FISCAL YEAR CAPITAL IMPROVEMENT PLAN AVIATION FACILITIES

Similar documents
FISCAL YEAR CAPITAL IMPROVEMENT PLAN AVIATION FACILITIESS

Staff: Interim Executive Director. Business Development Director Environmental Programs Director. Planning and Development Director

Improving Airport Planning & Development and Operations & Maintenance via Skyline 3D Software

DOCUMENT LIST OF DRAWINGS, TABLES AND SCHEDULES

TONOPAH AIRPORT RECONSTRUCT TAXIWAY A

Re: Comments Draft Advisory Circular 150/5220-xx, Airport Foreign Object Debris/Damage (FOD) Detection Equipment

RECORD GROUP NUMBER 156

City of Sparks. Fiscal Year 2008 Strategic Plan Progress Report

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

Frequently Asked Questions: United Open Call Artist Information Sessions December 8, 10, and 12, 2018

TECHNOLOGY IN AIRPORT INFRASTRUCTURE

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

CALL FOR ARTISTS REQUEST FOR QUALIFICATIONS

EMERGING TRENDS IN TECHNOLOGY THAT ARE CHANGING THE AVIATION WORLD

REVENUE MOBLISATION, ALLOCATION & FISCAL COMMISSION

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

Business Plan Summary

SCOPE OF SERVICES FOR STAGE 1 TECHNICAL ASSESSMENT TO DETERMINE THE COMPATIBILITY OF THE DEVELOPMENT OF AN ELECTRICITY INTERCONNECTOR FACILITY WITH

WHEREAS, the City of (the City ) is an Illinois municipality in. accordance with the Constitution of the State of Illinois of 1970; and,

HANSCOM FIELD ARFF AND CBP BUILDING

Also Present: Roll Call. As noted, all Board members were present, except for Mr. Khalid Bey.

LAX Development Program: Customizing a SharePoint GIS to provide Construction Information to the LAWA community

CAPITAL IMPROVEMENTS ELEMENT

Public Safety Radio System Update September 9, 2013

Chapter 3 Business and Industrial Development

PROPOSAL PACKAGE OPTIONS FOR A 35.0 METRE ANTENNA SYSTEM LOCATED AT 7196 LORIMER ROAD IN WHISTLER, BRITISH COLUMBIA

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

Automated Machine Guidance An Emerging Technology Whose Time has Come?

Appendix B. Airport Master Plan Update William R. Fairchild International Airport Port Angeles, Washington AIRPORT LAYOUT PLAN CHECKLIST

Traffic Operations Division. FY Budget Presentation

RTÉNL SCHEDULE OF TARIFFS

Objective 3.1: Provide or stimulate provision by the private sector of affordable housing units.


Phone: Fax: Mentor Radio, LLC. Airport Wireless Integrated Connectivity System (AWICS)

In a challenging environment, GE businesses are poised to perform with rigor and to capture new growth. Technology Infrastructure, Energy

SURVEILLANCE and BROADCAST SERVICES OVERVIEW

Evaluation Results of Airport Surface Multilateration. Hiromi Miyazaki Electronic Navigation Research Institute

ORDINANCE LIST ORDINANCE LIST 1

DRAFT For Discussion Purposes. Las Vegas Stadium Alternative Funding Concept

WASHINGTON COUNTY-WIDE Digital Trunked P25 Phase 2 Interoperable EMERGENCY RADIO, PAGING & SYSTEM for sheriff, police, fire

State College Area School District

LTE Pro Experimentation 2,6 GHz TDD & new business needs Air France - Paris CDG Airport

An Introduction to Airline Communication Types

Steven W. Jennings, CIO Harris County ITC

Operational Benefits of Ground Based Augmentation Systems

SPACEPORT ITALY. Economics Living Lab Università degli Studi di Verona. Prof. Federico Perali

BCSD TECHNOLOGY DEPARTMENT

TABLE OF CONTENTS 1200 PLAN PREPARATION

View referenced exhibit back-up material. (See Report to the City Council No ) Adoption of a Resolution certifying findings that:

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-4. Section 4(f) Mitigation Master Plan

