Joint Preparation prior to Tensioning: General:

Similar documents
Fluid Sealing Association

Practical Bolting and Gasketing for the Non Standard-Flanged Joint

4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL

MSR/MSB Mechanical Setting Tool

Reliance SG800 Series Steel Water Gage Valves

MECH-100: Fundamentals of Precision Maintenance

Live Loading Of Flange Joints To Prevent Leaks And Reduce Fugitive Emissions. W.C.Offutt P.E.

PROCEDURE:INSTALLATION OF BOLTED AND THREADED CONNECTIONS. as a result of improper lifting technique.

DRIVE COMPONENTS REMOVAL. 9. FXCW/C: see Figure Remove bolt (9), sprocket retainer (8), and thrust washer (7). NOTE PRIMARY DRIVE LOCKING TOOL

9 METHOD COVERED FOR BOLT TORQUING & TENSIONING

Small Block Ford. 289 / 302 / 351W / 5.0 Installation Manual For Systems with A/C #13600 / #13620

USER MANUAL MODEL MZ-100 BOLT TENSION CALIBRATOR

SERVICE INSTRUCTIONS Model 9670 Lubricant Pump

Hydrajaws Safety Lifeline Tester

Fisher 667 Diaphragm Actuators Size 80 and 100

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models

NTTC Tank Truck Week Awareness Gaskets/Fasteners/Flanges

UNIVERSITY OF THESSALY

INSTRUCTION MANUAL IM 251 For Gas Turbine Tensioned Studs and Nuts VENDOR SUPPLIED

SYGEF Standard SYGEF Plus PVDF Flanges

ZipTENSIONER Wind Turbine

LS7 CHEVROLET TOP MOUNT Installation Manual For Systems with A/C #13460 / #13490

Type XTSR71 Sizes

LPK1550 Hydraulic Crimping Tool 15-ton

Power Train Lift Max. Capacity: 1,250 lbs.

INSTRUCTIONS 360 CHAINROLL

MSR/MSB Mechanical Setting Tool

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extension Sections. Reliable Connections

INSTRUCTION MANUAL IM 382 For Gas Turbine Tensioned Studs and Nuts CUSTOMER'S INFORMATION BOX CONTENTS ARE INDEPENDENT OF RIVERHAWK DOCUMENT CONTROL

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket.

25000 Series Lo-T TM Butterfly Control Valve Instructions

Motorized M3 AX7200 Rotary-Style Gasket Cutter Operating Instructions

MTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1.

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT

PORTABLE PULL TESTER

Figure 11 Flange Adapter and Back-Up Ring

The Virgo/Libra Steam Engine

4" (DN 100) 5RET Tank Car Fire-Tite Bottom Unloading Valves. Installation, Maintenance and Operating Instructions

BOLTIGHT HYDRAULIC BOLT TENSIONING TIGHTEN BOLTS SIMULTANEOUSLY TO ENSURE EVEN PRELOAD

BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G10 SERIES HYDRAULIC SPRING RETURN ACTUATORS WITH M11 HYDRAULIC OVERRIDE

SPECIFICATION FOR HIGH STRENGTH STRUCTURAL BOLTS

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections

Fisher 667 Diaphragm Actuator Sizes 30/30i 76/76i and 87

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward.

INSTALLATION MANUAL FOR STAINLESS STEEL, GROOVE-END, FLEXIBLE COUPLINGS

Big Block Installation Manual For Systems without A/C

Setup & Operating INSTRUCTIONS. for (FOR PIN FITTING AND ROD RECONDITIONING)

SHBP10M HYDRAULIC PRESS WITH MANDRELS

HYDRAULIC NUT SPLITTER

Auto-Spreader Spreader HS10K Hydraulic Flange Spreader

Chiltern Model Steam Engines

MTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1.

AutoSPLITTER STRAIGHT HEAD MODELS

MetFit MECHANICAL FITTINGS

Hydraulic Portable Nut Splitter

Small Block Ford. 289 / 302 / 351W / 5.0 Installation Manual For Systems without A/C #13605 / #13625

AF-4 Grooved Flange Adapter

Clocking a TD-04 Turbo Compressor Housing. Appendix A : AWIC Silicone and Tubing Fitting

Reliance SG777 Series Steel Water Gage Valves

JARVIS. Model Brisket Scissor EQUIPMENT... TABLE OF

Band-Master ATS Nano Pneumatic Banding Tool Operating Instructions

TECHNICAL INSTRUCTIONS

25 TONNE HYDRAULIC PRESS MODEL NO: AHP 26

Pack Mount Instructions:

Bolt Tightening Solutions Torque and Tension, we ve got got it covered.

