PPAP REQUIREMENTS. Revision: March Methode Electronics, Inc. G-MB of 12 Printed copies are not controlled.

Production Part Approval Process (PPAP) Marion Body Works, Inc.

Guideline for initial sample deliveries including initial sample test report to. Pankl Systems Austria GmbH. Systems

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations

GPSC Academy Leaders Teach & Leaders Learn. Supplier Technical Review Training Revision 1.0

CIRRUS AIRCRAFT FAI INSTRUCTION

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

(R) Aerospace First Article Inspection Requirement FOREWORD

Cover sheet ISIR (Initial Sample Inspection Report)

AS9102 Training. First Article Inspection Guide. Rev A

Section Meetings Section Material and Equipment. None Required

a. Does a written detailed procedure exist and is it utilized for the soldering process? Identify procedure number and revision.

DRAWING STANDARDS D01

Design For Manufacturing. Design Documents. Gage R&R DFM

COSPAS-SARSAT ACCEPTANCE OF 406 MHz BEACON TYPE APPROVAL TEST FACILITIES

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

QUALITY CONTROL INSTRUCTIONS

DNVGL-CP-0338 Edition October 2015

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

AAR SPECIFICATION M-214 INSPECTION CHECKLIST

VCE Product Design and Technology: Administrative information for Schoolbased Assessment in 2018

2017 EDITION. CLEARED FOR PUBLIC RELEASE Copyright 2017 Lockheed Martin Corporation. All Rights Reserved

(Non-legislative acts) DECISIONS

CHECKLIST FOR DESIGNATING AUTHORITIES DESIGNATION OF NOTIFIED LABORATORY. 1. General Requirement Complies Comments

SECTION SUBMITTAL PROCEDURES

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID

THE KENYA POWER AND LIGHTING CO. LTD. SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT

CONTINUED ON NEXT PAGE..

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

NZ China EEEMRA. Topics:

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Software Validation Considerations within Medical Companies per FDA 21 CFR PART 11

GENERAL DESCRIPTION OF THE CMC SERVICES

LOCOMOTIVE ENGINEERING DEPTT.

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES

Object: Aptiv external communication about Product and/or Process evolution. Raw material securisation (PA 6.6 worldwide capacity shortage)

Working Drawing Manual

Chrysler EMC/Electrical Laboratory DC-11224/5 & DC Self-Assessment

SEI Certification Program Manual

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

SUBDIVISION PLAT APPLICATION

REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03

TPS 49 EDITION 2 JUNE 2009

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A

VCE Systems Engineering: Administrative information for Schoolbased Assessment in 2019

SECTION SUBMITTAL PROCEDURES

PURCHASE DIVISION DEPARTMENT QUALITY MANUAL Revision No. : 02 Issue No: : 2 Dt of Revision : Issue Dt. :

Working Drawing Procedure

Content of Presentation

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

11-SDMS-03 REV. 02 SPECIFICATIONS FOR

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

Standards and Quality In Research Laboratories. By Geoff Visser SABS Research Fellow And Prof Roy Ramphal - UNISA

Type Approval JANUARY The electronic pdf version of this document found through is the officially binding version

TECHNICAL SPECIFICATION OF LT SHACKLE BOLT (G. I. BOLT) WITH NUT AND SPRING WASHER

This specification describes the general requirements for Engineering Services provided to Vale.

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

FIELD CORRELATED LIFE TEST SUPPLEMENT TO SAE/USCAR-2 SUMMARY OF CONTENTS 1. SCOPE OUTLINE REFERENCED DOCUMENTS EQUIPMENT...

