Read and understand the requirements of this procedure Assist students with installation as needed

Similar documents
Figure 1 Photograph of a strain gage on a helical wire

Vinyl Installation Guide and Tips

Applications Engineering Notes

Repairs. Chapter 10 Repairs 10. 1

3M Impact Protection Profile Installation System Instructions

Mirrorcraft Project Especially for Dogs

DASH KIT INSTALLATION

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

IMPORTANT: This product cannot perform its intended function if not properly installed.

Tape Measure Metal Clippers Screw Bit Set With Extensions

ODiSI Fiber Optic Sensor Installation Guide

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

REVISION LIST CHAPTER 25: AFT WINDOWS. The following list of revisions will allow you to update the Legacy construction manual chapter listed above.

8 x 10 Sandwich Panel

Curium 19.4H Installation Instructions & Parts List

BLADE REPAIR INSTRUCTION BOOKLET

INSTALLATION INSTRUCTIONS

Field Installed Connectors for TraceTek 7000-HUV Bulk Cable Installation Instructions

Step by Step Wing Bagging

Instructions for Making Repairs to 3M 8681HS Blade Tapes Installed on Enstrom Helicopter Blades.

SUPERSEDED REVISION. Reasons for reissue of this instruction sheet are provided in Section 7, REVISION SUMMARY.

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE 1400A-1700A-1800A

How to make climbing grips. By,

Curium 19H Installation Instructions & Parts List

PanelKeeper GL1500 Kit

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions

3/16 OR 1/4 FRAMELESS SWING DOOR WITH SINGLE INLINE PANEL OR TWO INLINE PANELS

Application guidance for Printed Vinyl decals

PANEL INSTALLATION GUIDE

1/4 FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE

Wax Resist. Judi Watanabe. Design by: 2007 Craft TV Weekly, Inc.

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

Reasons for reissue are in Section 6, REVISION SUMMARY.

SUPERSEDED. NOT the LATEST REVISION

Jeep Cherokee Door XJ Set Part # Revision J

WRIGHT FLYER 1 INSTRUCTIONS FOR THE D10LC KIT

Big Oz. Rocket. User Guide V0313

Aerospace Speciality Products

SGTalon s Enterprise-A Foamie Build Guide. SGTalon s. Enterprise. Enterprise--A. Assembly Instructions

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

*Before starting, please read entire manual *Changes can be made in order for this manual to work for you. 3 x 6 I-Beam

MIL-STD B (SH) UPDATE

Basic Stenciling Techniques

SlipGrip Data Sheet & Installation Guide

Cold curing adhesive K-X280

How to use a Touch Up Bottle & Brush

4-H Model Building. Monroe County. Grades 3-12

APPLICATION OF JAC FILMS

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

How to build a Javelin Skiff

GrafiWrap Vehicle Wrapping

Cardboard Model Buildings

PBWWinc. GEN-U-LINE 4000 Series Application Guide. Technical Data Sheet. General Guidelines:

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Pre-Paint>Wings>Fit ailerons. Objectives of this task: Materials and equipment required: Size the ailerons and pre-mould strips

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

Repair Instructions. Durametallic PSS III. Experience In Motion. Split Seal

Roll Out Vinyl Installation Guide

TOOLS & SUPPLIES (Included in ProTops Tool Kit)

Jeep Cherokee 4-Door XJ Set Part # Rev

COMPOSITES LAB MANUAL

UNIT No FRAMELESS PIVOT SHOWER DOOR

Peel Adhesion of Pressure Sensitive Tape

#85-2-5A: PAINT STRIPPING AND FINISH ANALYSIS AND CORRECTION - (Aug 7, 1985)

TRAVEL TOUGH TRANSLUCENT ROOF REPAIR GUIDE REPAIR KIT FOR SMALL AND LARGE ROOF REPAIRS FOR USE WITH ALL R50T-FIX REPAIR KITS

