INSTALLATION INSTRUCTIONS

Similar documents
INSTALLATION INSTRUCTIONS

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Installation Guide Contemporary Alfresco V1.3 LU

4-lite Patio Door. Installation Instructions

DIY GLASS BALUSTRADE AND POOL FENCING THE CHOICE IS SIMPLE

Method of Build 1. General

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

37.5 M6. If the basin chain hole is not used, please cover it with the screw and nut supplied.

Installation Guide Simplicity 16. V2.9 Lu171117

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel -

Tools you will need for this install

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Installation Guide Simplicity 6. v3.5 lu171117

Curium 19H Installation Instructions & Parts List

PORCH-LOC INSTALLATION INSTRUCTIONS

Dura-Lock Roof System

Quick Fit Installation Guide Retractable Screen - Double Door

Installation Guide. Step-by-Step Guide

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

a.k.a. casegoods instructions

Installation - Sub Cills

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

Step-by-Step Installation Instructions for

Gallium 03 Installation Instructions & Parts List

Method of Build 1. Fire. Sound

INSTALLATION GUIDE. Flat Roof Homesheds TM. Onto Concrete BEFORE YOU START TOOLS REQUIRED

Step-by-Step Installation Instructions for

Curium 19.4H Installation Instructions & Parts List

ALL SEASON PATIO COVER

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

W L. Standard Sizes: 2.125m underside of gutters m total height m roof m roof m roof.

Oxford Stalls Installation Instructions

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

Pergola Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing.

Sliding Glass Door Assembly and Installation Guide

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Frameless Glass Balustrade Systems

ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height

TREX TRANSCEND RAILING

Installation Instructions Models: SESD180, DESD180, MESD180 1/4" Semi-Frameless Door and 3/8" In-Line Panel

Balustrade Systems / Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing stair kit.

Laminate Cabinet Installation Instructions

INSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Horizontal Cable Systems

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

ATLANTIS RAIL Contact Information

InStallatIon InStruCtIonS for vinyl 2-lIte PatIo door assembled

Garage Door Frame Retro-Fit Clad Installation Instructions

OUTBACK FLAT ATTACHED VERANDAH PATIO CARPORT - INSTALLATION GUIDE BEFORE YOU START TOOLS REQUIRED ADDITIONAL MATERIALS

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

Bumper Sign INSTALLATION INSTRUCTIONS

Installation Guide Important:

Installation Instructions

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Dubnium 11 Installation Instructions & Parts List

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions

Installation Instructions for Vista Air Vertically Folding Walls

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS

FUSION JULIETTE BALCONIES FITTING INSTRUCTIONS

Installation Guidelines

Display Shelving Installation Instructions

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

OXYGEN INSTALLATION. Revision date

Deck Mount Installation with Bench

600mm 3 drawer base cabinet

INSTALLATION INSTRUCTIONS Aluminum Railing System

CAUTION. It is the responsibility of the INSTALLER to ensure that the installation complies with council and or local authority bylaws.

12 Wide Evolution Cedar Partition Assembly Instructions

Installation Instructions for. Before You Begin TOOLS REQUIRED

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

Steel Solutions USA 602 E. Walnut Street Watseka, IL p: (888) f: (815)

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS

TrendWall Floor-To-Ceiling Panels Installation Instruction

N35 ALUMINIUM ROLL-UP DOOR INSTALLATION MANUAL

Installation Instructions

Quick Fit Installation Guide Retractable Screen - Single Door

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Installation Guide. Bi-fold Doors

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

LEGENDS RETRACTABLE DOOR SCREENS

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

Hinge Door + Side Panel

InstallatIon InstructIons for 2-lIte PatIo Door unassembled

SLIDING TUB / SHOWER ENCLOSURE WITH STATIONARY 90º PANEL

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

Shower Screen and Door Kit Instructions

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

Transcription:

Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit. H. Aluminium cutting Drop saw. I. Dust pan and brush J. Soft faced mallet. K. Timber wedges and blocks for supports. L. Quick Grip clamps. Assembly of the balustrades in the factory 1. Cut the posts to length and pair the posts so you end up with a left and right hand post. 2. Label the inside of the post clearly with the Words ( Left Hand Bay 1 and Right Hand Bay 1 ). This will ensure that the bays are going to clip together on site. All bays are labelled as if you were standing outside looking in. 3. Mark out the position of the bottom rail on all of the posts. Use a jig with pre drilled holes to ensure a perfect placement. Drill the holes using a 5mm Drill bit. Please Note: It is important to remember that the bottom of the horizontal rail should not exceed 100mm from the finished floor level to the underside of the lowest point of the horizontal rail. 4. Determine what the length of each bay is and cut the lower horizontal rail to length 5. Minus the width of the glass insert from the lower rail length. 6. Mark out the position of the glass. 7. Line up the lower rail with the pre drill holes and using a 6G x 25 Pan head screw fix the rail to the posts. 8. Screw the under cap to the top of the post. Onsite Installation. 9. Identify the balustrade bays and lay them on the floor on top of timber studs to keep them off the ground. 10. Start at one end of the bay and snap the posts together using a quick grip clamp. 11. Snap on the top hand rail over the glazed under cap. 12. Slide the base covers over the post legs and tape to the lower rail. 13. Lift the balustrade bays up evenly and insert into the clean Core Drill holes. 14. By using a timber block and wedge under the lower rail, level the balustrade horizontally. 15. Two critical measurements must be set, The 1050 from the highest point to the finished floor level reference mark and the 100mm from the floor to the under side of the lower rail.

15. Two critical measurements must be set, The 1050 from the highest point to the finished floor level reference mark and the 100mm from the floor to the under side of the lower rail. 16. Use two string lines to align all of the post legs and the tops. 17. Start at one end and insert the timber wedges in and around the legs on the first balustrade post leg. 18. Work your way along the balustrade until the system is level horizontally and vertically. 19. Mix enough grout to fill a few holes at a time 20. Carefully pour in enough grout mixture to half fill the hole. 21. Allow the grout to set for at least 1 2 hours and remove the timber wedges. 22. Continue filling the holes with enough grout to fill the hole just under the finished floor level. 23. Install the Top caps into the balustrade posts. 24. Remove all remaining timber blocks from the lower rails. 25. Install two glass setting blocks per panel where the glass will seat. 26. Insert the glass into the under cap and line the bottom of the glass up with the lower pocket. 27. Centre the glass on the rail and push in the rubber wedge or wet glaze as required. 28. Cut the infill pieces to length. You will need 1 for the under cap and one for the lower rail. 29. Install that infill s either side of the glass and be sure to leave a minimum of a 1mm gap. 30. Repeat the process for both rails. 31. Remove the timber support blocks from the rails. Alternative fixing methods the Solaris Balustrades Direct fixing Concrete base. By using the direct fixing feet supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid concrete base. The Die cast Foot plates are custom made for this role. The foot plates are fitted to the base of Posts and screwed in place with 4-6G x 25mm Stainless Steel CSK screws. Once the foot place is fitted it s then bolted to the concrete base with 4 - M10 Chemical Anchors. IMPORTANT NOTE TO INSTALLERS. Use a spare foot plate to assist you marking the holes out onto the concrete base. At no point should the holes be drilled through the foot plate. Clearly mark out all holes with a blank Foot plate and remove when drilling. Direct fixing Steel or timber By using the direct fixing feet supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid and stable steel or timber base. The Die cast Foot plates are custom made for this role. The foot plates are fitted to the base of Posts and screwed in place with 4 6G x 25mm Stainless Steel CSK screws. Once the foot place is fitted its then bolted to the concrete base with 4 - M10 Chemical Anchors.

