UNCONTROLLED 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES

Similar documents
INSTALLATION INSTRUCTION HEATSHRINK TRIFURCATING TRANSITION JOINT TO SUIT 3 CORE

C-L-X ARMOR REMOVAL PROCEDURES

Risk Assessment & Safe Working Practice

LAGGING PIPES UP TO 125 mm IN DIAMETER WITH K-FLEX TUBING

Written by Frank Garcia Ver. 2

Tape Measure Metal Clippers Screw Bit Set With Extensions

Dubnium 11 Installation Instructions & Parts List

Preparing & Working on LV Waveform Cable

Curium 19.4H Installation Instructions & Parts List

Gallium 03 Installation Instructions & Parts List

Wiring Techniques for Wiring a Lamp

Curium 19H Installation Instructions & Parts List

Radon 07 Installation Instructions & Parts List

Medium Voltage Power Cables

Operating & Maintenance Instructions 320 Dome Blowing Unit

Carbon Pole Kit Assembly Instructions

Loose Tube Cable End Preparation for Splicing For Series 11D, 1GD, 12D, 1AD, 1DD, 1CD, 11, 1G, 12, 12L, 1A, 1D, 1C, 1NY, 13, 1H, HZD and HZA

Xenon 05 Installation Instructions & Parts List

Step by Step Wing Bagging

Wiring Repair WIRING REPAIR

INNOVATIONS. KNIPEX Siphon and Connector Pliers. Exclusively distributed by MADE IN GERMANY

3M 200 Amp Loadbreak Connector System

SIDE SLIDING/ FIXED WINDOWS

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

How to Build an Advanced Composite Clipboard

STANDARD INSTALLATION PROCEDURES FOR RAYATEN COATED MOULDED PARTS STRAIGHT, 90 AND 45

Spiderbeam Balun Construction Guide

VSOF-BS403A. Splice Closure for Fiber Optic Cable User Manual Rev.3

Sabre Series 2 Inspired Design Precision Engineering

Argon 02 Installation Instructions & Parts List

CORNER ENTRY ENCLOSURE

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

Catalog October Speedi-Sleeve The quickest and most economical way to repair worn shafts

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

Pacific Antenna RF Probe assembly

SKDG Cable Repair Kit Instructions

METHOD STATEMENT. Sika FloorJoint S

WET AREA PANELLING. Designer Walls. Fast

ascading Create the tiered appearance of chandelier crystals in this elegant set by Jennifer Jordan Park

Tools for cables preparation

unit 3: GENErAL ElectriCAL SySTEM DiAGNOSiS

How to repair a wall or ceiling FREE

Installation Instructions

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Water Level Meter: Op Instructions

M A N U A L 6 June 2017

Sellotape Dispenser E112134#1

EC 200 CHARACTERISTICS D A T A S H E E T. Kabelwerk EUPEN AG cable. M e c h a n i c a l c h a r a c t e r i s t i c s

1. General Repair Methods

Wet Area Panelling. Linear Series

2016/02 Hideo Nakano STRAW KITE

Robert Bosch GmbH. Lounge light fixture

AMENDMENTS Manual of STANDARD SPECIFICATIONS. Adopted by Standard Specifications Committee. Amendment. No. 6. Published by

Instructions for Preparing AFL OPTICAL GROUND WIRE CABLE (ALUMACORE CABLE DESIGNS) FOR BPA

Termination of D-621 Triaxial Connectors to Shielded Twisted Pair Cable for MIL-STD-1553B Applications

Ideal. Ergonomic, Cushion-Grip, Vinyl Coated

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

Schluter -DITRA-HEAT Repair procedure for the DHE-HK Heating Cable

Jeep Cherokee Door XJ Set Part # Revision J

Making Bassoon Reeds (Eryn Oft Style, using Rieger 1A shape GSP cane)

OpenROV. Guide 3 - Electronics. We will now move to the assembly of the electronics that will control the ROV. Written By: OpenROV

PAC-12 Kit Contents. Tools Needed Soldering iron Phillips screwdriver Wire stripper Wrenches, 7/16 and 1/2 Terminal crimp tool Pliers Solder

