DESIGN OF THE ASPHALT LAYER ON HIGH SPEED LINES

Similar documents
VIBROACOUSTIC MEASURMENT FOR BEARING FAULT DETECTION ON HIGH SPEED TRAINS

Automating Track Inspection through the use of Automatic Machine Vision Systems

Evaluation of service life of jointed rails

Use of ground based radar to monitor the effect of increased axle loading on rail bridges. Evgeny Shilov. IDS GeoRadar

The IRIS 320 High speed Measurement Train set

Development of a New-Generation Dowel and Screw Combination 2014 International Crosstie and Fastening System Symposium Urbana, IL, USA 3 June 2014

ScienceDirect. A comparison of dielectric constants of various asphalts calculated from time intervals and amplitudes

PREDICTION OF RAILWAY INDUCED GROUND VIBRATION

Fatigue Performance Evaluation of Bitumen with Controlled Stress DSR Test Hong-zhou ZHU 1,*, Er-hu YAN 1 and Zhang-tian LU 2

The use of high frequency transducers, MHz, allowing the resolution to target a few cm thick in the first half meter suspect.

Optimum Design of Nailed Soil Wall

AMTS STANDARD WORKSHOP PRACTICE. Bond Design

Ageing modelling of seal bitumen binder

DSMF FIBERS, A COMPARISON OF VARIOUS SOLUTIONS

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

EFFECT OF YARN CROSS-SECTIONAL SHAPES AND CRIMP ON THE MECHANICAL PROPERTIES OF 3D WOVEN COMPOSITES

Dowel. Design. Performance-Based World of Concrete Official Show Issue. Lift-truck design changes require a new look at joint durability

The development of EME in Europe requires an. for the climate. Tine Tanghe Hilde Soenen NCCA, Nynas NV

Analysis of the influence of track quality for new and existing urban railway lines on train operation

Process optimised FEA- Calculation for Hydroforming Components

A5EE-337 DURABILITY OF A BITUMEN IN A HOT MIX ASPHALT: CONSEQUENCES OF OVER-HEATING AT THE MIXING PLANT

Characterization of Train-Track Interactions based on Axle Box Acceleration Measurements for Normal Track and Turnout Passages

Precast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6

Analysis and Examination in wayside equipment failures of High speed line Train control system

158.doc. 1 The MEDES System

New detection criteria and shunting monitoring in railway track circuit receivers

GUIDELINES FOR THE APPROVAL OF HIGH SPEED LINES

Bridge Vibrations Excited Through Vibro-Compaction of Bituminous Deck Pavement

Assessment of layer thickness and uniformity in railway embankments with Ground Penetrating Radar

TEACHING PARAMETRIC DESIGN IN ARCHITECTURE

Presentation of Autoclot: calculation and drawings of tracks for guided transport systems

ASSESSMENT AND PREDICTION OF STRUCTURE-BORNE RAIL NOISE IN DOMESTIC DWELLINGS

3D Non-Linear FEA to Determine Burst and Collapse Capacity of Eccentrically Worn Casing

ERTMS/ETCS UNIT INTERFACES BETWEEN CONTROL-COMMAND AND SIGNALLING TRACKSIDE AND OTHER SUBSYSTEMS

STUDY OF PERFORMANCE OF BITUMINOUS CONCRETE WITH ADDITION OF COIR/COCONUT FIBER

Submersible pressure sensor For water and wastewater Model LW-1

Materials Characterization Cluster A new European initiative

High-temperature properties of bituminous binders and asphalt mixtures

Prying of a Large Span Base Plate Undergoing a Moment Load Applied by a Round Pier

THIN-WALLED HOLLOW BOLTS

PRIMARY LOOP ACOUSTIC EMISSION PROCEDURE: AN UPGRADED METHOD AND ITS CONSEQUENCES ON THE IN-SERVICE-INSPECTION

CASE STUDY June Advance in the Case Study 2.2 Clamping of thin-walled curved workpieces. CASE STUDY 2.

INFLUENCE OF PILES ON LOAD- SETTLEMENT BEHAVIOUR OF RAFT FOUNDATION

Innovative composite dowel for steel concrete composite bridges. Neil Westmacott, Wolfram Schwarz

Reinforcement with Soil Nails

EFFECT OF GRADATION OF AGGREGATES ON MARSHALL PROPERTIES OF SDBC MIX DESIGN

Experimental investigation of crack in aluminum cantilever beam using vibration monitoring technique

In-line measurements of rolling stock macro-geometry

Modelling of Rebar and Cable Bolt Behaviour in Tension/Shear

A Numerical study on proper mode and frequency selection for riveted lap joints inspection using Lamb waves.

