INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Similar documents
EZ-SKIRT. Conveyor Skirting System. Installation and Users Manual. Manufactured by

INSTALLATION INSTRUCTIONS

Skirt & Dust Control Sealing Systems

Sunrise Deck Assembly Instructions for Kingston Left

Assembly Instructions 10 X 10 Aluminum Frame Building

Dura-Lock Roof System

Woodline USA Woodline Spacer Fence System

Installation Guidelines

PLEASE ENSURE THAT YOU ARE WEARING THE NECESSARY PPE BEFORE ATTEMPTING INSTALLATION

6000 Horizontal Router Table Owners Manual Please Read Carefully!

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

Giraud Tool Company, Inc.

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

WPS crew Doors Installation instructions

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

Straight Stringer Installation Instructions

Nancy s Knit Knacks LLC 4 Yard Option Upgrade Kit Assembly Instructions and User Manual

Balustrade Systems / Installation Instructions

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

Frameless Inline Door With Return QCI5263

ABM International, Inc.

CV1B Sliding Table Installation and Setup Guide

Pow-R-Feed Systems Service Manual

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Installation Guidelines

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

Contractors Rack Assembly and Installation Instructions

Rolling Curtain door Manual

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Welding & Fabrication Tools FT-Flat Electrode Welding

Super Sky Surfer 2000 Assembly Instructions

Hardware and Components:

Core EZ. Operating Manual. Toll Free B East Broadway Avenue Tampa, FL 33619

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105

INSTRUCTION SHEET. PIECE INVENTORY - MOBILE BASES Refer to the diagram for part identification.

VACUSEAL MODEL 300 & 400

Work Space Set-up. Slats will level the pipe during bending and help minimize twisting of the bow.

VACUSEAL MODEL 200. HOT TUB PRODUCTS 233 Carrington Road Bethany CT

SawStop. T-GlideTM. Fence System- Professional Series II OWNER S MANUAL

Precision Steel Car s 100 T Steel Coil Car

INSTALLATION INSTRUCTIONS

6625 WEST WILSHIRE BLVD. OKLAHOMA CITY, OK (405) FAX (405)

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

FUSELAGE CONSTRUCTION

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

Spiral Slide

INSTALLATION INSTRUCTIONS WINCH MOUNTING PLATE Part Number: Application: 2007 JEEP JK WRANGLER

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Horizontal and Vertical. Metal Cutting Band Saw MODEL: BS-115

Chapter 1. Beam and Sill Plates

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

Installation Instructions for. Handrail Component System

Contemporary 3 Panel Classic 5 Panel French Panel

Assembly Instructions 10 X 10 Aluminum Roof Support

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Method of Build 1. Fire. Sound

D. Drill Bolt Holes Through Topper Shell and Bed Rails

ATLANTIS RAIL Contact Information

TK 422 PORTABLE BRAKE

Sliding Door Kit

Installation Guidelines

INSTRUCTION MANUAL DWX723-XE HEAVY-DUTY MITER SAW STAND FINAL PAGE SIZE : 8.5IN X 5.5IN

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

TrendWall Floor-To-Ceiling Panels Installation Instruction

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

Gared Pro-S Portable Backstop

Installation Instructions. WEDLOK Splice. For conveyor and elevator belts. phone

SAFETY. Injury hazard

Aluminum Sprinter Rack Installation

MobileTrak5 Installation Instructions

Hatchback Wing Riser Kit

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

ClearSpan PolyMax Windbreak Wall

Horizontal Cable Systems

Please read these Installation Instructions in their entirety prior to installing or operating this equipment.

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...

3400 to 3440 Scarfing Sled Owners Manual Please Read Carefully!

