European Research Infrastructures Framework Programme 7

Similar documents
Research Infrastructures: Towards FP7

Research Infrastructures in FP7

Research Infrastructures within

Community actions for. Research Infrastructures. Maria Theofilatou. Research Infrastructures Unit. DG RTD-B ERA: Research Programmes and Capacity

FP7-INFRASTRUCTURES

The Research Infrastructures in FP7

Research Infrastructures from FP7 to Horizon 2020

Developing Research Infrastructures for 2020 and beyond

Developing Research Infrastructures for 2020 and beyond

Developing Research Infrastructures for 2020 and beyond

Introducing the 7 th Community Framework Programme for Research and Technological Development ( ) 2013)

Building the ERA of Knowledge for Growth. Proposals for the 7 th Research Framework Programme

Commission proposal for Horizon Europe. #HorizonEU THE NEXT EU RESEARCH & INNOVATION PROGRAMME ( )

Research Infrastructures. Infodays in Greece. December 20 and 21, 2004

Plenary Assembly European Construction Technology Platform (ECTP( Building the Europe of Knowledge ECTP) Special features. Specific Programmes

NATIONAL MINISTRIES. GSO Framework for Global Infrastructures G8 + 5

e-infrastructures for open science

Opportunities for Science & Technology Cooperation between the European Union and Russia

The main FP7 instruments. Aurélien Saffroy. 6 Dec

Provisional Work Programme 2007

Access to Research Infrastructures under Horizon 2020 and beyond

The European Union Research Framework Programme opportunities for cooperation with third countries

Position Paper on Horizon ESFRI Biological and Medical Research Infrastructures

TOWARD THE NEXT EUROPEAN RESEARCH PROGRAMME

The Biological and Medical Sciences Research Infrastructures on the ESFRI Roadmap

Commission proposal for Horizon Europe. #HorizonEU THE NEXT EU RESEARCH & INNOVATION PROGRAMME ( )

Research Infrastructure Programme

NMR Infrastructures. in Europe. Lucia Banci Sco1

Framework Programme 7 and SMEs. Amaury NEVE European Commission DG Research - Unit T4: SMEs

Research DG. European Commission. Sharing Visions. Towards a European Area for Foresight

EU initiatives supporting universities

EC-Egypt Science and Technology Cooperation Agreement. Road Map

An introduction to the 7 th Framework Programme for Research and Technological Development. Gorgias Garofalakis

4th BioHorizon International Brokerage Event 26 th of June Fare clic per modificare lo stile del titolo

The Rolling Agenda. 3-year strategic programme and 2-year work programme, what about it? Opportunities and obstacles

The European Union and Brazil: Cooperation in Science and Technology

FET Flagships in Horizon 2020

FP7-INFRASTRUCTURES

Overview of FP7 activities and perspectives for Horizon Wim Jansen DG CONNECT e-infrastructure

Horizon Europe. #HorizonEU THE NEXT EU RESEARCH & INNOVATION PROGRAMME ( ) DG Research and Innovation September Research and Innovation

Europe as a Global Actor. International Dimension of Horizon 2020 and Research Opportunities with Third Countries

SEAS-ERA STRATEGIC FORUM

HORIZON Leadership in Enabling and Industrial Technologies (LEIT)

Mid-term review of the 6th Framework Programme and the Lisbon agenda

10246/10 EV/ek 1 DG C II

Engaging Stakeholders

The EU s new Research Framework Programme : FP7

HORIZON Peter van der Hijden. ACA Seminar What s new in Brussels Policies and Programme 20 th January Research & Innovation.

