How To Create An Entertainment Unit

Similar documents
129 KITCHEN BASE CABINET 480

COMPLIMENTARY WOODWORKING PLAN

Entrance Cabinet Plans

WOODWORKING GUIDE: BASIC JOINERY

BUILDING A STORM DOOR

Extendable Large Dovetail Jig

The WoodWorker s Edge

CABINETRY Assembly Instructions

15 Dovetail Jig. Instruction Manual. Part # 3452

Chess board. The true origins of chess are. from old wood scraps Michael T Collins makes a chessboard and a box to store the pieces

Materials and Tools: Printer s Triple Console Cabinet. Free Plans to build a Triple Console Cabinet

GENERAL NOTES: Page 1 of 9

Klamp Trak. Instructions (39052)

EXTREME LOAD no. TWO

NEXUS SERIES CABINETS

Grade 11 Woods Lift Lid Coffee Table. Based on Under the big Top from Popular Mechanics Website

Corner Entertainment Center Plans

Build your own Drawer unit. D3 / D4

Hudson Dresser [1] Hudson Dresser Published on Ana White ( Submitted by dan-k [2] on Fri, :43 [1]

Trestle Table and Benches Materials List

Woodline USA Woodline Spacer Fence System

Australian Vintage Radio Society Inc.

Chest of Drawers Plans

Contents. pages 20-24: Installing Edge sinks into. custom laminate countertops page 8: Installing Edge sinks into postform laminate countertops

The Ultimate Storage Cart Tutorial

SE5a Instrument Board part 2 - rev 1.1

Xenon 05 Installation Instructions & Parts List

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

Somewhere along the way, we ve

Silverware Chest Plan

BBQ Trolley. 25 oiam. 240 oiam. 19

Bathroom Storage Unit. Wilkerdos.com

Demilune 4. Apron Joinery. Curved Apron Tenon. Bridle Joint Legs. Bridle Joint Front Apron

End-On-End Dovetails D4R - CHAPTER 12

136 PLYWOOD DESK 522

Shelf Divider Top Panel. Trim Piece

Plans. Easy-to-Build Full-size Deluxe Murphy Bed Plan. For more plans, tools and hardware visit rockler.com

Making Simple Bookbinding Equipment. A Lying Press. Making Simple Bookbinding Equipment. A Lying Press. Tony Firman

Art Rack Assembly Instructions:

CHAPTER 8. Through Dovetail Procedures

Scissor Stool. Written By: Feitan

woodworkersjournal.com MATERIAL LIST

DIY Wine Storage Cabinet

Copyright 2010 Springbok Publishing All Rights Reserved- Page 1

Step-by-Step Instructions for Making the Wall-hung Bookcase

Curium 19.4H Installation Instructions & Parts List

Mid-Century Credenza Thoughtful details and modern joinery merge in this sleek design

ARTS AND CRAFTS CHAIR

A H M 531 The Civil Engineering Center

Gallium 03 Installation Instructions & Parts List

Installing your SHOE KEEL

Dubnium 11 Installation Instructions & Parts List

Shaker Shop Stool. By Glen D. Huey

Install Instructions for Torrance Jurastone #4004 Mantel

Robert Bosch GmbH. Minimalist washstand

G. Building the Cab, Cab Roof and Cab Boiler Extension Page 14 and Backhead.

REINFORCING THE CORNERS OF FLAT FRAMES

Building and installing dividing walls, by Tobias Sternberg

Pergola. How To Build A. ***Safety First*** Please read the section on workplace safety at the end of this manual before proceeding with any work.

COMPLIMENTARY WOODWORKING PLAN

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Framework joints FABRICATION - WOOD JOINTS. Corner joints. Tee joints. Worksheet 15a. Cable Educational Ltd


Curium 19H Installation Instructions & Parts List

COMPLIMENTARY WOODWORKING PLAN

1 ¼-inch Pocket Screws Brad Nailer or Hammer 1 ¼-inch Brad Nails Clamps

Empire Dresser Plans

Sideboard. Essential design. Sideboard Unique eye-catcher and practical storage space all at once: The sideboard with fashionable multimaterial

Project Skill Level: INTERMEDIATE Plywood Used: CANPLY EXTERIOR Good Two Sides (G2S) or precision sanded Aspen

Making a Massive Bookcase Step-by-Step

The Q Frame PROJECT. a picture frame with secrets created exclusively for the Router Forum

Bird Feeder. Tool Requirements

EZYSTONE WORKSURFACES

installation care & maintenance instructions moistureshield.com limited lifetime warranty

Coffee table with recessed tray

About.com :

COFFEE TABLE WITH RECESSED TRAY

VCE VET FURNISHING (CABINET MAKING)

Kitchen Step Stool. Premium Plan. In this plan you ll find: America s leading woodworking authority

BONDO PROCESS. Installation Guide.

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

Serving Tray. When some good friends got married recently, An exercise in template-making yields a great gift project that s easy to duplicate

You Can Build a Bedside Table

Install Instructions for Solano Jurastone #4012 Mantel

4 Column Display Row Corner

Harriet Chair with Modifications

Copyright WilkerDos.com Dining Table. Project Designed By April Wilkerson - Plan Created By Jay Bates (jayscustomcreations.

