The Importance of the Neutral-Grounding Resistor. Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T.

Similar documents
Upgrading Your Electrical Distribution System To Resistance Grounding

A DUMMIES GUIDE TO GROUND FAULT PROTECTION

Webinar: An Effective Arc Flash Safety Program

high RESISTANCE GROUNDING SYSTEM the power to protect www. ElectricalPartManuals. com Instruction Manual C-102

Wisconsin Contractors Institute Continuing Education

Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services

Grounding Recommendations for On Site Power Systems

thepower to protect the power to protect i-gard LITERATURE Low and medium voltage

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

2 Grounding of power supply system neutral

Protecting Large Machines for Arcing Faults

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

high RESISTANCE GROUNDING SYSTEM the power to protect SLEUTH Instruction Manual C-408EM

Education & Training

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Continued from Part 1 Rules 1 25.

TABLE OF CONTENT

Ground Fault Location. Turbo Sleuth. Instruction Manual

EPG. by Chris C. Kleronomos

> the power to protect. Ground Fault Protection on Ungrounded and High Resistance Grounded Systems. Application Guide.

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

Grounding System Theory and Practice

Preface...x Chapter 1 Electrical Fundamentals

Ground Fault Protection on Ungrounded and High Resistance Grounded Systems APPLICATION GUIDE

Protection of Electrical Networks. Christophe Prévé

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

CONTENTS. 1. Introduction Generating Stations 9 40

Table of Contents. Introduction... 1

American Electrical Institute

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

This document covers common questions concerning the design of an effectively grounded system.

WHITE PAPER. Medium Voltage On-Site Generation Overview. BY MIKE KIRCHNER Technical Support Manager at Generac Power Systems

Modern transformer relays include a comprehensive set of protective elements to protect transformers from faults and abnormal operating conditions

Industrial Electrician Level 3

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

Transformer Protection

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

TECHNICAL INFORMATION

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

INSTALLATION AND MAINTENANCE MANUAL FOR GROUND MONITOR GM-250 COPYRIGHT 1983 AMERICAN MINE RESEARCH, INC.

Article 250 Grounding & Bonding

Jake Leahy s Electrical Code Connection. A look at Grounding and Bonding of Electrical Services Article Florida Building Code 5 th Edition

How to maximize reliability using an alternative distribution system for critical loads

Grounding for Power Quality

Effective System Grounding

Electrical Measurement Safety. Sponsored By:

ENGINEERING STANDARD FOR INSTRUMENTS ELECTRICAL POWER SUPPLY AND DISTRIBUTION SYSTEMS FIRST EDITION MAY 2013

Ground Fault Isolation with Loads Fed from Separately Derived Grounded Sources

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

Utility Interconnection and System Protection

TN, TT & IT Earthing Arrangements

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

SINGLE-PHASE VSV SWITCH

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

The Connecticut Light and Power Company

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

PJM Manual 07:: PJM Protection Standards Revision: 2 Effective Date: July 1, 2016

Overview of Grounding for Industrial and Commercial Power Systems Presented By Robert Schuerger, P.E.

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design

SE-502 MANUAL GROUND-FAULT GROUND-CONTINUITY DETECTOR

The InterNational Electrical Testing Association Journal. BY STEVE TURNER, Beckwith Electric Company, Inc.

UProtection Requirements. Ufor a Large scale Wind Park. Shyam Musunuri Siemens Energy

GROUND-FAULT PROTECTION ON RESISTANCE-GROUNDED POWER-DISTRIBUTION SYSTEMS WITH ADJUSTABLE-SPEED DRIVES 1. Modified_103007

Our Brands. Where we are?

Generation Interconnection Requirements at Voltages 34.5 kv and Below

FERRORESONANCE SIMULATION STUDIES USING EMTP

Electrical Wiring: Commercial, Seventh Canadian Edition

Busbars and lines are important elements

Specialists in HV and MV test and diagnostics. Testing in Substations

Appendix C-1. Protection Requirements & Guidelines Non-Utility Generator Connection to Okanogan PUD

Transformer Protection

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

Electrical Arc Hazards

System Protection and Control Subcommittee

Variable Transformers Product Design & Engineering Data

CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS

ECE 528 Understanding Power Quality

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

SINGLE-PHASE VSV SWITCH

Distribution/Substation Transformer

PC IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

Substation applications

E S C R I P T I V E B U L L E T I N .,.,.,. Bulletin DB-106. October, Square D Company Power System Studies ---1 I SQU ARED COMPANY --

Transformer Protection Principles

Distance Protection for Distribution Feeders. Presented By: Yordan Kyosev, P.Eng. & Curtis Ruff, P.Eng.

