Welding Qualification/Certification

Similar documents
SMAW LESSON #1: Initiating and maintaining an arc using the scratch start method

Standards and Competencies

WELDING FABRICATION NYS

WELDER ONTARIO PRACTICAL ASSESSMENT

stringer bead tack welds tee joint trailing electrode angle weave pattern

Boot Scraper. Description: Materials: Tools: Procedure: Name: Date:

WELDING FABRICATION. First, download and review the General Regulations at: updates.skillsusa.org.

Make a Safe. Description. Lesson Objectives. Assumptions. Terminology

BC WELDER TRAINING PROGRAM

2019 Welding- Individuals Secondary & Post-secondary

Welding Symbols. Faculty of Engineering Mechanical Dept.

Module 4 Design for Assembly IIT BOMBAY

Trade of Sheet Metalwork. Module 3: Thermal Processes Unit 13: MMA Butt Weld Flat Position Phase 2

Welding Fabrication - California Regionals 2019 Quench Tank

ACF Maintenance Bulletin. TC-200 Revision B. ACF 200 Stub Sill Underframe Inspection, Repair, and Enhancement

Bolted Joint Types Grip Washer

STEEL REPAIR PROCEDURES OPERATIONS MANUAL

New Mexico Welding Fabrication 2018 Purpose:

Welding 2 go. alhuzaim_af [Type the company name] 8/2/2012

Basic Welding Symbols and Their Location Significance

Make a Pencil Holder. Description. Lesson Objectives. Assumptions. Terminology

Recommended Work Keys Scores for Welding

FORWARD FUSELAGE SIDES & REAR TOP SKINS

6625 WEST WILSHIRE BLVD. OKLAHOMA CITY, OK (405) FAX (405)

Weldment Visual Inspection Requirements

IBEX 1132 REAR AXLE UCA TRUSS GOAT BUILT IBEX REAR AXLE UPPER CONTROL ARM BRACKET/TRUSS

Inspection Kit Alignment, Measurement & Weld Measuring Gauges Model: IK-BACT13. Welders, CWI Inspectors, Instructors

HANDS-ON PRINT READING FOR WELDERS

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

STANDARD SPECIFICATION FOR STEEL FRAMING FOR RAILROAD SHELTERS

Welder Harmonization Transition Plan

Oroville Union High School District Industrial Technology

FLUX CORE 90 WELDER ASSEMBLY & OPERATING INSTRUCTIONS

Side Sill Closure Inspection and Repair

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

From Plate Materials & Services - To To COMPLETE PRESS FRAMES

Rorty No.2 Tube Bender.

Welding Lab Safety Test

UTAH S 2016 WELDING FABRICATION COMPETITION

Welding & Fabrication Tools FT-Flat Electrode Welding

Bulldozer Mailbox North Dakota Welding Fabrication Contest Standards

Make a Welded Die. Description. Lesson Objectives. Assumptions. Terminology

My Career in Welding Engineering

SECTION METAL FABRICATIONS

Grinders, Sanders, Drills, Lathes, Saws, Shear, Break, Punch, And Roller

Haukaas Bale Rack Kit

Delmec Engineering Limited

Credentials for Career Technical Education Teachers and/or Students

NAVSEA STANDARD ITEM. 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure

STATEWIDE CAREER/TECHNICAL EDUCATION COURSE ARTICULATION REVIEW MINUTES

Welding-Oxy Fuel Metals Joining

A. Extent of structural precast concrete work is shown on drawings and in schedules.

Curriculum for Mechanical Sub Overseer

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

Metal Shaping Taught by a World Renowned Master: Fay Butler

MIL- B Rev NAVSEA 0900-LP

PS ARC Welder Assembly & Operating Instructions

SECTION BULLET- RESISTANT DOORS

Maintenance Manual 8. Drive Axle Housings. Welding and Repair Procedures Revised 02-18

1. The saddle is located on the underside of the crossmember in the front of the frame, just under the engine oil pan.

Installation Instructions

SAULT COLLEGE OF APPLIED ARTS AND TECHNOLOGY SAULT STE. MARIE, ONTARIO COURSE OUTLINE

Fig. 9 Different weld positions. There are five basic types of common joints. They are

Architecturally Exposed Structural Steelwork (AESS) Code of Practice (for Fabricators)

PRODUCT CATALOGUE. Major Features: Arc Bends Manufactured to: Pipestar now offering full-line of flanged Arcbends

PLK CJ PRODUCT INSTRUCTION PI002 REV Page 1

Hose Hanger Cold Metal Work

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A

New generation of welding and inspection systems

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

Making a 1911 frame from scratch the easy way. 7 parts make up the frame in a 1911 pistol,

