The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

Similar documents
The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

*************************************************************************************************************

SECTION LOW PRESSURE DUCTWORK

LOW PRESSURE STEEL DUCTWORK Mechanical Systems Insulation Outlets (HVAC) Testing and Balancing.

Ductwork Controls and Instrumentation Outlets (HVAC) HVAC Control System.

SECTION HVAC DUCTS PART I - GENERAL 1.1 RELATED DOCUMENTS

Round Duct and Fittings. Standards and Dimensional Data for Air Duct and Fittings

Technical Development Program

COMMERCIAL KITCHEN HOOD WORKSHEET/ CHECKLIST

FLUOROPOLYMER COATED DUCT FOR CAUSTIC ENVIRONMENTS

SECTION AIR DISTRIBUTION SYSTEM

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION DUCTWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS:

FIRE STATION NO TH STREET NORTH ST. PETERSBURG, FL M-1 SCOPE OF WORK SYMBOL DESCRIPTION SYMBOL DESCRIPTION HVAC SYMBOL LEGEND

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

SHEET METAL FLASHING AND TRIM Christ on the Mountain

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

PRODUCT CATALOG STOCK ITEMS OR CUSTOM FABRICATIONS MADE TO YOUR SPECIFICATIONS - SHEET METAL SYSTEMS

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

SECTION SHEET METAL FLASHING AND TRIM

Installation and Maintenance Manual IM 770-1

GE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -

APPENDIX A, UMC STANDARD 6-5 STANDARD FOR INSTALLATION OF FACTORY-MADE AIR DUCTS

SECTION COMMON WORK RESULTS FOR HVAC

CHAPTER 6 DUCT SYSTEMS

M1.0 MECHNANICAL FLOOR PLAN

2. All work and materials shall be in full accordance with Local and State ordinance and with any prevailing rules and regulations.

OVER THE RANGE MICROWAVE OVEN INSTALLATION INSTRUCTIONS

SECTION MECHANICAL IDENTIFICATION

INSTALLATION GUIDE MICROWAVE OVEN UPMC3084ST. MFL _00

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

SECTION BULLET- RESISTANT DOORS

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

AUXILIARY FRAMING AND ACCESSORIES

KS SERIES - VERTICAL INSTALLATION

ASSEMBLY, INSTALLATION AND OPERATION MANUAL

CROSSBAR RAFTER ISOMETRIC

Design and Construction Standards SECTION ATHLETIC LOCKERS

Sheet Metal Worker Level 2

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION METAL LOCKERS

Dura-Lock Roof System

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

Installation and Maintenance Manual

ADDENDUM NO. 4 November 15, Page 1

New Product Release: October 2014 Boone Racks

Steel Sound Enclosure

Household Appliances. Over-the-Range Microwave. Installation Instructions. For Models: HMV9302, HMV9305, HMV9306, HMV9307

PART MATERIALS. Section Fencing Materials. Description

Slate Shingle Specifications

BEFORE YOU BEGIN Read these instructions completely and carefully.

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

CSP PSYCHIATRIC SERVICES UNIT SECTION IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

IMPORTANT! READ BEFORE PROCEEDING! SV Weather Caps

APPENDIX FENCE GENERAL NOTES

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

St. Monica Food Pantry

Installation Guide. Model #400. Corporate Office: 349 Highland Road East Macedonia, Ohio

ALUMINUM PIPE GUIDERAIL 01/01/

Index Pipe Hangers and Straps

BEFORE YOU BEGIN Read these instructions completely and carefully.

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

SECTION SHEET METAL FLASHING AND TRIM

CITY OF PITTSBURG ENGINEERING DEPARTMENT CONTRACT NO A WATER TREATEMENT PLANT CAPITAL IMPROVEMENTS PHASE 1A ADDENDUM #1 FENCE AND DITCH AUGUST

BEFORE YOU BEGIN Read these instructions completely and carefully.

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

Over the Range Microwave Oven

Thru Wall Floor Seals For New Installation

Installation Instructions Student 101 Fume Cupboard

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

STEEL PIPE GUIDERAIL 01/01/

Salter Industries Spiral Stair

SECTION MECHANICAL IDENTIFICATION

Modular Gazebo Kit Series GardenHouse 12

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

Testing. Material testing will be according to applicable AASHTO, ASTM or Department methods as specified.

