Renaissance. Assembly Instructions GREENHOUSE. for models BEFORE OPENING ANY OF THE BOXES PLEASE READ THESE INSTRUCTIONS 03/07

Similar documents
GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

GROWING BETTER THROUGH DESIGN LEAN-TO. Lean-To. Assembly Instructions 04/02

GROWING BETTER THROUGH DESIGN. Regent Royale Rosette Regal GREENHOUSE. Assembly Instructions 04/02

Summer Greenhouses 6x8 GREENHOUSE 185. Assembly instructions for the. 6x8 Aluminium Greenhouse 185 PLEASE READ ALL INSTRUCTIONS BEFORE PROCEEDING

Gardman Lean-to Greenhouse Assembly Instructions

Greenhouse Assembly Instructions

A (mm) B (mm) A (mm) B (mm) 12 x x x ft extension. 8ft extension ft extension ft extension 3720

6 x 6 OCTAGONAL CEDAR GREENHOUSE

6 5 Wide TRADITIONAL CEDAR GREENHOUSE


6 Wide AMATEUR CEDAR GREENHOUSE

10 Wide AMATEUR CEDAR GREENHOUSE

8 Wide AMATEUR CEDAR GREENHOUSE

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

Zero Threshold TM. Hints and Tips Handbook. Birdlip. Burford. Blockley. Bourton

8 Wide AMATEUR CEDAR GREENHOUSE

10 Wide AMATEUR CEDAR GREENHOUSE

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

LAWN AND GARDEN GREENHOUSE

LAWN AND GARDEN GREENHOUSE

A (mm) B (mm) A (mm) B (mm) 14 x x x ft extension. 8ft extension ft extension ft extension 3720

ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH

8 Wide Victorian Cedar Greenhouse Assembly Instructions

6 Wide Evolution Cedar Greenhouse Assembly Instructions

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

Walk-in Greenhouse. Assembly instructions. 6x4. 6x6. 6x8. Model GH0490 Model GH0491 Model GH1040. Model GH0492 Model GH0493 Model GH1041

S H E D A S S E M B L Y I N S T R U C T I O N S

8 Wide Evolution Cedar Partition Assembly Instructions

Installation Guide. Bi-fold Doors

12 Wide Evolution Cedar Partition Assembly Instructions

NOMINAL SIZE A (mm) B (mm)

NOMINAL SIZE A (mm) B (mm)

S H E D A S S E M B L Y I N S T R U C T I O N S

Potting Store Assembly Instructions

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

8 Wide Evolution Cedar Greenhouse Assembly Instructions

10 Wide Victorian Cedar Greenhouse Assembly Instructions

WARNING Please refer to all safety notices in the greenhouse manual before assembling any of the sections

Extension Standard building 03/15

Installation Guide Simplicity Alfresco. V1.9 Lu070318

NOMINAL SIZE. A (mm) B (mm) 8 X 6 8 X 8 8 X X

ASSEMBLY INSTRUCTIONS FOR STORETTE STA42

Installation - Sub Cills

Ensure there is reasonable access for materials and working space, ensure the shed site is level and consider the disposal of run-off water.

GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

Cold Frame Instructions

Version 2016_1.1 VICTORIAN ASSEMBLY INSTRUCTIONS. Victorian Vi-23, 34, 36

10 Wide Victorian Cedar Greenhouse Assembly Instructions

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

Garden Room 2.4m BCGRSM2360 Assembly Instructions

Corner Potting Store Assembly Instructions

GIRTS ON BACK OF BUILDING

Assembly Instructions 10 X 10 Aluminum Roof Support

Walk-in Greenhouse. Assembly instructions. 8x6. 8x8. 8x10. 8x12. Model GH1399A Model GH1400A. Model GH1402A Model GH1403A. Model GH1405A Model GH1406A

6 Wide Victorian Cedar Greenhouse Assembly Instructions

INSTALLATION GUIDE. Flat Roof Homesheds TM BEFORE YOU START TOOLS REQUIRED

SMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE

8 Wide Victorian Cedar Greenhouse Assembly Instructions

Assembly Instructions

6 Wide Victorian Cedar Greenhouse Assembly Instructions

NOMINAL SIZE. A (mm) B (mm) 8 x 6. 8 x x x

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

Absco Premier Garden Shed Assembly Instructions Model: J30302G

NOMINAL SIZE A (mm) B (mm)

Absco Premier Garden Shed Assembly Instructions Model: J30302G

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Walk-in Greenhouse. Assembly instructions A B. MODEL A (mm) B (mm) C (mm) / / 2. Hobby / / 16

