3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 99 2 3,900 $,83,90 SITE $,823 Campus Total 3,900 $2,03,2 Category: Building Exterior Entrance Entrance Control - Audio and Video 2 EA $,3 Exterior Doors - Exterior FRP Door EA $0,3 Exterior Doors - Overhead Rolling/ Garage Door EA $,33 Exterior Doors - Side lite EA $,880 Exterior Doors - Transom Lite EA $3, Foundation Lighting Roof System Foundation - Concrete,000 LF Superstructure - Steel 3,900 SF Exterior Lighting - Wall Mounted 22 EA $,32 Chimney - Metal Flue 30 LF $, Coping - Metal,99 LF $38,09 Downspouts - Exterior Downspouts LF $2,2 Downspouts - Interior Downspouts 0 LF $2,02 Parapet - " - 30" Height LF $2,3 Parapet - Parapet < " Height,0 LF $23, Roof - Metal 3,9 SF $8,0 ORTIZ DE DOMIGUEZ Page of Assessment Date: /0/20
Category: Building Exterior Roof System 3000 S Lawndale Ave Chicago, IL 023 Roof - Modified Bitumen 3, SF $29,0 Roof Structure - Steel / Metal Deck/ Concrete Topping 3,3 SF Walls Windows Exterior Walls - Brick 2, SF $,099 Exterior Walls - Stone-Cast 80 SF $,20 Guard - Guards perforated,00 SF $,0 Lintels - Steel 830 LF $2,09 Lintels - Stone 9 LF Windows - Sash Aluminum Double-pane,20 SF $,33 Windows - Sash Aluminum Double-pane,02 SF $, Building Exterior Subtotal: $3,9 Category: Electrical System Emergency System Automatic Transfer Switch EA $8 Emergency A/C Power - Corridors and Stairs 8,92 SF $2,80 Emergency A/C Power - Gym 3,2 SF $,38 Emergency A/C Power - Lunchrooms 2,20 SF $ Exit Signs - Corridors and Stairs 9 EA $2, Exit Signs - Gym 2 EA $3 Exit Signs - Lunchroom 3 EA $9 Security System - CCTV 3,900 SF $9,89 Security System - Intrusion Detection 3,900 SF $,8 Main Service Power Distribution Independent Electrical Service for emergency power EA $2,92 Main Electrical Service - 200 A 2/80/3PH EA $,3 PA System 3,900 SF $2,0 Lighting and Power Panels - 00 A EA $,9 Lighting and Power Panels - Above 00 A EA $,92 Main Distribution Panels - 0-00 amp 2 EA $,0 ORTIZ DE DOMIGUEZ Page 2 of Assessment Date: /0/20
Category: Electrical System Power Distribution 3000 S Lawndale Ave Chicago, IL 023 Transformers - 2/80-20/208 EA $3,9 Transformers - 2/80-20/2 EA $,09 Electrical System Subtotal: $98,98 Category: Safty System Fire Alarm Pump Room Assembly Sprinkler System Fire Alarm Panel EA $20,03 Fire Alarm Strobe Lights 3,900 SF $22, Fire Alarm_System 3,900 SF $3,08 Fire Pump Controller EA $,823 Fire Pump - 2-0 hp EA $,8 Jockey Pump EA $8 Sprinkler Heads 3,900 SF Sprinkler Piping 3,900 SF $,89 Wet Sprinkler System 3,900 SF $,8 Safty System Subtotal: $0, Category: Mechanical System Air Conditioning Air Handling Systems Condensing Unit- Roof Mounted - -20 tons EA $,0 Condensing Unit- Roof Mounted - 2-30 tons EA $2,3 Condensing Unit- Roof Mounted - Greater than 0 tons 2 EA $3,20 Air Handling Unit-Package Single Zone- Indoor- Hot Water and DX Cooling Coils - 200-20000 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and DX Cooling Coils - 2000-30000 cfm EA $3,30 EA $3,30 ORTIZ DE DOMIGUEZ Page 3 of Assessment Date: /0/20
