Vanity Installation Instructions

Similar documents
Vanity Installation Instructions

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Installation Instructions

Platinum Swing Panel Installation Instructions

Mirror Cabinets. Planning & Installation Information

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

Bathroom Installation Guide

VANITY INSTALLATION INSTRUCTIONS

BATHROOM CABINETRY INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

Toilet Vanities: Sub & Nes 400. Planning & Installation Information

Vanity Cabinets and Mirrors Installation and User Guide

Frameless Hinged Door Enclosure. These instructions must be left with the user. Installation Guide W2-B

Exponents Bench Cushion

ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL

B A T H R O O M G L A S S

INFINITE RANGE - HINGE DOOR

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

Installation Operation Care

Installation Instructions

Hinge Door + Side Panel

Frameless Inline Door QCI5250

Installation Instructions

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

Hinge Door + Inline Panel + Return Panel

Installation Instructions

STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE

Fitted Furniture Installation and Aftercare Guide

UNIT No FRAMELESS PIVOT SHOWER DOOR

CROWN IMPERIAL ASSEMBLY INSTRUCTIONS

Frameless Inline Door QCI5254

Portofino Case2 Installation Guide

Deauville Installation Guide

INOVO 2-LITE SLIDING PATIO DOOR

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

ASS 70 FD folding / sliding door. Installation Guide

Installation Instructions

Frameless Heavy Glass Door with Header

Frameless Inline Door With Return QCI5263

Two Panel Frameless Bypass Door

INSTALLATION INSTRUCTIONS

Frameless Fixed Panel Slider

Information for your Installer. Azur Furniture Range

Series----SP3600A SHOWER DOOR

Gallium 03 Installation Instructions & Parts List

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

Bathroom Installation Manual

OSBORNE SHOWER DOOR INSTALLATION

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

Hinge Door + One Inline Panel

Side Light Frame Pack Assembly Instructions

Heavy Wall Applied Stop Tube Frame and Door Installation

Information for your Installer. Bliss Furniture Range

600mm 3 drawer base cabinet

INFINITE RANGE - CENTRE FOLDING DOOR

A-935 RODA WALL MOUNT HINGES

RECREATIONAL VEHICLE DOOR INSTALLATION INSTRUCTIONS

Xenon 05 Installation Instructions & Parts List

PVCu FOLD & SLIDE DOOR OUTWARD OPENING

Side Light Frame Pack Assembly Instructions

BASIC TOOLS AND MATERIALS NEEDED. Introduction HOW TO CARE FOR YOUR DOOR

MISCELLANEOUS CABINET REPAIRS

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel -

Frameless Fixed Panel Slider QCI5279

TIP FOR GETTING STARTED

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

Curium 19H Installation Instructions & Parts List

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

Frameless Door QCI5284

INSTALLATION INSTRUCTIONS

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

Installation Instructions

Portofino Installation Guide

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

Deauville Installation Guide

Installation, Operation and Care Instructions. Retractable Cord Operating System

Assembly guide. Before you start...check the pack and make sure all the components and fixings are included see. Tools required (Not Supplied)

Frameless Heavy Glass Door with Wall Mount Hinges

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

PFW 6875 Installation Guide Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d Installation, Installatie gids

Installing flat panels on the MPL15 wall mount

Argon 02 Installation Instructions & Parts List

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE

Frameless Inline Door QCI5248

COLONADE CURVED CORNER SLIDING DOOR + TRAY

Due to possible damage in shipping, the vertical stop assembly has been removed from this machine.

Model 6100 Illustrated Installation Instructions Contractors Wardrobe

ASS 70 FD folding/sliding door installation guide

Wooden Frame Type Instruction Manual

Radon 07 Installation Instructions & Parts List

Dubnium 11 Installation Instructions & Parts List

Transcription:

Vanity Installation Instructions Segments of these instructions will relate to your vanity. Please read these instructions thoroughly and ensure the appropriate instructions are used during the installation PLEASE LEAVE THESE INSTRUCTIONS WITH THE HOMEOWNER FOR FUTURE REFERENCE July 2016