ASSEMBLY INSTRUCTIONS GG77. BASE SIZE: 2.190m x 2.020m

Extension Standard building 10/14

6 Wide Victorian Cedar Greenhouse Assembly Instructions

8 X 8 Extension ASSEMBLY INSTRUCTIONS TO BE USED IN CONJUNCTION WITH 8 WIDE INSTRUCTUIONS ISSUE: 2

Absco Regent Shed Assembly Instructions Model: J30372R

Dura-Lock Roof System

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

Curium 19H Installation Instructions & Parts List

Model 2400/4000 Illustrated Installation Instructions

Installation Guidelines

CONSTRUCTION GUIDE 27ft Wide and 30ft Wide SHEEP HOUSE

NEW skypod INSTALLATION GUIDE

16ft Polytunnel Assembly Instructions

Skypod. Pitched PVC-U skylights. Installation guide PITCHED PVC-U SKYLIGHTS ISSUE 1

STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE

Easy2Build TM. 6 x 8 Easy-Grow Greenhouse. Assembly Instructions. Smart Tech solutions

English/French 06/04

Synseal assembly guide 2009:Synseal assembly guide /2/09 12:38 Page 1. Conservatory Roof Assembly Guide

GrowSpan Estate Pro I Greenhouse

Assembly Instructions

46, 66, Page /01/17

Curium 19.4H Installation Instructions & Parts List

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

W6 series greenhouse

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS

Installation Guide Contemporary Alfresco V1.3 LU

ASSEMBLY INSTRUCTIONS SS2520. BASE SIZE: 2.520m x 2.020m

12ft Ultra Polytunnel Assembly Instructions

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

skypod INSTALLATION GUIDE Issue 2 CONTENTS 1. Preparing to install 3 2. Installation 4 3. Installing jack rafters Installation examples 11

Dubnium 11 Installation Instructions & Parts List

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Rockwell 4-in-1 Sliding Door

Transcription:

Renaissance GREENHOUSE ssembly Instructions for models 68 610 612 EFORE OPENING NY OF THE OXES PLESE RED THESE INSTRUCTIONS 03/07

RENISSNCE Greenhouse ase Plan You may have already considered the position of your new Robinsons Greenhouse and be aware of the importance of a square and level base. We cannot emphasise how important it is to have a proper base. It is essential that the base is flat, level and square as well as being substantial enough to take the weight of the greenhouse including 4mm toughened glass. If not already completed the base should ideally be a concrete perimeter footing a spade s width and of sufficient depth for your local ground conditions. brick perimeter base is equally suitable (and more attractive) providing there is a suitable concrete foundation beneath it. Width of greenhouse 696mm 491mm 491mm 491mm Greenhouse base rail ase Diagonal 6x8 2300mm quality stock brick or semi-engineering brick is recommended. The dimensions given for the greenhouse base plan allow the building to overhang the base in order to help prevent water running back into the building. If you are using a flat slap base, which may be easier to prepare, then you may get water seeping underneath. You can apply a watertight sealant between the bottom rail and the base if required. (Not supplied) Diagonal 6x10 Diagonal 6x12 491mm Length EXTERNL DIMENSIONS (mm) MODEL Width Length Diagonal 6 x 8 1678 2300 2847 6 x 10 1678 2920 3367 6 x 12 1678 3540 3917 1678mm Safety dvice It is advisable that two people should assemble this greenhouse. Particular care should be taken when handling glass and the wearing of gloves is strongly recommended. Favourable weather conditions should be chosen. Do not try to erect the building in windy conditions. Keep children and pets away until the work is finished. Take your time - rushing causes accidents. Tools required Step ladders 2m high (two if possible) Spanners or 10mm socket Drill + bits including 7mm masonry Spirit Level Screwdriver, manual or power with attachments Sharp scissors or knife Gloves PREMIER LUMINIUM GREENHOUSES 2

RENISSNCE Example model: 6 x 8 Renaissance Please refer to the Parts List at the back of this manual to help you identify specific items during assembly 3