Report on investigation of failure of 315 MVA Auto transformer at 400 kv Bawana Substation of Delhi Transco Ltd.(DTL)

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009

Arc Flash Hazard. Can HRG Technology play a role in prevention?

SUBJECT CODE : EE6702 SUBJECT NAME: Protection & switchgear STAFF NAME : Ms.J.C.Vinitha

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION

GE Ventilated Dry-Type Transformers. Secondary Substation Transformers - 5 and 15kV Class

Transcription:

The Importance of the Neutral-Grounding Resistor Presented by: Jeff Glenney, P.Eng. and Don Selkirk, E.I.T.

Presentation Preview What is high-resistance grounding (HRG)? What is the purpose of HRG? Why is the neutral-grounding resistor (NGR) so important Why monitor the NGR? Code requirements Summary Case studies

What is High-Resistance Grounding? High-Resistance Grounding of, an electrical power system, is the grounding of the system neutral through a resistance which limits ground-fault current to a value equal to, or slightly greater than the capacitive charging current of that system.

What is High-Resistance Grounding? The Neutral-Grounding Resistor is the connection between the system neutral and ground. It provides a path for ground-fault current to return to the transformer neutral.

What is High-Resistance Grounding? A properly designed high-resistance-grounded system: Combines the benefits of ungrounded and solidly grounded systems: Allows the user to run with a single ground fault on the system, or shut down in an orderly manner Prevents transient overvoltages and limits voltage fluctuation at the neutral during a ground fault Facilitates the location of ground faults Minimizes the risk of arc flash and arc blast on the first ground fault Limits energy available to a ground-fault fault Provides current to current-sensing ground-fault protection

Wire Wound NGR

Edge Wound NGR

NGR in Vented Enclosure

What is the importance of the NGR? Why Monitor the NGR What are the consequences of an NGR failure?

Why Monitor the NGR L o a d Ground-Fault Relay

Why Monitor the NGR? False Sense of Security L o a d Ground-Fault Relay

UNGROUNDED SYSTEM: NORMAL OPERATION & FAULTED OPERATION All phases are at line-to-neutral voltage above ground (eg: 347V) A & B phases are at line-line voltage above ground (eg: 600V) Neutral point established by distributed capacitance Phase C at ground potential No fault current (no return path to source) Normal operation Ground fault on phase C

UNGROUNDED (DELTA) SYSTEM: FAULTED OPERATION WITH TRANSIENT OVERVOLTAGE A & B phases are: > Line-line voltage above ground Phase C > ground voltage Intermittent fault current Personnel danger Normal operation Intermittent ground fault on phase C

WHY MONITOR THE NGR? False Sense of Security Ungrounded Wye Open NGR Ungrounded Delta

Why Monitor the NGR? During a ground-fault the NGR is a critical component. Without the NGR current sensing ground-fault protection does not operate on a ground fault. Does this really matter?

Courtesy of Jack Woodham - Jedson Engineering POWER SYSTEM GROUNDING COURSE INDUSTRIAL POWER SYSTEMS Failure Mode 1. Line-to-ground 2. Phase-to-phase 3. Three-phase Percentage of Failures 98 % < 1.5 % < 0.5 % Most three phase faults are man-made: i.e. accidents caused by improper operating procedure.

For a Resistance-Grounded System: In 98 out of every 100 electrical faults the protection system will not operate as designed with out the NGR.

Why Monitor the NGR? DESIGN, STARTUP, AND COMMISSIONING OF A 230 KV - 13.8 KV SUBSTATION Each ground-fault relay has a redundant back up plus the adjacent two main buses and bus tie section zones are protected by full bus differential relays and backed up by partial bus differential protection. Feeder units have two redundant relays. The relays are different models with different CT inputs, but perform the same functions and send simultaneous trips to the feeder circuit breaker.

Ground Protection Single Line

Ground Protection Single Line

NGR Monitoring Methods A V Does not monitor NGR continuity, only measures neutral-point voltage and current Active only when GF present This is back-up groundfault protection, not NGR monitoring

A Superior Method Sensing Resistor Monitoring Device Monitors ground current Monitors Voltage at the neutral Continuously monitors the NGR continuity The monitor provides indication of the NGR continuity whether there is a ground-fault or not Isolates the monitor from line-toneutral voltage Detects NGR failure without an energized load

Code Requirements for NGR Monitoring NGR Monitoring US and Canadian Code References Where is resistance grounding required? Where is monitoring required?