Installation Instructions Stainless Steel Wall Panels

INSTRUCTION MANUAL. Force Transducer Output Tube Repair Kit

3Insert the second rod no. 4

Application of 3M Pressure Sensitive Films to 3M Panagraphics Substrates

Instructions for Installing Vinyl Stair Treads with Musson 3 Wide Double-Face Tape

Root Seal Installation. Intro:

Installing 3M DI-NOC Architectural Finishes on Doors

BRUSH APPLICATION INSTRUCTIONS

1Take the keel (3) and

Xyron Professional 2500 Laminating System

CLICK BOND, INC LOCKHEED WAY CARSON CITY, NV PHONE: CAGE CODE: FAX:

Read and understand the requirements of this procedure Provide concrete samples for cutting Clean-up of the machine after use

EZYSTONE WORKSURFACES

Agricultural Mechanics and Technology Power Tool Safety Rules

Deck Repair Grady White Runabout

UNCONTROLLED 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES

NOTE: This product can be used externally if UV Guard is added (BY REQUEST ONLY).

Dusty Harp Pickup for lever harps

Gluing windows with SABA Glasstack 760

Quality Marine Equipment Since Antifouling Paint For Metal Under The Waterline SPRAY. Application Instructions.

Swift assembly guide

Bolt-On/Rugged Fender Flares Ford F150 (15-ON) Please read instructions entirely before installing this product.

Self-Adhering Reflective Sheet Membrane

How to Sharpen a Knife

Industrial Contractors Supplies, Inc.

SUPER BLUE INSTRUCTIONS FOR INSTALLING

A complete collection of information about installing a Dana Decals vinyl decal.

Quality Marine Equipment Since Antifouling Paint For Metal Under The Waterline ROLLER. Application Instructions.

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST

Continuous Hinge Frameless Single Swing Shower Enclosure QCI-5214

3M Wrap Film Series 1080 Preparation of Substrates, Application, Maintenance and Removal

Dubnium 11 Installation Instructions & Parts List

Signal Mirror Installation Instructions

Tools and Tips: ( 1 )

Transcription:

1. PROCEDURE OVERVIEW This procedure is to be used for installation of bonded strain gages on reinforcing bars. It includes necessary materials and a recommended practice for surface preparation, installation, and protection of strain gages. Actual installation of the strain gage itself is a relatively minor portion of this procedure. The majority of this procedure is related to waterproofing and mechanical protection of the gage. These items are needed to ensure the gage will survive the concrete casting process. 1.1. Student Responsibilities: Read and understand the requirements of this procedure Provide reinforcing bars for instrumentation Acquire all materials for strain gage installation 1.2. Staff Responsibilities: Read and understand the requirements of this procedure Assist students with installation as needed 2. EQUIPMENT AND TOOLS There are two primary suppliers for strain gages at FSEL: Texas Measurements (http://www.straingage.com/) and Micro Measurements (http://www.vishaypg.com/micromeasurements/). Texas Measurements is an importer of gages manufactured by Tokyo Sokki Kenkyujo (http://www.tml.jp/e/). Lead times for purchasing gages vary wildly. Occasionally gages are in stock in the U.S. and can be shipped right away. Often gages are not in stock and occasionally gages must be sent from Japan to local suppliers. In that case, lead times can be 2 to 3 months. Historically, Micro Measurements has had a longer lead-time than Texas Measurements. It is recommended that the supplier be contacted prior to ordering to get estimated lead times. 2.1. Gages Purchased from Texas Measurements The typical gage for reinforcing bars is FLA-5-11-5LT. This gage is a 5-mm, 120 Ω general purpose, uniaxial gage that is temperature compensated for mild steel. It has a pre-attached 3-lead wire that is 5 m long. An alternative gage that is commonly used is FLA-6-350-11-3LT. Rev. 0 1