RENISSNCE - PRE SSEMLY efore starting the assembly of your new greenhouse please read these instructions carefully. Check that all parts have been delivered against the parts list. Once happy with the instructions start by locating eight Corner Glazing ars, (3) 1930mm in length, plus the roll of the PVC Glazing Strip. NOTE: ll the threading of the glazing strips - including both the side and roof glazing bars - can be done prior to assembly, perhaps in the relative comfort of a garage or shed. Using a little drop of washing up liquid at the start, thread the PVC glazing strip into both grooves in all the corner glazing bars. (See diagram 3). In all cases cut to full length taking care not to stretch the PVC strip. little overlap may be advisable, this can be trimmed while assembling. SSEMLY We are now going to assemble four identical end panels (1,2,3 and 4-see plan). You will need to locate a Short ase ngle, (1) a Hip Gutter (2) and two base brackets for each panel. Loosely fix a 15mm long bolt and nut in each hole of the base ngle, and a 10mm bolt and nut to the Gutter. See diagram. 1 2 Inside grooves with the PVC Glazing Strip in place Corner Glazing ar Fix the two Hip Gutter ar Corner Glazing ars with the 4 base brackets, (using the elongated hole, and on the inside of the greenhouse) and base rail (see diagram 5) Corner Glazing ar rests on this lip and tighten the nuts firmly. Next connect the Gutter (4) to the Corner Glazing ars - to form a frame - the corner glazing bar is to rest on the lip on the inside of the gutter. 3 Check all nuts are tight but be careful not to overtighten. Now repeat the same process on remaining three panels. IMPORTNT You will require two strong step ladders for this part of the assembly. If this is not possible then extra people to hold sections in place is essential. You will require the remaining two base angles and hip gutters plus the appropriate nuts and bolts. Trim any access PVC glazing strip prior to assembly. 6 7 Corner Glazing bar 5 ase connections Short ase ngle Short Hip Gutter For ease lay these parts, in position, on the ground, as if viewed from inside the greenhouse, per the plan. Ensure suitable protection is put down if the surface is likely to scratch the coating/paint. ase Rail ase racket in position with a 15mm nut and bolt ase Rail Carefully support the first of the made panels in an upright position (6) - by fastening it to the step ladders, or a second person holding it. Connect both the base angle and gutter to the supported panel with 10mm nuts and bolts, in the previously described way. Next, position the second completed panel and secure with correct nuts and bolts. (Eg connect sections 1 to 2 and 3 to 4) 4

RENISSNCE - SSEMLY PLN Corner Glazing ar Corner Glazing ar PVC Glazing Strip ase racket 4 Fit the top rail with gutter drainage hole, and a base bracket to the glazing bar supporting the down pipe. 1 ase racket Length of ase rail and top rail is dependant on model 15mm olt + nut Used when connecting the base brackets Length of Ridge bar is dependant on model 10mm olt + nut 3 Door End, note two base brackets are required on the supporting glazing bars 2 Used on all occasions where the 15mm is not required 5

RENISSNCE - CONNECTING THE SIDES On the top connecting point of each corner glazing bar, place and secure the triangular eaves bracket with two 10mm nuts and bolt - see diagram 7. Repeat this operation for the other end. You should now have the two angled end sections complete. Check all nuts are tight but be careful not to overtighten. The sections can now be positioned in the final position. If the greenhouse is being placed on an oversized based, eg slabs, a waterproof sealant (NOT SUPPLIED) can be applied to the base if required. It is not essential, but water seepage may occur. Place the two base rails (length dependant on model) roughly in position and adjust into final place with the end sections, secure together with 10mm nuts and bolts. Next secure the top rail in a similar manner. Note: the top rail with the gutter drainage hole should be located at the back of the greenhouse - opposite the doorway. This should now be the basic framework of the greenhouse. Check the final position of your greenhouse. ny manoeuvring should be done with care and two persons. t this stage check that all nuts are firm. Minor adjustments may be require when fitting the glass, but it is important that the frame is sturdy and square. SIDE GLZING RS If not already done so thread the PVC Glazing Strip into the side glazing bars. Diagram 9. 612 Model will have five glazing bars 610 Model will have three glazing bars 68 Model will have two glazing bars Note that the glazing bars adjacent to the PVC Glazing Strip positioned in door will only require the side Glazing ar the pvc glazing strip in the inner groove. See diagram 8 at the bottom of page. Fixing of the glazing bar to the base rail 9 10 11 The glazing bar supporting the door and the centre bar on the back should also have a base bracket fixed with 15mm nuts and bolts, (as previously stated). Depending on model the remaining bars should be secured in position with 10mm nuts and bolts, dia.10,11. ROOFING GLZING RS Fixing of the glazing bar to the hip gutter rail gain if not already done so thread the PVC glazing strips in all the roofing glazing bars. Diagram 12 There are two sorts of roofing bars which need to be identified prior to assembly. The shorter square version () will be used on the straight ridge sections. The longer and angled version () will be used for both the ends of the greenhouse. 8 12 Thread PVC Glazing Strip PVC Glazing Strip Note: The glazing bars that make the door opening do not require the PVC Glazing Strip on the door side. PVC Glazing Strip Door End Position of glazing bars at the Door End with the PVC Glazing Strips correctly inserted The two type of Roof Glazing ars 6