Sheet Metal Worker A Guide to Course Content

WPS crew Doors Installation instructions

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

General Information...SA1-SA4

SECTION METAL FABRICATIONS

COMMERCIAL GRAIN SILO

System 3000 specifications

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

PIPE/CONDUIT SUPPORTS

SHEET METAL STUDENT GRADE RECORD Career & Technical Education

Hardened Structures Hardened Shelters, LLC. Explosion Resistant Pre-hung Sealed Blast Door

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

IOM 004 Effective 3/29/04 Rev A. MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance

Transcription:

SECTION 23 31 13 METAL HVAC DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section. PART 2 - MATERIALS AND METHODS 2.1 DUCTWORK A. Furnish and install all supply, return, exhaust, outside air and other ductwork shown, together with splitters, extractors, dampers, etc. All ductwork, supports, bracing, etc. shall be constructed of new grade, lock forming quality, G-60 or better galvanized steel sheets. B. Dimensions of duct work shown on Drawings are inside air stream dimensions. Allowances have not been made for duct insulation. C. Provide adjustable extractors with quadrant lock mechanism equal to Titus AG-45 at all supply outlet taps into trunk duct. Provide conical tap with damper and raised quadrant lock for flexible duct taps, reference detail on the Drawings. Provide adjustable round elbows (0-90 ) at ceiling devices connected with flex ducts (not required if Flexmaster self supporting flex is installed). D. Ductwork shall conform with current edition of SMACNA "Duct Manual and Sheet Metal Construction for Ventilating and Air Conditioning System" and the National Board of Fire Underwriters Pamphlet 90A, plus more stringent requirements of these Specifications. Adjust location of standing seams to clear structural members. E. Duct connections to air handling units and fans shall match the outlet/inlet size, or as recommended by the equipment manufacture, including straight lengths of duct before transitions, to minimize system effect losses. Where duct adapters or damper trays are provided with roof fans, duct connections shall match size for a minimum of 36 before elbow or transistion. F. All duct transitions shall be gradual with a 15 maximum angle as measured from centerline of duct. This includes angled offset, mitered offset, eccentric transition and concentric transition (2 x 15 ). G. Ductwork shall be constructed to operate at the pressure as specified under "external static pressure" of the associated air handling unit and fan schedule. Ductwork downstream of VAV boxes and fan coil unit shall be 1 static class ductwork. Ductwork operating at.75 to 2.0 shall be 2.0 pressure rated. Primary ductwork from a variable air volume air handling unit shall be constructed in accordance with Section 2.2 Medium Pressure Ductwork. H. Square turns shall be equipped with airfoil turning vanes built to SMACNA Standards. Provide radius turns for elbows less than 90. I. Support ductwork with 1" wide x 20 gage galvanized steel straps; 6'-0" maximum centers but not more than allowed by SMACNA. Connect strap to duct with two sheet metal screws on each side of duct and one on bottom. Exposed ducts shall be supported in a manner to provide a finished appearance. 23 31 13 Metal HVAC Ducts Page 1