US Regulations NEC 2005 Article 250 Grounding and Bonding 250.188 (D) Ground-Fault Detection and Relaying. Ground-fault detection and relaying shall be provided to automatically de-energize any high-voltage system component that has developed a ground fault. The continuity of the equipment grounding conductor shall be continuously monitored so as to de-energize automatically the high-voltage circuit to the portable or mobile equipment upon loss of continuity of the equipment grounding conductor.

US Regulations - 30 CFR Section 18.47 Gassy Mines or Tunnels Electric motor-driven mine equipment and accessories 30 CFR 18.47 Voltage Limitation (2) A continuously monitored, failsafe grounding system is provided that will maintain the frame of the equipment and the frames of all accessory equipment at ground potential. Also, the equipment, including its controls and portable (trailing) cable, will be deenergized automatically upon the occurrence of an incipient ground fault. The ground-fault-tripping current shall be limited by grounding resistor(s) to that necessary for dependable relaying. The maximum ground-fault-tripping current shall not exceed 25 amperes.

US Regulations - 30 CFR Section 56 Testing grounding systems PART 56--SAFETY AND HEALTH STANDARDS SURFACE METAL AND NONMETAL MINES 30 CFR 56.12028 Testing grounding systems. Continuity and resistance of grounding systems shall be tested immediately after installation, repair, and modification; and annually thereafter. A record of the resistance measured during the most recent tests shall be made available on a request by the Secretary or his duly authorized representative.

US Regulations - 30 CFR Section 57 PART 57--SAFETY AND HEALTH STANDARDS UNDERGROUND METAL AND NONMETAL MINES 30 CFR 57.12028 Testing grounding systems. Continuity and resistance of grounding systems shall be tested immediately after installation, repair, and modification; and annually thereafter. A record of the resistance measured during the most recent tests shall be made available on a request by the Secretary or his duly authorized representative.

US Regulations - 30 CFR Section 75 Mandatory safety standards--underground coal mines 30 CFR 75.801 Grounding Resistors The grounding resistor, where required, shall be of the proper ohmic value to limit the voltage drop in the grounding circuit external to the resistor to not more than 100 volts under fault conditions. The grounding resistor shall be rated for maximum fault current continuously and insulated from ground for a voltage equal to the phase-to-phase voltage of the system.

US Regulations - 30 CFR Section 75 Mandatory safety standards, surface coal mines and surface work areas of underground coal mines 30 CFR 77.801 Grounding Resistors The grounding resistor, where required, shall be of the proper ohmic value to limit the voltage drop in the grounding circuit external to the resistor to not more than 100 volts under fault conditions. The grounding resistor shall be rated for maximum fault current continuously and insulated from ground for a voltage equal to the phase-to-phase voltage of the system.

US Regulations - 30 CFR Section 75 Mandatory safety standards--underground coal mines 30 CFR 75.814(3) Electrical Protection 3) Ground-fault currents must be limited by a neutral grounding resistor to not more than-- i. 6.5 amperes when the nominal voltage of the power circuit is 2,400 volts or less; or ii. 3.75 amperes when the nominal voltage of the power circuit exceeds 2,400 volts.

4) High-voltage circuits extending from the section power center must be provided with-- i. Ground-fault protection set to cause deenergization at not more than 40 percent of the rating of the neutral grounding resistor ii. iii. A backup ground-fault detection device to cause deenergization when a ground fault occurs with the neutral grounding resistor open; and Thermal protection for the grounding resistor that will deenergize the longwall power center if the resistor is subjected to a sustained ground fault. The thermal protection must operate at either 50 percent of the maximum temperature rise of the grounding resistor, or 150 deg. C (302 deg. F), whichever is less, and must open the ground-wire monitor circuit for the highvoltage circuit supplying the section power center. The thermal protection must not be dependent upon control power and may consist of a current transformer and overcurrent relay.

US Regulations - 30 CFR Section 75 Mandatory safety standards--underground coal mines 30 CFR 75.1719-2 Lighting fixtures; requirements. (2) Alternating current circuits supplying power to stationary lighting fixtures shall contain conductors energized at voltages not greater than 70 volts to ground. Alternating current circuits, energized at 100 volts or more and used to supply power to stationary lighting fixtures, shall originate at a transformer having a center or neutral tap grounded to earth through a proper resistor, which shall be designed to limit fault current to not more than 5 amperes. A grounding circuit in accordance with 75.701-4 shall originate at the grounded terminal of the grounding resistor and extend along with the power conductors and serve as a grounding conductor for the frames of all equipment receiving power from the circuit.