Spring Loaded All Season Roll-Up Doors

Installation Instructions

ALUMA-CLASSIC FENCE W1716 & W1720 INSTRUCTION MANUAL

Assembly Instructions

Big Sweep Lathe Dust Catcher System

Shetland Stalls Installation Instructions

Hardware and Components:

INSTALLATION AND CARE INSTRUCTIONS

17MAY18 U.S. RACK, Inc Falcon Drive, Madera, CA

Low Headroom Rear Mount TorqueMaster

RLP Flat Track Hardware sliding door hardware/ barn door track

Segmented Transfer Plate Installation Instructions

Support Stands & Conveyor Mountings. Parts, Assembly & Maintenance Manual. Steel Support Stand. Aluminum Support Stand Rev.

Frameless Inline Door QCI5250

Tools Required. Bench Hardware. Bench Parts. Planter Hardware. Planter Parts. BENCH/PLANTER INSTALLATION GUIDELINES for

OPERATOR'S MANUAL 46" SNOW BLADE. Model Numbers OEM IMPORTANT: READ SAFETY RULES AND INSTRUCTIONS CAREFULLY

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT

Installation Instructions For Slider Casement Air Conditioners

HDL(M)6 Nut/Screw Assembly

RAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Transcription:

CLAMP MOUNT SKIRTING SYSTEM CLAMP MOUNT/ DURA-SEAL / TRACKEEPER / VACU-SKIRT INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS Check us out at www.asgco.com Customer Service 800-344-4000 800-394-2358 2003 Copyright ASGCO Manufacturing, Inc. 24 Hour Emergency Service and Parts 610-821-0210 ASGCO Mfg., Inc. 301 Gordon Street Allentown, PA 18102 610-821-0216 FAX 610-778-8991

Important Safety Notice Always observe the basic rules of safety when working with any conveyor system. To avoid injury and equipment damage, be sure that all controls to the conveyor are locked out and the power source is disconnected at all times during installation. Installation Tools In addition to the items provided by ASGCO, you will need some or all of the following, depending on the configuration of the system you will install. 1. Adjustable wrenches or open-end wrenches 5. Carpenter s square 2. Marking crayon or soapstone 6. Welding equipment 3. Folding rule and/or tape measure 7. Metal Saw 4. Cutting Torch 8. Level Introduction ASGCO Clamp Mount is a skirting system featuring two options, Clamp Mount I and Clamp Mount II. Clamp Mount I is a system where the actual clamps are on two (2) foot centers and is used where only moderate clamping forces are needed such as the skirt extensions beyond the load zones. Clamp Mount II is a system where the clamps are on one (1) foot centers and is used where maximum clamping forces are needed such as in the load zone where there is high impact on the belt and on the rear of the chute wall. Clamp Mount can be installed in several different configurations. Look at the illustrations below and determine which configuration corresponds to the equipment that needs to be installed. Standard Clamp Mount Skirt sealing mounted flush to the skirtboard. Sealing compound is generally vertical. (See Page 4) ASGCO Mfg., Inc. 2 CLAMP MOUNT SYSTEMS

Clamp Mount with Support Plate where the sealing compound is flexed and laying on the belt. (See Page 9) Clamp Mount is being adapted to retrofit into a Martin Trac- Mount System. (See Page 12) ASGCO Mfg., Inc. 3 CLAMP MOUNT SYSTEMS

Standard Clamp Mount Installation Instructions CLAMP MOUNT with DURA SEAL 1. Remove the existing sealing compound and mounting hardware. Make sure that the chute wall is clear of all old brackets, bolts, studs, etc. 2. Measure the gap between the bottom of the chute wall and the belt. ASGCO recommends that this distance be ½" at impact point increasing to 1½" over the length of the chute wall. This will allow material to roll forward and not get trapped or wedged in place. When the gap is greater than 3"; Additional chute wall must be added prior to installation of the Clamp Mount Skirting System. Keeper Clamp Sealing Compound 6½ ½ to 1½ gap between belt and chute wall No more than 3 between belt and chute wall 3. Clean the chute wall at the approximate locations of the keepers, To ensure a good weld and correct clamping force onto the sealing compound, there must be a clean flat surface for mounting the keepers. ASGCO Mfg., Inc. 4 CLAMP MOUNT SYSTEMS

