Photo-Guide (ZE & ZE )

Similar documents
Section 6-T-3 Elevator

Section 75-ZA-2. Rudder Mounting

STOL CH 701. Clamp a reference extrusion on the bottom of the spar. Clamp the bottom flange of the rib to the extrusion. Rear Root Rib 7V4-2

CENTER WING SECTION (CWS) WORK REPORT

ZODIAC CH 601 Series Kit Aircraft

Section 75-AA-1. Flaperon Assembly

ZODIAC CH 601 Series Kit Aircraft

Elevator Assembly. To assemble the SR3500 Elevator, you will need the following tools:

Horizontal Stabilizer Service Bulletin

REAR FUSELAGE ASSEMBLY

16. Wing Final Assembly and Installation

75-TA-4. Elevator Skins

Three vertical L angles must be riveted to each main spar (length = 206mm see boxed diagram on drawing 7-V-2).

ZODIAC 601 XL. REAR RIBS 6W6-1 to 6W6-9. Reference to drawing 6-W-00 for orientations of ribs flanges. Rear ribs are tapered: rib #9 is the shortest.

Section C75-WA-1. Wing Skeleton

FORWARD FUSELAGE SIDES & REAR TOP SKINS

Section 6-B-4 Rear Fuselage Riveting

ZODIAC 601 XL. ZODIAC CH 601 Series. Parts are labeled for easy identification with a part number and description:

SERVICE BULLETIN

Section 75-SA-1 Slat Section

Section 6-B-6, 6-B-7, & 6-B-8 Firewall Assembly

Section 75-FA-5. Firewall Assembly

SERVICE BULLETIN

Section C75-FA-2 Top Fuselage Skin & Rear Fuselage Assembly

WING ASSEMBLY 23.5 (Continued)

Section 75-FA-2 Top Fuselage Skin & Rear Fuselage Assembly

11) Chromate the mating surfaces of the Leading edge Root Rib, Doubler and Root Rib Stiffeners. Rivet together with 1/8 rivets (RV-1410).

STOL CH 701. Layout the cut line along the bend tangent line on the web. 7V6-1 and 7V6-2SP

ZODIAC CH650. ZODIAC CH 650 Series. Parts are labeled for easy identification with a part number and description:

STOL CH 801 SECTION 2: Nose Rib 8R1-7

ZODIAC CH 601 Series Kit Aircraft

2.1 Parts List Tool requirement Before you start assembling the Stabiliser Front Spar Center Doublers...

FLAP AILERON FLAP / FUSE SEAL KIT

STOL CH 701. Standard L ANGLES are supplied in 4ft length. Ref. bottom left diagram on drawing 7-V-2

Page: REV 2: Added "Step 1: Straighten the W-0007B Rear Spar Reinforcement Fork as described on Page 10-03, Step 4."

10. Wing prep and subassembly

STOL CH H3-3SP Center Hinge Bracket. IMPORTANT: The Bracket 7H5-3SP is not symmetrical

STC GROUP LLC 480 RUDDIMAN DRIVE MUSKEGON, MICHIGAN REPORT NO: G REV E TRIO AUTO PILOT INSTALLATION INSTRUCTIONS

Cut the center and pre-drill the Hinge Plate. Do not drill the Rudder Hinge hole at this time.

Check the jig with the Slat Ribs. Notice the front tip is cut off, this will allow the slat to fit in the jig correctly.

77.5 degrees REAR CHANNEL PLYWOOD TEMPLATE

ZODIAC 601 XL. Detail of outboard end. Full length recessed elevator trim tab. Detail of inboard end. Trim tab along left trailing edge of elevator.

STANDARD CANOPY WORK REPORT B-1

Chap. 9.2 SR3500 Fuselage Assembly - Cabin. MODEL: SR Murphy Aircraft Mfg. Ltd. All rights reserved.

9.3 FUSELAGE ASSEMBLY 14/03/02

Flaperon Assembly Manual

FLAPERON ASSEMBLY. Ref. Drawing 8XA-1 Exploded view SECTION 1 REAR SKIN AND NOSE RIBS ASSEMBLY

IMPORTANT - STATE AIRCRAFT REGISTRATION NUMBER IN ALL CORRESPONDENCE MOONEY AIRCRAFT, INC. M-l8 SERVICE LETTER NO.17

WING ASSEMBLY SECTION 4. Mounting Wing Ribs to Main Spar. 1. Identify the proper locations for those ribs with attachment brackets.

