SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

Similar documents
SECTION OPERATION AND MAINTENANCE DATA

A. Section includes administrative and procedural requirements for project record documents, including the following:

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

Section Project Closeout

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

Vanderbilt University Standard Specification Revised 2/6/08

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

SECTION SUBMITTAL PROCEDURES

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Construction Phase Project Management and Documentation

Section Meetings Section Material and Equipment. None Required

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

East Central College

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES

SECTION PROJECT MANAGEMENT AND COORDINATION

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

Answer: Qualification statement should be provided with the bid.

Facility Services Subgroup Preface for Divisions 21` through 28

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

C. This Section is based on completion and acceptance of the entire project during a single time period.

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

Jacksonville District Master

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION OPERATIONS AND MAINTENANCE MANUALS TRACTION POWER EQUIPMENT

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Working Drawing Manual

01100 SUMMARY OF WORK

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

SECTION III SUBMITTALS AND APPROVALS

SECTION PANELBOARDS

SECTION BASIC MATERIALS AND METHODS. A. The requirements of the General Conditions and Supplementary Conditions apply to all Work herein.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Solid Surface Countertops

SECTION SUBMITTALS

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

This specification describes the general requirements for Engineering Services provided to Vale.

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

SECTION PROJECT COORDINATION VIA BIM

Heat Exchanger Construction Checklist

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

Booster Pumping Station 115 Booster Pump Procurement

UNIFIED FACILITIES GUIDE SPECIFICATIONS

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

SECTION LIGHTING PART 1- GENERAL

National BIM Standard - United States Version 3

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

Bidders for the Oak Brook Park District Family Locker Room Renovation

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Bid No. B14-02 Building 100 HVAC Improvements

ADDENDA ADDENDUM NO. 1 DATE: MARCH 1, 2016

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

Solid Surface Fabrications

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

Merck VENDOR DOCUMENT REQUIREMENTS. Caustic Tank. Elkton, VA PRESSURE GAUGES 63PZ0234-J-VD PZ PZ02XX Report For: Project: Document No.

ADDENDUM #2 September 12, 2018

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

DIVISION 11 EQUIPMENT SECTION PHOTO DARKROOM FUME EXHAUST VENT-HOODS

Transcription:

PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative Requirements: Submittals procedures, shop drawings, product data, and samples. B. Section 01 77 00 - Closeout Procedures: Contract closeout procedures. C. Individual Product Sections: Specific requirements for operation and maintenance data. D. Individual Product Sections: Warranties required for specific products or Work. 1.03 SUBMITTALS A. Record Drawings: 1. Draft: Submit one (1) set of searchable PDF electronic files and updated.dwg files of final Contract Documents and shop drawings on labeled compact disk (CD) or digital video disk (DVD) including hard case of marked up prints prior to request for review for Substantial Completion. 2. Final: Submit one (1) set of searchable PDF electronic files and updated.dwg files on labeled compact disk (CD) or digital video disk (DVD) including hard case of marked up prints within thirty (30) days of date established for Substantial Completion or prior to request for review for final completion, whichever occurs first. 3. Disk Format: Provide one (1) electronic file per document. File names shall clearly identify the Owner, project name, drawing name and date. File names shall be established to list in the same order as identified in the Contract Documents. Disks and hard cases shall be clearly labeled with Owner, project name, date and number of disk in total number of disks associated with submission (i.e. Disk X of Y). B. Record Specifications: 1. Draft: Submit one (1) set of searchable PDF electronic files on labeled compact disk (CD) or digital video disk (DVD) including hard case of marked up prints prior to request for review for Substantial Completion. 2. Final: Submit one (1) set of searchable PDF electronic files on labeled compact disk (CD) or digital video disk (DVD) including hard case of marked up documents within thirty (30) days of date established for Substantial Completion or prior to request for review for final completion, whichever occurs first. 3. Disk Format: Provide one (1) electronic file per document. File names shall clearly identify the Owner, project name, specification section and date. File names shall be established to list in the same order as identified in the Contract Documents. Disks and hard cases shall be clearly labeled with Owner, project name, date and number of disk in total number of disks associated with submission (i.e. Disk X of Y). C. Operation and Maintenance Manuals: 1. Draft: Submit one (1) set of searchable PDF electronic files on labeled compact disk (CD) or digital video disk (DVD) including hard case prior to request for review for Substantial Completion. Architect will review draft and return with comments. Revise content of all document sets as required prior to final submission. Month Year Parkrose Middle School Project 01 78 00-1

