Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1

Similar documents
Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

UNIFIED FACILITIES GUIDE SPECIFICATIONS

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SUBMITTAL REVIEW COVERSHEET

SECTION SUBMITTAL PROCEDURES

LETTER OF TRANSMITTAL

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

May 15, 2012 Hugh Anderson Legal Counsel to the Engineers Joint Contract Documents Committee

submittals 1s e c t i o n

Submittal Packages Detailed with Items and Reviewers

LETTER OF TRANSMITTAL

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

HOLLOW METAL DOOR/WINDOW SYSTEM FOR THERMALSAFE CF WALLS WINDOW ASEMBLY GUIDE PIONEERING INSULATED METAL PANEL TECHNOLOGY

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

INTEX Millwork Solutions SECTION EXTERIOR PVC PERGOLAS (IBC Compliant)

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

SECTION SUBMITTAL PROCEDURES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION ADMINISTRATIVE REQUIREMENTS

East Central College

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

SECTION SUBMITTAL PROCEDURES

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Jacksonville District Master

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

DESIGN INTENT DRAWING PACKAGE/CONTRACTOR DESIGN BUILD DRAWINGS

SECTION SUBMITTAL PROCEDURES

Working Drawing Manual

Section Meetings Section Material and Equipment. None Required

LETTER OF TRANSMITTAL

PANEL FASTENERS. Fairfield Metal 9 Audrey Place, Fairfield, NJ Phone: SUBSTRATE, BY OTHERS

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

Submittal Packages Detailed with Items and Reviewers

Working Drawing Procedure

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

HIA AIR CARGO HAMILTON ADDENDUM #3. Addendum No. A03 (Architectural) o Text 1 page o SK-10a o SK-10b o SK-11

00-General Drawings. Doc. no.: NA-00-STS002

UNIFIED FACILITIES GUIDE SPECIFICATIONS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

UNIFIED FACILITIES GUIDE SPECIFICATIONS

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

SEI Certification Program Manual

A101 CARVER, MINNESOTA S.P B C D E F G FLOOR PLAN CARVER PARK AND RIDE 1 FLOOR PLAN

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS:

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

Submittal Transmittal

Series Sloped glazed Curtain wall. Installation Instructions

1st Review of Submittal Materials for Willow Bend Development; CSP (Hansen #1734) Comment Responses

Table of Contents. Linings/Sheathing/Dry partitioning. Rigid sheet fine linings and panelling / Rev

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7)

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

LETTER OF TRANSMITTAL

CROSSBAR RAFTER ISOMETRIC

SECTION G ESTIMATE OF QUANTITIES

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

REQUEST FOR INFORMATION

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

SECTION SIGNAGE

Construction Phase Project Management and Documentation

Transcription:

1700 NEW YORK AVENUE N.W., WASHINGTON, D.C. 20006 Office: 202.842.2100 Museum of the Bible Submittal Pkg. No.: 074213.13.0 Submittal Review Form Submittal Items 1 thru 1 SG Project No: 26865.000 Response Date: 03/21/16 Agency/Owner: Attention: GC/CM: Museum of the Bible 7707 SW 44 th Street Oklahoma City, Ok 73179 405-745-7341 Cary L. Summers Clark Construction Group, LLC 7500 Old Georgetown Road Bethesda, MD 20814 301-367-8346 Description: A/E: FORMED METAL WALL PANELS SmithGroupJJR. 1700 New York Avenue NW Suite 100 Washington, D.C. 20006 202-842-2100 Attention: Brian Cummings William R. Jones Distribution/Copies: Overnight Mail Courier Hand Deliver Email Constructware X Owner: Museum of the Bible (1 copy) Consultant: X Contractor: Clark Construction Group (1 copy) Consultant: X File: Project File (1 copy) SUBMITTAL REVIEW STATUS: Architect s review is only for the limited purpose of checking for general conformance with information given and the design concept expressed in the Contract Documents. The results of Architect s review are entered in the table below. The Final Review Code prevails. AP APPROVED; AN APPROVED AS NOTED; AN-R APPROVED AS NOTED Resubmit; REJECTED; X Not Requested by Contract Documents; NA No Action Taken, For Record Only Subm # Type Item Description AP AN AN-R REJ NA X 1 074213.13-003.2 Reviewer SD X100 Sill Metal Panels - Shop Drawings Resubmittal Janki Bhatia Comments: *Check submittal since comments listed might not be inclusive or represent graphic issues. X Please refer to attached SGJJR comments. Issued By: Rennie J. Grant P:\projects\26865.000\CA\Submittals\Div 07\074213.13-003.2 - X100 Sill Metal Panels - Shop Drawings Resubmittal\074213.13-003.2.doc 21-Mar-16 1 of 2