Power Verification in Racks B and B950-02

APMP GUIDELINES FOR ACCEPTING A QUALITY SYSTEM(V.2.0 WD2) approved on July 2010

PowerAmp Design. PowerAmp Design EVAL195 EVALUATION KIT FOR MODEL PAD195. Rev B

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

Operator s Manual. PP016 Passive Probe

MIL- B Rev NAVSEA 0900-LP

This document is a preview generated by EVS

Accredited calibration of field strength meters

SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Edition

Report Number B0622. Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center

Plant Client Contract Code Document ID Contract No. TECHNICAL SPECIFICATIONS DC SHUNT Rev 00 Page 1 of 2

Norris Sucker Rod Project. Andrew Dickey, Justin O Neal, and Daniel Whittlesey

(AMMA) American Maritime Modernization Association

Thank you for your business. Sincerely, Jason Greeson

MATERIALS DIVISION MEMORANDUM

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 30 November Approved. Frank Mariot

Q16 - Engineering Directed Standard Tool/Perishable Tool Inspection Requirements

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Part 7: Thermography

Q16 - Engineering Directed Standard Tool/Perishable Tool Inspection Requirements

FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

Statistical Software for Process Validation. Featuring Minitab

UNPLATTED SUBDIVISION APPLICATION PACKAGE SUBMITTAL REQUIREMENTS

Notice of Advice. RevA: 18-September-2017 RevB: 26-September Engineering Assessment of Aurizon network's Capital Claim

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules. 45-day Formal Comment Period with Initial Ballot June July 2014

Lens Impact Resistance Testing Plan Revised,

VCE Media: Administration information for School-based Assessment in 2018

TECHNOLOGY QUALIFICATION MANAGEMENT

URBN Fabric Manual (Version 2 March 2016)

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules

The Statistical Cracks in the Foundation of the Popular Gauge R&R Approach

TYPE APPROVAL PROCEDURE

Lessons Learned in Integrating Risk Management and Process Validation

East Central College

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Standard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules

Transcription:

PPAP 3rd Edition Check List Supplier: PPAPKIT_F01 Rev. A (May_03) Date: Submission Level: Part #: Eng. Chg. Level: Reviewed By: Yes No N/A Comments 1. Design Records / Drawings 2. Eng. Chg. Documents On file / with Package 3.Engineering Approval Customer Eng. Approval 4. DFMEA, Design Responsible DFMEA present Format to 3rd or latest edition 5. Process Flow Diagram Production Process Flow Diagram 6. PFMEA High RPN's Addressed Corrective Actions in Place Format to 3rd or latest edition Includes entire process(receiving to shipping) Complete 7. Dimensional Results Dimensions Verified Complete and Acceptable 8. Material / Performance See Drawing notes Material Certificates Included Complete and Acceptable 9. Initial Process Study Initial Study Ppk / Cpk > 1.67 Complete 10. MSA Studies GR&R Studies completed Acceptable 11. Qualified Lab Documents Scope and Accreditation Certificate to ISO/IEC 17025 12. Control Plan Matches process flow Acceptable 13. Part Submission Warrant Correct Part Name & Number Purchase Order Number Signed and Dated 14. AAR Appearance Items 15.Bulk Material Checklist Specific Requirements / List 16. Sample Product Sample provided if applicable 17. Master Sample Retained w/ Approval Date Correctly Identified by Part # 18. Checking Aids Checking aids Required GR&R App'd 19. Customer Specific See Drawing notes section and supplier manual for specific requirements Are there any customer specific requirements? Are Parts identified properly? (correct label)