This gage is similar to the previous gage but has a longer gage length of 6 mm and a resistance of 350Ω. 2.2. Gages Purchased from Micro Measurements Strain Gages The typical gage for reinforcing bars is C2A-06-250LW-350. This gage is very similar to the FLA- 6-350-11-3LT gages described in the previous section. 2.3. Materials from Texas Measurements CN adhesive SB Tape VM tape Epoxy overcoat (Hardman Epoweld 8173, Part A & Part B) 2.4. Materials from Micro-Measurements M-Coat A Gage Installation Tape (PCT 2M) 2.5. Materials Generally Available at FSEL Pneumatic Angle die grinder Fine Sanding Disc Coarse Sanding Disc Non-Woven Sponges Razor Blade or Utility Knife Digital Multimeter Electrical tape Zip ties 2.6. Additional Materials Acetone 3. PERSONAL PROTECTIVE EQUIPMENT Safety glasses Safety shoes Dust Mask Rubber gloves 4. DETAILED PROCEDURE 4.1. Mark the area of the bar to be gaged. Typically, an area about 1 in. long is sufficient for gage installation. Avoid placing a gage directly on a longitudinal rib because it would require removing a considerable portion of the rebar cross section. 4.2. Grind the bar surface Rev. 0 2

4.2.1. Using a coarse sanding disc on a pneumatic angle die grinder, begin smoothing the bar surface. Typically, the strain gage installation area will be longer than the transverse rib spacing of the bar. Use the coarse sanding disc to remove the transverse ribs and make the bar surface smooth. Excessive grinding of the bar, i.e. to the extent that the resulting surface is flat instead of round surface, should be avoided. 4.2.2. Using a fine sanding disc on a pneumatic angle die grinder, complete smoothing the bar surface. The finished surface should be smooth, shiny, and free of grinding marks, as shown in Figure 1. Figure 1 Photograph of bar after grinding 4.3. Clean the bar surface using acetone and non-woven sponges. Wet the sponge thoroughly with acetone and wipe across the polished area of the bar. Repeat the process with fresh sponges and wiping in one direction until the non-woven sponge remains white after wiping. Be careful not to wipe the sponges through a dirty un-polished area into the clean, polished area as shown in Figure 2. Note that acetone is a highly flammable material and should be handled accordingly. Wear safety glasses to protect your eyes from acetone. Long-term exposure to acetone vapors is harmful and at a minimum, can cause headache and dizziness. Use acetone in a properly ventilated area and avoid breathing in acetone vapors. Rev. 0 3

Figure 2 Wiping the clean area 4.4. Mark the gage location. Mark the final gage location with a pencil or marker. The mark should be adjacent to the freshly cleaned area, i.e. not in the gage installation region, to avoid contamination. 4.5. Attach the strain gage. For satisfactory bonding of the gage to the bar, it is essential that the bar surface be completely clean prior to gage installation. If there is a delay between surface preparation steps described above and the gage installation, carefully inspect the surface, and repeat the cleaning steps as needed. Re-applying acetone is highly recommended to remove the collected dust on the surface. Using the fine sanding disc might also be needed for delays that are longer than 1 to 2 days. Attaching the gage consists of a number of smaller steps. These steps need to be done quickly and smoothly to ensure a reliable bond between the gage and the substrate. 4.5.1. Identify the top and bottom surfaces of the strain gage before removing it from the protective sleeve. The top of the strain gage has the visible metallic wires printed on it. The top of the gage will also have the lead wires attached to it; these can be seen in Figure 3. The printed wires are visible from the bottom, but they will be dull in color. Do not touch the bottom surface of the strain gage, as it would contaminate the bonding surface. Rev. 0 4

Top Surface Bottom Surface Figure 3 Identifying the top of the gage 4.5.2. Remove the gage from the protective plastic and apply a piece of gage installation tape to the top of the gage without touching the bottom of the gage. The tape serves two purposes: 1) it allows handling of the gage without touching it and 2) it helps position the gage on the specimen for bonding. The piece of tape should be 2 to 3 in. long with the gage centered in the strip of tape, as shown in Figure 4. The gage can be temporarily placed on a clean glass surface to apply the tape. If this technique is used, the glass surface needs to be completely cleaned before placing each gage, preferably using acetone. Figure 4 Applying tape to the gage Rev. 0 5