J. Install duct braces in duct openings to hold shape of duct until grilles, registers and/or diffusers are installed. Then remove duct brace. K. Seal all duct joints, adjustable elbows and spin-in taps with Elgen Duct Seal-it, Design Polymerics DP1010 or Hardcast IG601 Iron Grip installed full strength (no dilution). Ductwork subject to moisture and not required to be welded, shall be sealed with Benjamin Foster 3214. DP1020 may be used. L. In areas noted to have round double wall ductwork, provide United McGill Acousti-K27. Outer duct shall be constructed of paintable, 18 gauge galvanized steel. Inner duct shall be perforated galvanized steel. Between the inner and outer ducts install 2 thick fiberglass insulation coated to inhibit growth of micro-biological organisms and to eliminate erosion of fibers. M. The minimum distance between the air terminal box and the first tap shall be 54. The minimum distance between taps on the same side of the duct shall be 54. N. Provide equivalent sized duct of different aspect ratio to accommodate ceiling cavity conditions. O. Sheet metal contractor shall install control system and fire alarm system devices that are attached to ductwork. This includes control dampers, sensors and duct smoke detectors. 2.2 MEDIUM PRESSURE DUCTWORK A. Furnish and install medium pressure round and oval ducts as indicated on the Drawings, connecting air handling units to fan powered boxes. All ducts shall be sized as indicated on the Drawings, and properly supported and hung from the building structure by trapeze hangers. The minimum size hanger rod shall be 3/8. Completed duct system (taps and access panels installed) shall be tested at 5 water column at which pressure leakage shall not exceed 3/4 of 1% of the total designed CFM for the individual duct system being tested. All ductwork shall be externally insulated per the Specifications. All turning vanes shall be heavy gage, double thickness type. B. Medium pressure round or oval duct shall be spiral lock seam duct as manufactured by Gowco, Graco or United Sheet Metal with matching factory made fittings and couplings. All transitions shall be gradual with 15 maximum angle with centerline of the duct. All joints and fittings shall be spot-welded and sealed. Gauges of round medium pressure ducts shall be as follows: 3 thru 8 26 gauge 9 thru 22 24 gauge 24 thru 36 22 gauge 38 thru 50 20 gauge 52 thru 60 18 gauge Fittings and couplings thru 36 shall be 22 gauge, 38 thru 60 shall be 20 gauge. Gauges of flat oval spiral ducts shall be 22 gauge up to 48 major axis and 20 gauge from 49 thru 74 major axis. Fittings shall be 20 gauge up to 36 major axis, 18 gauge for 37 thru 50 and 16 gauge for 51 and larger major axis. Centerline radius of elbows shall be 1½ duct diameters. Provide conical take-off s where possible. C. All square to round/oval transitions at air handling unit discharges shall be 18 gauge galvanized steel with all welded connections, and shall have flanged rectangular connection. 23 31 13 Metal HVAC Ducts Page 2

D. All joints in ducts and fittings shall be sealed with United Sheet Metal High Pressure Unigrip duct sealer or Benjamin Foster No. 3214. DP1020 may be used. E. Connections to fan powered boxes from main duct to box extension shall be made with a two foot length of straight flexible connecting duct. This flexible duct shall be Flexible Tubing Corporation Thermaflex, insulated Type M-KC, U. L. approved, or equivalence product of Atco and Peppertree Air Solutions. Provide a hard, straight section of round duct at VAV box connections with length 1½ times duct diameter. Connect inner liner to spin-in, VAV box, round rigid duct or air device with stainless steel, adjustable bands (hose clamps), or plenum rated panduit strap. Secure outer cover with nylon wire tie strap. F. Duct work supports shall consist of unistrut with 3/8 thick or heavier all thread rods attached to structure. Provide double nuts and cut all tread so no more than 1 extends beyond nut. 2.3 KITCHEN HOOD EXHAUST DUCTWORK A. GENERAL: Make connections to all hoods and extend ductwork to exhaust blowers. Securely fasten and support ducts at every change of direction. Supports or fasteners shall not penetrate any duct or plenum. Systems shall be installed to maintain not less than 1500 feet per minute velocity. Discharge air outlets shall be at least 40" above roof and at least 24" above any intake opening with 10 feet. B. DUCT CONSTRUCTION: Install ductwork without forming dips or traps and slope not less than 1" per foot downward toward hood. Provide cleanout openings at each change in direction. Cleanout openings shall be equipped with tight fitting doors, same thickness as duct, equipped with latching to make grease tight. Doors shall be operable and removable without the use of a tool. C. COOKING HOOD EXHAUST DUCT: Black steel, minimum 16 gage, with grease tight, continuous external welded joints. D. DISHWASHER HOOD EXHAUST DUCT: 18 gauge, Type 316L stainless steel, watertight construction with continuous external welded joints. 2.4 DUCTWORK FOR OUTSIDE AIR HOODS AND FANS Where hoods or fans are shown open to mechanical room, shop, etc., provide short length of duct to allow installation of OBD and/or motorized control damper. Duct dimension shall be roof curb opening size or larger if required by damper size. 2.5 PLENUMS AND BLANK-OFF PLATES A. Provide plenums at louvers, air handling units, fan coil units and other equipment where return air or outside air ducts are shown to connect. Provide plenums for the mounting fans to louvers. Provide full or partial blank-off plates on return air openings as necessary for properly balancing of system supply air, outside air and return air flows or to cover openings where air transfer is not desired. B. Construct plenums with galvanized steel framing members and galvanized sheet steel, cross broken or rigidly braced with galvanized angles. Gages and bracing shall conform to SMACNA recommendations for ductwork of like size. Openings for fans, access doors, etc., shall be framed with galvanized steel angles. 23 31 13 Metal HVAC Ducts Page 3