Research Infrastructures

Conclusions concerning various issues related to the development of the European Research Area

Horizon Catherine Holt, Innovate UK

Sta atus Horizon 2020 Preparations 26/

the EU framework programme for research and innovation

Research Infrastructures in HORIZON 2020 and possible actions to increase the synergies

Opportunità per i ricercatori SSH in Horizon Monique Longo

Horizon 2020 The EU s new framework programme for research and innovation ( )

FP7 Cooperation Programme - Theme 6 Environment (including climate change) Tentative Work Programme 2011

Proposing a European Partnership in HORIZON EUROPE

Report on the Results of. Questionnaire 1

Horizon 2020 Towards a Common Strategic Framework for EU Research and Innovation Funding

Horizon 2020 and Photonics

Horizon Europe The next EU Research & Innovation Programme ( )

Christina Miller Director, UK Research Office

Water, Energy and Environment in the scope of the Circular Economy

Developing Smart Specialisation through Targeted Support

Materials in the knowledgesociety and the role of the EU 7th Framework Programme

Annex 5 COMMISSION OF THE EUROPEAN COMMUNITIES. DRAFT Proposal for a COUNCIL DECISION

European Multidisciplinary Seafloor Observatory

Research Infrastructures and Innovation

Post : RIS 3 and evaluation

FP7 Funding Opportunities for the ICT Industry

Brief presentation of the results Ioana ISPAS ERA NET COFUND Expert Group

IMI Revolutionising Europe s Pharmaceutical Industry. IMI Matters!

What is on the Horizon? 2020

Wind Energy Technology Roadmap

Workshop. Common challenges

Societal Challenge 6 Europe in a changing world: inclusive, innovative and reflective societies

Information Society Technologies in the 6th Framework Programme. Tom Bo Clausen Project Officer European Commission, IST programme Embedded Systems

Space in the next MFF Commision proposals

Education and Culture

Real-time, Long-term Integrated Observations of European Seas for Monitoring and Research

HORIZON Overview of structure and funding opportunities for EuNetAir partners and network

Horizon Societal Challenge 1: Health, demographic change and wellbeing. Jeremy Bray DG Research & Innovation European Commission

EOSC Governance Development Forum 6 April 2017 Per Öster

ESF Exploratory Workshop "The future of research in sport participation in the lifespan"

Materials and Material Innovation From FP7 to Horizon 2020

Commission proposal for Horizon Europe. #HorizonEU THE NEXT EU RESEARCH & INNOVATION PROGRAMME ( )

Data Infrastructures for Science in the Digital Age

RIO Country Report 2015: Lithuania

An Introdcution to Horizon 2020

International Conference on Research Infrastructures 2014

European Union - New Zealand SCIENCE AND TECHNOLOGY COOPERATION ROADMAP Research and Innovation Priorities

European Technology Platforms

MARITIME POLICY Assessment and Outlook for EU and CPMR. Aarhus, 23 January 2009 CPMR Political Bureau CPMR 2009

Open Opportunities For Library Networks. in the European Union s 6th Framework Programme ( )

POLICY BRIEF BILAT-UKR*AINA. Research Infrastructures

EU expert briefing: Thematic context of the Seminar: Overall strategic approach

HORIZON Wissenschaft mit und für die Gesellschaft. Mag. Daniel Spichtinger DG RTD B6 Ethik und Gleichstellung

Citizens' Observatories & Crowdsourcing Novel ways to engage citizens in science and environmental policy-making

EXTEREME LIGHT INFRASTRUCTURE. ELI and experience with international cooperation. Date:

Transcription:

European Research Infrastructures Framework Programme 7 Brigitte WEISS European Commission 15.3.2007 FP7 2007 2013 Specific Programmes Cooperation Collaborative research Ideas Frontier Research People Marie Curie Actions Capacities Research Capacity + JRC non-nuclear research JRC nuclear research Euratom 1

The Seventh Framework Programme: 2007-2013 JRC 1 751 Euratom 4 062 Cooperation 32 413 Capacities 4 097 People 4 750 Ideas 7 510 FP7 budget (M ) Revised FP7 agreed by Council + Parliament in October 2006 FP7 versus FP6 Significant increase of budget Increase in duration 4 Specific Programmes European Research Council Evolution, no revolution Simplification 2

The Community Research Infrastructures action Research infrastructures refers to facilities, resources and related services used by the scientific community for leading edge research Major scientific equipment Scientific collections, archives and structured information Entities (of unique nature) used for research ICT-based infrastructures Can be single-sited, distributed, virtual Objectives of the Community Research Infrastructures action Optimising the use and development of the best existing research infrastructures in Europe (e.g. smart grids?) Helping to create in all fields of S & T new research infrastructures of pan-european interest needed by the European scientific community Supporting programme implementation and policy development (e.g. international cooperation) 3