Concrete Direct concreted posts The posts being inserted directly into the concrete footing must be treated with the use of a rubber based bitumen paint or barrier medium to stop the direct contact of concrete on bare aluminium. All cut surfaces must be treated prior to being inserted. Failure to treat the aluminium can cause corrosion and affect the painted surface of the posts. The post must be embedded as per the fixing details provided. The local shire requirements and standard BCA regulations over write Solaris Balustrade s recommendations where needed and must and must be complied too at all times. Consult your engineer for further rulings and advice on local footing requirements. Core Drill Installing the Posts into Core Drill. 1. Clearly mark out the post centres onto the slab. 2. Core Drill each of the holes a minimum depth of 100mm. 3. Remove the core plug and clean out the remaining dust. 4. Insert all of the aluminium posts into the holes. 5. Start at the end of balustrade run first. With the use of 4 timber wedges centre and level the posts by forcing the timber wedges into the core hole against the post. Once you have established post and stabilised it move back to the last post on the other side of the balustrade run. 6. With the use of 4 timber wedges centre and level the posts by forcing the timber wedges into the core hole against the post. Level and centre the post into final position. 7. Run two separate string lines from the first post to the last post. One at the top and another 100 mm from the bottom of the post off the slab. These stringlines will act as a marker and aid in the placing of the remaining posts. 8. Starting at one end and working back towards the last post also ensures that the glass panels remain the same size. 9. Once all of the posts have been placed, prepare enough grout to fill a couple of holes at a time. 10. Filling the core holes with grout as follows a. Fill half of the core drilled hole only, ensuring that the grout mix runs freely into all of the spaces around the post. a. Continue half filling all of the remaining post holes. b. Allow the grout mix to harden at least for 1 hour after pouring. c. Remove the timber wedges from the core holes. If wedges cannot be removed it can be left in the core hole and trimmed level with the top of the hole after filling. d. Remove the remaining timber wedges. e. Continue filling the remaining core holes with the grout mix no further than the finished floor level. f. Remove the string lines and measure for the glass if not having already done this. Please refer to the glass formula sheet in Section C for deductions and size charts.

Installing the glass panels into a Solaris Balustrade system. There are two methods of installing glass. Glazed in front or glazed from on top. Method 1. Glass panels inserted from the front. 1. The Spigots are inserted into the top of the post and screwed into place from either side of the underside of the caps shoulder using the 6G x 12mm CSK self-tapping screw. Failure to use the correct screw will result in glass breakages. 2. Place the selected handrail onto the spigots and centre the handrail so it seats onto the spigot shoulder. Ensure all end caps and joiners are in place prior to final screwing off the handrail from underneath through the 8 holes in the spigot body. End caps are squeezed in with a small bead of clear silicone behind the head as a means of sealing off any opening where water may find its way in. A 6G x 12mm CSK self-tapping screw can be used from underneath to lock the end cap in place. IMPORTANT NOTE TO INSTALLERS. All joins in handrails must be made directly above the spigot by using the correct joiner available in the components list. This is inserted and silicone into the hand rail opening. The handrails are the screwed in place from underneath by using 8-6G x 25 CSK Stainless Steel self-tapping screws. 3. Continue by inserting the glass panel into the Left hand side post. Line up the right hand side with the opening in the opposite post. The glass should clear the post by 3mm if cut correctly. 4. The glass panel is then centred and rested on two timber blocks laid on the floor. 5. Slowly lift the glass panel evenly up until it touches the underside of the post spigot. 6. Support the glass in this position by holding it in place or by the use of timber blocks. 7. Push in the rubber PVC wedge on either side of the glass into the gap. ( Wet glaze if required ) 8. Trim the rubber to length no longer than the glass bottom edge. 9. Measure and cut the infill pieces to fit below the glass. ( Gap from glass to floor 6mm ) 10. Insert the Resilient Nylon Glass saddle. 11. Insert the saddle and infill piece into the post pocket and tap into place with a soft faced mallet. The infill is inserted with the nylon saddle in the end under the glass. 12. Remove the timber blocks supporting the glass. Method 2. Glass panels inserted from the top prior to installing the handrails. This method can be used if there has been an issue with the panels being cut large, lack of glazing space, or difficultly inserting the glass into the post or the glazing posts have not been correctly installed. 1. Measure and cut the infill pieces to fit below the glass. ( Gap from glass to floor 6mm ) 2. Insert the Resilient Nylon Glass saddle. 3. Insert the saddle and infill piece into the post pocket and tap into place with a soft faced mallet.