4.5.3. Position and tape the gage on the bar. Using the tape to handle the gage, position the gage over the ground and cleaned area of the reinforcing bar. Press the tape to the bar to temporarily hold the gage in place as shown in Figure 5. Inspect the position of the gage. If repositioning after pressing the tape is needed, make sure the area to be covered by the strain gage is not contaminated by the residue from the tape. Use acetone and non-woven sponge as needed to ensure a clean surface. Figure 5 Strain gage held in position with tape 4.5.4. Partially peal back the tape to expose the bottom surface of the gage. Starting with the end of the tape near the strain gage lead wires, slowly peel the tape from the bar. Stop peeling the tape once the complete gage is expose. The portion of the tape beyond the gage should be left adhered to the bar to allow the gage to be returned to its previous location as shown in Figure 6. Rev. 0 6

Figure 6 Strain gage and tape peeled back for gluing 4.5.5. Apply one drop of CN adhesive to the junction between the peeled back tape and the bar. Apply the adhesive here Figure 7 Application of glue to strain gage 4.5.6. Slide a finger or thumb from the attached end of the tape to the free end of the tape in a smooth and continuous motion to press the gage into the adhesive and force out air bubbles. Rev. 0 7

Figure 8 Pressure applied to strain gage and adhesive 4.5.7. Maintain pressure on the tape and gage for approximately 1 minute to allow the adhesive to set and harden. Adhesive drying times are affected by ambient temperature and humidity. 4.5.8. Carefully remove the tape from the gage and bar. Peel back the tape from the end of the gage opposite the lead wires. The tape must be peeled back slowly, carefully, and as horizontally as possible to avoid damaging the gage or lead wires. 4.5.9. After removing the tape, inspect the gage for unbonded areas. Unbonded areas will appear as air bubbles or areas of a slightly different color than the bonded areas. If the unbonded areas are on the edges of the gage, more adhesive can be added. If more adhesive is added, reapply pressure to allow the adhesive to cure. Rev. 0 8

4.5.10. Using a razor blade or utility knife very carefully debond the lead wires from the bar. The adhesive will likely have glued the exposed lead wires to the reinforcing bar underneath. The wires can be freed by using a utility knife (Figure 9). Figure 9 Using a utility knife to debond the exposed lead wires 4.5.11. Apply electrical tape to the area below the exposed lead wires. The lead wires can be carefully bent 180 degrees to allow room to apply the electrical tape (Figure 10). The tape should be placed as close to the edge of the gage as possible. When doing this step, be careful not to peel off any portion of the strain gage. If necessary, this step can be omitted as the exposed lead wires will be further separated from the bar in a later step of the installation. Figure 10 Electrical tape applied below exposed lead wires Rev. 0 9

4.6. Apply waterproofing and mechanical protection to the gage. Since the gage and bar will be placed in fresh concrete and that concrete will be consolidated with vibration, the gage will need both waterproofing and mechanical protection. 4.6.1. Apply coating(s) of M-Coat A to the strain gage, exposed lead wires, and surrounding area. Apply a thin coat of M-Coat A using the brush provided (Figure 11). Allow 10 to 15 minutes for the coating to dry. It is recommended that three layers of M-Coat be used for each strain gage. Each coating layer needs to dry before applying the next layer. Figure 11 Application of M-Coat A to exposed lead wires 4.6.2. Cut a strip of SB tape long enough to cover the entire strain gage. 4.6.3. Completely cover the gage with SB tape, peel off the paper backing. Rev. 0 10