Category: Mechanical System Air Handling Systems Boiler Systems Heating Devices Mechanical Plumbing Temperature Control Ventilation 3000 S Lawndale Ave Chicago, IL 023 Air Handling Unit-Package Single Zone- Indoor- Hot Water and DX Cooling Coils - Less than EA $3,30 00 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water Coils - Less than 00 cfm EA $3,30 Air Intake EA $3,88 Fan Power Box - Fan Power Box with Hot Water Coil 9 EA $3,003 Indoor Return Fans- Centrifugal Inline - 000-0000 CFM 2 EA $3, Indoor Return Fans- Centrifugal Inline - Less than 000 CFM EA $,282 Make Up Air Unit- Roof Mounted- Gas Heating - Less than 000 cfm EA $22,2 Outdoor Return Fans- Air Handling Unit Type - 000-20000 CFM EA $,9 Outdoor Return Fans- Air Handling Unit Type - Greater than 20000 CFM EA $2,0 Outdoor Return Fans- Air Handling Unit Type - Less than 000 CFM EA $,282 VAV Box 20 EA $,83 Boiler Auxiliary- on Condensing Hot Water - 00-2000 MBH 2 EA $,093 Chemical Pot Feeder EA $,8 Combustion Dampers 2 EA $88 on Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler - 00-2000 2 EA $,99 MBH Water Fill System EA $,8 Cabinet Heaters - With Hot Water Coil EA $,2 Fin Tube - Hot Water 29 LF $2, Hot Water Pump - 0-20 HP 2 EA $2,8 Hot Water Pump - Less than 0 2 EA $2,222 Hydronic Supply and Return - Galvanized 00 LF $,2 DDC System 3,900 SF $0,0 Electric Thermostat EA Thermostats - DDC EA Exhaust Fans- Roof Mounted - 0-8000 CFM 2 EA $,8 Exhaust Fans- Roof Mounted - 00-00 CFM EA $2,30 Exhaust Fans- Roof Mounted - Less than 00 CFM EA $29 Roof Mounted Duct Work 30 LF $,3 ORTIZ DE DOMIGUEZ Page of Assessment Date: /0/20
Category: Mechanical System Ventilation 3000 S Lawndale Ave Chicago, IL 023 Type I Exhaust Hood- Kitchen EA $,28 Type II Exhaust Hood- Warming Kitchen EA $920 Mechanical System Subtotal: $33,2 Category: Plumbing System Hot Water Gas Heater - 0000-300000 BTU/HR 2 EA $20 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 3,900 SF Domestic Piping-Cold Water Horizontal Lines 3,900 SF Domestic Piping-Cold Water Risers 3,900 SF Domestic Piping-Hot Water from Risers to Fixtures 3,900 SF Domestic Piping-Hot Water Horizontal Lines 3,900 SF Domestic Piping-Hot Water Return Lines 3,900 SF Domestic Piping-Hot Water Return Risers 3,900 SF Sanitary Piping 3,900 SF Storm Piping 3,900 SF Vent Piping 3,900 SF Pumps - Domestic Booster Pump-Duplex EA $,9 Pumps - Sump-Simplex EA $ Plumbing System Subtotal: $3,3 Category: Classrooms Art Room ( room) Casework LF Ceiling - Lay-in 980 SF Chalk Board LF $,9 Doors - Wood Doors inclu hw EA ORTIZ DE DOMIGUEZ Page of Assessment Date: /0/20
Category: Classrooms Art Room ( room) 3000 S Lawndale Ave Chicago, IL 023 Floor - Tile 980 SF $2, Lighting - Lay-in 3 EA Storage/ Closet 2 SF $90 Walls - Concrete Block 82 SF Walls - Plaster/Drywall SF $,90 Work Sink EA Computer Lab ( room) Kindergarten (3 rooms) Pre School (2 rooms) Ceiling - Lay-in,0 SF Chalk Board 8 LF $3 Charging Station EA Doors - Wood Doors inclu hw EA Floor - Tile,0 SF $2,3 Lighting - Lay-in EA Marker Board LF Walls - Concrete Block 2 SF Walls - Plaster/Drywall SF $2,39 Casework LF Ceiling - Lay-in 3,00 SF Doors - Wood Doors inclu hw 3 EA Floor - Tile 3,00 SF $, Lighting - Lay-in EA Marker Board 32 LF Storage/ Closet SF Walls - Concrete Block 2,0 SF Walls - Plaster/Drywall,2 SF $,8 Work Sink EA Casework 80 LF Ceiling - Lay-in 8 SF $33 Ceiling - Lay-in 2,32 SF Chalk Board 20 LF $,83 Doors - Wood Doors inclu hw 2 EA Floor - Tile 2,332 SF $,02 Lighting - Lay-in 30 EA Storage/ Closet SF ORTIZ DE DOMIGUEZ Page of Assessment Date: /0/20
