay Tile Arch 82,3 SF Exterior Lighting - Wall Mounted EA $, Exterior Lighting - Wall Mounted EA JAH Page of Assessment Date: //2
Category: Building Exterior Roof System 39 Wolcott Ave Chicago, IL Chimney - Brick Chimney- Concrete/ Mortar Liner 2 LF $,99 Chimney - Brick Chimney- Concrete/ Mortar Liner 2 LF $9,9 Coping - Clay Tile LF $,93 Coping - Metal 2 LF $,2 Coping - Stone 8 LF $2,2 Downspouts - Exterior Downspouts LF $,98 Parapet - " - 3" Height 9 LF $,2 Parapet - Parapet < " Height 9 LF $8,928 Parapet - Parapet > 3" 2 LF $3,32 Roof - Asphalt Shingle 8,3 SF $8,98 Roof - Metal SF $,99 Roof - Modified Bitumen,2 SF $,8 Roof Structure - Steel with Clay Tile Arch 23,93 SF Walls Windows Cornice - Metal Projecting 98 LF $2,2 Exterior Walls - Brick 2 SF $32,93 Exterior Walls - Brick,92 SF $,833 Exterior Walls - Brick 2,2 SF $8,2 Exterior Walls - Prefabricated Metal Panel Wall,2 SF $,83 Exterior Walls - Stone-Cut 98 SF $,32 Exterior Walls - Terra Cotta 3 SF $8 Exterior Walls - Terra Cotta,22 SF $2,32 Curtain wall - Louver 29 SF $, Guard - Guards perforated,9 SF $8,9 Guard - Guards wire guard 2 SF $,33 Lintels - Brick 8 LF $,9 Lintels - Brick 9 LF Lintels - Steel 2 LF $, Lintels - Terra Cotta 2 LF Windows - Sash Aluminum Double-pane,3 SF $,9 Building Exterior Subtotal: $,33, Building: Main Category: Electrical System JAH Page 2 of Assessment Date: //2
39 Wolcott Ave Chicago, IL Emergency System Main Service Power Distribution Emergency A/C Power - Auditoium and Aisle Lighting 2,9 SF $,3 Emergency A/C Power - Corridors and Stairs 2,3 SF $3,9 Emergency A/C Power - Gym 2, SF $98 Emergency A/C Power - Lunchrooms, SF $,2 Emergency Battery Packs - Auditoium and Aisle Lighting 3 EA 8 Emergency Battery Packs - Corridors and Stairs EA $2,228 Exit Signs - Auditoium EA $898 Exit Signs - Corridors and Stairs 9 EA $2,8 Exit Signs - Gym EA $8 Exit Signs - Gym 2 EA $3 Exit Signs - Lunchroom 3 EA $9 Security System - CCTV 82,3 SF $2,3 Security System - Intrusion Detection 82,3 SF $2,23 UPS - Less than 3 KW EA 2 $99,2 Main Electrical Service - 2 to 3 A 2/28/3PH EA $,8 PA System 82,3 SF $2,93 Lighting and Power Panels - A EA $,88 Main Distribution Panels - - amp 2 EA $, Main Distribution Panels - Greater than amp EA $2, Main Distribution Panels - Less than amp EA Main Distribution Panels - Less than amp EA $3 Transformers - 2/2-2/28 EA $3,2 Electrical System Subtotal: $228, Building: Main Category: Safty System Fire Alarm Fire Alarm Panel EA Fire Alarm Strobe Lights 82,3 SF Fire Alarm_System 82,3 SF Safty System Subtotal: Building: Main JAH Page 3 of Assessment Date: //2