Commonwealth of Pennsylvania - Department of Environmental Protection Mine Power Substation - The area containing electrical switchgear (circuit breakers, fuses, switches, and/or transformers), used for the purpose of controlling power from the surface power system to the underground mine power transmission. I. Alternating current installations shall include A through M. G. Secondary or mine feeder circuit breaker with: 4. Automatic tripping of circuit breakers by protective relays and shall provide as a minimum tripping by: f. Ground fault-current limiting resistor protection and monitoring by current and potential transformer relaying.

Commonwealth of Pennsylvania - Department of Environmental Protection Load Center 13. Main breaker tripping devices, which must include: a. Overload and short circuit protection b. Ground fault by current protector. c. Ground fault by potential protector in the event of an open ground resistor. d. Continuous monitoring of the ground resistor is acceptable in lieu of potential protector. e. Time delay tripping for coordination of tripping is allowed.

Canadian Regulations C22.1-06 10-1102.3 10-1102 Use (1) Should read Neutral grounding devices shall be permitted to be used only on systems where all neutral conductors are insulated to the nominal system voltage. (3) Where line-to-neutral loads are served, provision shall be made to automatically de-energize the system on the occurrence of (a) a ground fault; (b) a grounded neutral on the load side of the neutral grounding device; or (c) a lack of continuity of the conductor connecting the neutral grounding device from the neutral point through the neutral grounding device to the system grounding electrode.

Canadian Regulations CSA M421-00 Section 3.5.5 CSA M421-00 Use of Electricity in Mines General Protection and Control Ground-Fault Protection Where ground-fault protection is used, the supply shall be (a) Grounded through a neutral-grounding device that limits ground-fault voltage to 100 V or less; and (b) de-energized in less than 1 s if ground-fault current exceeds 20% of the prospective ground-fault current

Canadian Regulations CSA M421-00 Section 3.6.2 General Grounding Neutral-Grounding Devices A neutral-grounding device shall be (a) Continuously rated, except when ground-fault tripping is provided: (b) Monitored so as to de-energize the supply in less than 60s if the neutralgrounding device opens; and (c) Connected as close as practical to the supply neutral.

Canadian Regulations CSA M421-OO Section 4.5.1 Surface Mines and Quarries High-Voltage Power Distribution to Movable Equipment Ground-Potential Rise A circuit supplying movable equipment shall be grounded through a neutral-grounding device that limits ground potential rise at the movable equipment to 100 V or less.

Canadian Regulations CSA M421-OO Section 4.7.3.4.1 Surface Mines and Quarries Movable Electrical Equipment Wiring Methods On Board AC-Supply Circuits Resistance Grounding Where on-board, three-phase power transformers larger than 20 kva and operating at voltages in excess of 300 V are used, the following requirements shall apply: (a) Except as permitted by Item (g), either a direct or derived neutral shall be grounded through a resistor at the power source to limit the prospective ground-fault current to 25 A or less (see Appendix A).

Canadian Regulations CSA M421-OO Section 6.9.6 Underground Coal Mines Wiring Methods for non-intrinsicallysafe Wiring AC Supply to Mobile Electrical Equipment Mobile electrical equipment operating at voltages in excess of 150 V shall be supplied by a system wherein (a) the neutral is grounded through a neutral-grounding device that limits ground-fault voltage at the mobile equipment to 50 V or less; (b) ground-fault protection is provided; and (c) ground-conductor monitoring is employed.

Canadian Regulations CSA M421-OO Section 6.9.6 Underground Coal Mines Grounding Grounding of Alternating Current Systems Systems operating at voltages-to-ground in excess of 150 V shall be (a) grounded through a neutral resistance; and (b) provided with ground fault protection.