Minor Site Plan Review Process

Location of World Shooting Complex

Chapter Four AIRPORT LAYOUT PLAN SET COMPONENTS

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Electromagnetic Compatibility. Wi-Fi Installations. Federal Aviation Administration. Administration. David B. Walen

FREQUENTLY ASKED QUESTIONS ABOUT ALLOWABLE USES OF 911 FEES Updated January, 2018

MOTOTRBO SYSTEMS AT-A-GLANCE

EMERGENCY COMMUNICATIONS

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

strategic policies in the adopted development plan for South Cambridgeshire. Some

SAN FRANCISCO AIRPORT COMMISSION MINUTES

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan

Comprehensive Emergency Management Plan

A Bill Regular Session, 2017 HOUSE BILL 1926

TOPAZ Regional Wireless Cooperative (TRWC) Board of Directors

Continuing Education Credit

A PUBLICATION OF THE VIRGIN ISLANDS PORT AUTHORITY. HERA s New Fire Station. 2 New Board Secretary & Members. 3 FY 16 Budget

FAA Research and Development Efforts in SHM

Attachment C to Modification # 6 to VA HSMM. Schedule of Fees

Saskatchewan Polytechnic Board of Directors

INSTALLATION AND MAINTENANCE MANUAL FOR P/N: D564-XXX-001 L864 RED MEDIUM INTENSITY BEACON

Communications Design Challenges for the Edmonton North LRT Extension

Annex III - 3. Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT)

TAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:

Agenda Town of Duck Planning Board Regular Meeting Paul F. Keller Meeting Hall Wednesday, October 11, :30 p.m.

X X X X X - Finalize drawing list X X B. Project Description

CTA Blue Line Forest Park Branch Feasibility/Vision Study

Research Program Overview Maintenance & Inspection (M&I) Technical Community Representative Group (TCRG) Part of BLI A11e Continued Airworthiness

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

NOTICE. INFRASTRUCTURE: Currently, the District is responsible for infrastructure in Lakewood Ranch COD 5 including but not limited to the following:

McKenzie County Healthcare Systems

NEW HANOVER COUNTY AIRPORT AUTHORITY REGULAR PUBLIC MEETING February 4, 2015

Ordinance DT-O AN ORDINANCE AMENDING THE DU PAGE COUNTY CODE RELATIVE TO WIRELESS TELECOMMUNICATION FACILITIES IN COUNTY RIGHTS-OF-WAY

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Instructions for Continued

OPERATIONAL ADVICE NOTICE (OAN) OAN 114/2018 MAN-TP PP16 HV & AGL PIT & DUCT INSTALLATION This OAN replaces OAN with immediate effect.

Required Documents for Commercial Permits Permit Types 1. New Structure 2. Addition 3. Remodel 4. Tenant Finish 5. Change of Tenant/Use 6.

TECHNOLOGY SERVICES. 800 MHz Joint Operating Committee October 19, 2018 STAFF REPORT - AGENDA ITEM # 11

CALL FOR ARTISTS REQUEST FOR QUALIFICATIONS

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Intelligent Surveillance and Management Functions for Airfield Applications Based on Low Cost Magnetic Field Detectors. Publishable Executive Summary

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

CHAPTER 77 UTILITIESMAN (UT) NAVPERS F CH-77

SURVEILLANCE SYSTEMS. Operational Improvement and Cost Savings, from Airport Surface to Airspace

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

Optimized LED Architecture based on a Parallel Circuit

Joel Russell, AvPorts Brian Johansson, Federal Security Director (TSA) Eric Anderson, Times Union

GALVESTON - BOLIVAR FERRY SYSTEM. ITS Implementations

MINUTES OF A REGULAR MEETING OF THE FRIEDMAN MEMORIAL AIRPORT AUTHORITY* September 6, :30 P.M. IN ATTENDANCE: BOARD MEMBERS: Chairman Ron Fairfa

Transcription:

FISCAL YEAR 2018-2022 CAPITAL IMPROVEMENT PLAN AVIATION FACILITIES 1

FISCAL YEAR 2018-2022 CAPITAL IMPROVEMENT PLAN Aviation Facilities Planned CIP Planned appropriations for the Fiscal Year 2018-2022 Adopted Capital Improvement Plan are projected to reach $2.05 billion. The George Bush Intercontinental Airport (IAH) International Terminal Redevelopment Program (ITRP) dominates the five-year CIP representing 64%; airfield projects represent 12%; garage projects represent 2%; while infrastructure projects represent 10% of the five-year CIP planned appropriations. The George Bush Intercontinental Airport Master Plan is complete, waiting on FAA s approval for Layout Plans. Projects stemming from this Master Plan include: the overall plan for the ITRP International Terminal Redevelopment Program. The FAA Environmental Assessment for ITRP will be completed in calendar year 2017. Planning activity levels are being monitored at IAH and William P Hobby Airport (HOU) to determine the timing and need for the projects identified in the Master Plan. Projects underway at HOU include: New Southwest Hanger on South Airfield, reconstruct conversion of existing Southwest hanger into a cargo provisioning facility, and relocation of the Airport Maintenance Complex. The northwest portion of the airfield will be reconfigured to meet FAA airfield standard requirements. At Ellington Airport: Spaceport Phase I development will include utility infrastructure and possible incubator facility. The EFD Air Traffic Control Tower is in construction. Funding for the Airport Facilities CIP The Fiscal Year 2018-2022 Airport Facilities CIP is being funded from various sources including the Airports Improvement Fund (AIF, Fund 8011), Airports Renewal and Replacement Fund (R&R, Fund 8010), Grants-in-Aid from the FAA Airports Improvement Program (AIP Fund 8000), other transaction funds from Department of Homeland Security (DHS) and Commercial Paper / General Airport Revenue Bonds (GARB) and passenger facility charges. Major CIP Projects The new Terminal C North opened in March 2017. New United Hanger and supporting facilities are being planned and headed for design. Construction of Baggage System Rehabilitation at Terminal A is underway. Master plans for Ellington Airport (EFD) and HOU are complete. EFD has obtained the FAA s Spaceport license. The IAH Master Plan includes: airfield reconstruction projects for larger aircraft, installation of more aircraft gates, and improved terminal facilities designed to improve the passenger experience. The major IAH terminal project scheduled in the five year CIP is ITRP which redevelops the International Terminal D with more gates to handle the large wide body aircraft. 2

CITY OF HOUSTON - AVIATION FACILITIES Planning Fiscal Year Planned Appropriations Project Allocation 2018-2022 Acquisition-Land 2,830 2,830 Design 259,644 2,194 5,261 175 267,274 Construction 345,971 680,943 402,479 2,325 38,429 1,470,147 Equipment Acquisition Salary Recovery Other 188,815 34,460 44,801 35,352 11,210 314,638 Total Allocation 797,260 717,597 452,541 37,852 49,639 2,054,889 Source of Funds 8011 - HAS-Airports Improvement 189,774 95,870 198,562 19,330 37,915 541,451 FAA/AIP 4,188 10,125 14,313 REV BONDS/CP 591,871 601,792 253,979 18,522 8,625 1,474,789 R&R 11,427 9,810 3,099 24,336 Total Funds 797,260 717,597 452,541 37,852 49,639 2,054,889 3 Form D

Fiscal Year Planned Appropriations A-000138 Technical Engineering Services Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000138 000 8011 - HAS-Airports Improvement 2,120 2,120 Project Total 2,120 2,120 A-000348 Miscellaneous Construction Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000348 000 8011 - HAS-Airports Improvement 1,770 545 560 575 590 4,040 Project Total 1,770 545 560 575 590 4,040 A-000422 Civic Art for Aviation-HAS Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000422 000 8011 - HAS-Airports Improvement 2,239 9,000 179 465 11,883 Project Total 2,239 9,000 179 465 11,883 A-000423 General Environmental Services - HAS Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000423 000 8011 - HAS-Airports Improvement 250 250 R&R 5,704 552 6,256 Project Total 5,954 552 6,506 A-000477 PN 604A Inter-Terminal Train-Repairs Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000477 000 8011 - HAS-Airports Improvement 5,000 19,650 24,650 R&R 1,060 9,810 10,870 Project Total 1,060 9,810 5,000 19,650 35,520 A-000494 APM Guide Way Structural Enhancements Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000494 000 REV BONDS/CP 29,000 29,000 Project Total 29,000 29,000 A-000495 Public Wi-Fi Expansion-HAS Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000495 000 8011 - HAS-Airports Improvement 318 3,296 3,614 Project Total 318 3,296 3,614 4