IMPROVEMENT OF SHEAR STRENGTH OF SOIL USING BITUMEN EMULSION

ASSESSMENT OF COMPOSITES REINFORCED WITH INNOVATIVE 3D WOVEN HOLLOW FABRICS

AC CREEPAGE DISCHARGES IN SF 6, CO 2, N 2 AND SF 6 -CO 2 AND SF 6 - N 2 MIXTURES

Rec. ITU-R P RECOMMENDATION ITU-R P *

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Nonlinear Shielded Multipair Railway Cable Modeling with COMSOL Multiphysics

CHAPTER 4 COMPARISON OF DYNAMIC ELASTIC BEHAVIOUR OF COTTON AND COTTON / SPANDEX KNITTED FABRICS

Baltic Marine Environment Protection Commission

Module 2 WAVE PROPAGATION (Lectures 7 to 9)

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

RD SET. Masimo Sensors. Maximising Patient Comfort Optimising Clinician Workflow Helping Hospitals Meet Their Green Initiatives

Advancement simulation of parallel tunnels and their interchange with two other subway lines using a new FEM approach, a case study

Experimental investigation of fracture and healing of bitumen at pseudo-contact of two aggregates

Comparative Analysis of Fancy Yarns Produced on a Ring Twisting System

Scaled Laboratory Experiments of Shallow Water Acoustic Propagation

The experimental evaluation of the EGNOS safety-of-life services for railway signalling

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

Increasing the precision of mobile sensing systems through super-sampling

ERTMS/ETCS UNIT INTERFACES BETWEEN CONTROL-COMMAND AND SIGNALLING TRACKSIDE AND OTHER SUBSYSTEMS EUROPEAN RAILWAY AGENCY.

Modelling and Hazard Analysis for Contaminated Sediments Using STAMP Model

DavidsonSensors. Fiber Optic Sensing System Definitions. Davidson Fiber Optic Sensing System

Further Comparison of Traffic Noise Predictions Using the CadnaA and SoundPLAN Noise Prediction Models

Evaluation of High Recycled Asphalt Pavement Contents in Warm Mix Asphalt Technologies

GALILEO JOINT UNDERTAKING

CHAPTER V SUMMARY AND CONCLUSIONS

Articulated Concrete Block Mattresses ACBM

European Infrastructure Compatibility Standards. Maya Petkova 7 March 2014

New Instrumentation technologies

Experimental Investigation Of The Real Contact Arc Length Measurement In The Cylindrical Plunge Grinding

Bend Sensor Technology Mechanical Application Design Guide

Daytime modelling of VLF radio waves over land and sea, comparison with data from DEMETER Satellite

Experimental Study on Pile Groups Settlement and Efficiency in Cohesionless Soil

RAPS, radio propagation simulator for CBTC system

A TIMKEN COMPANY SUBSIDIARY

Bend Sensor Technology Mechanical Application Design Guide Mechanical Application Design Guide

Intelligent Tyre Promoting Accident-free Traffic

The first Floating Wind Turbine in France (SEM-REV) I. Le Crom, ECN, EERA Deepwind 19/01/2018

Journal of Textile Science & Engineering

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

Centre for Doctoral Training: opportunities and ideas

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

Piled raft foundation for the W-TOWER Tel Aviv

Study of Space-Time Coding Schemes for Transmit Antenna Selection

Notice of Advice. RevA: 18-September-2017 RevB: 26-September Engineering Assessment of Aurizon network's Capital Claim

Fail Safe Operation of Audio Frequency Track Circuits for Railway Signalling C. Gautham Ram #1, A. Nithya #2, V. Jayashankar *3, P. R.

For crossing under a railroad, contact the specific railroad company's engineering department.