RENISSNCE ROOF SSEMLY ROOF SSEMLY Locate the two Ridge brackets (13), Spacers and the Ridge ar. Ridge racket Position the two 22mm nuts and bolts into each end of the ridge bar along with the steel spacers. Position the Ridge racket as shown in diagram 14, 15 and tighten. Note: Ensure there is room to fit the square roofing glazing bar adjacent to the bracket. It may be worth offering up the bar and checking this before securing the nuts. Repeat this operation at the other end. 14 Ridge ar with the Ridge racket in position Spacer 13 Double check that the Ridge brackets are square and secure. Next, fix two of the longer angled glazing bars to the centre two connections of the Ridge racket ( and ) with 10mm nuts and bolts, as shown below (16). Secure but allow for slight adjustments when fixing to frame. Do this at both ends. 16 The next operation will ideally be done with two people. You may also need the use of a step ladder. With support, manoeuvre the ridge bar assembly unit into position and secure into the 15 correct place on both ends of the greenhouse with 10mm nuts and bolts. t this point check final positions and tighten the nuts, being careful not to overtighten. The remaining roof glazing bars can now be fixed, it is advisable to complete the end sections first. efore securing the square glazing bars (17), ensure the greenhouse is good and square. Ridge ar with the Ridge racket and all four angled roof glazing bars 17 lso note, prior to fixing the square glazing bars work out the position of any roof vents (number is dependant on model). 10mm bolt will have to be slid in to each roofing bar which will support the vent. Hint: use a piece of tape to temporarily hold these bolts in place. The greenhouse frame is now sturdy and self supporting and any support can be removed. ut be aware that strong winds may cause the greenhouse to move as it has not yet been secured to its base. FINILS ND CRESTING Now the finials and ridge cresting need to be positioned and secured. efore starting it is worth measuring the ridge bar and then laying out the finials and cresting to create the desired effect. One of the male finials requires the tongue removing and the last cresting will have to be trimmed to get the correct finished length. Centre the crestings on the ridge bar and secure the finials in position with the supplied silicone. 18 68 model 610 model 612 model 7

RENISSNCE - GLZING THE SIDES PRT ONE It is advisable to glaze the four corner section of the greenhouse as part one of the glazing. This is to ensure the stability of the building and help to keep the building square. Each of these glazing sections are complete units and will not effect future glazing work. Note: DO NOT complete the glazing of the greenhouse at this stage. Separator Strip 19 21 PVC Strip Corner ar PVC Strip Glass The four sections to start with are section 1,2,3 and 4. (please refer back the diagram on page five). This is assuming that the louvre vents are being fitted in the two end sections of your greenhouse. Short Glass Glass Standard ar Capping It is advisable to have these vents in the end panels, to create a healthy flow of fresh air. You can however, place them where it suits you needs. Do not site any vents in the panel next to the door(s). Fix just the lower self-tapping screw to start with. 22 Only take the glass pieces you require and keep the other the parts safe. Working with glass can be dangerous, care should be taken at all times and protective gloves should be warn. 20 Starting from one section, select a bar capping and secure with ONLY one self tapping screw at the bottom only. Position the first 610 x 305 piece of glass, fitted with a 4mm separator strip, between the capping and the glazing bars. Next carefully place the large pane - 1628 x 610 - into the separator at a slight outward angle. The top of the glass can now be gently positioned under and into the gutter, in the same motion push the separator joint inwards until glass is in final position. Diagram 20. Next, secure the glass panels by fastening all the self tapping screws in the corner capping bar/glazing bars. (Diagram 21) Secure the capping cover by clicking it into position at the top edge, then gently pressing, in a downward motion, push the cover in with the side of your hand. (Diagram 22). Continue fitting the other Push Top glass Glazing bar 23 4mm Separator Strip three corner' glass panels in this manner, securing the standard bar capping as you go. t this point you need to assemble and fix the door threshold and door guide track before continuing with the glazing. FITTING THE DOOR TRCK Locate the Inner Door Track, Outer Door Track and Centre Door Stop. (See diagram 23/24 on page 9). Using short bolts secure the stop to the track using the holes provided. 8