2. For equipment, or component parts of equipment put into service during construction and operated by Owner, submit completed documents within ten (10) days after acceptance. 3. Final: Submit one (1) set of searchable PDF electronic files on labeled compact disk (CD) or digital video disk (DVD) including hard case of marked up documents within thirty (30) days of date established for Substantial Completion or prior to request for review for final completion, whichever occurs first. 4. Disk Format: Provide one (1) electronic file per document. File names shall clearly identify the Owner, project name, specification section and date. File names shall be established to list in the same order as identified in the Contract Documents. Disks and hard cases shall be clearly labeled with Owner, project name, date and number of disk in total number of disks associated with submission (i.e. Disk X of Y). D. Warranties and Bonds: 1. Submit a summary of warranties included in the bid within seven (7) days after Notice of Intent to Award Contract (Prior to Execution of the Contract). Indicate duration of each warranty and start date. 2. For equipment or component parts of equipment put into service during construction with Owner's permission, submit documents within 10 days after acceptance. 3. Draft: Submit as part of normal submittal process. 4. Final: Submit final forms of warranties prior to request for review for final completion. 5. Submission Requirements: Submit one (1) set of searchable PDF electronic files on labeled compact disk (CD) or digital video disk (DVD) including hard case as required. Provide one (1) electronic file per document. File names shall clearly identify the Owner, project name, specification section and date. File names shall be established to list in the same order as identified in the Contract Documents. Disks and hard cases shall be clearly labeled with Owner, project name, date and number of disk in total number of disks associated with submission (i.e. Disk X of Y). PART 2 PRODUCTS - NOT USED PART 3 EXECUTION 3.01 PROJECT RECORD DOCUMENTS A. Maintain on site one set of the following record documents; record actual revisions to the Work: 1. Drawings. 2. Specifications. 3. Addenda. 4. Change Orders and Construction Change Directives. 5. ASI's and responses to RFI's. 6. Reviewed shop drawings, product data, and samples. 7. Manufacturer's instruction for assembly, installation, and adjusting. B. The record documents shall include all disciplines of work whether changes occur or not. These documents, as well as the approved permit set of plans, shall be available to the Architect and Owner at the site and reviewed with them on a monthly basis. Satisfactory maintenance of upto-date record drawings on a monthly basis will be a requirement for approval of progress payments. C. Store record documents in the field office apart from the Contract Documents used for construction. Do not use project record documents for construction purposes. Maintain record documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to project record documents for Architect's reference during normal working hours. D. Record Drawings: 1. Content: Types of items requiring marking include, but are not limited to, the following: a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. Month Year Parkrose Middle School Project 01 78 00-2

c. Depths of foundations below first floor. d. Locations and depths of underground utilities. e. Revisions to routing of piping and conduits. f. Revisions to electrical circuitry. g. Actual equipment locations. h. Duct size and routing. i. Locations of concealed internal utilities. j. Changes made by Addenda. k. Changes made by Change Order or Construction Change Directive. l. Changes made following Architect's written orders, including ASI's and responses to RFI's. m. Details not on the original Contract Drawings. n. Field records for variable and concealed conditions. o. Record information on the Work that is shown only schematically. 2. Record drawings shall include, as a minimum, the location and performance data on each piece of equipment, general configuration of duct and pipe distribution system, including sizes, and the terminal air and water design flow rates. 3. Mark the Contract Drawings and Shop Drawings completely and accurately. Utilize personnel proficient at recording graphic information in production of marked-up record prints. 4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location. 5. Mark important additional information that was either shown schematically or omitted from original Drawings. 6. Mark revisions and/or clarifications issued by Addenda, ASI, Construction Change Directive, Change Orders or responses to RFI's to reflect the change. Each such revision shall be graphically depicted to represent physical construction and clearly noted with the applicable Addenda, ASI, Change Order or RFI number. Notation of the Addenda, RFI, ASI, Construction Change Directive or Change Order number alone will not be acceptable. 7. Ensure entries are complete and accurate, enabling future reference by Owner. E. Specifications: Legibly mark and record at each product section a description of actual products installed, including the following: 1. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected. 2. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made. 3. For each principal product, indicate whether record Product Data has been submitted in operation and maintenance manuals. 4. Mark revisions and/or clarifications issued by Addenda, ASI, Construction Change Directive, Change Orders or responses to RFI's to reflect the change. Each such revision shall be graphically depicted to represent physical construction and clearly noted with the applicable Addenda, ASI, Change Order or RFI number. Notation of the Addenda, RFI, ASI, Construction Change Directive or Change Order number alone will not be acceptable. 3.02 OPERATION AND MAINTENANCE DATA A. For Each Product or System: List names, addresses and telephone numbers of Subcontractors and suppliers, including local source of supplies and replacement parts. B. Product Data: Mark each sheet to clearly identify specific products and component parts, and data applicable to installation. Delete inapplicable information. C. Drawings: Supplement product data to illustrate relations of component parts of equipment and systems, to show control and flow diagrams. Do not use Project Record Documents as maintenance drawings. Month Year Parkrose Middle School Project 01 78 00-3

