Case Study: Advanced Classification Contracting at Former Camp San Luis Obispo

Similar documents
Terminology and Acronyms used in ITRC Geophysical Classification for Munitions Response Training

Welcome to Munitions Response and Remediation Moderator: Ms. Nelline Kowbel Speakers:

Quality Management for Advanced Classification. David Wright Senior Munitions Response Geophysicist CH2M HILL

Former Maneuver Area A Remedial Investigation Fort Bliss, Texas. Public Meeting November 16, 2016

Closed Castner Firing Range Remedial Investigation

REMEDIAL INVESTIGATION OF THE CLOSED RANGES AT F.E. WARREN AFB: A CASE STUDY

APPENDIX E INSTRUMENT VERIFICATION STRIP REPORT. Final Remedial Investigation Report for the Former Camp Croft Spartanburg, South Carolina Appendices

FINAL REPORT. ESTCP Pilot Program Classification Approaches in Munitions Response Camp Butner, North Carolina JUNE 2011

Geophysical Classification for Munitions Response

MEC HA Training Example. San Antonio, TX March 2009

APPENDIX B RISK ASSESSMENT

Final Meeting Minutes. Issued: July 7, Project: Former Camp Butner Restoration Advisory Board (RAB)

FINAL PILOT STUDY ADVANCED GEOPHYSICAL CLASSIFICATION

Advances in UXO classification

Closed Castner Firing Range Remedial Investigation

TECHNICAL REPORT. ESTCP Project MR Live Site Demonstrations - Massachusetts Military Reservation SEPTEMBER John Baptiste Parsons

(MR ) Demonstration of Advanced Geophysics and Classification Technologies on Munitions Response Sites

Paul Black, Ph.D. Kate Catlett, Ph.D. Mark Fitzgerald, Ph.D. Will Barnett, M.S.

MEC HA: A Tool in the Decision Making Toolbox

New Directions in Buried UXO Location and Classification

FINAL REPORT MUNITIONS CLASSIFICATION WITH PORTABLE ADVANCED ELECTROMAGNETIC SENSORS. Demonstration at the former Camp Beale, CA, Summer 2011

Trial Use of the USACE Risk Management Method

1. Kevin Pien called the meeting to order at 6:45 p.m. and welcomed everyone.

DEMONSTRATION REPORT

The subject of this presentation is a process termed Geophysical System Verification (GSV). GSV is a process in which the resources traditionally

ESTCP Cost and Performance Report

UTAH ARMY NATIONAL GUARD

Munitions and Explosives of Concern Hazard Assessment (MEC HA) Initiative. Joint Services Environmental Management Conference March 23, 2006

Appendix C: Quality Assurance Project Plan DRAFT Phase II Interim Action Work Plan

Hazard Level Category

Revised Site 1 Burn Pit Area (BPA) Munitions and Explosives of Concern (MEC) Phase 2 Report Lockheed Martin Corporation, Beaumont Site 1 Beaumont, Cal

Advanced EMI Data Collection Systems' Demonstration

1. David Henkin called the meeting to order at 7:10 p.m. and welcomed everyone.

APPENDIX: ESTCP UXO DISCRIMINATION STUDY

REPORT FOR THE MPV DEMONSTRATION AT NEW BOSTON AIR FORCE BASE, NEW HAMPSHIRE

TECHNICAL REPORT. ESTCP Project MR Demonstration of the MPV at Former Waikoloa Maneuver Area in Hawaii OCTOBER 2015

FINAL REPORT. ESTCP Project MR Clutter Identification Using Electromagnetic Survey Data JULY 2013

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Meeting Minutes Purcell NAGS RI/FS February 23, 2005

SECTION 2 GENERAL REQUIREMENTS

(MR ) February This document has been cleared for public release; Distribution Statement A

1. Kevin Pien called the meeting to order at 6:40 p.m. and welcomed everyone.

Defense Environmental Management Program

Update: July 20, 2012

APPENDIX I Geophysical Data. Geophysical data is provided in the electronic copy of this report.