4. Place timber support blocks (75 x 35) on the floor next to each post. 5. Slide the glass in slowly from above the posts. Insert and slowly lower the glass panel until it rests on the timber blocks and centre the glass. 6. Support the glass in this position by holding it in place or by the use of timber blocks. 7. Push in the rubber PVC wedge on either side of the glass into the gap. (Wet glaze if required, glass should remain supported for 24 hours at least) 8. Trim the rubber to length no longer than the glass bottom edge. 9. Measure and cut the infill pieces to fit above the glass. (Gap from glass to underside of cap 6mm) 10. Insert the Resilient Nylon Glass saddle. 11. Insert the saddle and infill piece into the post pocket and tap into place with a soft faced mallet. 12. The Spigots are inserted into the top of the post and screwed into place from either side of the underside of the caps shoulder using the 6G x 12mm CSK self-tapping screw. Failure to use the correct screw will result in glass breakages. 13. Place the selected handrail onto the spigots and centre the handrail so it seats onto the spigot shoulder. Ensure all end caps and joiners are in place prior to final screwing off the handrail from underneath through the 8 holes in the spigot body. End caps are squeezed in with a small bead of clear silicone behind the head as a means of sealing off any opening where water may find its way in. A 6G x 12mm CSK self-tapping screw can be used from underneath to lock the cap in place. IMPORTANT NOTE TO INSTALLERS. All joins should be made directly above the spigot by using the correct joiner. This is inserted and silicone into the hand rail opening. The handrails are the screwed in place from underneath by using 8-6G x 25 CSK Stainless Steel self-tapping screws. 14. Removed the timber blocks supporting the glass. Direct fixing Concrete base. By using the direct fixing base plates supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid concrete base. The Die cast Base Plates are custom made for this role. The foot plates are fitted to the base of Posts and screwed in place with 4 x 6G x 25mm Stainless Steel CSK screws from underneath the base plate. Once the foot place is fitted it s then bolted to the concrete base with 4 x M10 Chemical Anchors. IMPORTANT NOTE FOR INSTALLERS. Use a spare base plate to assist you marking the holes out onto the concrete base. At no point should the holes be drilled through the base plate being installed. Clearly mark out all holes with a blank base plate and remove when drilling. Once the holes are drilled out, clean thoroughly and install the assemblies.

Direct fixing Steel or timber base. By using the direct fixing base plates supplied by Solaris, fabricators and installers are able to direct fix the posts to a solid steel or timber base. The Die cast Base Plates are custom made for this role. The base plates are fitted to the base of Posts and screwed in place with 4-6G x 25mm Stainless Steel CSK screws from underneath the base plate. Once the base plate is fitted it s then bolted to the base structure using the listed bolts. IMPORTANT NOTE FOR INSTALLERS. Use a spare base plate to assist you marking the holes out onto the concrete base. At no point should the holes be drilled through the base plate being installed. Clearly mark out all holes with a blank base plate and remove when drilling. Once the holes are drilled out, clean thoroughly and install the assemblies. Concrete Fixing instruction The posts being inserted directly into the concrete footing must be treated with the use of a rubber based bitumen paint or barrier medium to stop the direct contact of concrete on bare aluminium. All cut surfaces must be treated prior to being inserted. Failure to treat the aluminium can cause corrosion and affect the painted surface of the posts. The post must be embedded as per the fixing details provided. The local shire requirements and standard BCA regulations over write Solaris Balustrade s recommendations where needed and must and must be complied too at all times.