Effects of filler/bitumen ratio and bitumen grade on rutting and fatigue characteristics of bituminous mastics

Loop Installation. Manual

Introduction to Measurement Systems

Double Bar Plate Dowels for Saw-Cut Contraction Joints

Transcription:

DESIGN OF THE ASPHALT LAYER ON HIGH SPEED LINES SNCF/PSIGT Lines, Track, Environment Department Coordination, Innovation and research Division Division Head 6 avenue François Mitterrand 93574 La Plaine Saint Denis France alain.robinet@sncf.fr tel : 00 33 (0) 1 41 62 02 92 words : 1908 submission date : 2013/08/01

2/10 ABSTRACT The SNCF (French railways operator) and RFF (French railways owner) have launched a research program in order to validate the feasibility and the design of a sub-ballast layer made of a bituminous material for a ballasted track on a high speed line. The objective of the research was to define the specifications required of the layer of bituminous material to take into account the particularities associated with high speed railways lines, the traffic and the thermal behaviour of this kind of material. After this research, SNCF and RFF have decided to realise a test zone of 3 Km on the Eastern European High speed Line (LGV Est Européenne). The test zone has been equipped by mechanical and thermal sensors and the measurements have been made during four years. The paper will present: o The asphalt layer design method; o The test zone; o The new developments.

3/10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 INTRODUCTION The first railway track bed design was developed for the studies of the first French high speed line in the years 1970. The first structural modelling was undertaken starting from road models adapted to railway specificities. These models were based on the experience feedback realised after repairs of the railway platforms were required on the network, due to their being partially destroyed after the Second World War. This dimensioning was thereafter optimised taking into account the improvements made in the quality of granular materials. After 40 years of experience feedback, these structures give satisfaction. However, the realization of the track bed requires the purchase and transport over long distances of the aggregates and a significant know-how for their placement. RFF (Réseau Ferré de France, the owner of the network) and the SNCF (Société Nationale des Chemins de Fer Français ) thus launched research of alternative solutions. The initial idea was to borrow from the road companies the techniques used for the complex of layers, integrating an asphalt layer under the ballast. The main objective was to find optimisations for the project: on the one hand, reduction of earthwork volumes and of the granular material supply, thanks to the global reduction in the layers thickness; on the other hand, the ease of placement of the track and of the equipment (catenaries, signalling, etc); lastly, the third optimisation considered, a reduction of the maintenance costs thanks to the flexibility and to the improved stability of the track at high speeds that would be brought using the asphalt layer. THE DESIGN The modelling of the asphalt layer put in place in the track bed was made according to the dimensioning method of the roadways. The justification is based on the behaviour with the fatigue of materials. The weakest point of the layer is the bottom. So, we will study the horizontal deformation at the bottom of the layer. The method includes two calculations. On the one hand, one calculates the horizontal constraints and horizontal deformations which will be exerted on each layer of the structure modelled under the action of a static axle. This calculation is done with computation software to the finite elements usually used in the structural analyses (CESAR, ABAQUS, ). On the second hand, one calculates the permissible deformation during the lifetime of the layer. Each material is characterized by a fatigue curve established with laboratory test.

4/10 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 Figure 1: Fatigue curve The fatigue curve represents the permissible deformation ε versus the number of cycles of solicitation N. Each material is characterized by the fatigue slope (b) and ε6, which represents the deformation leading to the breaking of the sample if it is applied 10 6 times. First of all, to get the permissible deformation, we have to calculate NE which represents the number of train axles that we expect during the lifetime of the trackbed. Two traffics have been taken into account in the model: o Road traffic related to the construction of the superstructure o Rail traffic with a design life of 60 years NE tadm 6 * 6 10 ε = ε b * kc * kr * ks With: kc : adjustment coefficient, linked with the kind of material; ks : parameter linked with the soil support quality;

5/10 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 kr : it is the most important parameter for the engineer because it is linked with the risk that the owner accepts to take in account. In others words, it allows a balance between the initial investment and the cost of maintenance. Regarding the difficulty for the maintainer to work on a high speed line, the risk coefficient has been chosen very low. The design is validated if the deformation ε calculated in the first step under an axle load is less than the permissible deformation εtadm. The calculation made for the Eastwards High Speed lines gave the following design: Trackbed geometry: o Ballast : 35 cm o Asphalt layer : 14 cm o Adjustment layer 20 cm o Treated soil >80 MPa Asphalt characteristics: o E = 9000 MPa o E6 = 110 µdef o Voids index < 4% THE TEST ZONE The Eastern European High speed Line (LGV Est Européenne) connects Paris to Strasbourg in 1h50. 78 79 80 81 82 83 84 85 86 87 88 89 Figure 2: LGV Est Europe The 3 km long test area starts at kilometer 109 of the line, near the station Champagne Ardenne. The selected test zone presents a very heterogeneous character since there are embankments, cuttings, curves, alignments, together with structures and switches equipments. The placement of the bitumen gravel was undertaken using typical road methods.