C. Where access doors are shown, provide hinged doors with #202 Ventlok latch. 2.6 DRYER EXHAUST DUCTWORK A. Snap lock, round galvanized sheetmetal with taped, slip-fit joints. Eliminate edges and sheetmetal screws that could catch lint. B. Install flexible connections of fire resistant material with spiral inner liner wire, stainless steel clamps between unit and exhaust duct. C. Roof discharge cap shall have baffled outlet, without bird screen similar to Penn Pul-Air. 2.7 SHEET METAL SHOP DRAWINGS Prior to fabrication of any sheet metal, submit Shop Drawings for all ductwork, showing coordination of mechanical, electrical, plumbing and structural components. All crafts shall sign off on final drawings. The shop drawing shall include a construction details booklet (multiple copies), one blueline set of drawings and one reproducible set of drawings. The booklets and reproducible set with comments noted will be returned. Contractor shall provide blueline sets of drawings from the reproducible set for distribution to Owner, Architect and others. 2.8 SCREENS Furnish and install screen on all duct, fan, etc., openings which lead to or are outdoors. Screens shall be No. 16 gage, galvanized steel 1/2" mesh bolted into removable galvanized steel frame. Install screens over return air openings between floors. 2.9 CONNECTIONS TO LOUVERS All connections to louvers shall be in a manner that will be watertight. Ductwork behind louver for a minimum of three feet shall have watertight soldered joints and shall be sloped to weep holes in bottom of louver. Duct shall be lapped over bottom louver blade where possible. Make connections to aluminum louvers with dielectric connections. 2.10 METAL CLOSURES A. Provide metal closures around all openings in floors or walls through which ducts or piping are passing. B. Build 3" high by 3" wide concrete "dam" around duct or return air penetrations of mechanical room floors above grade. Floor return air openings without sound attenuator attached shall be covered with 1" x 1/8" welded steel bar grating supported by 2" x 2" x 1/4" angles attached to slab with 3/4" round drilled anchors, 24" on center. C. MATERIALS: 1. Where no fire rating required, and where no fire dampers installed: 18 gage galvanized sheet metal. 23 31 13 Metal HVAC Ducts Page 4

2. Where fire rating required or where fire damper is installed: Gage of sleeves shall be as required by the conditions of U. L. listing, but not less than the gage of duct. Minimum 18 gage. Install 1½" x 1½" x 1/8" angles around duct on both sides of wall or floor penetration. 3. Sleeves for floor pipe penetrations above grade shall be a section of Schedule 40 steel pipe extending 3" above finished floor and sealed watertight. 2.11 SADDLES Provide sheet metal protective saddles at all pipe supports for insulated piping. Insulation Section. Refer to 2.12 DRAIN PANS A. GENERAL: Provide drain pan under fan coil units, air handling units, water heaters and other equipment subject to water leakage not mounted on concrete floor in mechanical room. B. CONSTRUCTION: 16 gauge galvanized steel suitably stiffened, with minimum 2" perimeter lip and all joints soldered watertight. Provide connection and overflow drain to suitable location. 2.13 INSTALLATION OF DUCTWORK AND AIR DEVICES A. Prior to all work of this section, Carefully inspect the installed work of all other trades and verify that all such work is complete to the point where fabrication and installation of the work of this section may properly commence. B. Verify the location of all ducts, structure, piping and equipment. Coordinate the routing of all work with that of other trades prior to installation. Verify that all ductwork will fit spaces indicated prior to fabrication or installation of any ductwork. C. Exact location of all registers, grilles or ceiling outlets shall be verified by the Architect before roughing-in. Reference shall be made to reflected ceiling plan in locating ceiling outlets. D. Ducts shall be installed in a neat and workmanlike manner. 2.14 ADJUSTMENTS AND CORRECTIONS Balance all systems of ductwork including exhaust systems to obtain the air quantities indicated for each inlet and outlet. Air quantities shall be further adjusted as required to obtain uniform temperatures in the spaces. END OF SECTION 23 31 13 Metal HVAC Ducts Page 5