D. Typed Text: As required to supplement product data. Provide logical sequence of instructions for each procedure, incorporating manufacturer's instructions. 3.03 OPERATION AND MAINTENANCE DATA FOR MATERIALS AND FINISHES A. For Each Product, Applied Material, and Finish: 1. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and crossreference Specification Section number and title in Project Manual and drawing or schedule designation or identifier where applicable. 2. Product data, with catalog number, size, composition, and color and texture designations. 3. Information for re-ordering custom manufactured products. B. Instructions for Care and Maintenance: Manufacturer's recommendations for cleaning agents and methods, precautions against detrimental cleaning agents and methods, and recommended schedule for cleaning and maintenance. C. Repair Materials and Sources: Include lists of materials and local sources of materials and related services. D. Moisture protection and weather-exposed products: Include product data listing applicable reference standards, chemical composition, and details of installation. Provide recommendations for inspections, maintenance, and repair. E. Additional information as specified in individual product specification sections. F. Provide a listing in Table of Contents for design data, with tabbed fly sheet and space for insertion of data. 3.04 OPERATION AND MAINTENANCE DATA FOR EQUIPMENT AND SYSTEMS A. For Each Item of Equipment and Each System: 1. Description of unit or system, and component parts. 2. Identify function, normal operating characteristics, and limiting conditions. 3. Include performance curves, with engineering data and tests. 4. Complete nomenclature and model number of replaceable parts. B. Panelboard Circuit Directories: Provide electrical service characteristics, controls, and communications; typed. C. Operating Procedures: Include start-up, break-in, and routine normal operating instructions and sequences. Include regulation, control, stopping, shut-down, and emergency instructions. Include summer, winter, and any special operating instructions. D. Maintenance Requirements: Include routine procedures and guide for preventative maintenance and troubleshooting; disassembly, repair, and reassembly instructions; and alignment, adjusting, balancing, and checking instructions. E. Provide servicing and lubrication schedule, and list of lubricants required. F. Include manufacturer's printed operation and maintenance instructions. G. Include sequence of operation by controls manufacturer. H. Provide original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance. I. Provide control diagrams by controls manufacturer as installed. J. Provide charts of valve tag numbers, with location and function of each valve, keyed to flow and control diagrams. Month Year Parkrose Middle School Project 01 78 00-4

K. Provide list of original manufacturer's spare parts, current prices, and recommended quantities to be maintained in storage. L. Include test and balancing reports. M. Additional Requirements: As specified in individual product specification sections. 3.05 OPERATION AND MAINTENANCE MANUALS A. Prepare instructions and data by personnel experienced in maintenance and operation of described products. B. Prepare data in the form of an instructional manual. C. Contents: Prepare a Table of Contents for each volume, with each product or system description identified, in three parts as follows: 1. Part 1: Directory, listing names, addresses, and telephone numbers of Architect, Contractor, Subcontractors, and major equipment suppliers. 2. Part 2: Operation and maintenance instructions, arranged by system and subdivided by specification section. For each category, identify names, addresses, and telephone numbers of Subcontractors and suppliers. Identify the following: a. Significant design criteria. b. List of equipment. c. Parts list for each component. d. Operating instructions. e. Maintenance instructions for equipment and systems. f. Maintenance instructions for special finishes, including recommended cleaning methods and materials, and special precautions identifying detrimental agents. 3. Part 3: Project documents and certificates, including the following: a. Shop drawings and product data. b. Air and water balance reports. c. Certificates. d. Photocopies of warranties and bonds. D. Provide a listing in Table of Contents for design data, with tabbed dividers and space for insertion of data. E. Table of Contents: Provide title of Project; names, addresses, and telephone numbers of Architect, Consultants, and Contractor with name of responsible parties; schedule of products and systems, indexed to content of the volume. F. PDF Electronic File: After review of draft manuals, assemble each manual into a composite electronically-indexed file. 1. Name each indexed document file in composite electronic index with applicable item name. Include a complete electronically-linked operation and maintenance directory. 2. Enable inserted reviewer comments on draft submittals. 3. File Names and Bookmarks: Enable bookmarking of individual documents based upon file names. Name document files to correspond to system, subsystem, and equipment names used in manual directory and table of contents. Group documents for each system and subsystem into individual composite bookmarked files, then create composite manual, so that resulting bookmarks reflect the system, subsystem, and equipment names in a readily navigated file tree. Configure electronic manual to display bookmark panel upon opening file. 3.06 WARRANTIES AND BONDS A. Obtain warranties and bonds, executed in duplicate by responsible Subcontractors, suppliers, and manufacturers, within ten (10) days after completion of the applicable item of work. Except for items put into use with Owner's permission, leave date of beginning of time of warranty until the Date of Substantial Completion is determined. Month Year Parkrose Middle School Project 01 78 00-5

B. Verify that documents are in proper form and contain full information. C. Co-execute submittals when required. D. Retain warranties and bonds until time specified for submittal. SECTION 01 78 00 E. Table of Contents: Neatly typed, in the sequence of the Table of Contents of the Project Manual, with each item identified with the number and title of the specification section in which specified, and the name of product or work item. F. Schedule of Warranties: Provide a summary schedule of start and end date of each warranty. G. Separate each warranty or bond with index tab sheets keyed to the Table of Contents listing. Provide full information, using separate typed sheets as necessary. List Subcontractor, supplier, and manufacturer, with name, address, and telephone number of responsible principal. END OF SECTION Month Year Parkrose Middle School Project 01 78 00-6