Michelle Muro, AIA, NCARB

Similar documents
Total Precast Concrete Structures

Designer s NOTEBOOK DESIGN ECONOMY, PART 3

American Institute of Architects New Hampshire Chapter High School Design Competition Program

LAWRENCE PUBLIC LIBRARY ADDITION/RENOVATION creating a new civic hub for the city of lawrence, kansas

ELLIS. Ellis Research Center PROPERTY HIGHLIGHTS BRIAN CARR, CCIM LEE CLYBURN. Research Triangle Park North Carolina.

ican A Art New York, NY Memo Chang

A-308 SITE 75A. Gensler 2020 K Street, Northwest Suite 200 Washington DC Telephone Facsimile

ASSIGNMENT 04: Library Massing + Program

Central High School. 275 Lexington Parkway North. Project Summary: Issues Identified By School Community In 2015

Cambria II. Cambria II A (Options shown - Stone, Cast Stone and Wrought Iron)

214 Wilshire Blvd., Suite 102 Santa Monica California 90401

State College Area School District

ARCHITECTS SUPPLEMENTAL INSTRUCTIONS (ASI)

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

Continuing Education Credit

Architectural Design Process

TOTAL PRECAST. A sensible way to build

The New Transit Oriented Town Center Development. metrocentreom.com 100 Painters Mill Road, Owings Mills, MD

CAC MEETING, FEB. 28 TH, 2017 NADAAA

In Denver, a recently completed flyover

Delivering Reliability. Services. Strength You Can Count On. oldcastleprecast.com/services

Proximity to Employee Housing and Centers of commerce. 2 Minutes to Georgetown. 3 Minutes to The Pentagon

DIVISION 12 - FURNISHINGS. Section General Discussion. Introduction

PROVENANCE AT THE CLEVELAND MUSEUM OF ART

Mt. Angel Library by Alvar Aalto; featuring a major daylight fixture. Ball State Architecture ENVIRONMENTAL SYSTEMS 1 Grondzik 1.

Proposed Hotel, Restaurant. and Banquet Facility

Buildings and Grounds Supervisor, EASD. CG Schmidt, Sr. Project Manager

CHAPTER 5 ARCHITECTURE

shedkm architects complete first Ruskin Square office in Croydon

Radiused Precast Concrete

Operating Standards Attachment to Development Application

CORPORATE COUNSEL SYMPOSIUM XXIV OCTOBER 22, 2013

Designer s NOTEBOOK REVEALS

INNOVATION IN CONCRETE. Education OFFSITE BUILD SYSTEMS

Public Call to Artists for Expressions of Interest Newton Recreation Centre Glass Curtain Wall Design for glass frit application

B. The designated coverage areas shall include both indoor and outdoor coverage.

Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado

Maximizing the value of highperformance

Video: Design Process Architecture

DEVELOPMENT OF THE SECTIONS

Construction Phase Project Management and Documentation

CS2.0 COVER SHEET VOL. 2

Harvard Innovation Lab

BUILT TO ENDURE. North Central College s Unique Residence Halls 12-Month Schedule Met. INSIDE: See Features on Safety from Extreme Weather Conditions!

Hoover Dining Hall DEPAUW UNIVERSITY S

Architectural Review Application

Melford Bowie, MD 20715

RETAIL FOR LEASE. brewpub TRACY CORNELL AARON BENNETT

Designer s NOTEBOOK WINDOW PANELS

Article 4.0 Measurements and Exceptions

Greenleigh at Crossroads

PRECAST CONCRETE STRUCTURES

Richardson olmsted complex core project Community Presentation. buffalo, new york

Addendum #1 - Bid Package #

AGENDA: BIM Introduction. Large-Scale Value. Value for Architects. Conceptual BIM / Small BIM. All-Out BIM. BIM Introduction

April 7, City of Verona Adam Sayre, AICP Director of Planning & Development 111 Lincoln St. Verona, WI 53593

andrew p. vuono AndrewVuono.com Luis Vidal + Architects contact Kendall/Heaton Associates, Inc. experience education technology activity/publications

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Nasri Group Hollowcore factory