RENISSNCE - FITTING THE DOOR TRCK NOTE: The stop is slightly off set and the off set should faceup towards the single hole. Fix the outer and inner tracks by clipping them together. Put a 10mm bolt in each of the holes near the ends. (See diagram 25). Identify Hip Double Door Header, two Doorway Header Plates, and Door Header racket. 25 Inner Door Track clipped into the Outer Door Track. 10mm nut and bolt joins the two pieces, with the nut facing outwards. 26 up tight. Screw through the holes of the door track with self tapping screws into the bar capping behind it. The plastic Z Trim can now be pushed into place. (See diagram 30). The combined Door Tracks fitted with the Door Header Track Fix the side of the door header with 3 holes in it to the door track with 10mm bolts (See diagram 26). Identify the two Door Track rackets ( S Shape) and hook one end into the top of the bar cap covers either side of the door. (See diagram 27). D085 24 Inner Door Track Outer Door Track Ensure the underside of the track is sitting on the S shaped brackets. Check everything is square and double check all bolts are done Door Header Track Fitted with three 10mm nut and bolts, in the holes provided 28 27 23 Top of Door Stop Fix the Door Header racket with a 10mm bolt in the hole in the gutter at the centre of the doorway. Note the bracket is not symmetrical and fits as shown. (Diagram 28). Now with someone helping you offer the assembled door track up in position and secure it to the bracket with a 10mm bolt. Door Header The S shaped Door Track rackets hook simply into the top of the bar cap cover Zed Trim SIDE VIEW 29 Fix the doorway header plates, using a cropped head bolt in the glazing bar and two 10mm bolts in the other two holes. (See diagram 29). 30 Inner Door Track Outer Door Track

RENISSNCE DOOR GUIDE & THRESHOLD GLZING - PRT TWO RENISSNCE - ROOF ROOF VENT From the door kit locate the door guide and the door threshold. Position the Door Guide onto the Gable ase Rail to fit with an equal gap at either end. The door guide should sit in comfortably onto the gable base rail groove. (Please refer to diagram 31). Now fit the Door Threshold in the doorway, by placing the short angle end into the door guide. With downward pressure clip the threshold until it locks into position. (Please refer to diagram 31). Gable ase Rail Door Threshold Fit by inserting the correct end into the groove in the Door Guide and by pushing down clip into position Ensure it fits in the doorway between the two glazing bars Door Guide Fits by interlocking the two pieces together and pulling into final position. Ensure it fits equally on base rail. Note: the glazing and corner bars have been omitted from this diagram for clarity purposes only. The remaining side sections can now be glazed. Each section is completed as described on page 8. LOUVRE VENTS The panels which are to contain the louvre vents can also be completed. See page 18 for full instruction on how to assemble the olt louvre vent. 32 Vent closure Screw 31 olt Screw 33 Vent side Slam Rail Cleat Slam Rail assembly Cropped head bolts olt Identify the vent kits, fittings packs, two pieces of glass 550 x 450 mm and the boxes containing the automatic openers. The slam rail first needs to have the nylon brush strip slid into the appropriate channel, protruding by approximately 5mm each end. Get two 15 mm bolts and nuts (from the supply of fittings in the utomatic Opener ox, not the Vent Smalls Pack) and temporarily fix them in the centre of the groove of the slam rail. These will be used later for fixing the openers. From the Smalls olt Pack slide a 10mm square headed bolt into each end the same groove and fix one end of the cleat to it. Fix a cropped head nut and bolt into the Screw other hole in the cleat and put these and the openers out of the way for use later. Vent hinge Screw Vent cill Nylon brush strip Now assemble the vent (see diagram 32). First fit the two side members to the vent hinge with 10mm bolts and slide the glass into position. Now fix the vent cill with 10mm bolts. Use the self-tapping screws to fix through the holes at each corner, not forgetting to fix the vent hinge closures at the same time. Check the vent is square, all fixings tight, and then run a bead of silicone (supplied), on the outside, around the perimeter of the glass and the edge of the frame to seal any gaps. Loosely fit the screws into the Vent Hinge Stops, and being careful not to lose them, put these and the vents to one side for later use. 10

