CPVC-10. CPVC Pipe Hangers Straps To Support Your Piping

Similar documents
SWAY BRACE PIPE ATTACHMENT FIG. 010

Installation and Assembly: Ceiling mount for LCD screens up to 29"

Hang-TITE Rod Hanger Screws

Factory Assistance: Phone: Fax: Page 1

VPN: ISBXLR. Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

OPA-11. Communications & Data Seismic Solutions. OSHPD Pre-Approved Numbers

AUXILIARY FRAMING AND ACCESSORIES

B3199R - Ceiling Flange B3199RCT - Ceiling Flange Dura-Copper Coated. TOLCO Fig All Steel Ceiling Plate. 216 Eaton

Transmission Line Support Systems

Part No. Thread Size B Design Load Approx. Wt./100 A in. (mm) Lbs. (kn) Lbs. (kg)

Track Rack. * Track Racks are not lockable

Index Pipe Hangers and Straps

Installation & Assembly: Suspended Ceiling Kit

Max. Rec. Load. Wt. Per Inch lbs. kn lbs. kn lbs. kg. Wt. Per Inch lbs. kn lbs. kn lbs. kg 750 F (399 C)

Instruction Sheet For: SCM-2

CSS Central Mount System

Beam and Purlin Clamps Beam Clamps

Installation & Assembly: Two Piece Suspended Ceiling Plate

BIKE FILE (301)

HPH Series J-Hook Installation Instructions

NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS

CABLE RUNWAY & TRAY PRODUCTS

Superstrut Stainless Steel Channels and Accessories

Cat. No. A1200 A1200-S A1200-KO. Finishes & Materials. E142-1/4x100EG 1/4 x 1 A100-5/16EGC A100-3/8EGC. Standard Finish: Electrogalvanized

Grate-Lock Safety Grating - Design Load Table of Contents

Elco Construction Products 1301 Kerr Drive Decorah, IA fax:

SRIS-001 Arista Mounting System Instruction Sheet Solar Rooftop Support Ballasted

SYW Industry Sdn. Bhd. Stud Anchor. Hexagon Nut / Flange Nut. U - Bolt (c/w 2 Nuts) Steel Band. 1 of 8

LPR System Installation instructions

Mounting a BalanceBox 400 to a brick wall

CNC Router Parts PRO Machine Kit Cable Track Installation Instructions

Peco Fasteners 3/8 Internal Plug Drop In 50 Per Jar 3/8-16 SMART DROP IN ANCHOR ZINC

MPA-9000 Universal Ceiling Projector Mount Kit

Steel Casework Metal Framing System

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Cable Runway. Telco-Style Cable Runway. UL Classified Cable Runway

INSTRUMENT MOUNTING STANDS PRODUCT CATALOG Continuous Tray Support System for Instrumentation and Controls

TO O L K IT. Public Bike Repair

FURNITURE LABORATORY METAL FRAMING SYSTEM. For additional information and help in planning contact Mott Manufacturing.

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

Installation and Assembly: Ceiling mount for LCD screens up to 29"

CMA-455 Suspended Ceiling-Tile Reinforcing Kit

TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF

Introduction. Depending on your kennel project, you may have some or all of the following hardware: Part # Description Part # Description 1468

Extensive cable management on a footprint that fits on a 24-inch floor tile.

table of contents Sliding Door Accessories Page Latches & Snuggers Stay Rollers Brackets & Stops

Rayport G Eco Dealer Kit

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

Downtown Rack. Custom logo option available

TC9217MM-C, TC9220MM-C, TC9227MM-C

Swerve Rack CUSTOM RACKS AVAILABLE

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

43107 Rhino Jerry Can Holder Rhino Jerry Can Holder - Horizontal

STEEL C-CLAMP WITH LOCKNUT

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

SEISMIC DESIGN GUIDE FOR FIRE SPRINKLER COMPONENTS EDITION 2.0 FOR NFPA COLOR CODED PRE-STRETCHED BREAK STRENGTH CERTIFIED

Attachment of Residential Deck Ledger to Side of Metal Plate Connected Wood Truss Floor Ladder. Installation Instructions Revised 9/2/2016

Approvals and Listings 3. Sammys for Wood 4. Sidewinder for Wood 5. Sammys Swivel Head for Wood 5. Sammys for Steel 6. Sidewinder for Steel 7

Superstrut. Metal Framing. Beam Clamps. Design Loads. Finishes and Special Materials