JVI Vector Connector

NSRP All Panel Meeting

AESS Documents prepared by CISC ad hoc committee

Industrial Solutions & Innovation, LLC. Watts Specialties

Engineering Policy & Procedure

Make a Portable Hibachi

COOL-SHIELD AUTO-DARKENING FILTER CARTRIDGE (ADF) HELMETS

INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER:

LocoGear. Technical Bulletin - 14 November 28, 2003 Copyright 2003 by LocoGear LIVE STEAM CASTINGS. Tech Bulletin - 14

Basic terms of a welded joint are shown in Fig and the five basic types of joints are shown in Fig

RECOMMENED TOOLS FOR MACHINING COUNTERTOPS

College of Forestry 610: Power Tools

(AMMA) American Maritime Modernization Association

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

SAFETY INSTRUCTION TEST

Jointer. Given a properly adjusted jointer, instruction and demonstration of use, each student will be able to:

West Sound Technical Skills Center 101 National Avenue N. Bremerton WA Welding Trades Course Syllabus updated October 2012

Specifications: Hole Sizes: Selector Pin Hole: 3/8 (0.375 ) Trigger Pin Hole: 5/32 (0.156 ) Hammer Pin Holes: 5/32 (0.156 )

LABORATORY MANUAL W-SHOP TECHNOLOGY LAB ME-105-F

Shay - Boiler Cosmetics - Part I

1.1 RELATED DOCUMENTS

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

SAFETY INFORMATION PACKET

Meat Hook. Tools: Materials: Directions: Name: 1/4 round cold rolled steel 20 long 1 wooden dowel 5 long Epoxy Wood Stain Sand Paper Emery Cloth

Machine Shop Processes

CABINETMAKING. ELIGIBILITY Open to active SkillsUSA members enrolled in programs with cabinetmaking or millwork as the occupational objective.

Comprehensive Program Review Report

J-BOLT LIP SHROUDS FOR LOADERS & SHOVELS

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

Transcription:

Welding Qualification/Certification 9/14/2011 1

Index Page Number Pre-testing Procedure 3 Bend Test Procedure Coupons 4 Drawing for cutting Coupons and Back strap removal 5-9 Preparation and Testing Procedure for 1 10 1 Test Plate Fit-up 11-12 Helpful Hints 13 Testing Procedure for 1 14-15 Summary of Visual Inspection Criteria 16 Testing Procedure Final Sign Off For 1 17 Shop Bend Test For 3/8 18-23 Preparation and Testing For 3/8 24 3/8 Test Plate Fit-up 25-26 Helpful Hints 27 Testing Procedure for 3/8 28-30 Craftsmanship Expectations for Projects 31 9/14/2011 2

Pre-Test Requirements PCC offers plate welding and Pipe welding qualification/certification tests. The welding portion of the test is given in the Welding Shop at PCC and then is sent to an independent test lab for evaluation. Once the test plate passes inspection the test lab will issue the appropriate paper work indicating the results. The student will have the option of purchasing a City Card with the test results. This card will allow the student to weld on a City Project without having to be re-tested. This is an excellent tool in securing a job! Before a welding test will be issued at PCC the student must pass two mock-up tests to prove their ability to make sound welds that are visually acceptable. This means that two plates per position will need to be completed and pass both visual and bend test criteria set forth by the American Welding Society, D1.1 Structural Steel Welding Code. Visual Criteria Example of a High Quality Weld per AWS D1.1 VT Criteria Cover Pass Reinforcement (groove welds) Flush to 1/8 Fillet Weld Size See specification on drawing Undercut 1/32 deep Weld Contour Smooth Transition Root Pass 100% fusion, free of slag and porosity Cracks None Allowed Arc Strikes None Allowed Fusion Complete Fusion Required Porosity None Allowed 9/14/2011 3

Bend Test Criteria 4.8.3.3 Acceptance Criteria for Bend Tests The convex surface of the bend test specimen shall be visually examined for surface discontinuities. For acceptance, the surface shall contain no discontinuities exceeding the following dimensions: a) 1/8 - measured in any direction on the surface. b) 3/8 - the sum of the greatest dimensions of all the discontinuities exceeding 1/32, but les than or equal to 1/8. c) ¼ - the maximum corner crack, except when that corner crack results from visible slag inclusion or other fusion type discontinuity, then the 1/8 maximum shall apply. Specimens with corner cracks exceeding ¼ with no evidence of slag inclusions or other fusion type discontinuity shall be disregarded and a replacement test specimen from the original weldment shall be tested. 9/14/2011 4