2560 LORD BALTIMORE DRIVE BALTIMORE, MD SJPI.COM

Minor Site Plan Application

Chapter 3 : D e s i g n D e v e l o p m e n t

RESTAURANT AND RETAIL SPACE AVAILABLE FOR LEASE

A Higher Status 6901, 6903, 6905 ROCKLEDGE DRIVE BETHESDA, MARYLAND

CALL TO ARTISTS DC PUBLIC LIBRARY REQUEST FOR QUALIFICATIONS PUBLIC ART COMMISSION - VESTIBULE OF THE MLK LIBRARY

Ondrej Slunecko architect portfolio selected works

SITE STATISTICS SQ.FT [ SQ.M.]

BUILDING PLANS. BUILDING DEPARTMENT

Greenleigh at Crossroads

PUBLIC ART PLAN FOR THE NEW PATIENT TOWER, ETOBICOKE GENERAL HOSPITAL CAMPUS 101 HUMBER COLLEGE BLVD. TORONTO ONTARIO

CS 2. Case Study. Grounded in strength.

Architectural Precasters Design Assist Role

PCI Design Awards Buildings Submission Guidelines

Greenleigh at Crossroads

Total precast solution for large stadium projects meet tight schedule

GUIDELINES FOR SUBMISSION OF FINAL PLAN MATERIALS FOR BOARD OF TRUSTEES PRESENTATIONS MAJOR PROJECTS

DESIGN REVIEW PROCESS AND APPLICATION

Designer s NOTEBOOK CORNERS AND RETURNS

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

ADDENDUM NO. 1 November 10, 2016

6 Lobby Elevators with Destination Dispatch

Part 4: Visitability Ordinance. City of Austin Development Services Department

ARCHITECTURAL PORTFOLIO. Alexander Reed

MIXED-USE DEMANDS ENCOURAGE PARKING

TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM

FOURTH WARD THIRD WARD FIRST WARD SECOND WARD FUTURE LIGHT RAIL EXTENSION LIGHT RAIL. W Trade St. E Trade St. N Church St N Tryon St CTC STATION

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

DETAILS ARE OLD ARCHITECTURE.

SEPTEMBER 20-21, 2018

QUICK FACTS. The restaurants have their own exterior entrances, with guests having the option of using either valet or convenient self-parking

A201 SCALE: 1" = 10'-0"

CUSTOM PRECAST CONCRETE

BEYOND TECHNOLOGY. DSO at a glance:

CITY FOUNDRY ST. LOUIS 2

City of Whitefish Planning & Building Department PO Box E 2 nd Street Whitefish, MT Phone: Fax:

11/29/12. Des Moines Social Club Urban Design Review Project Narrative

WE USE WISCONSIN SEASONED NATURAL PINE LOGS The Woody insulates to tame the most ferocious weather, no problem

Technical Services Talk

FUZION Fused Glass Countertops - Andrew Pearson Design

Transcription:

Michelle Muro, AIA, NCARB Portfolio of Work jj_mj_muro@yahoo.com 720 425 0842

AT & T Broadband World Headquarters, Denver, Colorado Barber Architecture, Intern: 1997 2001 For the interiors, Barber Architecture created a "corporate community" that encouraged synergy, cooperation, and interaction. The primary interior, two level circulation path, called "Main Street", is naturally lit by a continuous clerestory light monitor. To promote interaction and improve teamwork and efficiency, BA created an environment with an open plan and shared work spaces. The public lobby includes a reception hall with a monumental staircase that leads to a sidewalk café, an outdoor food market, and a sunny terrace. An award winning auditorium hosts a variety of formal and informal company functions, including employee gatherings. Multiple smaller spaces offer the opportunity for impromptu conversations essential to communication, creativity, and the exchange of ideas. Awards: Presentations Magazine Best Grand Auditorium Built: 1998

AT & T Broadband World Headquarters, Denver, Colorado Barber Architecture, Intern: 1997 2001 Responsible for the design implementation of the primary circulation path railings and iconic curved stairs.