MUNITIONS AND EXPLOSIVES OF CONCERN HAZARD ASSESSMENT GUIDANCE. Public Review Draft

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

INTERIM TECHNICAL REPORT

ESTCP Live Site Demonstrations Former Camp Beale Marysville, CA

Introduction to the Revised Environmental Review Primer for Connecticut s Historic Properties

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

Welcome Thanks for joining us. ITRC s Internet-based Training Program. Survey of Munitions Response Technologies

FINAL REPORT. ESTCP Project MR High-Power Vehicle-Towed TEM for Small Ordnance Detection at Depth FEBRUARY 2014

FINAL. SUPPLEMENTAL ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) REPORT ALPHA AREA McCLELLAN, ALABAMA

DEMONSTRATION REPORT

DEMONSTRATION REPORT

2011 ESTCP Live Site Demonstrations Vallejo, CA

REPORT DOCUMENTATION PAGE

MARINE GEOPHYSICAL PROVE-OUT AND SURVEY AT FLAG LAKE BOMBING RANGE BARKSDALE AIR FORCE BASE, LOUISIANA

Clutter Identification Using Electromagnetic Survey Data ESTCP MR Cost and Performance Report

ESTCP Live Site Demonstrations Massachusetts Military Reservation Camp Edwards, MA

CMW DELIVERABLES SPECIFICATION Version 1.0

Phase I: Evaluate existing and promising UXO technologies with emphasis on detection and removal of UXO.

Abstract. Introduction

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

EM61-MK2 Response of Standard Munitions Items

Final Report. Geophysical Characterization of Two UXO Test Sites. submitted to

FAST TRACK WORKSHOP OBJECTIVES

Unexploded ordnance (UXO) contamination is a high-priority problem for the Department of Defense (DoD). As

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

FINAL Geophysical Test Plot Report

AD NO. DTC PROJECT NO. 8-CO-160-UXO-021 REPORT NO. ATC-9418 STANDARDIZED UXO TECHNOLOGY DEMONSTRATION SITE BLIND GRID SCORING RECORD NO.

Geophysical System Verification

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

STATE UNIVERSITY CONSTRUCTION FUND

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

Environmental Quality and Installations Program. UXO Characterization: Comparing Cued Surveying to Standard Detection and Discrimination Approaches

ESTCP Cost and Performance Report

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

ATTACHMENT 2. EM61 MKI Walkaway Test. Fort McClellan. December, 2002

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

2014 Annual Munitions and Explosives of Concern Inspection Report Potrero Canyon (Lockheed Martin Beaumont Site 1) Beaumont, California

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Organizational Perspective and Technical Requirements

PRELIMINARY PLAT CHECK LIST

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Underwater Munitions Response Technologies. Herb Nelson

The coordinate system and vertical datum shall be noted in the drawing in the metadata.

SECTION ADMINISTRATIVE REQUIREMENTS

GSFC CONFIGURATION MANAGEMENT MANUAL

Leading Change for Installation Excellence

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES

Engineering Drawing System

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION OPERATION AND MAINTENANCE DATA


Transcription:

Case Study: Advanced Classification Contracting at Former Camp San Luis Obispo John M. Jackson Geophysicist USACE-Sacramento District US Army Corps of Engineers BUILDING STRONG

Agenda! Brief Site Description and Background! Intent of Treatability Study at Camp SLO! A Walk Through the Request for Proposal- Performance Work Statement and Technical Evaluation Factors! Lessons Learned (so far)! Conclusion/Questions 2 BUILDING STRONG

Camp SLO- Location! Located in the southern portion of California, roughly 6 miles northwest of San Luis Obispo! FUDS ProjectJ09CA203105! Former Camp SLO occupied 14,959 acres. MRS 01, 02, and 05 occupy 2,549 acres 3 BUILDING STRONG

Background! Initially established as a National Guard Camp in 1928! Expanded from 5,800 acres to 14,959 acres during WWII! After the Korean War, the land was transferred to a variety of private owners, most of which went to educational purposes- Cal Poly and Cuesta College- with the original 5,800 acres being retained by the California National Guard! Previous Investigations Preliminary Assessment (1986 and 1993) Time Critical Removal Action- El Chorro Park (1992) Archives Search Report (1994) Site Inspection (2007) ESTCP Demonstration (2009) TCRA Portion of MRS05 (2010) Remedial Investigation (2011) 4 BUILDING STRONG

Remedial Investigation Bristol (with InDepth) has completed the RI field work Currently completing the RI/FS Report Approximately 38 DGM line miles and 24 analog line miles resulted in: 3956 anomalies 3280 MD finds 13 MEC 5 BUILDING STRONG