The role of the Community Research Infrastructures action Member States Inclusion in national Programmes Inclusion in Specific RTD Programme(s) European Commission Inclusion in DG REGIO / DG DEV strategic plans Stakeholders incl. EIROs Projects EIB RSFF FP7 Research Infrastructures in brief Existing Infrastructures New Infrastructures Integrating activities Design studies e-infrastructures Construction (preparatory phase; construction phase) ESFRI Roadmap Policy Development and Programme Implementation 4

FP7 Support to existing Research Infrastructures Integrating Activities to promote the coherent use and development of research infrastructures in a given field, implemented through: A bottom-up approach for proposals open to all fields of science Targeted approach with topics defined in cooperation with the FP7 thematic areas 580 M 2007-2013 ICT based e-infrastructures in support of scientific research 420 M 2007-2013 FP7 Support to new Research Infrastructures Design studies: to support the conceptual design for new facilities or major upgrades, of clear European dimension and interest through bottom-up calls Support to the Construction of new infrastructures and major upgrades to existing ones Preparatory phase Construction phase 70 M 2007-2013 530 M 2007-2013 5

FP7 Support actions A mixed bottom-up / top down approach, for: the development of an RI European policy and the development of international cooperation Supporting programme implementation (NCPs) and the coordination of research infrastructures in emerging areas Activities: ERA-nets Conferences Studies Networking of NCPs 65 M 2007-2013 First call for proposals: new Research Infrastructures For design studies, preparatory phase, and support actions design studies: 35 M Support actions: 28 M Indicative budget for preparatory phase: 34 projects Closure: 2 nd May 2007 First contracts to come into force before end 2007 130 M 6

First call for proposals ctnd. Design studies Design and feasibility of a new research infrastructure Technical work, organization, logistics, Preparatory phase: Call limited to 34 projects on ESFRI list (member states commitment) Work comprises all activities that lead to a start of the construction at the end of the PP-project Projects have often been design studies in FP6 At least 3 member states or associated states What is ESFRI? The European Strategy Forum on Research Infrastructures Brings together representatives of EU Member States, Associated States, and EC To discuss the long term vision at European level and to support the development of a European RI policy Open method of coordination 7

The ESFRI Roadmap Addressing 7 fields of Research and major challenges From about original 200 proposals, thirty five (35) projects have been identified through several review stages The Roadmap is the result of two years of intensive work About 1000 high-level experts were involved, from every MS and AS, from most fields and user communities The ESFRI Roadmap for Environment AURORA BOREALIS EURO-ARGO 7 Projects IAGOS-ERI EUFAR EMSO LIFEWATCH ICOS 8

Second call for proposals for existing Research Infrastructures Project type: Integrating Activity Indicative budget of 275 M 25 to 30 projects to be selected Closure: spring 2008 Single stage procedure for evaluation remote + panel evaluation Results within 4 months after closure date First contracts will come into force before the end of 2008 No competition within one field of science! Objectives of an Integrating Activity project Structure better and integrate, on a European scale, the way research infrastructures operate and develop, in a given class: By opening and optimising the access to and the use of the existing research infrastructures in the different Member States and Associated States By better structuring and integrating, on a European scale, the operation(s) of research infrastructures, and by fostering their joint development (qualitative and quantitative) 9

Main characteristics of an Integrating Activity Collaboration of existing research infrastructures in a given field of science Ideally all major RI s in Europe in one field At least 3 member states or associated states 3 types of activities obligatory in one project Networking Activities Trans-national Access Joint Research Activities Project type: combination of collaborative project + coordination and support actions An average Integrating Activity in FP 6 Average number of contractors: 19 of which 7 are offering access (in FP6) Typical duration of 4 years Average EC contribution: ~10 M Management: ~ 6% Networking Activities: ~ 15% Trans-national Access: ~ 36% Joint Research Activities: ~ 43% List of funded projects (FP6) http://cordis.europa.eu/infrastructures/projects.htm 10