6/10 90 91 92 93 94 95 Figure 3 : The working site In consideration of financial implications, and in order to allow a simplified placement for the signal and telecommunication cables, the installation of the sand-gravel mix bitumen was limited laterally to the ballast sides. 96 97 98 99 100 101 102 Figure 4 : Cross section With an aim of checking the dimensioning assumptions and of ensuring a proper experience feedback on the innovative structure, a significant amount of instrumentation was installed on the test area.

7/10 Test zone P A P A P A P A J T Réference Cutting Embankment Flat ground T A P J Thermometers Accelerometers on sleepers Pressure sensors Strain gauges at the basis of the bituminous layer 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 Measure of load of wheel Figure 5 : Test zone Four zones of monitoring have been installed on the test zone. The reference zone is out of the test zone. This zone is equipped with a standard granular track bed. The purpose of the pressure sensors is to determine the pressure on the ground under the track bed. The sensor placed on the reference zone allows a comparison between classical and bituminous track beds. The strain gauges are placed under the bituminous layer. They allow the measurement of the tensile strength at the basis of the layer. This point is very important for the fatigue modeling of the loss of strength with time in the layer. The thermometers allow a permanent survey of the temperature in the bituminous layer. Finally, some accelerometers have been placed on sleepers on the four zones: they allow a comparison to be made of the track behaviour between the classical granular zone and the bituminous zone

8/10 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 THE MAIN RESULTS The track behaviour Figure 6 : Timon The Figure 4 is an example of the graphic tool (TIMON) used by SNCF to assess the behaviour of the track. The line is divided in 1 km sections, each one being represented by a graph. The upper part of the graph shows the maintenance effort undertaken for each section. The lower part shows the evolution of the track quality from the beginning of its exploitation up to the current days. The analysis of the graphs shows a relatively low track maintenance effort on the test zone for a good track quality. Pressure The comparison between the pressure on the ground between the classical and the bituminous track bed shows a strong reduction of the pressure due to the bitumen gravel. This result corresponds with the model. Strain gauge The tensile strength at the base of the bituminous layer is a very important characteristic of the model. It is the most delicate point of the design. The results of the measurement are in conformity with the model.

9/10 177 178 179 Temperature Relevé température 2006/2009 Occurences 20000 18000 16000 14000 12000 10000 8000 6000 4000 2000 Température ambiante Température base GB 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 0-14 -10-6 -2 2 6 10 14 18 22 26 30 34 38 Températures Figure 7 : Asphalt temperature vs air temperature The curve of figure x shows the repartition of temperature in the bitumen gravel layer (in dark) and the ambient temperature (in blue), as measured between 2006 and 2009. We can observe a Gaussian repartition of the ambient temperature between -14 C and 42 C. The repartition of the temperature in the bitumen gravel layer is more concentrated between 2 C and 25 C with a maximum of occurrences at 6 C and 15 C. THE DEVELOPMENT New high speed lines Three new high speed lines are under construction in France: o SEA : «Sud Europe Atlantique» 340 km o BPL : «Bretagne Pays de Loire» 182 km o CNM : «contournement Nîmes Montpellier» 80 km. The three projects include partially or totally asphalt layers. The third line, CNM, will be submitted to a mix traffic, passengers during the day and some freight train during the night.

10/10 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 It means that the time available for the maintenance will be very short during the lifetime of the line. So, the owner decided to install asphalt layers on the 100% of the line to allow maintenance compatible with the available time. Research projects SNCF have launched two research projects in the field of asphalt for railways. High speed lines A research has been launched in order to characterize the linear thermo-viscoelastic behaviour of asphalt mixes used in railway infrastructures. We need to have a better knowledge on the characterization of the bituminous materials working under high speed traffic conditions given the fact that they present a viscoelastic behaviour. The existing linear viscoelastic (LVE) models for bituminous mixtures are mostly conceived for the road industry and need to be validated to railway applications. Identifying the LVE behaviour of bituminous mixtures submitted to typical railway conditions (loading, frequency and environmental exposure) is therefore necessary to create a rational track structure design methodology, so as to optimize the use of asphalt concrete in railway sub-ballast layers. This can be achieved by modelling the LVE behaviour of bituminous mixtures in order to define their constitutive equations and integrate them to complex sub-ballast layer design methods. Classical lines SNCF has launched with others companies a new research dedicated to the classical lines; the goal is to design a new ballastless track, put on an asphalt slab in order to get a thin track, especially available in tunnels where we have some gauge problems. An experimentation of asphalted ballastless track has already been done near Strasbourg. We will work to optimize the design. 226 227 Figure 8 : Strasbourg ballastless asphalted track