4.6.4. Press the SB tape onto the bar making sure to seal the SB tape to the bar. Figure 12 Strain gage and bar covered in SB tape 4.6.5. Fold the exposed lead wired on top of the layer of SB tape applied in Article 4.6.4 and lightly press the wires into the SB tape. In this step, the lead wires should be bent 180 degrees from their original direction before embedding in the SB tape (Figure 13). Figure 13 Exposed lead wired bent onto SB tape layer Rev. 0 11

4.6.6. Place another small piece of SB tape on top of the exposed lead wires to encapsulate them. The bare lead wire should be completely encapsulated in SB tape. Only the insulated portion of wire should be visible after this step (Figure 14). Figure 14 Lead wire encapsulated in SB tape 4.6.7. Completely cover the SB tape with a single wrap of VM tape. Figure 15 Strain gage and bar covered in VM tape Rev. 0 12

4.6.8. Wrap the VM tape with electrical tape. Figure 16 Strain gage and bar covered with electrical tape 4.6.9. Mix a small amount of epoxy overcoat (Hardman Epoweld 8173) per the directions provided on the bottle. 4.6.10. Coat the entire strain gage area as defined by the electrical tape with a thin layer of epoxy and allow the epoxy to set and cure. 4.7. Wire protection. This epoxy forms a hard layer that improves mechanical protection of the gage during concrete casting. The wires also need mechanical protection in case the wire is pulled during concrete casting. 4.7.1. Using a zip tie, tightly attach the wire to the bar at the location where it exits the layer of epoxy. 4.7.2. Make a small loop in the lead wire by wrapping it ground a finger. Rev. 0 13

4.7.3. Using a second zip tie, secure the far end of the looped wire to the bar a short distance from the zip tie applied in Article 4.7.1. Do not completely tighten this second zip tie completely. This will create a small loop in the wires as shown in Figure 17. If the wire is accidentally pulled during casting, the loop will protect the gage from tension. Figure 17 Zip ties applied to wire for protection 4.7.4. Trim the free ends of the zip ties close to the connections. 4.8. Check the electrical resistance of the gage and ensure the gage is not electrically connected to the bar. It is recommended that the electrical connectivity of the gage be checked prior to casting concrete. If the checks below indicate a problem, the gage will likely need to be removed and replaced with a new gage. For typical strain gages, three lead wires are attached to each gage. One of these three wires is independent and the remaining two are connected to each other. For gages purchased from Texas Measurements, the independent wire is in a gray sheath marked with a blue stripe and the two connected, or dependent, wires are in unmarked, gray sheaths. For gages purchased from Micro Measurements, the independent wire is red and the dependent wires are black and white. 4.8.1. Check electrical resistance between the independent wire and each of the dependent wires. Using a multimeter set to measure resistance, connect the independent wire to one of the probes of a multimeter. Connect one of the dependent wires to the other Rev. 0 14

multimeter probe. These connections can be made by firmly pressing the bare wires to the multimeter probes. The measured resistance should approximately match the nominal resistance of the gage (120Ω or 350Ω). Perform this check on each of the two dependent wires. 4.8.2. Check the electrical resistance between each of the three lead wires and the reinforcing bar. One at a time, connect each lead wire to a multimeter probe while holding the other multimeter probe firmly to the bare reinforcing bar. The multimeter should read OL for overload, indicating a very high resistance. The overload indicates the gage is electrically isolated from the bar as it should be. 4.9. Label all strain gage wires and bundle them together. The lead wires must extend outside the concrete volume prior to casting. Typically, the wires are secured in bundles to nearby reinforcing bars using zip ties. The free end of the bundle should be placed to minimize interference with concrete casting and finishing operations. 4.10. Record the gage factor for the gage. When setting up the data acquisition system, the gage factor will be needed to convert voltage measurements to strain values. 5. SUPPORTING DOCUMENTS None. 6. REFERENCED DOCUMENTS None. Rev. 0 15

7. RECORD OF REVISIONS Revision Date Affected Pages Description 0 2016-09-23 All Initial Issue Rev. 0 16