earl Pearl Frame Instruction Addendum How to Load Fabric to Frame Model BLQF Model BLQF

Similar documents
Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

The Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.

Machine Quilting Frame assembly, and instruction manual

The Mini Pinni Quilting Frame

The Queen Quilter Professional Quilters Kit Frame

MACHINE QUILTING FRAME

Q-Zone Hoop-Frame. Assembly Instructions. Copyright July 11, 2018 Grace Company (Reproduction Prohibited) Version 1.8

DOUBLE POT HOLDER. Materials

Practicing Basic Machine Operation Sample #1

SINGER PROJECTS Sewing Machine Mat with Pockets PROJECT SKILL LEVEL:

Material Amount Cost Where to Purchase 1.1oz Breathable Ripstop 4 yards $12.80 DIY Gear Supply

{ FEATURING PARADISE COLLECTION}

Continuum Frame Assembly Instructions

Assembly Instructions. Copyright May 01, 2013 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited)

Brother PQ- Series Accessories

Perfect Binding Corners

A. Preparing the fabric (not shown):

NOLTING MANUFACTURING INC. CUSTOMER INSTRUCTION MANUAL

The Love Quilt Project Lap Quilt Pattern. Finished Quilt Size Lap quilt, 54 x 54

2016 Courtesy of Art Gallery Quilts LLC. All Rights Reserved.

Christmas Quilt. Skill Level: Easy. Created by: Diane Kron, Software and Embroidery Project Manager

Bound and Determined:

Name: Class: Monster Doll. Grading Rubric

The batting is just fed in between and hangs down to the floor in front.

HQ Studio2 Frame. Assembly Instructions. Table of Contents. What s Included

HQ Studio2 Frame. Assembly Instructions. Table of Contents. What s Included

P layful Cuties Quilt - Coral

featuring ABLOOM AGF STUDIO COLLECTION Arbor

free pattern featuring Rayon Striped COLLECTION BY AGF Studio

Pinwheels in the Park

Juki Quilting Frame. Assembly and Use Instruction Manual. Max Overall Dimensions: Length Crib: King: Tall: Wide: 42

Baby, Throw and Queen Size Pattern

TIPS & TROUBLESHOOTING

This versatile foot may also be used with zigzag and decorative stitches, as the guide does not extend through the needle opening.

featuring ALIGNED COLLECTION BY AGF STUDIO MONDRIATION FREE PATTERN

Dream Fabric Frame Assembly Instructions

INSTRUCTIONS BFC716 QIH LEOPARD BAG

Martha s A-Line Skirt with Darts

free pattern enlightment QUILT DESIGNED BY KATARINA ROCCELLA BED RUNNER DESIGNED BY AGF STUDIO FABRICS DESIGNED BY KATARINA ROCCELLA AVG-28910

Impulse. 1/4 yard each very dark green (A), dark green (B),

know you ve got your little three piece where they re all hooked together. I m going to take my next three piece, make sure that I don t have anything

Scooter Strips Wall Hanging

Checkered Baby Quilt

free pattern featuring aligned COLLECTION BY AGF STUDIO

featuring LETTERS COLLECTION AGF STUDIO

Inspira Quilt Frame and Mega Quilter FAQ s

featuring NEST AGF STUDIO COLLECTION Sir BeaR

Getting to Know: Model BL30A. A-Line Series. Baby Lock Consumer Helpline:

Dream Fabric Frame Assembly Instructions

You will need. Equipment

{ FEATURING PRISMA ELEMENTS}

Doll Tag Clothing Simply a Skirt Pattern 1

and FABRIC REQUIREMENTS CUTTING DIRECTIONS artgalleryfabrics.com Table Runner FINISHED SIZE: 36" x 36" Fabric A Fabric B Fabric C Fabric D Fabric E

Making Double Fold Straight of Grain Quilt Binding

Union Jack Variation Free Pattern Approximately 75-3/8 x 57

Tab-Top Panel Curtains with Button Accents

FREE PROJECT SHEET DESIGNED WITH LOVE BY

Fabric Preparation: At the Computer: 1. Fabric A - (Print) Cut Five - 2½ x 32 strips (to be embroidered) Cut One - 26 x 32 (Back)

featuring NEST COLLECTION AGF STUDIO

featuring METROPOLITAN

Riding Hood Quilt. Pieced by: Diane Kron, Software and Embroidery Project Manager Quilted by Cathy Brown, Baby Lock Quilting Ambassador