MSP-WRTIDSKY1 Light Weight Suspended Ceiling Kit for use with Island Display Skybox

F I X I N G M AT E R I A L

B Connectors. Automation. Structural Framing System Connectors & Fasteners

TABLE OF CONTENTS REQUIRED TOOLS

KM3000 PORTABLE KEY MILL

Standard Pole Mount Parabolic Antenna Mounting Instructions 3 ft. (90cm) & 4 ft. (120cm)

WIRE MESH CABLE TRAY

Technologies, Inc. Installation Instructions for Anchors & Components. Rev PAGE 1 / 11

MAST ARMS & POLES. Ornamental Pole Top & Bases

Installation Instructions for: Saris Cycle Aid. Saris Cycle Air. Saris Cycle Air HD

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

DBP Technical Data Series Rev. 0 Jan. 1, Pre Assembled Door Canopies

CEILING SYSTEMS. Between us, ideas become reality. Installing. Suspended Ceilings. International Version

Leveling Foot RB210. Leg Extender RLT66

Inc. BT Series. BW Series

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

MACHINE TOOL DYNAMOMETERS

Flush Mount. SunEarth Flush Mount Installation Manual. SunEarth Flush Mount. Asphalt Shingle Roofing

Titan Series Awning Assembly and Installation Instructions

4Post Server Rack-111 Assembly For Floor Anchored Models

SINGLE TRACK BYPASS (patent pending) barn door hardware

DOCK WEDGE - STANDARD

ACORNWIRE.COM MESH PARTITIONS DIVISION 10 - SPECIALTIES WIRE MESH PARTITION FOLDING GATE

TOGGLE CLAMPS. Holding Pressure Competitor Conversion Index General Information

SILVERBACK INSTALLATION MANUAL

99 Straight Sections 100 fittings, splices & connectors. 103 fasteners

ASSEMBLY GUIDE. Mia Narrow Bookcase

MONKEY LADDER A25188E ASSEMBLY INSTRUCTIONS WARNING

Dura-Lock Roof System

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual

Pickup Box Utility Rack Package Installation (Instruction ID: )

M4 Hex Nut [ ] M4 T-Nut 20 [20-044] Appx. 1. 3mm. 20 Series profiles (1 per hole) (1 per hole) Ordering Information

KENECO FLOW RACK INSTALLATION INSTRUCTIONS

Leveling Feet, Base Plates and Casters

Installation Instructions for Solar Snow Pad (SSP-T-3)

STRUCTURAL HOLDING, F150 TOOL BOARD, AND CART ASSEMBLY

Tel: +44 (0)

ENGINEERED BUILDING PRODUCTS. I-Beam HANGERS. NEW Enhanced Capacity with YELLOW MiTek 40 x 3.75mm nails

9. Weld a cross brace between the H frame and the A frame on each side. 10. Remove all the bracing and blocks, now you have I frame to work off.

INSIDE PANEL NOT SHOWN TO DETAIL ANCHORING SYSTEM

Transcription:

CPVC-10 CPVC Pipe Hangers Straps To Support Your Piping

CPVC Pipe Straps Cooper B-Line, Inc. is a leading manufacturer and fabricator of metal products used in the support of pipe and equipment for industrial, commercial, utility, and OEM installations. Cooper B-Line is proud of the exacting standards of research, design, engineering, and manufacturing that go into each and every product that comprise our pipe hanger product line. Our customers have access to the most complete support systems offered in the industry, including pipe hangers, metal framing, cable tray, slotted angle, fasteners, telecom, enclosures and anchors. Constructed of galvanized steel, CPVC pipe straps have flared edges to help protect pipes from damage. Packaged with hex head screws, the CPVC pipe straps can be installed onto wood beams without drilling. Special tek type screws are available (sold separately) to attach CPVC pipe straps to steel. B3181 One-Hole Wrap Around CPVC Pipe Strap (page 3) B3182 Two-Hole CPVC Pipe Strap (page 4) B3183 Two-Hole Side Mount CPVC Pipe Strap (page 5) B3184 Two-Hole Stand-Off CPVC Pipe Strap (page 6) 2

