MODULE TITLE : ENGINEERING DESIGN DESIGN PROJECT TUTOR MARKED ASSIGNMENT 2

Similar documents
MODULE TITLE : ELECTRONICS TOPIC TITLE : OSCILLATORS. TUTOR MARKED ASSIGNMENT 3 (v1.1)

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

TO O L K IT. Public Bike Repair

Copyright Pontcanna Publishing 2016 All rights reserved.

A - Railing Frame Material Specifications

Track Rack. * Track Racks are not lockable

installation guide

HD installation guide

How to Make a Rolling Machine for Sheet Metal Work

Pro Digital ebooks. Making the. Paint Bucket Work! Les Meehan

ISO INTERNATIONAL STANDARD

TABLE OF CONTENTS REQUIRED TOOLS

Alfa Laval Material Standard T

MAX STATION WE7050 J-CUP SPECIFICATIONS

Boat Lift Canopy Frame Assembly Instructions

Downtown Rack. Custom logo option available

LINEAR APPLICATIONS OF OPERATIONAL AMPLIFIERS

Status Date Prepared Reviewed Endorsed Approved

Detection of Internal OR External Pits from Inside OR Outside a tube with New Technology (EMIT)

Sheet Metal Design Guidelines

GURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM

WoodBike v1.5 Stephen Jay June 2000

Specifications for EA31002 U Tube Bundle for CDU 3

SADDLE BUDDY EASY ASSEMBLY. The Saddle Buddy is easy to install Galvanized Surface In-Ground. Rail.

Assignment /01

INSTALLATION INSTRUCTIONS

FUSION JULIETTE BALCONIES FITTING INSTRUCTIONS

ACTIVE FILTERS USING OPERATIONAL AMPLIFIERS

CATALOG FOR WOODCO USA Brand 150 TON SPIDER. API ROTARY TAPER TRADEMARK WOODCO BUY THE BRAND REG. U.S. PATENT OFFICE MANUFACTURER

One-sided rack, hot-dip galvanized Space between bicycles 350 mm length approx.kg Part-No. Two-sided rack, hot-dip galvanized

CONVERTING CAMBRIAN MODELS FOX BOGIES TO 45MM GAUGE AND SIERRA VALLEY STEEL WHEELS WITH BALL BEARINGS

C L. Farwest Corrosion Control Company Corrosion Control Products Company

INSTALLATION MANUAL H A

The W.I.S.E. Generator System

New Product Release: October 2014 Boone Racks

INSTALLATION GUIDE. This surround / suite is intended for use with electric fires only. It must never be used with a gas or solid fuel fire.

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

UPM 10X and 10XHD A. TEE SOCKET: 7 O.D. PIPE SOCKET TO FIT OVER 6 SCHEDULE 40 OR 80 STEEL PIPE

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

Veto spring agitator / kw burner heads

BIKE FILE (301)

ECE 53A: Fundamentals of Electrical Engineering I

WINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS

BP Brine Pro Brine Maker. Parts List. This Parts List is for BP-2000 brine makers with serial numbers beginning with and higher.

REVIEW ALL INSTRUCTIONS COMPLETELY BEFORE ATTEMPTING INSTALLATION

SolarMount (E)volution

CHARACTERISTICS OF OPERATIONAL AMPLIFIERS - II

Installation Instructions

Signature Choral Riser Side Rail

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

Haukaas Bale Rack Kit

DOLPHIN SHELL & TUBE MARINE CONDENSERS (DSTMC)

Brackets and Tenons. Product Specifications. PB Series

CAD PIPING INTRODUCTION Course Syllabus

CRYSTEEL S. this manual must be included with the vehicle after completing the installation.

Blizzard, PO Box , Milwaukee, WI UNDERCARRIAGE KIT

Sight glass window Sight flow indicator

ISO INTERNATIONAL STANDARD. Hexagon bolts with flange with metric fine pitch thread Small series Product grade A

Swerve Rack CUSTOM RACKS AVAILABLE

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Single 180 Double 180 Triple. 180 Quad

A simple demand feeder can be made with a 5 gallon bucket, a funnel, brass rods and PVC pipe. It can hold 12 pounds of extruded (floating) fish feed.