C-180 Builder s Manual

ROVs in a Bucket Building an Underwater Robot. 5.0 Building the Tether

Durapipe ABS Jointing Guide

Assembly Instructions for the 1.5 Watt Amplifier Kit

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Read and understand the requirements of this procedure Assist students with installation as needed

50948-RHN Putney. 06 January This document includes: Aluminium strip/ sheet coverings/ flashings 1. Code Section Revision Dated

Terminating D /-0289 Subminiature SolderTact Contacts to Twisted-Pair Cable

Repairs. Chapter 10 Repairs 10. 1

for Rigid Sun Lite Planning the layout

Kerman & Kavian Cable Industries ( KCI )

GORE Aerospace Ethernet Cables

Installation Instructions. for AFL Dead Ends Installed on. CTC Composite Core Conductor

Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE

EZYSTONE WORKSURFACES

I 2. Installation of Omega-Flex Panels over Plywood Sheathing. Installation over Plywood:

Risk Assessment & Safe Working Practice

Tapecoat. Application Guideline

Javelin Integra Inspired Design Precision Engineering

Copyright 2008 Robert Conroy

Athearn RTR AMD103/P42 Tsunami Digital Sound Decoder Installation Notes

for Flexi Sun Lite Planning the layout

eco-shake INSTALLATION INSTRUCTION

Three layer Felt Roofing using cold applied adhesive

Rosalina Accessories Tutorial Version March 2011 Martyn

Metal Clay-Wrapped. used a commercially available sterling silver and tear department, bracelets are not

a Nexans company Catalogue 2009

There are three primary units to this box: two three-sided trays (one made to fit over the other) and one case that wraps around the trays.

Notes for Making Wood Rings With Stainless Steel Insert Centers

Max Launch Abort System Prod. No *Kevlar is a registered trademark of Dupont

IFRC SHELTER TOOL KIT

Monster Marionette ART GRADE LEVEL FOURTH FIFTH MATERIALS

GORE Aerospace Ethernet Cables

The Serpent Website s Squarpent

Jeep Cherokee 4-Door XJ Set Part # Rev

Custom Pendant- Hardwire Assembly and Installation Instructions

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

1 SELECT suitable material. It takes time to cut a cab. Don t waste it on rubbish.

Transcription:

3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES 3.1 Single-Core Copper Wire Screened Polymeric Cables 3.1.1 Removing the Outer Sheath Clean and abrade the outer sheath with an approved abrasive paper for 150mm beyond the sheath removal point. Mark the removal point of the outer sheath as indicated on the relevant jointing instruction using a Chinagraph pencil. For cables with semi-conducting outer sheaths, either graphite or an extruded layer, extra care should be taken to ensure that all traces of conductive material are removed. Use an approved tool to remove the sheath. check the tool cutting wheel is set to the correct depth to avoid damaging the copper wire screens below. Starting at the removal point make a circular cut around the cable. Cut along the cable to the position of the sheath removal point, and remove the sheath. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 1

Remove the fabric or plastic tape wrap from the screen wire using an approved knife, taking care not to damage the copper wires below. Unwind the copper wires and lay them back along the over sheath in the position required by the joint being made and secure with PVC tape. If preparing for a termination a length of red mastic sealing tape should be applied to the outer sheath following the appropriate instruction. 3.1.2 Removing the Bonded Polymeric Screen The approved bonded screen stripping tool can be used to leave various lengths of black insulation screen from the outer sheath cut. This measurement varies depending upon the type of joint: Single-Core straight joints = 40mm. Single-Core branch joints = 80mm. Trifurcating joints = 100mm. Pot ends = 80mm. Single-Core terminations = 40mm. Section 3 I Page 2 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Smear a thin coating of Silicone grease over the conducting screen layer. Starting at the open end of the cable, set the tool to the correct cutting depth so that the entire screen is removed with only the minimum amount of insulation. It is essential that the core is as straight as possible for this operation otherwise traces of the screen may be left behind. Continue turning the tool until it butts up against the stop position (dependant on the screen termination point) and continue to turn the tool until a smooth right angled taper is produced. Test the tool firstly on the overlap section of the core if required. The insulation now requires polishing smooth with an appropriate aluminium oxide grit paper (minimum 150 grade) until smooth and free of ridges. To finish this process, reverse the paper and 'buff up' with the smooth side. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 3