Category: Mechanical System Air Handling Systems 39 Wolcott Ave Chicago, IL Air Handling Unit- Built Up-Multi Zone- Steam Coils - - 2 cfm EA $,38 Air Handling Unit- Built Up-Multi Zone-Double Delivery- Steam Coils - - cfm EA $238,2 Air Intake 2 EA $,29 Auxiliaries - - 2 cfm EA $,899 Auxiliaries - - cfm EA $22,8 Return Duct Work - Masonry and Ducts- Missing or Existing Shaft 2 LF Zone Dampers 3 EA $8,88 Boiler Systems Heating Devices Mechanical Plumbing Temperature Control Ventilation Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - - HP 2 EA $2,3 Chemical Feeder EA $3, Combustion Dampers 2 EA $, Condensate Pump 2 EA $3,392 Feed Water Pumps and Tank EA $92,9 on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - - HP 2 EA $2,3 Piping - Steam Pipe- Steel 2 LF $2,8 Steam Traps EA $2, Cabinet Heaters - With Electric Coil EA $3 Fin Tube - Steam 2 LF $98 Radiators - Steam EA $8,3 Unit Heater - Electric EA $28 Unit Heater - Gas EA $28 Wall Heater - Electric 8 EA $,293 Condensate-Steel or Galvanized 2 LF $,3 Pneumatic System 82,3 SF $28,3 Thermostats - Pneumatic 3 EA Exhaust Fans- Indoor - - CFM 3 EA $, Exhaust Fans- Roof Mounted - - 8 CFM EA $92 Type I Exhaust Hood- Kitchen EA $,28 Mechanical System Subtotal: $,,93 Building: Main JAH Page of Assessment Date: //2
Category: Plumbing System Hot Water 39 Wolcott Ave Chicago, IL Gas Heater - 3 - BTU/HR EA $2,29 Hot Water Storage Tank_Gas - - Gallons EA $2,29 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 82,3 SF $8,89 Domestic Piping-Cold Water Horizontal Lines 82,3 SF $8,93 Domestic Piping-Cold Water Risers 82,3 SF $,9 Domestic Piping-Hot Water from Risers to Fixtures 82,3 SF $,2 Domestic Piping-Hot Water Horizontal Lines 82,3 SF $, Domestic Piping-Hot Water Return Lines 82,3 SF $, Domestic Piping-Hot Water Return Risers 82,3 SF $, Sanitary Piping 82,3 SF $,389 Storm Piping 82,3 SF $,8 Vent Piping 82,3 SF $,3 Pumps - Domestic Booster Pump-Simplex EA $8,93 Plumbing System Subtotal: $2,382 Building: Main Category: Classrooms Art Room ( room) AC Units EA Casework LF $2 Ceiling - Lay-in SF $2,32 Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw EA $3 Floor - Wood SF $,33 Lighting - Pendent/Surface EA Marker Board 3 LF Storage/ Closet 2 SF $8 Walls - Plaster/Drywall 88 SF $2,3 Computer Lab ( room) AC Units 2 EA $99 Casework 8 LF $22 Ceiling - Lay-in SF $2,32 JAH Page of Assessment Date: //2
Category: Classrooms Computer Lab ( room) 39 Wolcott Ave Chicago, IL Doors - Wood Doors inclu hw 2 EA 2 Floor - Wood SF Lighting - Pendent/Surface EA Marker Board LF Storage/ Closet 2 SF Walls - Plaster/Drywall 88 SF $2,3 Kindergarten ( rooms) Language Lab ( room) AC Units 3 EA $,8 AC Units EA Casework 8 LF $,22 Ceiling - Lay-in 8 SF $8 Ceiling - Lay-in 3,2 SF $9,3 Ceiling - Plaster/Drywall 2 SF Chalk Board LF $,8 Doors - Transom Window 3 SF $ Doors - Wood Doors inclu hw EA $,9 Doors - Wood Doors inclu hw 2 EA 2 Doors - Wood Doors inclu hw EA Floor - Tile/Sheet 2 SF Floor - Wood SF $,33 Floor - Wood 2,32 SF $,39 Lighting - Pendent/Surface 28 EA $3,9 Lighting - Pendent/Surface 2 EA Marker Board 9 LF Storage/ Closet 22 SF $3,9 Storage/ Closet 2 SF $, Walls - Plaster/Drywall,32 SF $,983 Work Sink EA $,8 Work Sink EA AC Units EA Casework LF $2 Ceiling - Lay-in 3 SF $22 Ceiling - Lay-in SF $2,23 Doors - Transom Window 8 SF $3 Doors - Wood Doors inclu hw 2 EA $2,38 JAH Page of Assessment Date: //2