RENISSNCE - ROOF GLZING THE ROOF Each section comes as a single piece of glass. Great care should be taken when handling glass and it is recommended that suitable gloves should be worn. NOTE: efore glazing it is advisable to separate the various bar caps (34) and covers (35), required for the roof plus the self-tapping screws. The starting point should be the most convenient but it is recommended that you start with one of the triangular pieces of glass and then work around the greenhouse in one direction. We suggest right handers work in a clockwise direction and left handers anticlockwise. FIXING THE FIRST ROOF VENT Fix the vent slam rail in position above the small piece of glass already fitted. From inside the greenhouse slide the cropped head bolts into the grooves of the 36 34 35 Glazing ar capping glazing bars either side of the vent opening and slide rail down onto the edge of the glass to ensure a good tight fit before tightening the nuts to secure. Next the roof vent and vent stops need to be fitted by sliding them into the groove provided in the ridge (see diagram 33). vent stop goes either side of the vent and when the vent is centrally positioned over the aperture the screws on the stops should be tightened to stop the vent moving sideways. GUTTER JOINTS Where each angled gutter section meets a joiner (diagram 37) needs to be placed to make a water tight system. The fitting of these gutter joints can be hard work and will require some exertion to put into place. The wearing of protective gloves is essential. ar cap cover The knack of fitting is to insert the upstand on the bracket nearest the outside of the building first. Then push the back of the bracket down and locate the two rear upstands under the lip in the gutter profile. (Diagram 38) Finally apply a bead of silicone in/on joints that are left uncovered by the bracket 37 38 Right hand Left finish Start Left hand Use a set of steps that are being supported as some exertion is needed by the person inserting the bracket Start Right finish This is an example of how to proceed with the glazing of your greenhouse. Right hand clockwise, left hand anti-clockwise. The sample shown is a 68 model, use the same principle on the 610 and 612 models. This diagram shows the gutter joiner in the process of being fitted. Downward pressure is required to snap the joiner in to place. 11

RENISSNCE - FITTING THE DOOR SSEMLY OF DOULE DOORS Suitable for the 612 model From the box labelled Door locate the four Door Stiles, two plain plus plus one with lock pre-fitted and one with lock strike plate pre-fitted. REMOVE the key, attached to the stile, with the lock and keep safe. lso find the two Door Cross ars, Door ottom ars and Door Top ssemblies, with pre-fitted rollers, plus the Smalls Pack. Lay the parts out on a suitable flat surface as if viewed from inside the greenhouse. (See diagram 40). Loosely fix the Door Cross ar that goes in the middle of the door with Pan Head olts and nuts. Note: Cross ar fits with the glass recess facing down. 40 Top Door Crossbar 41 Fix door handle with two pan head bolts. Locate the glass to go in the bottom section of the door (922 x 555mm) and the PVC Edge Strips (905mm long). Refer to diagram 39 - and fit the PVC Edge Strips onto the glass, allowing an even amount of glass to stick out at each end. Now slide the edging strips into the grooves in the Door Stiles so the end of the glass fits into the recess of the Middle Cross ar. Now fix the ottom Door Cross ar with Pan Head olts. Fit the appropriate PVC Edge Strips to the piece of glass that goes in the top part of the door, again with an even amount of glass exposed at the top and bottom. Locate the PVC Edge Strips in the grooves of the Stiles and slide the glass into place. Now fix the Top Door ar. Check the pan head bolts are finger tight and lift the door onto its side and screw door stiles to the cross bars through the holes provided using self-tapping screws. D232/3 39 Fix the Door Handle through the pre-drilled holes after loosening off one of the bolts already occupying the lower hole. Now tighten up all the bolts. (41) Repeat this procedure to complete the other door. Fix the Nylon Door Guides centrally on the ottom Cross ar. Slide the Nylon rush Strip D097 D307 D093 Pan Head olts D092 Self Tapping Screws D095 into the groove on the Door Style and cut to length. Crimp the bottom of the groove to prevent it slipping out. These will seal against the door posts when the doors are closed. SINGLE DOOR SSEMLY Suitable for the 68 and 610 models To assemble the single door is based on the same instructions for the double door. The lock and handle will be on the left hand side, with a door stop on the corner glazing bar to the left side of the door. (42) The door will slide to the right. 12