Shop Pre-Test Bend Test Procedure The plate(s) in question must pass visual inspection first. Bend tests are used to determine the soundness of a weld joint. The test will determine if fusion was obtained in the weld joint. Reference the AWS D1.1 Structural Welding Code to determine the dimensional layout of the bend coupons (use this diagram for all positions). Use the following procedure in preparing and bending your coupons. 1. Flush back up strip off of the plate at the flushing station. 2. Layout two 3/8 wide coupons and cut using the track burner. Do Not Bend coupons greater than 3/8 wide they will not fit in the bend jig. 9/14/2011 5

3. Allow coupon to air cool. Do Not Quench! 4. Grind coupon s smooth, ensuring grinding marks are going with the length of the Coupon s and all edges are rounded. 9/14/2011 6

5. Request permission from your instructor to use the bend test machine. 6. CAUTION: Keep hands and fingers clear when operating equipment. Watts Bend Test Machine 7. Ensure guard is in the correct position. The coupons sometimes eject out of the end of the machine rapidly. Guard 8. Place coupon in the machine taking care not to position your hands/fingers in the way. Locate weld in the center of the die. Bend one coupon (from each plate) to test the face and one to test the root. 9/14/2011 7

9. Actuate the ram by the lever on top of machine and stand clear of the guard area where coupon will exit. 10. Inspect the convex surface of the bend specimen for fusion type defects. Reference the AWS D1.1 Structural Welding Code for Acceptance Criteria for Bend Tests. Four types of bend samples are shown above. Left to right are: face bend, face bend, root bend and a side bend The bend samples shown above differ in the radius that they were bent. This is a requirement set forth by the code or standard that is being used. 9/14/2011 8

Preparation and Testing Procedure For 1 Plate This section is for those students who plan on taking the AWS Welder Qualification Test. Permission to test is only issued upon successful completion of two consecutive sets of shop bend tests. This means two successful bends in the vertical position and two successful bends in the overhead position. Shop tests must meet visual inspection and bend test criteria set forth in AWS D1.1 prior to testing. Step #1: You must request permission from your instructor to test. Step #2: Complete Welding Performance Qualification Test Form. Check it for accuracy. All tests are submitted for x-ray or bend examination to AWS D1.1 Structural Steel Code unless otherwise specified. Take the test form to the PCC Business Office and pay the test fee. Fill out Form Below. Return Welding Performance Qualification Test form and receipt to your instructor. Your test plates will be issued only after payment of test fees. READ ALL INSTRUCTIONS CAREFULLY BEFORE YOU BEGIN. REVIEW THE TEST DISPLAY BOARD. SEE YOUR INSTRUCTOR IF YOU HAVE ANY QUESTIONS. Welding Performance Qualification Form Last Name First Name MI Social Security # Street City State Zip Phone Number Original Re-take Test Plate Cost $ Type of Test City Card Cost $ Material Total Cost $ Thickness Date Process PCC Instructor Signature Electrode Size Type Position Student Signature Account Number M910 9/14/2011 9

Test Plate Fit-up Procedure READ ALL INSTRUCTIONS CAREFULLY BEFORE YOU BEGIN. REMEBER, THE 3/8" PLATE TEST ASSEMBLY IS DIFFERENT FROM THE 1" TEST. SEE YOUR INSTRUCTOR IF YOU HAVE ANY QUESTIONS. Your test has 6 inspection points. Each inspection must be completed and signed by your instructor before progressing to the next step. STEP 1: Material Preparation using track burner Cutting List: See code for specific dimensions Bevel Angle will be 22 ½º for SMAW, GMAW and FCAW (Dual Shield) with a ¼ root opening and 10º for Coreshield-8 innershield with a 5/8 opening. ) Grind all surfaces in the area to be welded until free of mill scale. Surfaces to be cleaned include: all beveled surfaces, 3/16 to 1/2 front and back of plate adjacent to each bevel and one side of each back up strip. CAUTION: Clean material only. Excessive grinding will affect the quality of your fit up. STEP 2: Assemble Groove Joint and Strong Backs Root Opening = ¼ (5/8 with a 10 degree bevel for Coreshield-8 innershield wire). Use Clamps or fixturing device to ensure a tight fit-up. Adjust plate position as needed to ensure proper root opening. Ensure that there is NO gap between the beveled plates and the back strap surface. Tack the assembly together with 1" tack welds at the ends where the plates meet the back up strip. Do not tack weld on the backside of the test plate. Strong backs are used to control distortion of the plates during welding. Position strong backs on the backside of the groove assembly 3/16" in from the ends of the plates. Tack the strong backs across the ends of the plates. Weld only on the outside edge of the strong back. DO NOT weld on the plate side (inside) of the strong backs. 9/14/2011 10

STEP 3: TEST PLATE ASSEMBLY INSPECTION (See your instructor): Have your plates inspected for proper assembly and Stamped For Testing. Store test plates in designated locker. Review the testing procedures. The test examines your ability to weld in compliance with the specific acceptance criteria and your ability to comprehend and follow testing procedures. Violation of testing procedures will constitute automatic failure of your test. Which means you will be ineligible to take a welding test at PCC. 9/14/2011 11