Category: Classrooms Language Lab ( room) 39 Wolcott Ave Chicago, IL Floor - Wood SF $,33 Lighting - Pendent/Surface EA Marker Board 2 LF Storage/ Closet 2 SF $8 Walls - Plaster/Drywall 88 SF $, Office ( room) Play Room ( room) Pre School ( room) AC Units 2 EA Ceiling - Lay-in SF $ Ceiling - Lay-in 33 SF $99 Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw EA Floor - Wood 3 SF Lighting - Pendent/Surface EA Marker Board 8 LF Walls - Plaster/Drywall SF $,88 AC Units EA Ceiling - Plaster/Drywall 32 SF $,8 Doors - Wood Doors inclu hw EA Floor - Carpet 32 SF $ Lighting - Pendent/Surface EA Walls - Masonry 23 SF $89 Walls - Plaster/Drywall 2 SF $,9 AC Units 2 EA Casework 8 LF $22 Ceiling - Plaster/Drywall SF Doors - Wood Doors inclu hw EA Floor - Tile/Sheet SF Lighting - Pendent/Surface 8 EA Walls - Masonry SF $,99 Walls - Plaster/Drywall 3 SF Work Sink EA $39 (3 rooms) AC Units EA JAH Page of Assessment Date: //2
Category: Classrooms (3 rooms) Science Classroom (2 rooms) 39 Wolcott Ave Chicago, IL Casework 8 LF $2,2 Casework LF Ceiling - Lay-in 38 SF $3 Ceiling - Lay-in,3 SF $3, Chalk Board 8 LF $,892 Doors - Transom Window 2 SF $2,33 Doors - Wood Doors inclu hw 2 EA $,82 Doors - Wood Doors inclu hw EA $,8 Doors - Wood Doors inclu hw EA $2, Floor - Tile SF $,9 Floor - Tile/Sheet SF $ Floor - Wood,2 SF $9,32 Floor - Wood 2,32 SF $,39 Floor - Wood SF Lighting - Pendent/Surface 28 EA $3,9 Lighting - Pendent/Surface EA Marker Board 228 LF Storage/ Closet 2 SF $3,8 Storage/ Closet,32 SF $9, Walls - Plaster/Drywall 88 SF $, Walls - Plaster/Drywall,2 SF $29,3 Work Sink 2 EA $3, Work Sink 2 EA $8 AC Units 2 EA Casework LF $2 Ceiling - Lay-in SF $2,32 Ceiling - Plaster/Drywall SF $2,82 Doors - Transom Window 8 SF $3 Doors - Wood Doors inclu hw EA $, Doors - Wood Doors inclu hw EA $3 Floor - Wood, SF $22, Lighting - Pendent/Surface 28 EA Marker Board 28 LF Storage/ Closet 2 SF $, Walls - Plaster/Drywall, SF $,88 JAH Page 8 of Assessment Date: //2
Category: Classrooms 39 Wolcott Ave Chicago, IL Classrooms Subtotal: $389,8 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices AC Unit EA Ceiling - Lay-in 2 SF $,23 Ceiling - Lay-in 99 SF Ceiling - Plaster/Drywall SF $8 Doors - Transom Window 2 SF $ Doors - Wood Doors inclu hw EA $,8 Doors - Wood Doors inclu hw EA Floor - Carpet 28 SF Floor - Tile/Sheet 3 SF $3 Floor - Wood SF $2,933 Floor - Wood 33 SF Lighting - Lay-in EA $9 Lighting - Lay-in EA Lighting - Pendent/Surface EA Power Distribution EA Storage/ Closet 2 SF $3 Storage/ Closet 9 SF $,38 Walls - Plaster/Drywall 3,9 SF $8,88 Walls - Plaster/Drywall 3 SF Work SInk EA $8 Auditorium & Theater Balcony Seating EA $9,3 Ceiling - Plaster/Drywall 3,8 SF Doors - Steel Doors incl hw 2 EA Doors - Wood Doors inclu hw EA $,8 Floor - Carpet SF $82 Floor - Wood 2,3 SF $,88 Lighting - Pendent/Surface 2 EA Main Floor Seating 38 EA $3, Sound System EA $,2 Stage 9 SF $3,8 JAH Page 9 of Assessment Date: //2