A-000510 New GT Staging Area - GBIAH Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000510 000 8011 - HAS-Airports Improvement 3,800 3,800 Project Total 3,800 3,800 A-000513 Airport Pavement Replacement Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000513 000 8011 - HAS-Airports Improvement 500 6,000 6,500 R&R 4,663 4,663 Project Total 5,163 6,000 11,163 A-000515 Rehab Taxiway SA,SB & RA - GBIAH Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000515 000 8011 - HAS-Airports Improvement 5,000 294 67,713 73,007 Project Total 5,000 294 67,713 73,007 A-000516 Sanitary Sewer - GBIAH Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000516 000 8011 - HAS-Airports Improvement 9,221 9,221 Project Total 9,221 9,221 A-000519 Install Canopy at Pass Drop Off Area - H Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000519 000 8011 - HAS-Airports Improvement 4,590 4,590 Project Total 4,590 4,590 A-000523 Construction of New Taxiways - EFD Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000523 000 8011 - HAS-Airports Improvement 4,000 41,000 45,000 Project Total 4,000 41,000 45,000 A-000527 Non-Standard FAA Taxiways at HOU Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000527 000 8011 - HAS-Airports Improvement 375 3,375 3,750 FAA/AIP 1,125 10,125 11,250 Project Total 1,500 13,500 15,000 5

A-000528 LA for HOU-FPA/PIN Point Hobby HOU Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000528 000 8011 - HAS-Airports Improvement 2,830 2,830 Project Total 2,830 2,830 A-000539 Lactation Stations at GB IAH Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000539 000 8011 - HAS-Airports Improvement 261 261 Project Total 261 261 A-000543 SMGCS LGHTG & Markings - FIS Expansion Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000543 000 8011 - HAS-Airports Improvement 120 1,080 1,200 Project Total 120 1,080 1,200 A-000558 COMMON USE TICKET & GATE CHECK-IN SYS Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000558 000 8011 - HAS-Airports Improvement 1,240 1,860 3,100 Project Total 1,240 1,860 3,100 A-000563 Space Locator & Signage A/B/C/D Garage Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000563 000 8011 - HAS-Airports Improvement 15,300 15,300 Project Total 15,300 15,300 A-000572 Wayfinding Garage Facilities -IAH/HOU Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000572 000 8011 - HAS-Airports Improvement 2,500 2,500 Project Total 2,500 2,500 A-000580 Hobby Drainage & Roadway Flooding - HOU Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000580 000 8011 - HAS-Airports Improvement 3,245 3,245 Project Total 3,245 3,245 A-000581 Terminal A Modernization Program Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000581 000 REV BONDS/CP 35,000 40,000 75,000 Project Total 35,000 40,000 75,000 6

A-000590 Rehabilitate and Expand ARFF Station-HAS Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000590 000 8011 - HAS-Airports Improvement 1,900 22,100 1,925 25,925 Project Total 1,900 22,100 1,925 25,925 A-000599 Internal Signage at IAH & HOU Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000599 000 8011 - HAS-Airports Improvement 2,000 1,500 1,500 5,000 Project Total 2,000 1,500 1,500 5,000 A-000600 Infrastructure Staff Augmentation - HAS Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000600 000 8011 - HAS-Airports Improvement 7,000 3,360 3,450 3,540 17,350 Project Total 7,000 3,360 3,450 3,540 17,350 A-000601 PN720 HOU InternlFacility-LeaseAgrmnt.01 Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000601 000 REV BONDS/CP 126,000 126,000 Project Total 126,000 126,000 A-000602 On-Call Planning Services Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000602 000 8011 - HAS-Airports Improvement 7,500 3,360 3,450 3,540 17,850 Project Total 7,500 3,360 3,450 3,540 17,850 A-000608 Smiley Face Tablets in Restrooms - HAS Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000608 000 8011 - HAS-Airports Improvement 1,200 1,200 Project Total 1,200 1,200 A-000610 Cell Phone Lots on JFK & Will Clayton Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000610 000 8011 - HAS-Airports Improvement 5,445 5,445 Project Total 5,445 5,445 A-000612 PN900.01 Public WIFI Servs & Equip Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000612 000 8011 - HAS-Airports Improvement 608 608 Project Total 608 608 7