Helpful Hints 1. Be prepared to feel confident during your test. You need to have demonstrated consistency during your practice tests. Repeat the practice tests as many times as necessary to ensure confidence and consistent performance. 2. Be comfortable!!! Plan your test on a day that you know you will be at your best, well rested and able to concentrate. Check your clothing, to be certain you are protected from any stray sparks. Nothing breaks your concentration faster than getting burned or catching on fire! 3. Check the condition of your cover lenses; make sure that you can see clearly. 4. Bring a flashlight so you may thoroughly inspect your inter-pass cleaning. Clean the weld thoroughly. Make sure your slag hammer and wire brush are in good condition. 5. Plan the weld carefully to avoid having to patch up low spots. Decide before you strike the arc the size and location of the bead you are about to run. If the weld fill becomes uneven, fix it immediately by filling in the low areas, don't wait until the flush layer or cover layer. 6. Notify your fellow students in your area that you are testing; ask their cooperation in avoiding any banging or movement of the booth area while you are welding. 7. Above all don't panic! Relax and take your time. Don't hold your breath! If at any time you become uncomfortable stop and reposition. 8. If you cannot see STOP. If you feel you have lost or are loosing control of the puddle STOP. 9. Do not over heat the plates. Allow the plates to air cool to 200 degrees before you attempt to weld the cover passes. 10. See your instructor at anytime if you have a concern. Take a break as needed. 9/14/2011 12

TESTING PROCEDURE STEP 1: STEP 2: STEP 3: STEP 4: STEP 5: Read entire procedure before you start your testing. Notify your instructor that you are going to begin your test. Obtain a 300 degrees temp stick from the tool room. Using a torch preheat the test plates to 70 degrees shall be sufficient to prevent cracking. INSPECTION: (See your instructor): Test Plate Position Position the test plates at your welding station. The plate stamped 3G is Positioned vertical. The plate stamped 4G is positioned overhead. Have your instructor inspect the proper positioning of the test plates. Test plates must remain in position throughout the test. DO NOT MOVE THE TESTS Plates. Tests Plates must be cleaned and inspected in position. No grinding is allowed on the test. Inspection by instructor: Instructors signature: Date: Student signature: STEP 6: STEP 7: Complete the root passes in both positions. INSPECTION: Root Pass Inspection (See your instructor): Have your instructor inspect the root pass. Inspection by instructor: Instructors signature: Date: Student signature: STEP 8: Complete welding the V groove until the weld is within 1/16 to 1/8 below the base material. CAUTION: Control your inter-pass temperature. Use the 300-degree temp stick to monitor maximum heat input in the test material. DO NOT weld on the test plate if it is over 300 degrees to help avoid cracking. 9/14/2011 13

STEP 9: INSPECTION: Flush Layer Inspection. Have your instructor inspect the test. Inspection by instructor: Instructors signature: Date: Student signature: STEP 10: Complete the (cover pass) on both plates. STEP 11: INSPECTION: Final Visual Inspection (See your instructor): See your instructor for visual inspection. Both tests plates must pass visual inspection criteria to be submitted for x-ray examination. See visual inspection criteria below. STEP 12: STEP 13: STEP 14: STEP 15: Remove plates from position and allow to air cool. DO NOT quench test plates in water at Anytime. Remove strong backs and use the band saw to cut ¼ off each end. Remember that a minimum of 5 1/2 in length must be sent to the test lab for 1 test plates and a minimum of 7 in length for the 3/8 test plates. DO NOT REMOVE THE BACK UP STRIP!!! File all saw cut edges smooth for safe handling of test plates. Turn in finished test plates to your instructor for final visual inspection of plates. Instructor will turn test plates in for shipping to testing lab. Test Plates are submitted to the testing lab for RT or Bend examination. Results are usually received approximately two weeks after the tests are submitted. A. Arc strikes outside of the weld area are NOT acceptable. Review Welder Qualification AWS D1.1 Structural Steel Code. I have read all of the above information in reference to the proper procedures to follow: direction to cut, thickness and width of material, cleaning and assembly of my Welding Certification test plates. Sign off for Summary of visual Inspection Criteria Inspection by instructor: Instructors signature: Date: Student signature: 9/14/2011 14

Testing Procedure Final Sign Off Inspection by instructor: Instructors signature: Date: Student signature: Passed Root inspection Passed Visual Fillets Passed Visual Cover Failed Visual Failed Visual Failed Visual All forms and packet must be returned to the instructor before plates will be sent to the inspection lab. Support Technicians signature: 9/14/2011 15