Keeper Chalk Line 6½ 4. When locating and installing Clamp Mounts, always work from the rear of the chute wall toward the head pulley. On each straight run of the belt (that is, without any change in the angle of elevation of the belt), the first step is to determine the proper height for each keeper. Use a straight edge to measure exactly 6½" up from the belt surface onto the chute wall and mark that point Repeat this measuring and marking at several points in the straight run, including at the rear and head of the chute wall. These marks on the wall show the location of the bottom of the keepers. 5. Use a chalk line to connect the location marks. You need this line to make sure the clamp assemblies will be at the proper distance above the belt when you finish the installation work. NOTE: At a change in the angle of elevation of the belt you must measure the 6½ position for the bottom of the keeper before and after the change in elevation angle. Positioning of the Clamp Mount 6. When a combination of Clamp Mount I and II are used: Begin positioning the Clamp Mount ll s along the belt. Note: Clamp Mount II is used at elevation changes, terminal points, the rear of the chute wall, and high vibration and impact areas. After the Clamp Mount li s, position the Clamp Mount I s along the belt between the Clamp Mount II s. 7. Now you need to lay out the spacing for the keepers Starting at the rear of the chute wall, hold the first Clamp Mount against the chute wall with the bottom of the keeper positioned on the chalk line you just made. Make chalk marks on the wall to outline the top and sides of the keeper, and both ends of the clamp- blade. Move toward the head pulley and hold the next Clamp Mount against the wall with a gap of 1/8" to 1/4" between the blade-ends of the first and second Clamp Mount Mark the outline of the second Clamp Mounts keeper and blade-ends Repeat this for the third Clamp Mount and so on until you reach the head end of the chute wall - or until there is a change in the angle of elevation of the belt NOTE: Check the Position of the neighboring Clamp Mounts by measuring the distance between the center of adjacent blades - it should be about 24. ASGCO Mfg., Inc. 5 CLAMP MOUNT SYSTEMS

8. In the event of an obstruction on the chute wall, you have two options: a) The gap between the clamp-blades can be increased to as much as 2" to avoid the obstruction. (The Clamp can be temporarily inserted into the keeper to determine the increased distance.) Do not increase the gap beyond 2" or the system may not function properly. b) The involved clamp-blades may be shortened, either by sawing (preferably or cutting with a torch. If torch is used, the area affected by the heat must be painted to prevent rusting. Whichever method is used, be sure to cut the same amount off each side of the clamp. Cut blade to match the change in angle of elevation of the belt 9. Remove the keeper from the clamp assembly. Fasten each keeper to the chute wall with a bead weld at the top and bottom of the keeper. Optional method: Instead of a top bead weld, make plug welds in the holes provided and a bead weld. at the bottom. This prevents the keeper from bending during operating pressure. Cotter Pin Pug Weld Bead Weld Cotter Pin Bead Weld Keeper Handle Bead Weld Bead Weld Nut Pivot Clamp Blade ASGCO Mfg., Inc. 6 CLAMP MOUNT SYSTEMS