Ch. 9.0 ELITE FUSELAGE ASSEMBLY 14/02/2003

Section 75-CA-3. Rudder Controls

12. Wings, Flaps, Ailerons and Struts

Metal Aircraft Landing Light Installation Instructions

REVISION DESCRIPTION:

ZODIAC 601 XL. Outside Flashing 6C3-3. Mark the no rivet zone for Extrusion Handle 6C3-8

SERVICE BULLETIN. No. SB-AG-45 Rev. B JUNE 1, 2007 FIN SPAR & ATTACH FITTINGS INSPECTION AND UPGRADE IMPORTANT:

SE5a Wing Panels rev 1.0

STOL CH F2-2 Side Skin

Zodiac CH 601 XL drawing revision log, updates included in 4 th Edition, January 1, 2008.

RESolution V2 Manual

STC GROUP LLC Page Ruddiman Drive PA-28 & PA-32 Trio Pro Pilot Installation Instructions North Muskegon, Michigan 49445

ZODIAC 601 XL UPRIGHT CHANNELS 6B5-6. Top and bottom outboard flange is joggle to overlap the.093 extrusion 6B2-3 and 6B11-1

American Champion Aircraft Corp. Rochester, WI Page 1 of 5

Ford Ranger / Bronco II Set Part # Rev B 5-04

After the canopy hinge is square with the firewall and the nut plates are installed you can set up the hinge mounts. Start by clamping a 1/16 tongue

STC GROUP LLC 480 RUDDIMAN DRIVE NORTH MUSKEGON, MICHIGAN REPORT NO: REVISION H

FUSELAGE CONSTRUCTION

CHEVY 4100/4400 SUPERRAIL MOUNTING KIT WITH ADAPTER FOR B&W GOOSENECK PART #4434

STOL CH st Edition 1 st Revision Drawings Summary of changes from Edition 1 to Edition 1 Revision 1.

JAMISON SPECIAL. Building Guide

STC GROUP LLC 480 RUDDIMAN DRIVE NORTH MUSKEGON, MICHIGAN REPORT NO: REVISION A

Air Research Technology Inc. WING-X STOL Installation Guide NO: for kit(s) #R-1582,1582-1,1582-1CS,1582-SS

SERVICE BULLETIN

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

Page: REV 1: Step 5 and Figure 5 updated to better describe the potential necessity of modifying a rivet squeezer yoke.

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

Pre-Paint>Wings>Fit ailerons. Objectives of this task: Materials and equipment required: Size the ailerons and pre-mould strips

Ford Pick Up Rear leaf Spring Kit Installation Instructions

STC GROUP LLC 480 RUDDIMAN DRIVE MUSKEGON, MICHIGAN REPORT NO REVISION D TRIO AUTO PILOT INSTALLATION INSTRUCTIONS

Citabria Pro. Aerobatic Parkflyer. by Joel Dirnberger

MMD Convertible Styling Bar Customer Installation Guide

REAR FUSELAGE ASSEMBLY

Section 6-K-1 Fuel Sender Unit Installation

STOL CH nd Edition Drawings July 20, 2010 Summary of changes from Edition 1 to Edition 2.

Piper Cherokee /3 scale. Construction Manual

2000 Tomlynn Street P.O. Box 6861 Richmond, Virginia / FAX 804/ Service Bulletin

SZD-10 bis CZAPLA ASSEMBLY MANUAL IN PICTURES

FORD 4100/4400 SUPERRAIL MOUNTING KIT WITH ADAPTER FOR B&W GOOSENECK PART #4431

INSTALLING YOUR NEW SPRING LIFT ARM KIT

BMW X5 OEM RUNNING BOARD PART#SBBW

Rev: 01 Sept Technical Support: 01 Sept Evo Wing Assembly. F1 Evo Assembly Manual Chapter 6

Set Part # Rev

CHEVY 4100/4400 SUPERRAIL MOUNTING KIT WITH ADAPTER FOR B&W GOOSENECK PART #4432

Super Sky Surfer 2000 Assembly Instructions

INTERCOOLER UPGRADE INSTALLATION INSTRUCTIONS PART NUMBER D APPLICATION: F87 M2

STC GROUP LLC 480 RUDDIMAN DRIVE MUSKEGON, MICHIGAN REPORT NO: REV - TRIO AUTO PILOT INSTALLATION INSTRUCTIONS CESSNA MODEL 182

Land Rover Defender 90/110/ th Anniversary Style Front Cage Fitting Instructions

Building Tips This model can be built using the following types of adhesives:

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR

Please read BOTH these Installation Instructions and the General Towing Instructions before attempting to install or operate this equipment.