Category: Classrooms Pre School (2 rooms) (2 rooms) 3000 S Lawndale Ave Chicago, IL 023 Walls - Concrete Block,00 SF Walls - Plaster/Drywall, SF $3,9 Work Sink 2 EA Casework 80 LF Ceiling - Lay-in 8 SF $ Ceiling - Lay-in 83 SF $2,08 Ceiling - Lay-in 8,03 SF Chalk Board 30 LF $,93 Chalk Board 8 LF Doors - Wood Doors inclu hw 2 EA Floor - Tile 8,02 SF $39,8 Floor - Tile 83 SF Lighting - Lay-in 2 EA Marker Board 238 LF Storage/ Closet 3 SF $2 Storage/ Closet 0 SF Walls - Concrete Block SF $,8 Walls - Concrete Block,90 SF Walls - Plaster/Drywall 9, SF $2, Walls - Plaster/Drywall 8 SF Work Sink 3 EA Classrooms Subtotal: $, Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in SF $28 Ceiling - Lay-in 2 SF $0 Ceiling - Lay-in,02 SF Doors - Side-lite 99 SF Doors - Transom Window SF Doors - Wood Doors inclu hw EA Floor - Tile,090 SF $8,99 ORTIZ DE DOMIGUEZ Page of Assessment Date: /0/20
Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 3000 S Lawndale Ave Chicago, IL 023 Lighting - Lay-in 8 EA Power Distribution 2 EA Storage/ Closet 9 SF Walls - Concrete Block 3,8 SF Walls - Plaster/Drywall,0 SF $,20 Work SInk EA Gymnasia Kitchen Library Locker/Shower Room Bleacher Seating 3 EA Ceiling - Exposed 3,2 SF Doors - Wood Doors inclu hw EA Floor - Tile/Sheet 3,2 SF $3,28 Lighting - Metal Halide/Sodium Vapor EA Storage/ Closet 23 SF Walls - Concrete Block 80 SF $,2 Walls - Concrete Block, SF $20,88 Ceiling - Plaster/Drywall,200 SF $,3 Doors - Steel Doors incl hw EA Floor - Concrete Epoxy/ Painted,200 SF Lighting - Lay-in EA $9 Lighting - Lay-in 2 EA Walls - Concrete Block 2,30 SF Ceiling - Lay-in 2,000 SF Doors - Wood Doors inclu hw 3 EA Floor - Carpet 2,000 SF $,2 Lighting - Lay-in 2 EA Walls - Concrete Block 00 SF Walls - Plaster/Drywall SF $2,38 Accessories 8 SF Ceiling - Lay-In 2 SF Ceiling - Plaster/ Drywall 39 SF $,8 Doors - Wood Doors inclu hw EA Floor - Terrazzo SF ORTIZ DE DOMIGUEZ Page 8 of Assessment Date: /0/20
Category: Rooms (Other Than Classrooms) Locker/Shower Room Lunch & Multipurpose Room 3000 S Lawndale Ave Chicago, IL 023 Floor - Tile Ceramic/ Porcelain 9 SF Floor - Tile/Sheet 20 SF $20 Floor Drain EA Hand Dryer EA Lavatory EA Lighting - Lay-in EA Partitions 3 EA Showers EA Student Lockers - One Tier 3 EA Student Lockers - Two Tier 8 EA Urinals EA Walls - Concrete Block, SF Walls - Plaster/Drywall 0 SF $,3 Walls - Plaster/Drywall 8 SF Water Closet EA Ceiling - Lay-in 2, SF Doors - Wood Doors inclu hw EA Floor - Tile 2, SF $,809 Lighting - Lay-in 3 EA Serving Line 2 LF Storage/ Closet 2 SF Walls - Concrete Block 2, SF Walls - Plaster/Drywall 80 SF $,32 MDF_IDF Doors - Wood Doors inclu hw EA Finishes 2 SF $892 Ventilation and Cooling EA Mechanical/ Service Rooms Boiler Room,8 SF Janitor's Closet 32 SF $229 Janitor's Closet SF Mechanical/ Service Rooms,893 SF Storage Room 2 SF ORTIZ DE DOMIGUEZ Page 9 of Assessment Date: /0/20