Example: IA-SFS (Physics) EC contribution: 27 M developing a pan-european Synchrotron and FEL infrastructure TA (~19 M ): 15 installations, with 4000 users from a very broad spectrum of disciplines NA (~2 M ): Specialized workshops, conferences and schools (support areas of transnational cooperation) Exchange of scientists e-infrastructures JRA (~6 M ): European platform for Protein Crystallography Development of: Photo-injector for X-ray Free Electron Lasers Instrumentation for Femto-second Pulses Diffractive x-ray optics Superconducting Ondulator EC contribution: 5.1 M Example: EUSAAR (Environment) Developing a pan-european research infrastructure for the measurements of atmospheric properties TA (~0.2 M ): 11 ground-based stations for atmospheric research NA (~3.2 M ): Standards and exchange of good practices on sampling, measurement and analysis of aerosol parameters Training on aerosol sampling and measurements Web portal and Database on aerosol products JRA (1.7 M ): Methodology for determining aerosol optical density Standard procedures for aerosol hygroscopic growth determination A real time data collection of aerosol measurements A network of research stations exploiting the diversity of regional backgrounds 11

EC contribution: ~4.7 M Example: EUPRIM-Net (Biomedical Sciences) Developing a pan-european research infrastructure of primate centres TA (~1.3 M ): Gene, tissue, cell, gamete and serum banks Experimental animals NA (~1.7 M ): Standards (SOPs for quarantine and experiments) Training on handling (blood sampling, injections ) Courses and textbook (primate behaviour, husbandry, nutrition ) JRA (~1.7 M ): Molecular typing methods Pathogen detection assays Telemetry prototyping Refinement, Reduction, Replacement Integrating Activities in FP7 Bottom up approach for all fields of science (as in FP6) New: targeted approach with topics defined in a priority setting process Topics are complementary to R&D topics under the Cooperation Programme to help develop research infrastructures for European R&D needs To create synergies and ensure consistency with the Cooperation Programme To stimulate RI actions in specific fields that are currently not well covered 12

Priority topics for RI s under the targeted approach Health (6) Food, Agriculture and Biotechnology (4) Information and Communication Technologies (3) Nanosciences, Nanotechnologies and Materials (2) Energy (5) Environment (4) Transport (2) Socioeconomic Sciences and Humanities (4) 30 priority topics for RI s in 8 fields of R&D Priority topics for RI s under the targeted approach Example Environment: To bring together existing research infrastructures European e-infrastructure on earth system s understanding and modeling For seismic engineering research and testing infrastructures For establishing an efficient network on hydrological observatories,, for water resources research Integrating, for efficient polar research, existing observatories and monitoring stations 13

Priority topics for RI s under the targeted approach Example Energy: To bring together existing research infrastructures Aiming at the development of next generation biofuels Integrating European testing and analysis RI for hydrogen and fuel cells For ocean energy research For concentrating solar power research For research on Smart Energy networks Synergies Cooperation Programme and targeted RI activities: one Example Priority topic for RI: To bring together existing research infrastructures for research on Smart Energy networks Link with the Cooperation programme: Smart Energy networks, Activity Energy 2007.7.1 7.3 Typical existing RI relevant to the topic: EdF, France; ISET Test and certification Centre for Modular System Technology, D; CEA/CENEC/LSEC Laboratory for storage technologies, FR; T&D Consulting / High Power and high voltage laboratories, NL; Arsenal Research, Austria; 14

1. Research Infrastructures Planning of calls and indicative budget Total operational budget 1665 M Call 1 2007 Call 2 2007 Call 3 2008 Call 4 2008 Call 5 2010 Call 6 2012 Integrating activities 270 x x e-infrastructures 42 50 113 x x Design studies 35 x Construction Support to the Prep. Phase 130 x Construction Support to the Impl. Phase RSFF (200 M ) + 130 M Policy Development and Programme Impl. 14 14 5 x x Total per call (M ) 221 64 275 113 in summary, an improved FP7 action for Research Infrastructures An increased budget for FP7 (+30%) Better consistency within FP7 (targeted calls) Tackling better fragmentation (Integrating Activities) Catalysing effect towards the construction or major upgrade of Research Infrastructures A vision for the next 10-20 years fostering capacity building and excellence 15

Thank you for your attention For more information see http://cordis.europa.eu/fp7 16