Transcription:

Photo-Guide (ZE-2009-05 & ZE-2009-07) The following photo-guide is for educational purposes only. It is intended to assist owners and/or aircraft mechanics with the installation of elements from from 6Z-1G and 6Z-2G as part of Service Letters ZE-2009-05 and ZE-2009-07 for the ULM version of the Zenair CH. Other photo-guides (also available from ) address other aspects of the ULM upgrade package. The methods and sequences proposed in this guide are suggestions only; they were developed by experienced builders to simplify the installation process of these upgrades. Notes: 1) Photos depict scenes from both Right & Left wings and from various angles to best illustrate the instructions being given. 2) By following the procedures in this photoguide, no new inspection hole will be required in the wing to install the required parts. If un-explained variations and/or unclear discrepancies between the photos and the drawings are found, the drawings take precedence and should be followed. A note about the parts: Parts supplied in the Zenair kits are of correct material, have all the necessary bends (with grain in proper direction), and are of approximate size to ensure proper fit. Because there are often slight differences between airplanes, holes are not pre-drilled in these kits and cut-outs will need to be made so that each part fits each aircraft just right. The installer needs to fit and trim as necessary and file & finish all sharp edges and corners. Also, remember to de-burr all holes prior to final assembly. Application of Zinc chromate (or similar) is optional. For more information on allowable tolerances and on building standards applicable to Zenair designs, see Construction Standards for Zenair Light Aircraft available from the Builder Section of the Zenith Aircraft website: www.zenithair.com To better serve aircraft builders and owners everywhere, Zenair reserves the right to modify and/or update its photo-guides at any time and without notice. Check website for latest edition of guides. Drwg. 6Z-1G & 6Z-2G Page 1 of 25.

Inspect and inventory all the parts in your upgrade kit. Drawings are available on-line with the Service Letters at: Disconnect the ailerons from the aileron-rods for each wing. If installed, remove trim motor access-hole cover. Cut wires in order to allow for removal of aileron. Note: Label before cutting. Page 2 of 25.

Drill and remove the entire rivet line that holds the ailerons to the wings. Drill and remove the entire rivet line that holds the flaps to the wings. Carefully remove the ailerons and then the flaps from both wings. Page 3 of 25.

Drill out and remove the rear-spar root-doubler. Note: If rivets are installed from the inside, shear off the protruding back-ends and use the drill to remove remaining rivet. Drill out and remove rivets holding the rear spar to the rear ribs. Drill out and remove all remaining rivets holding rear spar to wings. Remove the nut and bolt at rear-spar attachment bracket. Page 4 of 25.

Remove entire rear-spar from wing. Caution: this piece is very flexible and easily damaged when not properly supported. Locate aileron bellcrank and remove bolt at nearest cable connection. Locate original bellcrank support channel (6W6-10) and remove all rivets. Note: Channel flanges may be bent to facilitate access to rivets If desired, bellcranks may be detached from their support angles (6W6-11) prior to removal of the rivets. Page 5 of 25.

Use the original Channel as a template to trim new parts (6Z-1G-1) to correct size, and to locate new rivet holes. Recommended: Only drill one positioning hole at each end; then use holes in actual rib for remaining hole locations. Use tin snips to trim parts to size. Smooth-out all rough edges and round sharp corners with a file. When drilling out a rivet, remove head first, then pull remaining part out from behind. Accumulated heads can be removed from the drill bit using a pair of pliers, as illustrated above. Page 6 of 25.

Measure the distance between ribs and cut four appropriate lengths of L angle (see drawings for locations). Attach two L angles to the U Channel with 2 rivets each. Caution: the two L angles will NOT be parallel due to wing taper. Trace a line down the center of the L angle flange (to be located later through holes in skins). Page 7 of 25.

Trace a line on the top and bottom surface of each wing, to mark the location of the L angles. Location is set by the L angles attached to the Bellcrank Support Channel. Mark the location of the rivet holes along the lines (pitch 40 between ribs 6 and 7; pitch 50 between ribs 7 and 8). Drill holes through skins. Note: support skin from below while drilling (i.e. with a piece of wood). Page 8 of 25.