One-Hole Wrap Around CPVC Pipe Straps Application: The One-Hole Wrap Around CPVC Pipe Strap is designed to support pipe running horizontally on the side of a beam. It can also be used, as a guide, to mount CPVC pipe that runs perpendicular across the top of a beam or on a vertical pipe run. Features: Beveled edges protects CPVC pipe from damage Easily attaches to wood structure with included screws or to minimum 20 gauge steel with special screws (sold separately) Strap is UL Listed Sizes: 3 /4 (19mm) through 2 (50mm) CPVC pipe Includes: one (1) each pipe strap and #10 x 1 5 /16 hex head screw Optional: 1 /4 x 1 (25.4mm) tek type screw for mounting to steel (sold separately) Strap has one (1) 1 /4 (6.3mm) diameter hole for mounting Material: 20 gauge (0.9mm) x 1 1 /8 (28.6mm) pre-galvanized steel UPC Part D Nominal L C Maximum Wt. Number Number Pipe Dia. Overall Spacing Per 100 in. mm in. mm in. mm in. mm lbs. kg 78205160064 B3181-3 /4 1.050 26.7 2 3 /8 60.3 1 3 /8 34.9 66 1676 9.0 4.1 78205160065 B3181-1 1.315 33.4 2 5 /8 66.7 1 7 /16 36.5 72 1829 10.0 4.5 78205160066 B3181-1 1 /4 1.660 42.1 2 7 /8 47.6 1 9 /16 39.7 78 1981 12.0 5.4 78205160067 B3181-1 1 /2 1.900 48.2 3 1 /16 77.8 1 5 /8 41.3 84 2133 12.0 5.4 78205160068 B3181-2 2.375 60.3 3 7 /16 87.3 1 13 /16 46.0 96 2438 15.0 6.8 Support Application Nominal Pipe Diameter D L C Guide Applications Horizontally mount CPVC pipe Running CPVC pipe vertically Running CPVC pipe perpendicular across top of beam 3

Two-Hole CPVC Pipe Straps Application: The Two-Hole CPVC Pipe Strap is designed to support pipe running horizontally on the side of a beam or pipe running perpendicular to the bottom of the beam. It can also be used, as a guide, to mount CPVC pipe that runs perpendicular across the top of a beam or on a vertical pipe run. Features: Beveled edges protects CPVC pipe from damage Easily attaches to wood structure with included screws or to minimum 20 gauge steel with special screws (sold separately) Retaining dimples simplify installation process Strap is UL Listed Sizes: 3 /4 (19mm) through 2 (50mm) CPVC pipe Includes: one (1) pipe strap and two (2) #10 x 1 5 /16 hex head screws Optional: 1 /4 x 1 (25.4mm) tek type screw for mounting to steel (sold separately) Strap has two (2) 1 /4 (6.3mm) diameter hole for mounting Material: 20 gauge (0.9mm) x 1 1 /8 (28.6mm) pre-galvanized steel UPC Part D Nominal L C Maximum Wt. Number Number Pipe Dia. Overall Spacing Per 100 in. mm in. mm in. mm in. mm lbs. kg 78205160069 B3182-3 /4 1.050 26.7 3 1 /16 77.8 2 3 /16 55.6 66 1676 9.0 4.1 78205160071 B3182-1 1.315 33.4 3 3 /8 85.7 2 1 /2 63.5 72 1829 10.0 4.5 78205160072 B3182-1 1 /4 1.660 42.1 3 3 /4 95.2 2 7 /8 73.0 78 1981 12.0 5.4 78205160073 B3182-1 1 /2 1.900 48.2 4 1 /8 104.8 3 1 /4 82.5 84 2133 12.0 5.4 78205160074 B3182-2 2.375 60.3 4 3 /8 111.1 3 1 /2 88.9 96 2438 15.0 6.8 Support Applications Guide Applications Nominal Pipe Diameter D Side mounted on wood joist C Running CPVC pipe perpendicular across top of beam L Bottom mounted on wood joist Running CPVC pipe vertically 4