Category: Rooms (Other Than Classrooms) Auditorium & Theater 39 Wolcott Ave Chicago, IL Stage Curtain EA Stage Lighting System EA $8, Stage-Stairs - Tile 32 LF $29 Walls - Masonry,8 SF $3,2 Walls - Plaster/Drywall, SF $2,92 Gymnasia Library Ceiling - Plaster/Drywall 2, SF $3,98 Doors - Wood Doors inclu hw 2 EA $2,38 Floor - Wood 2, SF $8,3 Lighting - Pendent/Surface 2 EA Scoreboards EA $2,2 Sound System EA $, Walls - Plaster/Drywall SF $, Walls - Plaster/Drywall, SF $,9 Walls - Plaster/Drywall 3, SF $8,83 AC Unit 2 EA $99 Casework 8 LF $2, Ceiling - Lay-in SF $3 Ceiling - Lay-in 82 SF $2,89 Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw EA $3 Floor - Carpet 92 SF $,93 Lighting - Pendent/Surface EA Storage/ Closet 9 SF $,38 Walls - Plaster/Drywall,9 SF $3,999 Lunch & Multipurpose Room Ceiling - Plaster/Drywall,32 SF $,9 Doors - Wood Doors inclu hw EA Floor - Tile SF $28 Floor - Tile 2 SF $38 Floor - Tile/Sheet, SF $,8 Lighting - Pendent/Surface 8 EA Serving Line 2 LF Storage/ Closet SF $,9 Walls - Masonry 2, SF $8,9 JAH Page of Assessment Date: //2
Category: Rooms (Other Than Classrooms) Lunch & Multipurpose Room 39 Wolcott Ave Chicago, IL Walls - Plaster/Drywall SF $,8 Walls - Vinyl Coated Gypsum Panel 2 SF $38 MDF_IDF Doors - Transom Window 9 SF $2 Doors - Wood Doors inclu hw EA $, Finishes 338 SF $2,2 Mechanical/ Service Rooms Boiler Room,3 SF $,2 Janitor's Closet SF $98 Mechanical/ Service Rooms 3,929 SF $28,9 Restroom Accessories 2 SF $9 Accessories,8 SF $,3 Accessories 2 SF Ceiling - Lay-in SF $3 Ceiling - Lay-in SF $2 Ceiling - Plaster/Drywall 2,93 SF $,89 Ceiling - Plaster/Drywall 3 SF Doors - Transom Window 3 SF $ Doors - Wood Doors inclu hw EA $,8 Doors - Wood Doors inclu hw EA Floor - Concrete 2 SF $3 Floor - Terrazzo 2 SF Floor - Tile Ceramic/ Porcelain 28 SF $,8 Floor - Tile Ceramic/ Porcelain, SF Floor - Tile/Sheet SF $ Floor - Tile/Sheet SF $ Floor Drain EA $,9 Floor Drain EA Hand Dryer EA $, Lavatory 9 EA $2,8 Lavatory 2 EA Lighting - Lay-in EA Lighting - Pendent/Surface 9 EA $, Lighting - Pendent/Surface 3 EA Lighting - Wall Mounted EA JAH Page of Assessment Date: //2
Category: Rooms (Other Than Classrooms) Restroom 39 Wolcott Ave Chicago, IL Partitions EA $ Partitions EA $, Partitions EA Urinals 8 EA $2,88 Urinals EA Walls - Masonry 3 SF $2,398 Walls - Plaster/Drywall SF $,89 Walls - Plaster/Drywall,3 SF $,223 Walls - Plaster/Drywall 2 SF Walls - Tile Ceramic/ Porcelain SF $8,3 Walls - Tile Ceramic/ Porcelain, SF $3, Walls - Tile Ceramic/ Porcelain 8 SF Walls - Vinyl Coated Gypsum Panel 2 SF $282 Water Closet 8 EA $, Water Closet 3 EA $,8 Water Closet 2 EA Rooms (Other Than Classrooms) Subtotal: $3, Building: Main