Lock on! Chris Tribe shows you how to cut a lock into the back of a door and fit an escutcheon

THE PODIUM MUSIC STAND

While creating a two-wall

Materials. Special Tools and Techniques Chisel Long pipe clamps Miters Router with 1/2" rabbet cutter Rabbets Dadoes. Hardware

ining Table Materials *Notes on Materials

Instructables Butcher Block Top

Radon 07 Installation Instructions & Parts List

Build a Rolling Tool Tote

Continue gluing the remaining top parts ensuring the angled piece is glued well. Set aside and let dry. See photo below

PORCH-LOC INSTALLATION INSTRUCTIONS

ENJOY THIS SELECTION FROM. Woodworking 101. Includes Step-by-Step Instructions for 8 Projects. Woodworking

Scratchbuild A Backwoods Water Tank Part V - Making the Frost Box and Hanging the Water Spout

Installation Guide. Deckorum. Composite Decking

Transcription:

How To Create An Entertainment Unit Materials required: 2 x Pine Panels - 1800mm x 450mm x 18mm 4 x Pine Panels - 310mm x 450mm x 18mm 1 x Pine Panels - 650mm x 450mm x 18mm 6 x Bun feet (your choice of style) 1 x Plywood - 2400mm x 1200mm x 10mm (or thinner) 1 x 500ml Selleys Aquadhere Interior 1 packet 25mm wall panel nails 6 x 8x45mm screws Minimum Tools required: Router and router bit 18mm or smaller Carpenters Square Hammer Saw Straight edge longer than 450mm 2 x (F) or (G) clamps Measuring tape Pencil Sharp chisel or utility knife 1. Take one of the full length panels (1800mm) and mark the centre of the length of the panel (900mm). Then measure and mark 320mm either side of the centre mark. From these marks, measure and mark a further 500mm on either side. 2. Place one of the 310 x 450 pieces on top of the marked line, then take a pencil and draw a line on either side using a square to keep it true. This marks out the channel to be routed.

3. Set Router cutter depth to 6mm (1/4 ). Set your straight edge up and clamp in position so the cutter is aligned to the INSIDE of the pencil marking. If you are using a smaller router bit you will need to complete the cut in 2 or more passes. Good idea to check the fit at this stage to make sure the cabinet cheek will fit nicely. Insert the 310 x 450 piece to ensure it fits. Better to be a bit on the snug side rather than a loose fit. 4. Repeat the process for the other 3 division marks. 5. Once one panel has been routed, position the other full size panel next to it (lengthways). Line up the ends, place and clamp straight edge (must be long enough to cover the 2 pieces) in position so as to allow the router to continue the previous rebate across and into the new panel. 6. Select a piece of waste panel or use the 310x450 piece and place into the slot across the 2 panels. This will assist in the alignment of the remaining cuts. Use the straight edge to continue the previously routed channels across into the new panel. 7. Once all 8 channels have been cut, test the fit using the 310x450 piece and place panels to one side. 8. Select 2 of the 310x450 pieces. These pieces will be used as shelf supports. Measured down 90mm. Router a channel across the panel. Use the same router settings as previously.

9. Position these 2 panels upright into the middle slots of the large panel you have chosen as the base of your unit. Have the 2 cut shelf rebates facing inwards with the channels on the topside. Stabilise the uprights and make sure they are at 90 degrees to the base. 10. Measure the distance between the bottoms of the 2 slots just cut for the shelf support. Transfer that measurement accurately to the spare panel 650mm and cut to size. 11. Do a dry fit. Place the 2 inside supports into middle rebates, slide in shelf to shelf rebates. Position remaining 2 end supports into base. Place top panel into place and push down onto support uprights. Check for squareness all round and flushness of joints. Make any necessary adjustments and once happy disassemble and glue up. 12. Start with the centre pieces. Glue in the shelf and wipe off any excess glue squeeze out with a damp cloth. Be sure to remove all traces of glue as it can inhibit the staining or finishing process later on. Put to one side making sure to keep it square.

13. Glue in and fit 2 end supports onto the base. Tap home with a sacrificial piece of wood and a hammer or mallet. 14. Repeat step 13 on the centre piece with the shelf in position and the other end panel. 15. Apply Selleys Aquadhere Interior to the tops of each upright. Place the top panel of the unit in place. Tap home with sacrificial wood and mallet or hammer. Wash off excess glue with a damp rag. If joints are loose then hold in place (making sure each upright is square) with some sash clamps until glue has set. 16. Measure the outer edge height and width of the unit and subtract 5mm from each measurement.

17. Use these measurements to cut the piece of Plywood or backing material to size. 18. Turn the unit over so the face side is resting on the bench. Use a blanket or something soft to protect the surface. As a guide use some masking tape to show where the internal supports run so when the back is in place you can nail with accuracy. 19. Apply a thin bead of Selleys Aquadhere Interior to the rear frame of the Unit. 20. Line up the bottom edge of the back panel to the bottom of the base of the Unit. This will leave a slight gap from the top of the unit to the backing board which is desirable. For extra security hammer in some thin wall nails approx. 400mm apart over the frame. Turn the unit over so that it is lying on its top. 21. To attach feet, apply a bead of Selleys Aquadhere Interior to the inner section of the foot.

22. Place the feet into position. Using a piece of scrap wood as a gauge set the feet one thickness in from the front and side edge of the Unit. 23. On the rear or unseen side of the unit the feet have been placed right on the edge of the base. On the front side of the Unit a gap has been left to the edge (18mm) so the feet are not as visible. You may find it necessary to secure the feet into position using a screw in the centre of each foot. If you do this remember to take into consideration the length of the screw used and use one that will hold the foot on but not exit the top of the panel above. 24. Allow the Project to sit until the glue has set. Move into position, fill it up and enjoy.