Starz Encore Headquarters, Denver, Colorado Barber Architecture, Intern: 1997 2001 When seen from above, the building plan is two arcs joined by a central rotunda. The shape and mass of the building evolved from multiple discussions of vision and purpose for the company, and from several studies to accommodate the spatial and functional program while satisfying the desire of the CEO to incorporate feng shui principles. Geometry studies were merged with function, floor plate size, and cost estimates. The result is a building with infrastructure to support a state of the art, multi channel digital up link/downlink broadcast, including two levels of production and edit space on raised flooring, with independent AC and backup power. Other building features include a full service cafeteria with outdoor dining terrace, a fitness center, an indoor racquetball court, and an award winning precast concrete cast stone exterior. Awards: Precast / Prestressed Concrete Institute Journal Harry H Edwards Award Built: 2000

Starz Encore Headquarters, Denver, Colorado Barber Architecture, Intern: 1997 2001 Research, design and implementation of the central rotunda s dome. Responsible for coordination of the precast skin with the consultant on profile requirements, final design detailing and construction administration in the field.

Starz Encore Headquarters, Denver, Colorado Barber Architecture, Intern: 1997 2001 Research, design and implementation of the central rotunda s dome and the primary iconic vertical circulation element in the main core of the facility. This central circulation spine was designed to encourage the staff to use the stairs and as a primary foci of the project.

PPL Center, Allentown, Pennsylvania Sink Combs Dethlefs, Job Captain: 2005 2014 The Arena was part of a larger redevelopment project of the central business district of Allentown. The $191.4 million project encompasses a 5 acre square block area, including a 8,500 seat arena, office building, parking garage, and a 200 room hotel. A dramatic eight story central glass atrium brings natural light deep into the core of the building, while extensive perimeter glazing provides abundant daylight to, and views from, all building spaces. The Plaza at PPL Center earned "Innovation in Design" credits for "Sustainable Education" and "Exemplary Performance in Water Use Reduction." Awards LEED NC Gold AIA/COTE Top Ten Green Projects 2004 Environmental Design & Construction Magazine Excellence in Design Awards Honorable Mention 2004 NESEA Green Building Awards Places of Work: Large Buildings First Place 2004 Urban Land Institute Award for Excellence 2004

Submittal Coordination 90% Construction Documents Submittal Coordination PPL Center, Allentown, Pennsylvania Sink Combs Dethlefs, Job Captain: 2005 2014 Responsible for reviewing millwork submittals and coordinating new details to maintain original design intent.

90% Construction Documents Submittal Coordination Submittal Coordination PPL Center, Allentown, Pennsylvania Sink Combs Dethlefs, Job Captain: 2005 2014 Responsible for coordination of the plan layout and wall types with the Life Safety consultant from Design Development to 90% Construction Documents. Led room name and numbering convention along with dimensioning and tagging all enlarged plans. Responsible during Construction Administration with reviewing millwork submittals and coordinating new details to maintain original design intent. 90% Construction Documents

Submittal Coordination PPL Center, Allentown, Pennsylvania Sink Combs Dethlefs, Job Captain: 2005 2014 90% Construction Documents Responsible for coordination of the plan layout and wall types with the Life Safety consultant from Design Development to 90% Construction Documents. Led room name and numbering convention along with dimensioning and tagging all enlarged plans. Responsible during Construction Administration with reviewing millwork submittals and coordinating new details to maintain original design intent. 90% Construction Documents Submittal Coordination

Cedar Park Center, Cedar Park, Texas Sink Combs Dethlefs, Job Captain: 2005 2014 Project Manager under direction of the Principal In Charge. Directed team members in generation of complete, comprehensive project documents from pre design thru construction documents. Interfaced with design consultants and owners to achieve project objectives within schedule and budget. Responsible for Construction Administration phase and coordination with the contractor.

MOD 4 East Parking Structure, Denver Colorado Iron Horse Architects, Project Architect: 2014 Present Under contract to provide Project Manager and Contract Administration assistance to Denver International Airport. The parking structure is Denver International Airport s first fully Design Build project. The 1,800 space, multi storey structure is post tensioned cast in place with a precast skin. Responsibilities include review and approval of all architectural submittals, maintaining logs, composing change orders, and maintaining status of budget. Spearheaded the modification of the Airport s standard procedures, which are for a traditional Design Bid Build process, to a modified design build review procedure.