Position the L angle inside the wing so that you can see the center-line through the holes in the skin. Drill and use clecos to hold parts in place while drilling rest of holes Remove all parts again to deburr holes and to file sharp edges and corners. Page 9 of 25.

Application of Zinc Chromate (or other corrosion inhibitor) is optional. If used, apply lightly. Clean out all loose rivetheads and other filings, dust, etc. Use of a vacuum cleaner is recommended Rivet the L angles to the Bellcrank Support Channel and position entire assembly back into wing again, using clecos. Page 10 of 25.

Once in position, rivet all parts in place. Once all parts are riveted in place, re-install aileron bellcrank and re-connect the cables. Recommended: Grease all bearing surfaces and rodends. Page 11 of 25.

Remove all drilled rivets, burrs, filings, etc. from skins and rear rib flanges. Position and clamp the Rear Channel Doubler (6Z-2G-3) to the rear spar at root. Back-drill through flange, and cleco in place. Back-drill through rear-spar web and cleco in place. Page 12 of 25.

Use a square to mark location of three new (additional) rivet holes. Location of Rear Channel Doubler with markings for new holes/rivets. Always refer to drawings for correct rivet size and locations. Drill holes for new A5 rivets. Page 13 of 25.

Mark a center line on the Aileron Rod Hole Doubler (6Z-2G-2) Position and clamp the Doubler on the rear spar. Back-drill holes along flange. Cleco in place. Page 14 of 25.

Back-drill through existing holes along web. Cleco in place. Mark the position of new rivets. Drill to the required size; use clecos to maintain parts in place. Page 15 of 25.

Use a hole-saw in order to cut the 38 mm hole for the aileron rod. Use a drill press for best results. Use a file to remove all sharp edges; then reposition on rear spar to confirm proper alignment of all holes. Page 16 of 25.

Old aileron-stop may be re-installed. Note that the two holes on the lower flange will have to be re-drilled in order for rivets to fit. Try to elongate holes in aileron stop, not in the rear spar flange. Locate and drill the added holes in the doubler. Remove parts, deburr and clean, then reinstall. Page 17 of 7.

Find the four Top Rear Channel Angles (6Z-2G-1) and mark the 100 mm overlap distance on two of them. Position the angles onto rear spars and clamp in place. Back-drill through top spar flanges into the doubler angles. Drilling on the edge of a wood tabletop works well; use clecos. Note: Clecos can be put right into table-top to support the work. Page 18 of 25.

Measure and mark the rivet line on the new doubler. Drill the entire rivet line (using clecos to hold everything in place). Take apart to deburr and clean. Position the rivets (using more clecos than illustrated below left!) and set the rivets with the rivet gun. Note: Always hold the riveter perpendicular to riveted surface. If there is interference, it may be necessary to grind down the riveter body. Page 19 of 25.

Finish marking, drilling, cleaning and riveting remaining doublers. Above: Use a drill press (if available) to back-drill 5/16 hole for rear attachment bolt. After setting rivets, remove any remaining burrs or sharp edges; then paint to match rest of wings. Page 20 of 25.

Carefully insert reenforced rear spar into position (at trailing edge of wing). If installed, thread wires from the electric trim through the appropriate hole (use a grommet). Make sure the aileron rod-ends are properly positioned. Cleco everything in place. Page 21 of 25.

After confirming that everything is in place*, set the rivets through the trailing edge rivet lines (where there are no flaps or ailerons. Do not forget the flap stops! Then set the rivets on the spar web, through rear ribs. *For extra assurance, the wing angles may be confirmed with a protractor prior to setting the trailing edge rivets. Page 22 of 25.

Set the flaps into position first, before the ailerons. Slide the flap onto flap actuator pin, then slide the hinge between the spar and the bottom wing skin. Cleco in position. Position the wing root attachment bolt. Then set the rivets. Page 23 of 25.

Set the ailerons in position by sliding the hinge between the spar and the top wing skin. Cleco in position. Set the rivets. Join the aileron to the control-rod end with the intended bolt. Reconnect the wires for the electric trim motor. Confirm appropriate movement, seal and close inspection plate Page 24 of 25.

This completes this section of the upgrade process for the ULM version of the Zenair CH 601 XL & CH 650E. For additional photo-guides covering the installation of other upgrade elements, visit zenairulm.com Page 25 of 25.