H8508 Impact Wrench SERVICE MANUAL. Model (Serial Code FWN) Model (Serial Code FWP)

General Four-Way Operation, Maintenance & Service Manual

Procedure for Consolidated Undrained Testing of Soil. 1. Pre-soak the porous stone for the upper and lower platten.

VALVTECHNOLOGIES, INC. INSTALLATION, OPERATIONS & MAINTENANCE MANUAL STEAM CHOKE VALVES

HANDHOLE SEAT GRINDER

Product Overview. Model RP-2 ( ) Utilized poppet style checks and a CDHS-20 relief valve.

Ruby 0-4-0T Kit Assembly Instructions

INSTALLATION INSTRUCTIONS

Additional Information

Repair Manual MK40A-MK45A-MK50A MK55A-MK60A-MK65A. Ref Rev.C General Pump is a Member of The Interpump Group

Caution: Installation and Operation Instructions. Locking Mechanism (if supplied) Set Screws Backed Out. Mounting Orientation

Castle Frame Assembly Table AT-8. Diagnostics Manual. Castle, Inc. Petaluma, CA

REPLACING THE CAT SEAL IN THE 90AD EXTRUDER

Installation Instructions

Service installation of hardtop Installing hardtop

GP-SD GENIE PROBE SMALL DIAMETER

I-W07/W77. Couplings DETAIL A WARNING. Photo Showing Pipe with Weld Seam Ground 6 inches/152 mm Back from Pipe End and an AGS Groove

CV Control Valves Installation and Operation Manual

Click Here to Go Back

Removing Right-Side. Components. Right-Side. Components. Click Here to Go Back AT THIS POINT

Gasket Installation Procedures. Assuring! joint integrity and! maximum safety

400 SERIES GRINDER PUMPS 41502, 42202,43302, AND MODELS

Structural Bolting. Notice the Grade 5 has a much smaller head configuration and a shorter shank then the grade A325 structural bolt.

Before assembly is started, all working surfaces shall be cleaned and visually examined.

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

4.2 - PUMP MAINTENANCE MODELS: AC, AS, WC, WS

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard

LS1/LS6 CHEVROLET Installation Manual For Systems without A/C #13405 / #13425

HOW TO TUNE A QB SERIES CO2 AIRGUN FOR NOOBS.

1/2 2 (DN 15 50) Standard Bore Series /2 1-1/2 (DN 15 40) Full Bore Series 9000 Flanged Ball Valves with ISO Bonnet

Transcription:

`Hydraulic Tensioner Procedure for 50% tensioning: Document: PWL-HTS-101 Joint Preparation prior to Tensioning: General: Clean Flanges and check for scars on the flange surface area Check studs and nuts for: size, material, specifications and cleanliness (Clean rust, paint, etc. with a wire brush) Remove burrs from all threads of studs and nuts If one stud is replaced all studs must be replaced (if the studs are being re-used) Gaskets to be checked for size and PROPER SPECS. No substitutions. Metal gaskets must be free of grease, etc. Install without tape/gook, etc. Check flange where nut makes contact. Area must be clean and smooth. Flanges must be parallel and gaskets inserted according to approved procedure. Flanges will be mated using the approved procedure as follows: Two bolts shall be installed diametrically opposite each other, and one bolt halfway between the previously installed (for flanged joints in horizontal line, one on the underside) for retaining the gasket. The nuts shall be engaged. The gasket shall be inserted, and centered between the flanges. Nuts shall be hand tightened to hold the gasket in place. The remaining bolts and nuts shall be installed with the flange faces parallel. Care shall be taken to ensure proper centering, seating and sealing of the gasket within the allowable tolerances. Make sure flange is relatively stiff Use ¼" thick hardened steel washers on both ends of studs when installing new bolts. Check flange alignment: Tolerance limited to 3/32" up to 24" flange diameter and 1/16" on flanges greater than 24". Lubricate if specified on the washer (side touching bolt), bolt threads and inside nut threads. Procedure for Tensioning using 50% Pullers (i.e.: One puller on every other stud, and performing two steps to ensure proper tensioning). (1.0) Prerequisites for assembly of tools: (1.1) Ensure that all the bolts have been assembled into the joint as per the above-mentioned procedure and the nuts fitted hand-tight. (1.2) = Ensure that the Tensioner Pump, the Complete Tensioner (including the Ram, Adaptor Kits,