Revised Conceptual Site Model Munition Type Maximum Depth Recovered (cm) 37mm projectiles 5 MKII hand grenades 10 M1 practice mines 8 M9A1 rifle grenades n/a* MK145 barrage rocket fuze with booster 0 2.36 rockets with or without motors still attached 8 MK5 and MK23 Practice Bombs 10 60mm mortars 5 81mm mortars 25 3 Stokes mortars 55 75mm projectiles n/a* 105mm projectiles 91 155mm projectiles 76 4.5 barrage rockets 38 5 rockets n/a* 6 BUILDING STRONG

MEC and MD 7 BUILDING STRONG

Current/Future Land Use! MRS 05- Cal Poly Agricultural School (cattle grazing and studies, geotechnical classes) Los Padres National Forest Firearms Ranges! Nearby- Campers for shooting events 5-7 times/year San Luis Obispo Public School District El Chorro Regional Park 8 BUILDING STRONG

Treatability Study Timeline! Spring 2013- ESTCP and USACE team up and agree Camp SLO is an ideal site to explore additional advanced sensor and classification deployment! June 2013- ESTCP/USACE meet with the California Department of Toxic Substances Control (DTSC) to discuss project objectives*! September 2013- ESTCP/USACE collect additional TEMTADS transects through two of the higher density areas depicted in RI *note- no final RI/FS report, no decision document 9 BUILDING STRONG

Timeline continued! October 2013- Project is given the green light and funded! December 15 2013- Request for Proposal (WERS)! January 10 2014- Proposals due! Late February 2014- award! June/July 2014- Expected start of field work 10 BUILDING STRONG

Treatability Study Objective The performance objective of this task order is to design and execute a Military Munitions Response Program (MMRP) remedial action as a Treatability Study that recovers all MEC and Targets of Interest (TOI) that can be detected using advanced EMI technologies and requires the least number of non-hazardous items to be excavated in the process. The detection threshold will be no greater than the equivalent necessary to detect a horizontal 37mm at 30cm subsurface, as demonstrated in Tasks 6 and 7. Government Furnished Property (GFP) will be available as described in Section 3.0.6. The intent of the Treatability Study is to supplement the Feasibility Study 11 BUILDING STRONG

What does this mean? -1foot- 12 BUILDING STRONG

What have we done well so far?! Engaged the state early on during the preplanning process! Developed initial Data Quality Objectives! Collected new data at the site utilizing advanced sensors allowing USACE and ESTCP to modify the site location! Developed an initial government estimate of roughly 15,000 anomalies across 7 acres (detection threshold only) 13 BUILDING STRONG

TEMTADS Transects 14 BUILDING STRONG

PWS Tasks! Task 1- Technical Project Planning! Task 2- UFP-QAPP and other documents! Task 3- Geospatial Data! Task 4- Surface sweep (mowing and silt fence options)! Task 5- QC Blind Seeding! Task 6- Advanced EMI Detection Survey! Task 7- Advanced EMI Cued and Classification! Task 8- Intrusive Investigation! Task 9- Report! Task 10- Community Relations 15 BUILDING STRONG

Task 1- TPP! Fully follow the four phase TPP process! Emphasis on defining the project objectives and developing the DQOs to meet those objectives! Emphasis on developing QAPP content to meet DQOs! Introduces concept of Verification Memo and requires initial development during the TPP process 16 BUILDING STRONG

Task 2- UFP-QAPP! Provided a draft QAPP template for Advanced Classification as starting point Advanced Classification QAPP is a joint team effort! Range Support Center (and likely other USACE Design Centers) will utilize Camp SLO s final QAPP as a template for future projects 17 BUILDING STRONG

Task 5- QC Blind Seeding! Requires contractor QC seeding (separate from government QA seeding)! At a minimum, requires inert 37mm and small ISOs (schedule 80) to be used! Requires the blind seed plan to be accepted by USACE with DTSC providing input at the TPP and UFP-QAPP stages! Develop a blind seed firewall plan 18 BUILDING STRONG

Task 6- Detection Survey! Survey design must demonstrate detection of a horizontal 37mm at 30cm! Requires use of advanced sensors! Requires an IVS memo to be submitted demonstrating a working instrument prior to start of data collection! Final data submittal requires each sensor s data to be resolved into separate database lines 19 BUILDING STRONG