B32157 UNDERCARRIAGE KIT. Jeep Cherokee Jeep Wagoneer Jeep Comanche Parts List and Installation Instructions CAUTION

Porta-Cleanse TM 4610/4620 Mastless Mixer Stand

Sept 13 Pre-lab due Sept 12; Lab memo due Sept 19 at the START of lab time, 1:10pm

Credit Value 10 QCF Level 3 GLH 75. Learner pack

HYDRO-TOWER INSTALLATION INSTRUCTIONS

ISSUE MODIF. ORDER NO. WEEK ISSUE MODIF. ORDER NO. WEEK ISSUE MODIF. ORDER NO. WEEK 01 SME SME SME

EXPERIMENT 1 PRELIMINARY MATERIAL

Installation instructions, accessories - Electric engine block heater

PRODUCT: 3/8 Rivet Nut Installation READ INSTRUCTIONS IN FULL BEFORE INSTALLATION. QUESTIONS? CALL M-F 7:00 AM 5:00 PM PST

96 (Standard Length)

ARMFIELD OPEN CHANNEL FLUME OBSTACLES AND DYE INJECTION SYSTEM DANIEL CAHN AND JEAN DORIOT SUMMER 2004

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

installation guide

Brackets and Tenons. Product Specifications. PB Series XA-TMDA8

Ultra Space Saver American Bicycle Security Company

ISO INTERNATIONAL STANDARD. Hot-rolled steel sections Part 14: Hot-finished structural hollow sections Dimensions and sectional properties

DEUTSCH Instructional Manual for HDP-400 Power Crimper (TE CONNECTIVITY PN )

2009 MODEL ASSEMBLY, INSTALLATION AND MAINTENANCE INSTRUCTIONS

Smart Electromagnetic Flowmeter Open channel Flowmeter Detector

Zann Jones

MM Strut Tower Brace, Cobra (MMSTB-7)

CENTER WING SECTION (CWS) WORK REPORT

ASSEMBLY INSTRUCTIONS FOR HAULER II SERVICE BODY A RACK

MTJ Outdoor Baggage Claim

ISO INTERNATIONAL STANDARD. Fasteners Torque/clamp force testing. Éléments de fixation Essais couple/tension. First edition

5. Outdoor equipment. Barrier posts. Stainless steel

AUXILIARY FRAMING AND ACCESSORIES

N5PUV s 4 Band Fan Dipole Experiment. Using the New SRI (Stanford Research Institute) Method

Monday 5 June 2017 Afternoon

ULT R A S PACE SAV E R SQ UA R E D

ISO INTERNATIONAL STANDARD. Fasteners Torque/clamp force testing. Éléments de fixation Essais couple/tension. First edition

HEAD TUBE BEARINGS. All content copyright AtomicZombie Extreme Machines. All rights reserved. 1

Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18. Manual 40100X35-8

HYDRO-TOWER INSTALLATION INSTRUCTIONS

Determine the proper ground fixing stair position, by using, as a reference, the landing tread [Fig. 7].

Transcription:

THIS BOX MUST BE COMPLETED Student Code No.... Student's Signature... Date Submitted... Contact e-mail... MODULE TITLE : ENGINEERING DESIGN DESIGN PROJECT TUTOR MARKED ASSIGNMENT 2 NAME... ADDRESS............ HOME TELEPHONE... EMPLOYER............ WORK TELEPHONE... EDE - 2 - TMA (v1)

Published by School of Science & Engineering Teesside University Tees Valley, UK TS1 3BA +44 (0)1642 342740 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise without the prior permission of the Copyright owner. This book is sold subject to the condition that it shall not, by way of trade or otherwise, be lent, re-sold, hired out or otherwise circulated without the publisher's prior consent in any form of binding or cover other than that in which it is published and without a similar condition including this condition being imposed on the subsequent purchaser.

1 IMPORTANT Before you start please read the following instructions carefully. 1. This assignment forms part of the formal assessment for this module. If you fail to reach the required standard for the assignment then you will be allowed to resubmit but a resubmission will only be eligible for a Pass grade, not a Merit or Distinction. You should therefore not submit the assignment until you are reasonably sure that you have completed it successfully. Seek your tutor's advice if unsure. 2. Ensure that you indicate the number of the question you are answering. 3. Make a copy of your answers before submitting the assignment. 4. Complete all details on the front page of this TMA and return it with the completed assignment including supporting calculations where appropriate. The preferred submission is via your TUOL(E) Blackboard account: https://eat.tees.ac.uk 5. Your tutor s comments on the assignment will be posted on Blackboard.

2 1. Following on from the first TMA in this module, produce a design report for ONE design of the product based on ONE of the scenarios covered on the following pages. The report should contain, where appropriate: Title page Acknowledgements Summary Contents Introduction Basic Product Design Specification Design Parameters Simple Description of chosen Design Design Evaluation Detailed drawings of the design, including dimensions, such that its constructional features can be seen* Conclusions References Appendices. *Drawings should be submitted as complete engineering drawings done using MicroStation (or other CAD software). If the maximum size of printing is A4 then several sheets, each showing a different view of the design, will probably be needed to show sufficient detail for the design to be constructed. In this case, all views should be clearly labelled and all sheets numbered. Only computer-produced drawings will be marked: it is not acceptable to submit hand-drawn work. You should therefore submit the computer files along with the printed hard copy. Note: you may have to invent information to make the Report complete.