Category: Building Interior Corridor Ceiling - Lay-in 8 SF $2,8 Ceiling - Lay-in,2 SF $3,99 Ceiling - Lay-in 2,82 SF $8, Ceiling - Plaster/Drywall 29 SF $3, Ceiling - Plaster/Drywall,8 SF $,2 Doors - Transom Window 32 EA $,8 Doors - Transom Window 2 EA Drinking Fountains - Single Fountain EA $,3 Drinking Fountains - Single Fountain EA Floor - Concrete,8 SF $889 Floor - Tile Ceramic/ Porcelain 29 SF $82 Floor - Tile/Sheet 8,8 SF Lighting - Pendent/Surface 29 EA Walls - Masonry 2,2 SF $,3 JAH Page 2 of Assessment Date: //2
Category: Building Interior Corridor 39 Wolcott Ave Chicago, IL Walls - Plaster/Drywall,88 SF $8,23 Walls - Structural Glazed Tile SF $2, Stairs Ceiling - Lay-in,88 SF $,8 Ceiling - Plaster/Drywall SF Floor - Concrete SF Floor - Tile Ceramic/ Porcelain 288 SF $,932 Floor - Tile/Sheet, SF Handrails 32 LF $3,22 Lighting - Pendent/Surface 28 EA Stairs - Concrete 2 LF $,92 Walls - Plaster/Drywall,28 SF $2,3 Building Interior Subtotal: $9,88 Total Building Cost $,2,23 SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin EA Civil/ Drainage - Site Drain 2 EA $2 Civil/ Drainage - Site Manhole EA Fencing - Chain Link 2 LF $2,22 Fencing - ew Standard Ornamental 9 LF Benches 3 EA Landscape - Hardscape- Concrete SF $8,28 Landscape - Hardscape- Concrete, SF $9,3 Parkway trees EA Planting Beds/ Area 3,33 SF Play Area - Asphalt/ Hardscape, SF $,2 Play Area - Asphalt/ Hardscape 2, SF $,92 JAH Page 3 of Assessment Date: //2
39 Wolcott Ave Chicago, IL SITE Category: Site Landscape Parking Lot Playground Sidewalks Signage Trash Receptacles 3 EA Surface - Concrete 2,2 SF Equipment - Pre K 3- EA Surface - Poured Surface 2,2 SF Sidewalks - Perimeter Sidewalks, SF $23,2 Flag Pole - Flag Pole EA $,3 Marquee - Free Standing Back Lighted EA Site Subtotal: $8,39 Total Site Cost $8,39 Campus Total ² ³ $,8,82 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). JAH Page of Assessment Date: //2
39 Wolcott Ave Chicago, IL Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. JAH Page of Assessment Date: //2
39 Wolcott Ave Chicago, IL Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Computer Lab Kindergarten Kindergarten Kindergarten Kindergarten Kindergarten Language Lab Office Play Room Pre School Science Classroom Science Classroom Kindergarten Kindergarten Special Education Special Program Pre School 3rd Floor 2nd Floor Basement st Floor st Floor st Floor 2nd Floor 3rd Floor st Floor Basement Basement st Floor st Floor st Floor 2nd Floor 2nd Floor 2nd Floor 2nd Floor 2nd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 3rd Floor 38 23 3 2 3 2 2 8 9 2 22 2 28 29 3 33 3 3 3 32 39 38 23 B 3 2 3 2 2 8 9 2 22 2 28 29 3 33 3 3 3 32 39 89 89 2 89 89 89 89 3 32 89 89 89 89 89 89 89 89 89 89 89 89 89 89 89 8 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 8 2 8 2 8 2 2 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 JAH Page of Assessment Date: //2