A-000614 SatelliteCntrlUtilities-SUP Facility-HOU Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000614 000 REV BONDS/CP 8,175 8,625 16,800 Project Total 8,175 8,625 16,800 A-000615 PN 691-GBAS-GROUND BASED AUGMENTATIO Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000615 000 8011 - HAS-Airports Improvement 300 300 Project Total 300 300 A-000619 Rehabilitation of Airfield Svc. Rd - EFD Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000619 000 R&R 2,547 2,547 Project Total 2,547 2,547 A-000621 Public Addressing (PA) System Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000621 000 8011 - HAS-Airports Improvement 1,930 1,930 Project Total 1,930 1,930 A-000622 Reworking Constr Taxiway WA/WB Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000622 000 8011 - HAS-Airports Improvement 55,000 55,000 110,000 Project Total 55,000 55,000 110,000 A-000623 Demolition of Tower at IAH -REIMB by FAA Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000623 000 FAA/AIP 3,063 3,063 Project Total 3,063 3,063 A-000625 IAH Fleet Maintainence Building Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000625 000 8011 - HAS-Airports Improvement 4,371 4,371 Project Total 4,371 4,371 A-000626 Term-A NO & SO Restroom Remodel Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000626 000 8011 - HAS-Airports Improvement 4,635 4,635 Project Total 4,635 4,635 8

A-000629 Aerospace Design & Solution Lab - EFD Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000629 000 REV BONDS/CP 18,504 18,504 Project Total 18,504 18,504 A-000630 Hobby Parking Office Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000630 000 8011 - HAS-Airports Improvement 1,800 1,800 Project Total 1,800 1,800 A-000634 On Call Technology Contract Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000634 000 8011 - HAS-Airports Improvement 2,120 2,180 2,240 2,300 2,360 11,200 Project Total 2,120 2,180 2,240 2,300 2,360 11,200 A-000635 Communication Cabling Infrastructure Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000635 000 8011 - HAS-Airports Improvement 1,770 1,770 Project Total 1,770 1,770 A-000636 Parking Revenue Control System - HAS Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000636 000 8011 - HAS-Airports Improvement 7,630 7,630 Project Total 7,630 7,630 A-000645 TAXIWAY RA PAVEMENT REHAB Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000645 000 8011 - HAS-Airports Improvement 976 976 Project Total 976 976 A-000646 SPACEPORT INFRA DEVELOPMENT Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000646 000 8011 - HAS-Airports Improvement 17,600 17,600 Project Total 17,600 17,600 A-000800 Executive Program Manager Services-ITRP Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year A000800 000 8011 - HAS-Airports Improvement 35,000 17,040 32,960 85,000 REV BONDS/CP 383,367 561,792 245,804 18,522 1,209,485 Project Total 418,367 578,832 278,764 18,522 1,294,485 9

Total Appropriations: 797,260 717,597 452,541 37,852 49,639 2,054,889 10

AVIATION - Department Related Projects 2018-2022 CAPITAL IMPROVEMENT PLAN ($ Thousands) This page lists projects that support the department but are found in other sections of the Capital improvement Plan Section Project Fiscal Year Planned Appropriations CIP No. Fleet 2018-2022 W-28ADSP HAS - Admin Support / Operations Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Planned Appro W28ADSP 000 8012 - HAS-AIF Capital Outlay 35 115 99 122 122 492 Project Total 35 115 99 122 122 492 W-28ERES HAS - Emergency Response Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Planned Appro W28ERES 000 8012 - HAS-AIF Capital Outlay 2,465 2,016 2,132 2,248 2,248 11,109 Project Total 2,465 2,016 2,132 2,248 2,248 11,109 W-28MTOP HAS - Maintenance Operations Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Planned Appro W28MTOP 000 8012 - HAS-AIF Capital Outlay 1,328 150 224 158 158 2,018 Project Total 1,328 150 224 158 158 2,018 W-28SCOP HAS - Security Operations Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Planned Appro W28SCOP 000 8012 - HAS-AIF Capital Outlay 355 355 Project Total 355 355 Total Appropriations: 4,183 2,281 2,455 2,528 2,528 13,975 11 Form R

FISCAL YEAR 2018 2022 CAPITAL IMPROVEMENT PLAN Intentional Blank Page 12