Two-Hole Side Mount CPVC Pipe Straps Application: The Two-Hole Side Mount CPVC Pipe Strap is designed to support pipe running perpendicular to the beam. When attached to the bottom of the beam it supports the pipe, but when attached to the top of the beam it will only act as a guide. Features: Beveled edges protects CPVC pipe from damage Easily attaches to wood structure with included screws or to minimum 20 gauge steel with special screws (sold separately) Retaining dimples simplify installation process Strap is UL Listed Sizes: 3 /4 (19mm) through 2 (50mm) CPVC pipe Includes: one (1) pipe strap and two (2) #10 x 1 5 /16 hex head screws Optional: 1 /4 x 1 (25.4mm) tek type screw for mounting to steel (sold separately) Strap has two (2) 1 /4 (6.3mm) diameter hole for mounting Material: 20 gauge (0.9mm) x 1 1 /8 (28.6mm) pre-galvanized steel UPC Part D Nominal W C HC Maximum Wt. Number Number Pipe Dia. Overall Spacing Per 100 in. mm in. mm in. mm in. mm in. mm lbs. kg 78205160075 B3183-3 /4 1.050 26.7 2 5 /16 58.7 1 11 /16 43.8 1 7 /8 47.6 66 1676 9.0 4.1 78205160076 B3183-1 1.315 33.4 2 9 /16 65.1 1 15 /16 49.2 2 3 /16 55.6 72 1829 10.0 4.5 78205160077 B3183-1 1 /4 1.660 42.1 2 15 /16 74.6 2 5 /16 58.7 2 1 /2 63.5 78 1981 11.0 5.0 78205160078 B3183-1 1 /2 1.900 48.2 3 1 /4 82.5 2 5 /8 66.7 2 13 /16 71.4 84 2133 12.0 5.4 78205160079 B3183-2 2.375 60.3 3 5 /8 92.1 3 76.2 3 1 /4 82.5 96 2438 13.0 5.9 Support Application Nominal Pipe Diameter D W C Guide Application HC Perpendicular pipe run bottom mounted on wood joist Perpendicular pipe run top mounted on wood joist 5

Two-Hole Stand-Off CPVC Pipe Straps Application: The Two-Hole Stand-Off CPVC Pipe Strap is designed to support CPVC pipe running horizontally on the side of a beam or perpendicular across the bottom of the beam. It can also be used, as a guide, to mount CPVC pipe that runs perpendicular across the top of a beam or on a vertical pipe run. Features: Beveled edges protects CPVC pipe from damage Easily attaches to wood structure with included screws or to minimum 18 gauge steel with special screws (sold separately) Strap is UL Listed Sizes: 3 /4 (19mm) through 2 (50mm) CPVC pipe Includes: one (1) pipe strap and two (2) #10 x 1 5 /16 hex head screws Optional: 1 /4 x 1 (25.4mm) tek type screw for mounting to steel (sold separately) Strap has two (2) 1 /4 (6.3mm) diameter hole for mounting Material: 20 gauge (0.9mm) x 1 1 /8 (28.6mm) pre-galvanized steel UPC Part D Nominal L H Maximum Wt. Number Number Pipe Dia. Overall Overall Spacing Per 100 in. mm in. mm in. mm in. mm lbs. kg 78205160081 B3184-3 /4 1.050 26.7 2 9 /16 65.1 4 1 /4 107.9 66 1676 9.0 4.1 78205160082 B3184-1 1.315 33.4 2 13 /16 71.4 4 1 /2 114.3 72 1829 10.0 4.5 78205160083 B3184-1 1 /4 1.660 42.1 3 3 /16 81.0 4 5 /8 117.5 78 1981 12.0 5.4 78205160084 B3184-1 1 /2 1.900 48.2 3 7 /16 87.3 5 127.0 84 2133 12.0 5.4 78205160085 B3184-2 2.375 60.3 3 7 /8 98.4 5 127.0 96 2438 15.0 6.8 Support Applications Guide Applications Nominal Pipe Diameter D Side mounted on wood joist H Running CPVC pipe perpendicular across top of beam L Bottom mounted on wood joist Running CPVC pipe vertically 6

Applications Note: Hex head screws are included with clamps for mounting to wood support surfaces. When mounting to a steel surface, a 1 /4 x 1 tek type screw is required (sold separately) Special screws are available when mount straps to steel, order separately. 7

Cooper B-Line Product Lines Strut Systems (Bolted Framing) Cable Tray Systems Electrical Enclosures Electronic Enclosures Metering Pipe Hangers & Support Systems Spring Steel Fasteners Cable Runway & Relay Racks (CommData) Meter Mounting & Distribution Equipment Safety Grating Anchors CPVC-10 Cooper B-Line 509 West Monroe Street Highland, IL 62249 Phone: 800-851-7415 Fax: 618-654-1917 www.cooperbline.com Contact Information Questions, Comments, Suggestions? B-VOCAL S M with Cooper B-Line Voice Of the Customer...Actively Listening bvocal@cooperindustries.com Toll Free: 877-351-9450 SYSTEMS THAT MAKE SENSE Cooper Industries, Ltd. 600 Travis, Ste. 5800 Houston, TX 77002-1001 Phone: 713-209-8400 www.cooperindustries.com 2010 Cooper B-Line, Inc. Printed in U.S.A. 10510