Clean and degrease the insulation with an approved solvent wipe to remove all traces of any remaining loose material. Always wipe from the open core end towards the screen wires to avoid contaminating the insulation with carbon from the remaining screen. 3.1.3 Removing the Polymeric Insulation Use the approved Alroc tool and set the 'stop gauge' to the connector insertion depth. Position the tool at the open core end and adjust the blade to the required depth; just deep enough so the blade does not damage the conductor. Rotate the tool along the core using the spiral cut setting until the stop gauge prevents it from moving any further. Section 3 I Page 4 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Remove the tool and the insulation spiral. Carefully remove the remaining conductor screen using an approved knife. 3.2 Single-Core Lead Covered Cables 3.2.1 Removing the Outer Serving or Sheath Mark the position of the serving or sheath termination as indicated on the relevant jointing instruction. Make a circular cut at this mark using an appropriate approved tool. Check that the cut is only three quarters through the sheath thickness. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 5

Now make a lengthwise cut along the sheath towards the sheath cut position taking care not to damage the underlying lead sheath. Lift the edge of the sheath and unwrap along its length, tearing off at the circular cut point. The use of a gas torch may assist this operation if necessary. 3.2.2 Removing the Lead Sheath Clean and degrease the lead sheath using the approved solvent wipes. Mark the lead sheath at the removal point as indicated on the relevant jointing instruction using a Chinagraph pencil. Section 3 I Page 6 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Use an approved hack knife to make an indented circular cut around the lead sheath, taking care to only cut part way through the sheath. Cut the lead sheath across from the open cable end to the circular cut. Use an appropriate approved hack knife. Take care not to damage the Copper Woven tape below. Open the lead sheath up along the length of the cut and carefully unwrap the lead sheath against the ring cut. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 7

3.2.3 Removing the Copper Woven Tape (CWT) Unwind the CWT and carefully remove it by cutting it against the lead sheath edge with an approved knife to leave a smooth finish. 3.2.4 Removing the Insulation Screen Mark the screen papers with a Chinagraph pencil at the removal point indicated in the relevant jointing instruction. Tie a twine binder around the screen at this point. Unwrap the screen carefully to the termination point and remove it by neatly tearing against the twine binder. Remove any carbon paper below the screen to the same termination position, followed by two of the insulation papers. Section 3 I Page 8 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.2.5 Removing the Insulation Papers Only remove the papers after fitting the barrier tubing as described in section 4.1.1. Mark the insulation papers at the point of removal as indicated in the appropriate jointing instruction. Using an approved sharp knife, cut around the core through the papers and clear barrier tube taking care not to damage the conductor below. Remove the clear barrier tube by pulling towards the end with a gentle twisting movement. Unwrap the papers up to the cut position and tear off neatly against the barrier tube edge. Clean any surplus compound from the cable conductor with an approved solvent wipe. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 9

3.3 Three-Core Paper Insulated Cables 3.3.1 Removing the Outer Hessian Serving or (PE) Sheath Mark the position of the serving or sheath termination as indicated on the relevant jointing instruction. Wear suitable gloves while removing the serving. Place a wire binder around the serving at the removal point and score in front of the binder using an approved knife. Remove the serving with the approved knife and heat from a gas torch if required or in the case of a polyethylene sheath use the approved tool for this operation. 3.3.2 Removing the Steel Wire Armour Place a wire binder around the armour wires at the point of removal as indicated in the relevant jointing instruction. Section 3 I Page 10 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Using an approved saw, make a circular cut around the armours at the binder position. Cut through only half the width of the armour to avoid damaging the lead sheath below. Wear suitable gloves while removing the armour. Lift and unwrap the armour wires a few at a time and break them off against the binder by bending them backwards and forwards. Remove the binder and lift the armours with a hack knife so they are 90 to the cable. Clean off all traces of bitumen from the wires using a gas torch and approved solvent wipes. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 11