Task 7- Cued Survey! Objective: To correctly classify 100% of the TOI and correctly classify at least 75% of the non- TOI throughout the study area.! All anomalies will be classified into Targets of Interest (TOI) and non- Targets of Interest (non-toi)! The Verification Plan is designed to provide compelling evidence that there are no native TOI classified as non-toi.! Demonstrate at least 90% of all inverted seed locations are within 0.2m (x,y) and 0.15 meters (z) of known location and 100% within 0.3m (x,y) and 0.25 meters (z) 20 BUILDING STRONG

Example CSM 21 BUILDING STRONG

Key Personnel! Project Manager (3) A minimum of ten (10) years experience as Project Manager, with minimum of (a): project management of one (1) advanced classification project to include management at the field operational level; or (b): five (5) years experience managing environmental or munitions projects at the field operational level.! SUXOS! Project Geophysicist (1) A degree in geophysics, engineering geophysics, or closely related field or equivalent demonstrated proficiency with advanced geophysical methods and concepts related to munitions response and possess 5 years of directly related UXO geophysical experience. (2) Must be experienced with the theoretical and practical aspects of detecting and selecting a wide range of targets of interest (TOI) and non-targets of interest (non-toi). 22 BUILDING STRONG

Key Personnel (cont.)! Project Geophysicist (cont.) (3) Experienced in the selection and utilization of various types of geophysical instruments and ancillary components to include high-precision global positioning systems, inertial motion sensors and the software used to control and integrate the geophysical system as a whole. (4) Shall have, at a minimum, documented experience performing advanced classification using only advanced EMI instrument survey data, to include documented experience processing and analyzing advanced EMI instrument data, and developing and performing or overseeing quality control procedures for advanced EMI data acquisition, analysis and classification processes.! Field Geophysicist (1) One year of directly related UXO geophysical experience (2) Documented or independently verifiable experience operating an advanced geophysical EMI system to include the geophysical instruments, high-precision global positioning systems, inertial motion sensors and the software used to control and integrate the geophysical system as a whole. 23 BUILDING STRONG

Evaluation Criteria and Weighting Factor 6: Past Performance Factor 4: MEC Safety Methods; Factor 5: Corporate Management Structure Factor 3: Corporate Experience in Advanced Geophysical Sensor Projects Factor 1: Technical Approach, Methods, Procedures; Factor 2: Personnel Experience in Advanced Geophysical Sensor Projects 24 BUILDING STRONG

Factor 1- Technical Approach! Incorporation of all government furnished data into technical approach! Understanding and ability to conduct a dynamic advanced sensor survey! Technical approach to designing and conducting a cued advanced sensor survey! Classification Scheme! Technical approach that is transparent, founded on logic and physics and is independently verifiable! QC seeding plan! Verification Plan 25 BUILDING STRONG

Factor 2- Personnel Experience! Detection and classification processes utilized on projects submitted in Factor 3! Number of years using advanced geophysical sensors! Number and type of lessons learned while performing Advanced Geophysical! Sensor projects! Personnel meeting the Key Personnel requirements described in Section 3.0.5 of the PWS 26 BUILDING STRONG

Factor 3- Corporate Experience! Advanced Geophysical Sensor projects accomplished by the Offeror.! Advanced Geophysical Sensor projects that required the detection and classification of multiple types of munitions that were similar to the munitions at the project site.! The manner in which lessons learned was incorporated into standard tasks and operations after performing Advanced Geophysical Sensor projects.! Number of Advanced Geophysical Sensor projects completed within the past five (5) years. 27 BUILDING STRONG

Subfactor 5b (c)! Offeror s succession plan: Offeror s ability to perform in the event key personnel need to be replaced 28 BUILDING STRONG

Lessons Learned! Project Geophysicist- A degree in geophysics, engineering geophysics, or closely related field or equivalent demonstrated proficiency with advanced geophysical methods and concepts related to munitions response and possess 5 years of directly related UXO geophysical experience.! Do not overcomplicate the evaluation criteria! Lessons Learned was a useful evaluation tool- may expand in future! Incorporation of government furnished data! Advanced sensor transects = great idea!! Assumptions/contingencies 29 BUILDING STRONG

Summary! Overall, a resounding success! It is clear that advanced sensors will save DoD money! USACE should have an excellent template to base future contracting actions 30 BUILDING STRONG