10. Install the clamp assembly on the keeper. Position the pivot parallel to the blade, with its protruding ends sitting firmly in the notched portion of the housing and tighten the adjusting nut to secure the clamp assembly. Using only hand pressure, close the handle. Installation of Sealing Compound - Dura Seal I. Lay the compound on the belt below the keepers. If the compound has a beveled edge, position the compound as shown in the first illustration. With a sharp knife, cut the sealing compound to the correct length, preferably in one piece. 2. If more than one length of sealing compound is required, follow this procedure for making buff joints: Cut the end of the first length at a 45 angle, then cut a mating 45 angle on the adjoining end of the second length. When using Clamp Mount I assemblies, the butt joint should be positioned as close to the keeper as possible. When using Clamp Mount II assemblies position the buff joint as close as possible to the center line between the keepers, Always make a butt joint as tight and as smooth as you can. And never locate a butt joint near the blade-ends, or at the small gap between blade-ends. This method for making butt joints can also be used when replacing sections of heavily worn sealing compound 3. Position the sealing compound on the chute wall. If there is a beveled edge, make sure the beveled edge is parallel to the belt angle, as shown in the previous illustration. Install the clamp assembly on the keeper. Position the pivot parallel to the blade, with its protruding ends sitting firmly in the notched portion of the housing and tighten the adjusting nut to secure the clamp assembly. Using hand pressure only, close the handle. 4. When all the clamp assemblies on one side of the chute wall have been installed, position the sealing compound so that it lightly touches the belt. Then tighten the adjusting nut with a wrench. If the handle cannot be opened and closed by hand the adjusting nut is too tight. 5. To adjust the sealing compound: Open one clamp at a time and lower or raise the compound until it touches the belt 'lightly, then close the handle. Remember: You must be able to open and close the handle with only hand pressure. 6. In areas of high vibration or impact: Install a cotter pin in the keeper after the sealing compound is in position. This will prevent accidental opening of the handle. Sealing the Rear of the Chute Wall 1. Measure exactly 6½ up from the belt surface onto the outside of the chute wall and mark points above the right and left ends of the horizontal idler. Connect these points with a chalk line. This line shows the location of the bottom of the keepers. ASGCO Mfg., Inc. 7 CLAMP MOUNT SYSTEMS

2. To determine the location of the keepers: Position the clamp assemblies with the bottom of the keeper along the chalk line. Mark the sides and top of the keepers and the blade ends. When the blade is too long: Cut off an equal length from both blade ends Rear View of Conveyor Chute Wall Cut blade to match belt angle Chalk Line Chute Wall Cut blade to match belt angle Blade 6½ 1 1 Horizontal Idler When the belt is angled up at its sides: The blade ends must be trimmed to match the angle of the belt. IMPORTANT: A minimum 1" clearance is required between the clamp-blade and the belt at all points in this installation. If the blade touches the belt, it could damage the belt or foul the operation of the conveyor. 3. Fasten each keeper to the chute wall with a bead weld at the top and bottom of the keeper. Bead Weld Keeper Clamp Handle 4. Install the clamp assembly on the keeper. Position the pivot parallel to the blade, with its protruding ends sitting firmly in the notched portion of the housing and tighten the adjusting nut to secure the clamp assembly. Using only hand pressure, close the handle. 5. Trim and position the sealing compound so that it lightly touches the belt Then tighten the adjusting nut with a wrench. If the handle cannot be opened and closed by hand, the adjusting nut is too tight. Cotter Pin Bead Weld Belt Travel Nut Pivot Blade Sealing Compound Tail Pulley ASGCO Mfg., Inc. 8 CLAMP MOUNT SYSTEMS

CLAMP MOUNT with SUPPORT PLATE with DURA SEAL, TRI-SEAL, MULTI -SEAL, VACU-SKIRT Clamp Mount with Support Plate Instructions Parts List Description Clamp Mount I Clamp Mount II Support Plate Part Number ASG-CK-1 ASG-CK-2 ASG-CZ-10 Support Plate Keeper Clamp Chute Wall 5 [H] From Chart A 1 Min. Sealing Compound Belt Installing Support Plates Always begin at the tail [rear] end of the conveyor and work towards the head pulley. Installation of sealing compound with support plate is done in the following steps: Check existing chute for clearances Remove old skirting Modify chute if required Mark chute for ClampMount support plates Install ClampMount Install sealing compound ASGCO Mfg., Inc. 9 CLAMP MOUNT SYSTEMS