Submittal Item file:///p:/projects/26865.000/ca/submittals/div%2007/074213.13-003.2%20-%20x100%2... Page 1 of 2 3/2/2016 Project [113343] - Museum of the Bible Submittal Item View Date 2/29/2016 Clark Construction Group, LLC 7500 Old Georgetown Road Bethesda, MD 20814 Phone: (301) 272-8100 Fax: (301) 272-1926 Submittal Item No. 074213.13-003 General Information Item No. 074213.13-003 Revision 2 Package No. Rev. 074213.13.0 Description X100 Sill Metal Panels - Shop Drawings Resubmittal CSI Code 074213.13 - FORMED METAL WALL PANELS Submitting Company Icon Exterior Building Solutions, LLC Reference No. Copies Required Status In Review Item Type Shop Drawings Responsible Team Adam Byrd (Clark Construction Group, LLC) Member Item Notes Primary Response Submission Notes Review Notes Dates Material Required on Site Approved Submittal Required By Submission Due Required Lead Time (days) Required Review Time (days) 21 Released for Fabrication Material Projected Delivery Actual Delivery Name of Manufacturer Manufacturer Phone Activity ID Project 2/29/2016 Supporting Documents Document Type Document Open Description Date Size (KB) File 074213.13-003.2 - X100 Sill Metal Panel SD For App 20160229.pdf 074213.13-2/29/2016 7808 003.2 - X100 Sill Metal Panel SD For... Distribution Recipient Company Method Date Adam Byrd Clark Construction Group, LLC Email: adam.byrd@clarkconstruction.com 2/29/2016 Andrew Ricigliano Clark Construction Group, LLC Email: andrew.ricigliano@clarkconstruction.com 2/29/2016

Submittal Item Page 2 of 2 Areta Pawlynsky R.A. Heintges & Associates Email: apawlynsky@heintges.com 2/29/2016 Bill Jones SmithGroup Email: bill.jones@smithgroupjjr.com 2/29/2016 Brian Cummings Clark Construction Group, LLC Email: Brian.Cummings@clarkconstruction.com 2/29/2016 Don Posson SmithGroup Email: don.posson@smithgroupjjr.com 2/29/2016 Girish Ganapati SmithGroup Email: girish.ganapati@smithgroupjjr.com 2/29/2016 Jessica Orlando Clark Construction Group, LLC Email: jessica.orlando@clarkconstruction.com 2/29/2016 Marcus Wilkes SmithGroup Email: marcus.wilkes@smithgroupjjr.com 2/29/2016 Meg Connolly Clark Construction Group, LLC Email: meg.connolly@clarkconstruction.com 2/29/2016 Mike Regimenti Clark Construction Group, LLC Email: mike.regimenti@clarkconstruction.com 2/29/2016 Rennie Grant SmithGroup Email: rennie.grant@smithgroupjjr.com 2/29/2016 Rick Yezzi Clark Construction Group, LLC Email: richard.yezzi@clarkconstruction.com 2/29/2016 Ryan Kim Clark Construction Group, LLC Email: ryan.kim@clarkconstruction.com 2/29/2016 Samuel Mitrani Clark Construction Group, LLC Email: Samuel.Mitrani@clarkconstruction.com 2/29/2016 Sean Leng-Smith Clark Construction Group, LLC Email: sean.lengsmith@clarkconstruction.com 2/29/2016 Sharif Khalje R.A. Heintges & Associates Email: skhalje@heintges.com 2/29/2016 Sharon Friedlander Clark Construction Group, LLC Email: sharon.friedlander@clarkconstruction.com 2/29/2016 Tiffany Lau R.A. Heintges & Associates Email: tlau@eharch.com 2/29/2016 file:///p:/projects/26865.000/ca/submittals/div%2007/074213.13-003.2%20-%20x100%2... 3/2/2016

074213.13 1.2A 074213. 003 2 074213.13-003.2 02/29/2016 Adam Byrd 02/29/2016 26865.000 X Janki Bhatia 3/21/2016 AN

SG: It is our understanding that existing CW is at right angle. VIF SG: Conc curb is at right angle, perpendicular to metal panel SG: Conc curb is at right angle, perpendicular to metal panel SG: It is our understanding that existing CW is at right angle. VIF

SG: Waterproofing SG: Stainless steel flashing SG: Mineral wool insulation SG: 109.67 deg, VIF SG: Metal closure panel above SG: Revise detail and continue 2-hr shaftwall assembly further out to face of curtainwall. Refer to CCD-70 SG: Joint in sill panel as required

SG: Provide mineral wool insulation in cavity SG: Refer to CCD-70 for revision to partition walls.

SG: VIF

SG: VIF

SG: VIF

SG: VIF

SG: VIF

AL HEAD PANEL AND AL COPING. COORDINATE WITH X100 SHOP DRAWINGS- 084413-011.2 FOR LENGTH OF AL PANEL HEAD. COMPOSITE METAL CLOSURE PANEL. SEE CCD-43, SHEET A5.2.1. REFER TO COMMENTS ON SUBMITTAL 074213.13-007.0 FOR PANEL JOINTS. X100 CURTAIN WALL ASSEMBLY NEW AL PANEL SILL, REF A5.9.2 PROVIDE AL PANEL TO MATCH EXISTING COPING A EXISTING METAL PANEL COPING 0.040" ALUMINUM END-CAP OVER EXISTING TO BE FABRICATED ON SITE. INSTALL BEFORE NEW SILL EXISTING CURTAIN WALL

SG: End cap to match existing profile SG: New flashing will be required to bridge the gap between existing and new

SG: End cap to match existing profile