Presentation Review Definition of HRG Benefits of HGR Consequences of an NGR failure Ground-fault relaying doesn t operate Transient over voltages Real world example of install and forget Continuous monitoring vs. back up ground fault protection An NGR monitor usually meets the requirements of back up ground-fault protection as well

Presentation Review Why monitor the neutral-grounding resistor (NGR)? In 98% of faults in industrial power systems the NGR is a critical system component With out it all current-sensing ground-fault protection does not function The NGR is no more resistant to failure than any other system component Minimize the risk of transient overvoltages Back up protection or monitoring required by various codes

Code Summary - US Article NEC 250.188 Comment High Voltage - Can not be met with an open NGR. 30 CFR 18.47 Gassy Mines or Tunnels 30 CFR 56.12028, 57.12028 Continuously monitored grounding system. Could be interpreted to include the NGR. Maintain the frame of the equipment and the frames of all accessory equipment at ground potential. Can not be met with an open NGR. Metal and Non-Metal Surface and Underground NGR continuity has to be confirmed after installation or repair and annually. Records must be available 30 CFR 75.814(3) Underground Coal Back up ground fault protection required in the event of fault with open NGR

Code Summary - US Pennsylvania Bureau of Mine Safety Article Mine Power Substation Load Center Comment Ground fault-current limiting resistor protection Ground fault by potential protector in the event of an open ground resistor Continuous monitoring of the ground resistor is acceptable in lieu of potential protector

Code Summary - Canada Article C22.1-06 10-1102.3 CSA M421-00 Section 3.5.5 CSA M421-00 Section 3.6.2 Comment Where line to neutral loads are served continuous NGR monitoring required. Where ground-fault protection is used, the supply shall be: Grounded through a neutral-grounding device that limits ground-fault voltage to 100 V or less General Grounding Neutral-Grounding Devices Continuous monitoring is required on any NGR De-energize supply in less than 60 s if NGR opens In Mining in Canada it is clearer: Any where ground-fault protection is used high-resistance grounding is required. Any where high-resistance grounding is used the NGR must be continuously monitored.

MONITORING NEUTRAL-GROUNDING RESISTORS Case Studies

NGR MONITORING: CASE STUDY I Situation: In 1952 Henry Post was tasked with reducing the high failure rate of ungrounded 3 Phase, 440 Vac oil-field pumping motors, at Humble Oil. Evidence pointed to failure of the stator windings due to over voltage caused by phase-to-ground faults. Action: Post had been working with the idea of Hi-R Neutral Grounding and decided to try it here. Result: Problem solved, for a little while. When the failure rate increased again inspection of the NGR revealed failure due to corrosion.

NGR MONITORING: CASE STUDY II Situation: In 2004 inspection of three NER s at a stationary surface substation of an Anglo Coal mine in Australia reveals all three to be open. Action: Startco suggests an SE-330 package for monitoring the NER s. Anglo Coal presents the topic of NER monitoring at the 2004 Queensland Mine Electrical Conference. Result: Anglo Coal is convinced that NER monitoring is beneficial. Another documented example of why we should monitor NGR s is brought forward.

NGR MONITORING: OPEN NGR PHOTO

NGR MONITORING: CASE STUDY III Situation: Shortly before they were about to be re-energized, inspection of eight NGR s at one of P&G s facilities revealed five NGR s were left open after transformer testing. Action: The NGR s were reconnected. But what if this had gone unnoticed?

NGR MONITORING: CASE STUDY IV Situation: 2001 while visiting the processing plant at a mine in Northern MN. Physical damage was noticed on a grounding resistor. The resistor was mounted too close to the overhang of the building and an iceberg sized icicle had fallen on top of the screened enclosure. The enclosure and the resistor were both crushed by the impact. Solution: Move to a warmer climate. This customer did not monitor his NGR but he may find the fault when he is looking for the reason he had so much damage caused by either a transient overvoltage or a phase-to-phase fault.

NGR MONITORING: CASE STUDY V Situation: Assistant Maintenance Manager at Cargill Fertilizer, Inc in Bradley Junction Florida reported an SE-325 trip on a 5 year old installation. The grounding resistor was hit and burnt out by a lightning strike. Problem: Without continuous monitoring how long would the open resistor have gone undetected?

MSHA Fatality Report

One of the contributing factors to the fatality

Reproduction of point 7 The grounding resistor in the section power center was burned apart causing it to be inoperable. It had been spliced in two other locations. The investigation interview confirmed that there had been problems with the grounding resistor burning open or apart in the past. A balanced flux relaying method was provided as a means of grounded phase protection in all the 3-phase circuits in the 001 section of the power center. This relaying method could not function properly when the grounding resistor was open.

NGR MONITORING: CONCLUSION NGR s fail. Monitoring the NGR will help prevent the problems associated with an ungrounded system.

Thank You