Dana Corp., Part Submission Warrant Part Name Part Number Government and/or Safety Regulation Yes No Engineering Drawing Change Level Dated Additional Engineering Changes Dated Shown on Drawing Number Purchase Order Number Weight kg Checking Aid No. Engineering Change Level Dated MANUFACTURING INFORMATION SUBMISSION INFORMATION Dimensional Materials/Functional Appearance Supplier Name Supplier Code Customer Name/Division Street Address Buyer/Buyer Code City State/Province Postal Code Application REASON FOR SUBMISSION Initial Submission Change to Optional Construction or Material Engineering Change Sub-Supplier of Material Source Change Tooling: Transfer, Replacement, Refurbishment, or additional Change in Part Processing Correction of Discrepancy Parts Produced at Additional Location Other please specify REQUESTED SUBMISSION LEVEL (Check one) Level 1 - Dana Warrant, Appearance Approval Report (for designated appearance items only) Level 2 - Dana Warrant, Parts, Drawings, Inspection Results, Laboratory and Functional Results, Appearance Approval Report. Level 3 - Dana Warrant, Parts, Drawings, Inspection Results, Laboratory Results, and Appearance Approval Report, Process Capability Results, Capability Study, Process Control Plan, Gage Study, FMEA. Level 4 - Per Level 3, but without parts. Level 5 - At Supplier Location Warrant, Parts, Drawings, Inspection Results, Laboratory and Functional Results, Appearance Approval Report, Process Capability Results, Capability Study, Process Control Plan, Gage Study, FMEA. SUBMISSION RESULTS Submitting: dimensional measurements material & functional tests appearance criteria? statistical process package These results meet all drawing and specification requirements: YES NO (if NO Explanation required) DECLARATION I hereby affirm that the samples represented by this warrant are representative of our parts, have been made to the applicable Production Part Approval Process Manual 3 rd Edition Requirements. I further warrant these samples were produced at the production rate of / 8 hours. IMDS DECLARATION We affirm that details of the materials used in these parts have been entered onto the IMDS and that the samples conform to all applicable government and safety requirements on restricted materials. YES NO (if NO Explanation required) IMDS Number: I have noted any deviations from this declaration below: EXPLANATION / COMMENTS Print Name Title Phone No. Supplier Authorized Signature Date: FOR DANA USE ONLY Part Disposition: Approved Rejected Other Representative Signature Date PPAP KIT Rev. B (March 04)

Feasibility Commitment Dana Locaton: Date: Part # Part description: Feasibility Considerations The following questions are not intended to be all-includsive in performing a feasibility evaluation. Drawings and/or specifications provided are for analysing your ability to meet specified requirements. All NO answers need to be supported with attached explanations, including proposed changes to meet specifications. Please respond to all questions. Yes No Consideration Is product adequately designed (application requirements, etc.) to evaluate feasiblity? Can Engineering Performance Specifications be met as written? Can product be manufactured to tolerances specified on the drawing? Can product be manufactured with Cpk's that meet requirements? Is there adequate capacity to product product? Does the design allow for the use of efficent material handling techniques? Can the product be manufactured without incurring any unusual: Cost fo capital equipment? Cost for tooling? Alternative manufacturing methods? Is statistical process control required on this product? Are you using statistical process control on similar products? Where statistical process control is used on similar products: Are the processes in control and stable? Are Cpk's greater than 1.33? Conclusion (check one) Feasible: Product can be produced as specified with no revisions. Feasible: Changes recommened (see attached.) Not Feasible: Design revision required to produce produce within the specified requirements Supplier Sign-Off List all team members Name Title Date PPAP KIT Rev. B (March 04)

Dimensional Test Results Page of PART NUMBER NAME/LOCATION OF INSPECTION FACILITY PART NAME ITEM DIMENSION/ SPECIFICATION MEASUREMENTS NOT COMMENTS (Dana use only) Submitted by: NAME TITLE SIGNATURE DATE PPAPKIT_F03 Rev. A (May_03)

Material Test Results Page of PART NUMBER NAME/LOCATION OF LABORATORY PART NAME TYPE OF TEST MATERIAL SPEC. NO./ DATE/ SPECIFICATION TEST RESULTS NOT COMMENTS (Dana use only) Submitted by: NAME TITLE SIGNATURE DATE PPAPKIT_F04 Rev. A (May_03)

Performance Test Results Page of PART NUMBER NAME/LOCATION OF LABORATORY PART NAME REF. NO. REQUIREMENTS TEST FREQ TEST QTY. TEST RESULTS AND TEST CONDITIONS NOT COMMENTS (Dana use only) Submitted by: NAME TITLE SIGNATURE DATE PPAPKIT_F05 Rev. A (May_03)