Beginning Level (9-11 Years)

Blue Heron Wall Hanging

EC How to Make Braided Rugs

featuring WOODLANDS COLLECTION AGF STUDIO

FREE PATTERN. featuring ETHEREAL COLLECTION BY AGF STUDIO

featuring REVERIE AGF STUDIO COLLECTION em ji

Decorative Black Wall Hanging Quilt

CAUTION- SAVE THESE INSTRUCTIONS This product is for household use, or equivalent.

FREE PATTERN. featuring RAISE THE VOLUME COLLECTION BY AGF STUDIO

MAIN PARTS

2018 Doll Tag Clothing Simply a Skirt 1

featuring CITY LOFT COLLECTION AGF STUDIO

DIY Christmas Advent Calendar Sewing Tutorial

Reverse Mount Roman Shade Fabrication. Seamless Workroom LLC 2017

Creative Sewing. Quilt Block Pillow Instructions and Visual Aid

Sashiko Autumn Leaves Wool Quilt

Margaret Moorehead s. Virtual Sewing Guild Video Series

Pajama Sock Monkey 2009 Cutest Creations

Sweet Dreams Gone Modern

Figuring the amount of fabric needed: 0 Measure the window and record each measurement A. Width inside frame B. Length inside frame C. Width outside f

T-Shirt Memory Quilt

f e a t u r i n g L i t t L e t o w n C O L L E C T I O N B Y a M Y S i n i B a L D i Winter f r e e p a t t e r n

featuring PINE LULLABY

featuring playing pop COLLECTION BY agf studio Spur of the Moment free pattern

SMILE AND STAND TALL By Suzan Pons

Under The S ea Table Runner

Kimono Collection MATERIALS. Finished quilt size CUTTING

Tiny Treasures Tote. Edge Joining foot Clear foot Empty bobbin

Mini 4-H SEWING PROJECT

Copyright 2016 MKKB Enterprises, INC

FREE PATTERN. featuring PRINTEMPS COLLECTION BY AGF STUDIO

The Basics of Longarm Quilting

Love Always Quilt. Additional Supp lies Needed. Fabrics Needed. Finished Size: 44" x 58 ½" (113.03cm x cm)

INSTALLATION LS MODEL

free pattern featuring paperie COLLECTION BY AMY SINIBALDI

Little Forest Quilt. 1. Use a rotary cutter and acrylic ruler to cut the number of pieces from each fabric as shown.

Computer Cozy. 830 Class

twiddletails Strippy Runner Tutorial Makes a runner approximately 17½ x 50

Build Your Own Design Wall

Transcription:

earl Pearl Frame Instruction Addendum How to Load Fabric to Frame Model BLQF Model BLQF www.babylock.com

Step 1 Anatomy of the Frame Note: A little preparation the first time you use your quilting frame will save you a lot of time later A. Set up the s 1. Ensure that all of your s are installed correctly and turning in the right direction a) The large black gears should always be placed at the right end of the Pearl Frame 2. The take-up turns toward the center of the frame a) The hand wheel at the right end can be used to turn this as the quilt is rolled forward b) If the is turning in the wrong direction, and the gears are on the wrong end, lift it off the frame, turn it around and place it back into the frame. (You are switching which end is on the right and which end is on the left.) 2. There are four s on the Pearl Frame. Descriptions of each follows. C. The Backing Rail 1. The top on the front of the quilt frame is the backing a) The quilt back will be rolled onto this 2. The backing rotates away from the center of the frame a) If the is turning in the wrong direction, lift it off the frame, turn it around and place it back into the frame. (You are switching which end is on the right and which end is on the left.) B. Take-up Rail 1. The that passes through the throat of the Crown Jewel is the take-up a) As you work, the portion of the quilt that has already been quilted will be rolled onto this 1