3 2. Having used MicroStation (or other CAD software) as part of your Design Report, evaluate its value TO YOU in terms of: costs functionality compatibility. SCENARIOS Either (a) Bicycle Rack When a full design specification was produced and the weighted objective procedure carried out, it was found that a tow bar mounted rack was the best solution. This would bolt to the tow bar once the tow ball has been removed. The dimensions of the tow bar bracket are as shown in FIGURE 1. The 330 mm dimension refers to the distance from the ground to the bottom of the bracket. In order to avoid the bikes fouling the car, it should be assumed that no part of either bike should protrude beyond the face of the tow bar bracket.

4 FIG. 1 The two bikes to be carried have the dimensions shown in FIGURES 2 and 3. The width of the handlebars of the man s bike (FIGURE 2) is 420 mm whilst that of the lady s bike (FIGURE 3) is 630 mm. The width across the pedals is 360 mm in both cases. Your good friend Fred has offered to help build the bike rack and he has access to the following materials and equipment: Square section steel tubing 25 mm 25 mm, 2 mm thick Steel plate 8 mm thick Steel strips 25 mm wide by 6mm thick Brazing and welding gear A powered hacksaw A Pillar drill. Design a suitable rack that can be made using Fred s materials and equipment. It is not necessary to worry about stresses, the materials are capable of exceeding the strength requirements of any design, and the rack should be designed to look right.

5 As part of the Design Report, you should produce: (i) An arrangement drawing showing the outline of the bikes on the rack. This does not need to be very detailed or show any dimensions but should clearly demonstrate that the rack will enable the two bikes to be carried without fouling the car or the ground. (ii) A detailed engineering drawing of the rack only, showing front and side views with all dimensions required for manufacture shown on them. FIG. 2

6 FIG. 3 OR (b) Heat exchanger Based on a full Product Design Specification, the shell and tube heat exchanger to be used will replace part of the pipe connecting the existing reactor feed inlet and the storage tank. This pipe is an 80 mm internal diameter pipe which has a wall thickness of 4 mm. The connections required on the heat exchanger will have the same internal diameter and wall thickness as the pipe and are to be made using flanges which are 150 mm diameter, 15 mm thick and joined to an identical flange on the pipe using 4 M10 nuts and bolts equally spaced with centres 15 mm from the circumference of the flange. The maximum horizontal space between the storage tank and reactor inlet is 7 m.

7 The large amount of cooling required means that water (rather than air) will need to be used for the cooling and this is to be supplied via a 42 mm internal diameter pipe, wall thickness 4 mm, fitted with a 100 mm flange, 10 mm thick with 4 holes equally spaced with centres 12 mm from the circumference to allow M8 nuts to be used for the connection to a similar pipe and flange on the water pipe. For higher efficiency, the water will flow in the shell counter current to the process fluid within the tubes. 96 tubes are required of 12 m length to give the required heat exchange surface area and each tube will need to be 20 mm internal diameter (to maintain the required flow velocity of process fluid), of 4 mm wall thickness (for strength) and at centres 50 mm apart. Square pitch is to be used to enable easier cleaning. The tube headers are semi-spherical of diameter D (the diameter of the shell) and 10 mm wall thickness. The tube plates are 6 mm thick. The total shell area per tube pass is to be 0.2618 m 2. Four shell side baffles are required to maintain the required water flow velocity and level of turbulence. The baffles will be equally spaced and will be of height 0.7D (D = diameter of shell). The baffles and any pass partition plates used will be 5 mm thick to give them the required strength. For safety reasons, the shell will be covered by 100 mm of lagging. You will be required to draw a central cross-section of the heat exchanger and a view of the tube plate at either end of the exchanger.

8 OR (c) Front Panel of Circuit Trainer An analogue/digital circuit trainer is required for open learning students to use to build circuits as part of their electrical/electronic practical work. The circuits that are to be built can consist of up to five integrated circuits and their associated discrete components. FIGURES 4, 5 and 6 each show a block diagram for each system of the intended design: (i) Power supply consisting of 240 V supply input Power on indicator +5 V output +12 V output 12 V output 0 to +12 V variable output 0 to 12 V variable output Output short-circuit indicators for + and supplies.

9 Variable supply controls (±12 V) Mains switch Power supply Fixed output Variable output Power-on indicator Short-circuit indicators (+ and suppliers) FIG. 4 (ii) Function Generator capable of generating sinusoidal, triangular and square waveforms variable amplitude variable frequency frequencies in the ranges 0 to 100 Hz, 100 Hz to10 khz and 10 khz to 1 MHz.

10 Sin/Tri/Sq Amplitude Function generator Output Frequency adjust Frequency range (0-100, 100-10k, 10k-1M Hz) FIG. 5 (iii) Multimeter capable of measuring resistance voltage current. Ω V I Multimeter Output GND V ma FIG. 6

11 You will be required to draw a plan view of the front panel to show the mounting of the various controls, etc. A photograph of an example of an existing circuit trainer is given in FIGURE 7. Breadboard FIG. 7

Question No.

Question No.