3.3.3 Removing the Inner Bitumen Layer Wear suitable gloves for this operation. Score around the inner bedding layers with an approved knife adjacent to the vertical armours taking great care not to score into the underlying lead sheath. At the open cable end lift the bitumen impregnated textile layer with a knife and unwrap it back to the vertical armour position, tearing it against the score previously made. The use of a gas torch may assist this process. Apply more heat to the final layer of bitumen on the lead sheath and armours and wipe off any remaining traces of bitumen with approved solvent wipes. The lead sheath and armours should be clean and bright after this process. Section 3 I Page 12 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Apply two wraps of black mastic sealant around the lead sheath butting up against the raised armours. Make a mark with a Chinagraph pencil 130mm from the end of the outer sheath. Wrap a length of copper mesh around the lead sheath up to the 130mm mark. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 13

Lay the armours down over the mastic, ensuring that none are crossed, and secure the armours over the copper mesh area with the two worm drive clips provided. Apply a layer of PVC tape to the worm drive clips to cover any sharp edges. Position the armour sealing sleeve 30mm beyond the armour edge and shrink down starting at the lead sheath end before proceeding towards the cable over-sheath. Section 3 I Page 14 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.3.4 Removing the Lead Sheath Clean and degrease the lead sheath using approved solvent wipes. Use a Chinagraph pencil to mark the lead sheath 430mm from the outer sheath as indicated on the relevant jointing instruction. Wear suitable gloves for this operation. Use an approved hackknife to make a circular indented ring cut around the lead sheath at the pencil mark, taking care to only cut part way through the sheath. From the open cable end, cut the lead sheath longitudinally to the circular cut using the appropriate approved hack knife. Take care not to damage the Copper Woven Tape (CWT) below. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 15

Open the lead sheath up along the length of the cut and carefully unwrap the lead sheath against the ring cut. 3.3.5 Removing the Copper Woven Tapes (CWT) Unwind the CWT and remove the core fillers carefully with the side cutters. Rewind the CWT tightly around the cable cores at the crutch position for a distance of 20mm from the lead sheath, then cut and tie off. Remove any surplus tape with insulated side cutters. Section 3 I Page 16 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.3.6 Removing the Insulation Screen Using an approved solvent wipe, remove any surplus cable compound from the screened core insulation. Mark the screen papers at the removal point indicated in the relevant jointing instruction. Tie a fine wire binder around the screens at this point. Carefully unwrap the first 50mm of the screen. Secure the end of the core insulation papers with numbered phase tape matching the numeral paper. Unwind the remainder of the screen to the termination point and remove it by neatly tearing against the applied binder. Remove the numeral paper and one layer of paper below to the same point as the screen papers, using the same method and marking the cores with the matching numbered phase tape. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 17

Note: It is important to mark the cores with the correct phase numbers immediately after each numeral paper is removed. 3.3.7 Removing the Insulation Papers Only remove the papers after fitting the clear barrier tubes described in section 4.1.3. Mark the clear barrier tube over the core papers at the point of removal as indicated in the appropriate jointing instruction. Using a sharp knife cut around the core and through the papers taking care not to damage the conductor below. Section 3 I Page 18 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Remove the clear barrier tube by pulling towards the end with a gentle twisting movement. Rounding of the conductor with water pump or similar pliers will assist this operation and will help prepare the conductor for insertion into the appropriate connector. Unwrap the papers to the cut position and tear off against the clear barrier tube edge. Clean any surplus compound from the cable conductor with an approved solvent wipe. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 19

3.4 Three-Core HSL Paper Insulated Cables 3.4.1 Removing the Outer Serving or Sheath Mark the position of the serving or sheath termination as indicated on the relevant jointing instruction. Wear suitable gloves while removing the serving. Place a wire binder around the serving at the removal point and score in front of the binder using an approved knife. Remove the serving with the approved knife and heat from a gas torch if required. Section 3 I Page 20 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