Spare Seals, Sockets, Tommy Bars, Pullers, and Bridges) are available for the particular sized flanges and studs. (1.3) Ensure that the tightening sequences and all procedures and application documents have been approved. Note: It is advisable to tighten the nuts down as much as possible by hand so as to avoid slackness in the joint assembly, as it will take longer to tension the bolts using the tools. (2.0) General information for Tensioning: 2.1. This procedure is for the use of: (a) All flanged joints with a stud diameter of 2" and above. (b) All flanged joints wit a bolt diameter of 1-1/2" and above in a critical service as defined by the owner or purchaser. (c) Shell and Heat exchanger flange assemblies with a bolt diameter of 1" and above. (d) Any flanged Joint with a bolt diameter of 1-1/2" and above, which can not be hydro-tested because of a construction or hydro-test boundary defined by the owner or purchaser. (e) Any other applicable equipment flanges defined by the owner or purchaser. 2.2 Approval of the Tensioning procedure as per Portable Works Limited's "Tensioning procedure MUST be given in writing by the Plant Owner and/or Contractor. 2.3 Using the PWL Bolt Tensioning Application Sheet (known as BTAS) that details the (1) Line number, (2) Flange details, (3) Bolt Load Calculations, and Pump Pressures in accordance with Aztec Bolting specifications (4) Equipment Make/Model/Type, Readout/Range/Accuracy, (5) Calibration Certificates, (6) Training Certificates for the operators, (7) Bolt Stretch Measurement Technique, and (8) Quality assurance plan And thereafter, proceed with the sequence of steps as detailed below. 2.4 When using Tensioning tools to achieve the correct final tension, each bolt must be as often as required "tensioned" until the application of the calculated oil pressure results in no further bolt extension (i.e.: until the nuts can not be turned any further whilst the tools are at the calculated working pressure). 2.5 If, During the application of pressure the tools attain their maximum permissible piston stroke BEFORE the calculated working pressure is reached, then the nuts must be tightened down at this point and the tools reapplied.

2.6 This means that even if every bolt in a joint is tensioned simultaneously, the bolts MAY NEED to go through more than one tensioning cycle. 2.7 In the case when only a few of the bolts in a joint are simultaneously tensioned regardless of whether maximum extension is achieved prior to working pressure, it is fairly certain that more than one pressurization cycle will be required. 3.0 Recommended Procedure for Testing the "Tensioners" prior to executing the Tensioner PROCESS: (3.1) The Nuts will have been hand tightened, with lubrication and have one stud diameter of thread extending above the nut or two stud diameters of additional threads extending above the flange face to accommodate the tensioning equipment. (3.2) Using Chalk or Metal marker, starting with the Stud/bolt located at right-most to the Stud/bolt at 12 O'clock, mark this as BOLT#1, Then the stud located to the right of the Stud/Bolt #1, will be Marked as BOLT#2. The bolt pattern is continued as Bolt#1,Bolt#2 and 1,2. Around the flange. The number of tools is half the number of bolts. (3.3) The studs are Numbered nuts for identification and control as per the steps listed below. Tension pattern is noted as one tensioner (Set #1) is to be applied on every-other-stud (50%). (3.4) Before installing the tensioner check to see that there are enough threads above the nut to properly engage the puller and that the nut runs freely on the stud past its point of travel. (3.5) Remove the puller from the tensioner assembly. Remove the socket from the tensioner assembly. The bridge and ram (load cell) remains complete. (3.6) Thereafter, install hex socket, then the RAM (Load cell assembly) with the bridge over one of the studs starting at 12 O'clock (Set #1). The Hydraulic fittings must point away from the center of the flanged joint. The Ram has a "window" which should be facing away from the flange and be free of interferences. The socket should be clearly seen. Place the Puller (threaded insert) into the bore of each load cell. Mate the threads and screw the thread insert onto the bolt until it tightens down onto the load cell sufficiently to hold the tool in place. (3.7) Connect the link hoses to the tensioners installed on the flange

(3.8) When the interconnecting link hoses are attached to each tensioner unit, it is necessary further screw the puller down until there exists no gap between the top of the tensioner and the puller. THEREAFTER, back off the puller 1/8 of a turn so as to give the ram some space to breathe when the oil is pumped into the Tensioner so that the tensioner will move on its own before getting resistance from the puller. (3.9) Fit the Tee Block on the tensioner nearest the pump (3.9.1) = Close the oil pressure release valve (G) on the pump unit (By Rotating clockwise). (3.9.2) = Very SLOWLY, open the pump unit air "On/OFF" valve (F), by rotating anti-clockwise. As this is done, the pump will begin to operate. After, a short time the pressure gage (B) will begin to register pressure. CONSTANTLY monitor the oil pressure. IF EITHER the operating oil pressure or Maximum piston extension is reached then stop the pump immediately, by closing the "On/OFF" valve (F) by rotating clockwise. Take the Pump PRESSURE UP TO 5,000 PSI. This is the "Test Pressure" at which we test the hose lines at 5000 PSI (to see if the lines leak). (3.9.3) = Check ALL fittings and make sure they are all tightened. If no leaks then proceed to next step. 4.0 Performing the Tensioning PROCESS: (4.1) Increase Pump Pressure-to-Pressure A (which has been given/known and verified by the Bolt Tensioning Application Sheet-BTAS). The stud will stretch to the desired elongation, and the Nut face will move from the flange face. The tensioner must pull the stud STRAIGHT. It cannot be cocked. (4.2) Using the "Tommy Bars" insert into the Tensioner socket provided and Tighten the nut (clockwise) to meet the flange face. This step must be performed on all the studs that are fitted with a tensioner until all the nuts are tightened. (4.3) Then very slowly open the oil pressure release valve (G) on the pump unit. The oil pressure registered on the gage will fall to zero. For RING TYPE joints the tensioner pump pressure must be held longer to achieve proper GASKET COMPRESSION. (4.4) Perform steps (4.1) and (4.2) and (4.3) two more times to compensate for gasket compression