RENISSNCE - FITTING THE DOOR FITTING THE DOOR Slide door wheels into the top track, at the same time ensuring the nylon door glide engages in the door guide. Diagrams 43 and 44. Slide on completely and repeat process for other door. Finally push the two plastic door track covers onto the ends of the door tracks. (46) 43 46 Check that both doors run freely, if not then check that the outer track is sitting squarely on the inner track. Check that door track is parallel to door guide. When the doors are running to your satisfaction, fit a rubber door stop (45) to each end of the track in the holes provided using M4 x l0mm stainless steel nut, bolt and washer. 42 44 SELING THE RIDGE ENDS & FIXING THE RIDGE CPS You need to silicone the small gaps between the ends of the ridge glazing bars and end of the ridge. Then fit the ridge cap. (See diagram 47). efore fitting with two self-tapping screws through into the bar cap cover, ensure the pointed end of the cap is tight up against the end of the ridge. 45 Silicone the small gaps Self-tapping screw 47 Self-tapping screw 13

RENISSNCE - FINISHING TOUCHES FITTING THE UTOMTIC OPENERS Remove the opener/s from their box and follow the manufacturer s instructions. SE RCKETS When the greenhouse is in its final position, check that it is square, diagonals are equal and the base rail overhangs evenly all around. Drill through hole in bracket with a 7mm masonry drill to a depth of 50mm. Insert a rawlplug and secure the bracket with the supplied 2 woodscrew. (See diagram 48). 49 Gutter rail Capping ar Gutter outlet stub Cut away for diagram proposes only Downpipe Fix to capping bar with a self tapping screw Congratulations, a job well done and thank you for purchasing a Robinsons Greenhouse, which we hope, will give you many years of gardening pleasure. DOWN PIPE Fit the gutter outlet stub in the drainage hole, located in the centre of the back gutter. NOW FIT THE STGING ND/OR SHELVING Follow the relevant instructions on pages 19 and 20. 48 Fit the angled rain water pipe outlet onto the end of the down pipe and push the other end onto the gutter stub (see diagram 49). Finish by drilling a small hole through the bar capping and using a self tapping screw to fix the pipe bracket at the appropriate height. NUT COVERS + DGE The greenhouse is all but complete, with just two jobs left to do. Go all round the building and fit the covers over every nut that is visible in order to produce a tidier finish. Finally fix the name badge centrally above the doors. 50 14

RENISSNCE - GLZING PLNS - 4mm TOUGHENED GLSS ONLY 68 MODEL Measurements in mm. Side and End panels Ref. D519 Panel above Louvre vent Ref. D521 Door top pane Ref. D911 1628 x 610 1016 x 610 812 x 555 Door bottom pane Ref. D912 Door End Ref. D1015 Ref. D1015 Side and End lower panels Ref. D1254 305 x 610 27 16.38 922 x 555 Roof Side Panel Ref. D1016 Ref. D1015 Roof Vent Ref. D1017 550 x 550 550 x 450 Ref. D1018 550 x 980 Ref. D1015 These sizes and reference numbers are common to both the 10 and 12 models. The 10 and 12 roof glazing plans are on the next pages. 930 71.26 D1014 984 D1015 71.27 658 350 15

RENISSNCE - GLZING PLNS - 4mm TOUGHENED GLSS ONLY 610 MODEL Measurements in mm. Ref. D1015 Roof Side Panel Ref. D1016 Ref. D1015 Ref. D1040 550 x 550 Ref. D1040 300 x 980 300 x 980 Roof Vent Ref. D1017 550 x 450 Roof Vent Ref. D1017 550 x 450 Ref. D1040 Ref. D1040 300 x 980 Roof Side Panel Ref. D1016 300 x 980 Ref. D1015 550 x 550 Ref. D1015 Door End 16

RENISSNCE - GLZING PLNS - 4mm TOUGHENED GLSS ONLY 612 MODEL Measurements in mm. Ref. D1015 Full glazing panel Ref. D1039 Roof Side Panel Ref. D1016 Full glazing panel Ref. D1039 Ref. D1015 550 x 550 980 x 610 980 x 610 Roof Vent Ref. D1017 550 x 450 Roof Vent Ref. D1017 Full glazing panel Ref. D1039 550 x 450 Full glazing panel Ref. D1039 980 x 610 Roof Side Panel Ref. D1016 980 x 610 550 x 550 Ref. D1015 Ref. D1015 Door End 17