D. The Quilt Top Rail 1. The quilt top is below the backing on the front of the quilt frame a) The quilt top will be rolled onto this 2. The quilt top rotates away from the center of the frame a) If the is turning in the wrong direction, lift it off the frame, turn it around and place it back into the frame. (You are switching which end is on the right and which end is on the left.) Step 2 Attach the Velcro and Leaders to the Rails A. Mark the Rail It is helpful to mark the center of each 1. Painters tape is an easy way to mark the s a) Place a line at the center of the b) If it makes it easier for you to remember which way the s fit into the frame, also label left and right on the tape E. The Batting Rail 1. The batting is below and slightly behind the other two s on the front of the frame a) The batting does not have ratchets and turns freely in both directions B. Cloth Leaders 1. Cloth leaders have markings that make it easy to get the quilt back and quilt top centered and straight on the frame 2. There are several different leader packages available at your local authorized Baby Lock retail store a) Baby Lock Quilt Leaders (1) 9.5 foot length - part #BLQL b) Start-Right Cloth Leaders (1) 10 foot length - part #GFCL (2) 12 foot length - part# GFCL-12 2

C. Attaching the leaders with Velcro 1. The hook side of the Velcro will be put on the take-up, the backing, and the quilt top a) There is no leader for the batting, so you will not need Velcro for that fourth b) Cut the Velcro to the length needed for each 4. If you are using the Start-Right cloth leaders, attach the shortest width leader to the take-up a) Match the center of the leader to the center of the b) The right side of the leader faces the back of the frame c) The Baby Lock leaders are all the same width, so it will not matter which of the three leaders is attached to the take-up c) Place the hook side of the Velcro on the s 1- The hook side is the stiff hard feeling side of the Velcro 2- Trim the Velcro so it does not interfere with gears on the end of the for the ratchet 3- The easiest way to attach the Velcro is to peel back about six inches of the paper and press the sticky Velcro into place. Then peel back the next six inches of paper and press Note: If you remove the paper from the entire length of the sticky Velcro, you will end up with a big knot of Velcro stuck to itself instead of the s! 5. If you are using the Start-Right cloth leaders, attach the medium width leader to the backing a) Match the center of the leader to the center of the b) The printed or right side of the leader faces the back of the frame c) The Baby Lock leaders are all the same width, so it will not matter which of the three leaders is attached to the backing 2. Prepare the leaders a) If you are using a frame set up smaller than the width of the leaders, cut the leaders to match the width of the s on your frame b) Attach the Velcro strips along the top edge of each leader on the wrong side 1- The Velcro loops are the strip that is soft and fuzzy 3. Fold each leader in half and mark the center at both the top edge and at the hem a) If you have marked the center of the, and marked the center of each leader, then it will be easy to get all of your leaders centered on the s 3

6. If you are using the Start-Right cloth leaders, attach the widest leader to the quilt top a) Match the center of the leader to the center of the b) The printed or right side of the leader faces the back of the frame c) The Baby Lock leaders are all the same width, so it will not matter which of the three leaders is attached to the quilt top Note that all of the leaders face the back of the frame and there is no leader for the batting Step 3 Load the Quilt on the Frame A. The back of your quilt and the batting will need to be cut larger than the quilt top 1. Always make the quilt back four to six inches wider than your quilt top 2. The back of the quilt should also be at least six inches longer than the quilt top 3. The batting should be at least two inches wider than your quilt top 4. Pin the quilt top to the right side of the leader a) Match the center of the quilt top edge to the center mark on your leader b) Long straight pins with flat heads are ideal for this 1- Pins are parallel to the edge of the quilt top, and placed about 1/4 apart 2- Pins can point either right or left, however you may want to place the pins on each end with the points toward the center of the quilt top. This will keep you from poking yourself with those pins on the end as you work B. Attach the quilt top to the leader on the quilt top 1. Roll the backing leader up so it is out of the way 2. Lay your quilt top over the top of the frame with the right side up 3. Find the center of the quilt on the edge that will be pinned to the leader and mark it with a pin 4