3.4.2 Removing the Steel Wire Armour Place a wire binder around the armour wires at the point of removal as indicated in the relevant jointing instruction. Using an approved depth guarded or junior saw make a circular cut around the armours at the binder position. Cut through only half the width of the armour to avoid damaging the lead sheaths below. Wear suitable gloves while removing the armour. Lift and unwrap the armour wires a few at a time and break them off against the binder by bending them backwards and forwards. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 21

At the open cable end lift the bitumen impregnated layer with a knife and unwrap it back to the armour cut position. Remove it at this point, taking care not to damage the underlying lead sheaths. Remove the binder and lift the armours with an approved hack knife so they are 90 to the cable. Clean off all traces of bitumen from the wires using a gas torch and approved solvent wipes. 3.4.3 Removing the Bitumen Layer Open out the three lead sheaths carefully and remove the bitumen/paper layer and fillers from all three sheaths up to the point where the under armour bedding remains. Section 3 I Page 22 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Apply more heat to the final layer of bitumen on the lead sheaths and wipe off all traces of bitumen with the approved solvent wipes. The lead sheaths should be free from bitumen on completion of this task. Build up the remaining inner bedding using the black mastic from the Three-Core transition joint and the HSL module to suit the support ring s inner diameter. Fit the support ring over the build up tape, positioning it 60mm from the uplifted armours. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 23

Wrap the length of supplied black mastic behind the support ring, butting it against the armours wires. Lay the armours down onto the ring and secure them with a wire binder. 3.4.4 Removing the Lead Sheaths Only remove the lead sheaths after firstly following the necessary steps described in section 4.1.5. (HSL module application). Clean and degrease the lead sheaths using approved solvent wipes. Use a Chinagraph pencil to mark the lead sheaths at the removal point as indicated on the relevant jointing instruction. Use an approved hack knife, make a circular indented ring cut around the lead sheath at the pencil mark, taking care to only cut part way through the sheath. Cut the lead sheath across from the open cable end to the circular cut. Use an appropriate approved hack knife. Take care not to damage the Copper Woven tape below. Section 3 I Page 24 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Open the lead sheath up along the length of the cut and carefully unwrap the lead sheath against the ring cut. 3.4.5 Removing the Copper Woven Tape (CWT) Unwind the CWT and carefully remove it by cutting it against the lead sheath edge with an approved knife to leave a smooth finish. 3.4.6 Removing the Insulation Screen Mark the screen papers with a Chinagraph pencil at the removal point indicated in the relevant jointing instruction. Tie a twine binder around the screen at this point. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 25

Unwrap the screen carefully to the termination point and remove it by neatly tearing against the twine binder. Remove any carbon paper below the screen to the same termination position, followed by two of the insulation papers. 3.4.7 Removing the Insulation Papers Only remove the papers after fitting the barrier tubing as described in section 3.1.2. Mark the insulation papers at the point of removal as indicated in the appropriate jointing instruction. Using an approved sharp knife, cut around the core through the papers and clear barrier tube taking care not to damage the conductor below. Remove the clear barrier tube by pulling towards the end with a gentle twisting movement. Section 3 I Page 26 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012

Unwrap the papers up to the cut position and tear off neatly against the barrier tube edge. Clean any surplus compound from the cable conductor with an approved wipe. 3.5 Moisture Testing on Paper Insulated Cables Full personal protective equipment shall be worn at all times for this test. Gently heat the paraffin wax container on a low heat, insert the thermometer through one of the rubber grommets in the top and wait until the wax reaches a temperature of 125 C. Always handle the papers to be tested with gloves, as moisture from your hands is enough to give a positive test. Lift out the basket and place the paper tapes to be tested in it. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 27

The samples from the following layers shall be tested: Inner and outer belt papers. Paper or string fillers. Inner and outer core papers. Immerse the basket complete with papers in the paraffin wax bath and note the results. If there is no reaction from the wax or it froths slightly, the papers are dry and the cable is fit to be jointed. If the wax froths excessively and a crackling noise is heard, the papers are wet and the cable should not be jointed. Remove the heat from container and leave to cool before moving. The wax can be re-used until it starts to discolour and there is no need to dispose of it after each moisture test. Section 3 I Page 28 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012