RENISSNCE - Louvre Installation Instructions D361 Louvre Kit INSTLLTION 1 Screw self-tapping screws through holes in the top and bottom cill members into the C groove of the side jambs to form a complete frame. No.6 x 12 screws Exploded View Top cill 2 From outside the greenhouse, fit the frame in place, fixing into position using the plastic bar caps and screws. 3 Open the louvre and slide glass blades into position from inside the greenhouse. To avoid excessive movement of glass, bend the retaining clips so that the louvre blade is firmly gripped. Left hand Glazing ar CONTENTS OF KIT Part No. Description No. Required - Instructions one D168 Louvre jamb set one D166 Louvre side member two D165 Louvre top/bottom (rubber fitted) one (pair) D362 Louvre smalls pack consisting of: FS 6013 N0.6 x 12 self-tapping screws four D729 T/G Louvre glass - 100 x 525mm (4mm thick) six Left hand Side Jamb ottom cill Right hand Side Jamb Right hand Glazing bar (not shown but as left hand bar) 18

RENISSNCE - SIDE ND RER PRE-SSEMLED HIGH SHELVING 3-Slat - shelving Fix the tubular brace () to aluminium greenhouse glazing bars, using cropped-head bolts. (The height of the shelving can be adjusted to suit individual needs). Ensure the bolts are correctly engaged in the nut groove before tightening. Next fix the short 90º brackets () in a similar manner ensuring the brackets are level. Minor adjustments can be made to the bracket once the shelf is fitted, by loosening the nut slightly and moving the bracket up or down. spirit level placed on the shelf will ensure it is level. The shelf is fixed into its final position by the used of three wood screws. (See diagram 51). Diagram 52 shows where the braces and brackets are place and the remaining shelves fit together. 51 Cropped-head bolt. 90º bracket 52 Tubular brace Cropped-head bolt. The head must be turned to engage before tightening Cropped-head bolt. The head must be turned to engage before tightening. 19 19

RENISSNCE - SIDE ND RER PRE-SSEMLED STGING 5-Slat - staging In a similar manner to the high level shelving fix the tubular brace () to aluminium greenhouse glazing bars, using cropped-head bolts. (The height of the staging can be adjusted to suit individual needs). Ensure the bolts are correctly engaged in the nut groove before tightening. Next fix the short 90º brackets () in a similar manner ensuring the brackets are level. Minor adjustments can be made to the bracket once the staging is fitted, by loosening the nut slightly and moving the bracket up or down. spirit level placed on the stage will ensure it is level. 1 1 The staging can now be fixed into its final position by the using of the wood screws. (See diagram 51, page 19) The diagram shows where the braces and brackets are place and the remaining staging fit together. Note that the (1) brackets (same bracket as ) are used to support the staging but are not connected to the greenhouse frame. See diagrams 53 + 54. 1 1 1 1 53 54 90º bracket 20

RENISSNCE - PRTS LIST Ridge member Corner glazing bar PVC glazing strip D231 Vent hinge 10mm olt + Nut bolt F5002 nut F5006 Glazing bar inside grooves with the PVC glazing strip in place ar capping Vent side 15mm olt + Nut bolt F5003 nut F5006 Glazing bar ngled Vent cill ar cap cover ase angle Hip gutter Door post capping Standard bar capping Vent stop D220 Screw FS6060 Door and plain end gable base rail Slam rail cleat D114 Door guide (door end only) No 8 x 12mm self tapping Pozidrive screws FS6017 21

RENISSNCE - PRTS LIST Vent closure D205R Inner door track D548 Door Header racket D552 Door side member (inner) D092 Cropped head bolts F5001 Separator Strip 4mm D101 F5006 Doorway header plate D163 ottom door crossbar D097 Door Track S Clip D845 Outer Door Track D549 Zed trim D223 Double door Centre door stop D150 top Doorway Header D512 Door side member (outer) D093 LH D094 RH Door crossbar D095 22

RENISSNCE - PRTS LIST Ridge Cap D1023 M6 x 10mm pan head bolts D263 Self tapping screws FS6016 Rubber door stop D312 PVC edging strip D232 & D233 Door threshold D088 D/D Gutter joiner D1024 Top door crossbar D307 E-Ring D252 Moulded door track cover D204 Rainwater pipe outlet D207 Nylon brush strip D840 Silicon dispenser syringe type D119 Nylon door glide D225 Gutter outlet stub D201 cut 1 4 (6mm) 23

ROINSONS GREENHOUSES, STTION WORKS, FENNY COMPTON, SOUTHM CV47 2X TELEPHONE 01295 770717 FX 01295 770819 Whilst the information contained in this leaflet is accurate at the time of publication, changes in the course of Robinsons policy of improvement through development and design might not be indicated. We point out this fact to avoid any infringements of the Trade Descriptions ct and also to advise that Robinsons Greenhouses reserve the right to change specifications and materials without prior notice. ll sizes nominal. ll weights approximate. Robinsons Greenhouses 04/07