5. Roll the quilt top onto the quilt top a) Do not pull and tug on the top as you are rolling it b) Smooth it, if needed, to roll it evenly 1- Run your hand over it the way you would smooth the sheets when making the bed C. Attach the quilt back to the leader on the backing 1. Lay quilt back over the top of the frame with the wrong side up 2. Mark the center of the back with a pin 3. Unroll the leader on the backing 4. Pin the quilt back to the leaders a) Match the center of the quilt backing to the center mark on your leader 5. Roll the back onto the backing a) Do not pull and tug on the back as you are rolling it b) Smooth it, if needed, to roll it evenly c) Run your hand over it the way you would smooth the sheets when making the bed D. Roll the batting onto the batting 1. There is no leader for the batting, so the batting will be attached directly to the 2. An easy way to attach the batting to the is to use painters tape a) A mark on the tape can be used to center the batting on the 3. Spread the batting on the floor 4. Roll the batting onto the batting Now we have all three layers of our quilt loaded onto the s at the front of the frame! 5

E. Attach the quilt back to the take-up 1. Unlatch the take-up so it turns freely and unroll the take-up leader 2. Unlatch the backing so it turns freely a) Bring the quilt back across the frame so it reaches the take-up leader b) Pin the quilt back to the take-up leader 1- Match the centers 2- Use the guide line on the leader to keep the back straight 3- The wrong side of the quilt back faces up a) Bring the batting up over the quilt back on top of the frame b) The leading edge of the batting should be just below the pins in the quilt back 2. Use a channel lock to stitch a straight line across the top of the batting a) This line of stitching will serve two purposes 1- The batting will be anchored to the quilt back 2- You will have a nice straight line that can be used to position the quilt top 3. Re-engage the latches on both the take-up and the backing a) Turn the s so the quilt back is stretched firmly across the top of the quilt frame and no longer sags loosely F. Bring the batting up to lay on top of the quilt back 1. Bring the batting to the front of the frame between the backing and quilt top s 3. Set up to channel lock a) Position the Crown Jewel so the needle is at the left end of the line to be sewn b) Place the optional channel lock (part #BLJ18-CL) over the wheel of the machine as shown in the picture below Note: This makes sense since the batting belongs between the quilt top and the quilt back (e) 6

c) The channel lock prevents the wheel from rolling forward or back, so the machine will now only move from left to right. d) You will be able to sew a perfect straight line across the top of the batting e) When using the channel lock (shown on the previous page), use a gentle touch as you move the Crown Jewel. 1- If you pull hard, you can defeat the channel lock and sew a crooked line 1- Hold both threads as you begin to sew, so you will not get a bird s nest of thread on the back of the quilt 4. If you have the Pro-Stitcher Software, you can use the channel locking feature to sew your straight line a) Touch Quilt b) Touch Manual/Channel c) Touch Horizontal Channel Lock 5. Pull up the bobbin thread before you begin to sew a) Hold the needle thread b) Use the Needle Up/Down button on the left handlebar to take the needle down and then back up to bring a loop of bobbin thread to the top of the batting. c) Hold the needle thread taut between both hands and swipe the needle thread under the foot so the bobbin thread is pulled out from under the foot G. Use a walking stitch to sew the straight stitch line across the batting 1. The walking stitch sews a long basting stitch 2. To sew a walking stitch with the Crown Jewel press and hold the Needle Up/Down key on the left handle bar while moving the machine H. At the end of the line of stitching 1. Remove the channel lock so you can move the machine in any direction 2. Move the machine about six inches away from the end of the stitching line. A loose thread is dragged across the fabric 3. Move the machine back to the end of the stitching line 4. Hold the loose thread and touch the Needle Up/Down button to pull the bobbin thread up through the fabric and batting 7

5. Move the machine to one side and trim both the top and bobbin threads J. Attach the clamps at each side of the quilt 1. The clamps should be attached to the quilt back and, if needed, to the batting. The clamps are not attached to the quilt top 2. Pull the bungee cord taut, being careful not to stretch the backing fabric too much, and pull down to settle the cord into the narrow part of the opening in the frame I. Bring the quilt top up to lay on top of the batting 1. Release the latch on the quilt top a) Bring the quilt top over the top of the quilt frame b) The quilt top is right side up c) Line up the leading edge of the quilt top with your channel lock stitching d) You may want to place a few pins along the top of the quilt top to keep it from shifting until you get it anchored e) Latch the quilt top f) Turn the quilt top so the quilt top lays smooth and firm 8