CHART A Bottom Height [H] of Support Plate Skirt Width 35 idler 45 idler 6 2½ 3¼ 8 3½ 3¾ 10 3¾ 4¼ 12 6 6¼ Keeper Chute Wall Line H Belt Support Plate 1. Before proceeding with the installation of Clamp Mount with Support Plates, you must remove a small portion of the old skirting system and check that you have at least I" to 1½", of clearance between the bottom of the chute wall and the belt surface. If you have more than 1½", then, you will have to fill in along the chute wall with more steel to get 1" of clearance. 2. Remove the existing skirting system. If needed, modify the chute for the proper clearances (above). Clean the chute wall at and below the approximate location of the support plates to insure a good weld and correct clamping force onto the sealing compound. 3. Beginning near the tail and working toward the head pulley, measure from the belt surface up the given height [H] from Chart A. As an example, for 6" high sealing compound on 35 degree idlers you would measure up from the belt 2½". Mark the chute wall with [H] every four feet for the length of the skirting required. Connect these marks with a chalkline. 4. Put the bottom lip of the support plate on line [H] and weld it with three equally spaced 2" bead welds TOP and BOTTOM. Butt the next support plate and continue the process for the length of the skirting system. NOTE: If there is a gap greater than 1/8" at the and below butt joint (due to an obstruction or change in elevation), cut one of the support plates for a tighter fit. ASGCO Mfg., Inc. 10 CLAMP MOUNT SYSTEMS

Installing Clamp Mounts Trackeepers Pivot Adjusting Nut Sealing Compound Clamp Mount Support Plate Blade Handle 1. At one end Of the first Support Plate; place a tape measure on it, measure from the bottom up 5,mark the distance and label it [K]. Repeat the process on the other end of the Support Plate. Draw a line connecting the marks [K] and label it Line K. 2. Assemble one Clamp Mount. Position it with the bottom of the keepers along Line K and one end at the leading edge of the first Support plate (beginning of the skirting system). 3. Mark an outline of the keepers on the Support Plate. 4. Position the keepers within the outline you marked on the chute wall. Beadweld the bottom and sides (and top, if possible) of each keeper to the Support Plate. 5. Repeat the measuring marking and welding process for the complete length of the skirting system. Cut blade to match the change in angle of elevation of the belt ASGCO Mfg., Inc. 11 CLAMP MOUNT SYSTEMS

CLAMP MOUNT and TRACKEEPER Clamp Mount with Support Plate Instructions Parts List Description Clamp Mount I Clamp Mount II Trackeeper Track Filler Part Number M-ASG-CT-1 M-ASG-CT-2 ASG-TK-1 ASG-TK-TF Trackeeper is an adapter that securely fastens the ASGCO Clamp Mount Skirting System to an existing TRAC-MOUNT skirting system. NOTE: The Clamp Mount blade can be shortened to accommodate a change in belt elevation or at the end of the skirting system. However, equal amounts of blade must be cut off each end. Either saw [preferred] or cut [with a torch] off the extra blade section and paint the exposed steel to prevent rusting. The Trackeepers and Track Fillers are designed to slide into the slots of the TRAC-MOUNT. Trackeepers have a threaded bolt stud, Track Fillers do not. Installation Instructions I. Remove the existing rubber block sealing compound. 2. Begin at the tail [rear] end of the conveyor and hold a Clamp Mount along the TRAC-MOUNT and position one end of the blade where the skirting material will end. 3. Insert a Trackeeper in the TRAC-MOUNT slots closest to the clamp handle[s]. Clamp Mount I has one handle, Clamp Mount II has two handles. 4. Insert Track Fillers in the other slots. 5. Position the second and additional Clamp Mounts on two foot centers along the conveyor. Install Track Fillers in the open slots. ASGCO Mfg., Inc. 12 CLAMP MOUNT SYSTEMS ClampMount and Trackeeper are trademarks of ASGCO Manufacturing, Inc. TRAC-MOUNT is a registered trademark of Martin Engineering Co., Inc.