Category: Rooms (Other Than Classrooms) Restroom 3000 S Lawndale Ave Chicago, IL 023 Accessories 2,8 SF Ceiling - Plaster/Drywall 2,8 SF $8,03 Doors - Wood Doors inclu hw 3 EA Floor - Tile Ceramic/ Porcelain 2,8 SF Floor Drain 3 EA Hand Dryer EA Lavatory 23 EA Lighting - Lay-in 3 EA Partitions 2 EA Urinals EA Walls - Concrete Block,9 SF Walls - Plaster/Drywall,930 SF $,32 Water Closet 32 EA Rooms (Other Than Classrooms) Subtotal: $8,93 Category: Building Interior Corridor Ceiling - Lay-in 2 SF $8 Ceiling - Lay-in,8 SF Ceiling - Plaster/Drywall,3 SF $,028 Doors - Wood Doors include hw 2 EA Drinking Fountains - Double Fountain EA Drinking Fountains - Single Water Cooler 2 EA Floor - Tile Ceramic/ Porcelain SF Floor - Tile/Sheet,982 SF $,33 Lighting - Lay-in EA Lighting - Pendent/Surface 3 EA Walls - Concrete Block,8 SF Walls - Plaster/Drywall 3,0 SF $,8 Safety Camera Viewing Station 2 EA $,3 Security Cameras EA $,38 ORTIZ DE DOMIGUEZ Page 0 of Assessment Date: /0/20
Category: Building Interior Stairs 3000 S Lawndale Ave Chicago, IL 023 Ceiling - Plaster/Drywall 80 SF $,2 Floor - Tile 9 SF $0 Handrails 2 LF Lighting - Lay-in 2 EA Lighting - Pendent/Surface 2 EA Stairs - Tile 90 LF $83 Walls - Concrete Block 8 SF $ Walls - Concrete Block,290 SF Vertical Conveyance Elevator - Elevator- Roped Holeless Hydraulic EA $9,238 Building Interior Subtotal: $,990 Total Building Cost $,83,90 SITE Category: Site Athletic Civil/Drainage Fencing Landscape Lighting EA $, Surface - Asphalt,02 SF $3,309 Surface - Synthetic including exc & retention 9,8 SF $2,20 Civil/ Drainage - Catch Basin 0 EA $0,938 Civil/ Drainage - Site Manhole EA $22,39 Fencing - Chain Link 2 LF $,0 Fencing - ew Standard Ornamental,80 LF $,2 Benches EA $3,00 Landscape - Grass 3,00 SF $,280 Parkway trees 2 EA $, Planting Beds/ Area 9,800 SF $, Trash Receptacles EA $, ORTIZ DE DOMIGUEZ Page of Assessment Date: /0/20
3000 S Lawndale Ave Chicago, IL 023 SITE Category: Site Parking Lot Playground Sidewalks Signage Concrete Curbs LF $,82 Lighting - Pole Mounted EA $,80 Surface - Asphalt,22 SF $3,00 Surface - Concrete 2,32 SF $,09 Trash Enclosure - Chain Links SF $, Equipment - Pre K 3- EA Surface - Poured Surface 2,3 SF Sidewalks - Internal Walks 2 LF $2,83 Sidewalks - Perimeter Sidewalks 3,00 SF $2,033 Flag Pole - Flag Pole EA Monument - Building Mounted Cut Letter Sign EA Site Subtotal: $,823 Total Site Cost $,823 Campus Total ² ³ $2,03,2 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). ORTIZ DE DOMIGUEZ Page 2 of Assessment Date: /0/20
3000 S Lawndale Ave Chicago, IL 023 Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. ORTIZ DE DOMIGUEZ Page 3 of Assessment Date: /0/20
3000 S Lawndale Ave Chicago, IL 023 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Computer Lab Kindergarten Kindergarten Kindergarten Pre School Pre School Science Classroom Computer Lab Kindergarten Kindergarten Pre School Pre School st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor 22 22 8 20 3 3 2 3 32 33 200 20 202 203 20 20 20 20 208 209 20 2 2 222 223 22 22 8 20 3 3 2 3 32 33 200 20 202 203 20 20 20 20 208 209 20 2 2 222 223 980,0 920 920,230,, 90 90 90 90 90 90 83 83 83 83 83 83 83 83 83 83 83 83 83,0,3 9 0 8 20 22 20 20 20 22 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 22 2 2 2 2 98 2 2 8 8 2 ORTIZ DE DOMIGUEZ Page of Assessment Date: /0/20