and therefore relaxation. When tightening the bolts be sure the nut is run up completely before you relieve the hydraulic pressure. (4.5) Disconnect the link hoses attached to the tensioners. At this stage there will be a gap between the piston and the load cell body indicating that the piston extension is attained. THIS gap must be returned to zero by manually tightening down each insert with the "Tommy Bar". (4.6) Unscrew and remove each puller (thread insert), and remove the Tensioners (puller, bridge, socket and ram) and begin assembly onto the other studs (Set Number 2) (4.7) Perform 5000 PSI pump pressure test on all hose connections as per step (3.6) to (3.9.3) above. (4.8) = Increase Pump Pressure to Pressure B (which has been given/known and should be 2000-3000 PSI below Pressure A or 20% less than Pressure A) as per steps (4.1) to (4.3) above. Tighten the nut to meet the flange face and release the pump pressure as per step (4.1), (4.2) and (4.3) USING Pressure "B" instead of pressure "A". (4.9) Perform steps (4.4) two more times to compensate for gasket compression and therefore relaxation (5.0) Inspection and verification: (5.1) Inspect the joint for uniform bolt loading. a) The gap between the flange faces shall be measured at 0/90/180/270 degrees to check for alignment. b) After Hydraulic Stud Tensioning the extra length of thread extending above the nut shall be protected using an extra nut, which shall be backed off from the "Engaged" nut. (5.2) The Both sets of studs have to be verified to determine that the Pressures A and B produce the desired result. Therefore: - Move one of the Tensioners that is STILL on Set #2, to one of the studs of set #1. - To make room for this tensioner on Stud#1, remove another tensioner (on Stud#2) on the other side of Stud#1. (5.3) Check the hose connection at 5000-PSI Then Gradually increase the pump pressure TO the point where the nut becomes SLACK.

(5.4) This BREAK-OUT pressure. It (Pump Pressure Break-Out or P(b-o))should be less than Pressure B and should not exceed Pressure A. If either of the above happens: - Move the One tensioner Back to set 2 and input Pressure A to all this set three times in all. - Then move all tensioners to Set 1 and test at 5000 PSI. - Then input Pressure B three times. - Check breakout pressure. It should now be between Pressure A and Pressure B. IF BREAK OUT Pressures are not Between A and B as a result of Not enough elongation (in the instance of NEW studs) THEN Input The Tensioner Steps #1 and Steps #2, three times. That is; Use "A Pressure" sequence, then "B Pressure" sequence, then go back to "A" and then to "B" and finally to "A" and then to "B". (5.5) On Completion of Work: 1. The application data sheets shall be signed 2. Assessment of the initial condition of the joint shall be documented. 3. Measured Elongation of the reference bolts shall be documented 4. Flange Gap measurements shall be documented 5. Calibration certificates shall be documented. 6. The PWL Bolt Tensioning report form will be completed and signed. 7. 10% of all flanges will be tested to verify the preload stress values and post load stress values by method of Stud Elongation. Note: Tensioning is inaccurate for low load applications Tensioning requires that the threads be in good condition Tensioning is not suitable for high yield (where the Residual Bolt Load) nears the yield strength. The above Procedure is given by Portable Works Limited and is endorsed by the "Engineering Construction Industry Training Board (UK Unit No.:PF015) as per the "Best Practices Method for the Assembly and Tightening of Bolted Flanged Connections", as well as the Standard Procedure adopted by "Aztec Bolting Services", world leaders in Bolting Solutions. Reviewed and Approved For an on behalf of Portable Works Limited Shaun Spiers Managing Director, ECITB (UK) Certified Unit No. PF015 Revision: 01 Date: 14th June 2002. Prepared by: Shaun Spiers (ECITB Certified, Unit No.Pf015)