Installation of Sealing Compound Trackeepers Track Fillers Pivot Adjusting Nut 45 Sealing Compound Clamp Mount Handle Butt Joint Sealing Compound at 45 Blade 6. Lay the compound on the belt below the keepers. If the compound has a beveled edge, position the compound with the angle of the edge parallel to the belt angle. With a sharp knife, cut the sealing compound to the correct length, preferably in one piece. 7. When more than one length of sealing compound is required, cut the ends at a 45, angle. Position the 45 joint as close as possible to the center of the blade. Always make a 45 joint as smooth as possible. Never locate a 45 joint near the blade end or in the gap between blades. 8. Install the Clamp Mounts onto the Trackeeper. Position the pivot parallel to the blade, with its protruding ends sitting firmly in the notched portion of the housing. Tighten the adjusting nut to secure the Clamp Mount. Using hand pressure only, close the handle. 9. When all the Clamp Mounts have been installed, position the sealing compound so that it lightly touches the belt. Tighten the adjusting nut with a wrench. If the handle cannot be opened by hand - the adjusting nut is too tight. 10. Adjust the sealing compound by opening one clamp handle at a time and lower or raise compound until it touches the belt lightly, then close the handle. 11. In areas of high vibration or impact; install a locking cotter pin in the keeper after the sealing compound is in position. This will prevent accidental opening of the handle. ASGCO Mfg., Inc. 13 CLAMP MOUNT SYSTEMS

Sealing the Rear of the Chute Wall NOTE: When the belt is angled up at its sides, the blade ends and sealing compound must be trimmed to match the angle of the belt. IMPORTANT: A minimum 1 clearance is required between the clamp blade and the belt at all points in this installation. If the blade touches the belt, it could damage the belt or foul the operation of the conveyor. 1. Using a Clamp Mount as a measuring device, determine how many will be needed to seal the rear of the chute and how much [if any] of the blade ends must be trimmed off. Remember - equal amounts of blade must be cut off each end. Either saw [preferred] or cut [with a torch] off the extra blade section and paint the exposed steel to prevent rusting. 2. Position the Trackeepers and Track Fillers according to instructions I through 5. NOTE: If the sealing compound has a beveled edge, position the leading edge of the compound toward the head pulley. 3. Position the sealing compound according to instructions 9 through 11. Sealing The Rear of the Chute Wall ASGCO Mfg., Inc. 14 CLAMP MOUNT SYSTEMS

Information Key Description Part Number 1 Clamp Mount I M-ASG-CT-1 2 Clamp Mount II M-ASG-CT-2 3 Trackeeper ASG-TK-1 4 Track Filler ASG-TK-TF 5 Support Plate ASG-CZ-10 Call your ASGCO Distributor for any questions or replacement parts ASGCO Mfg., Inc. 15 CLAMP MOUNT SYSTEMS

TROUBLE SHOOTING PROBLEM New Sealing Compound Vibrates New Sealing Compound Squeals New Sealing Compound Gets Hot and Smokes Material Leakage Between Belt and Sealing Compound Skirt Sealing Compound flips to the Outside of the Belt SOLUTION At times new sealing compound is installed too tight against the belt and will vibrate until the excess force will also wear the surface of the belt, therefore the sealing compound should be raised until the vibration ceases. At times new sealing compound is installed too tight against the belt and will squeal until the excess compound wears away. This excess force will also wear the surface of the belt, therefore the sealing compound should be raised slightly until the squealing ceases. At times new sealing compound is installed too tight against the belt and will smoke due to heat build-up until the excess compound wears away. This excess force will also wear the surface of the belt, therefore the sealing compound should be raised slightly until the smoking ceases. Material and dust leakage is caused by small gaps between the sealing compound and the surface of the belt. Tighten the skirting against the belt. At times when the sealing compound is installed with the side of the belt flexing the wil, at times, mistrack enough that the skirting flips down outside the belt. Train the belt so as not to mistrack or install a training idler just before the belt comes around the tail pulley. ASGCO Mfg., Inc. 16 CLAMP MOUNT SYSTEMS