IMPORTANT The vanity must not be exposed to excessive moisture e.g. directly beside a bath or open shower. The materials used in the manufacture of Clearlite vanities are water resistant NOT WATER- PROOF. If the installation is likely to encounter excessive moisture please consult your merchant for further advice. When tiling, do not cut the tiles to fit around the vanity. Pre-tile then place the vanity in front (the warranty does not cover any costs associated with re-tiling or re-decoration). Ensure the water temperature at the tap outlet does not exceed 55 C. This will void warranty Do not expose the vanity to solvents. Only use cleaning agents recommended for acrylics. Tools and Materials Drill and drill bits Spirit level Masking tape Tape Measure Caulking gun Screws Screw driver Pencil Sealant Cleaning materials Floor Standing Vanity Installation 1. Inspect that the unit is correct and undamaged. 2. Check that the floor is level and the walls plumb and straight If the floor is out of level use a proprietary floor levelling compound to level. It is important that the cabinet is fully supported by its base so the door and drawers will operate correctly The wall must not be bowed in either the horizontal or vertical plane as this will cause a twist in the cabinet resulting in door & drawer alignment issues and the soft close mechanisms not functioning 3. Remove the plastic transportation feet from the cabinet base. 4. Place the cabinet into the proposed position. Mark the positions of any plumbing outlets Access to the cabinet can be made easy by the removal of the shelf, doors and drawers. Refer to Removal & Alignment section. When removing the drawers ensure their positions are recorded as they are not interchangeable. 5 Remove the cabinet. Cut the holes required to accommodate the plumbing. 6. Return the cabinet into position and recheck that it is sitting level and is not twisted 7. If your cabinet has a recessed back rail a packer will need to be placed between back panel and wall at the screw fixing points to eliminate any distortion of the rear rail 8. Attach the vanity to the wall by screwing the back top rail of the cabinet into studs or nogs. Use No.8 x 50 countersunk screws or similar Important Do not induce a twist in the cabinet when screwing to the wall. The cabinet must remain true for the doors, drawers and Soft close mechanisms to operate correctly 9. Once the cabinet is in position the vanity top can be installed. Please refer to the Vanity top installation section

Wall Hung Vanity Installation IMPORTANT: Wall hung vanities MUST be installed into solid studs and nogs. Additional studs or nogs must be strategically located in the wall for screwing the vanity to. Failure to provide adequate support will void warranty 1. Inspect that the unit is correct and undamaged. 2. Check that the walls plumb and straight The wall must not be bowed in either the horizontal or vertical plane as this will cause a twist in the cabinet resulting in door & drawer alignment issues and the soft close mechanisms not functioning 3. Remove the Wooden transportation feet from the cabinet base. 4. Determine the height that vanity will be mounted at. This will depend on the required working height of vanity top surface and clearance requirements between tap ware and any mirrors above the vanity. 5. Place the cabinet into the proposed position. (rest the cabinet on firm supports) Mark the positions of any plumbing outlets. Access to the cabinet can be made easy by the removal of the shelf, doors and drawers. Refer to Removal & Alignment section. When removing the drawers ensure their positions are recorded as they are not interchangeable. 6 Remove the cabinet. Cut the holes required to accommodate the plumbing. 7. Reposition the cabinet back onto the supports. With a spirit level check that the cabinet is level 8. Using 75mm x 14 gauge hexagonal head self drilling wood screws with washers (not supplied) attach the vanity to the wall through the cabinet s Construction Brackets (must be into solid studs or nogs). Then screw the vanity s rear panel to the wall approximately every 350mm across and 50mm down from the top edge. If there is a gap between the wall and the back of the cabinet where it is to be screwed insert a packer to fill. Using smaller Countersunk head screws (e.g No.8 x 50) add a further row approximately 400mm below the first OR Important Do not induce a twist in the cabinet when screwing to the wall. The cabinet must remain true for the doors, drawers and soft close mechanisms to operate correctly. PLEASE REFER TO THE SUPPLEMENT INSTRUCTIONS SUPPLIED WITH THE CABINET FOR ADDITIONAL ASSISTANCE 9. Once the cabinet is in position the vanity top can be installed. Please refer to the Vanity top installation section IMPORTANT: Screw through construction bracket into a solid stud or nog

Drilling Tap Holes in the vanity top (if required) 1. To cut the holes use a high-speed steel hole saw of an appropriate size in an electric drill operating at a moderate speed. When cutting, apply gentle downwards pressure in a slow circular movement, minimising vibration. Take special care when nearing the end of the cut by supporting the drill so it does not impact on the vanity top surface. Carefully withdraw the drill / hole-saw when completed. Vanity Top Installation 1. Clean the perimeter of the vanity and the underside of the top ensuring they are free of dust and contaminants 2. Apply a small bead of neutral cure silicone (not supplied) to the four corners of the cabinet, as shown. 3. Place the vanity top into position 4. Install the tap-ware. If the tap-ware being installed does not have a gasket to seal it to the vanity top it is recommended that silicone sealant be applied to the underside of tap-ware flange. 5. Install the waste. Seal the underside of the waste flange with either Plumbers putty or silicone sealant. If tap-ware and waste are to be fitted immediately after installation, care must be taken to ensure top remains in correct position until silicone is cured Caution Do not over tighten the waste fitting during installation PLEASE NOTE: All PLUMBING CONNECTIONS MUST BE MADE BY A REGISTERED PLUMBER Allow the sealant to cure for a minimum of 24 hrs before use Special note about Vitreous China Tops The process of manufacturing vitreous china products is complex. During its manufacture the product shrinks significantly which can at times lead to the product being slightly twisted. At the time of installation it may be necessary insert small spacers between the cabinet and underside of the VC top for it to sit even Sealing the Vanity To ensure the vanity is protected from potential water damage the following areas must also be sealed using a sanitary grade silicone sealant. The base of the cabinet to the floor The sides of the cabinet to the wall The rear edge of any vanity top to the wall The underside of the vanity top to cabinet The perimeter of a basin to the bench top and the wall if applicable A neat finish will be achieved by masking along the areas being sealed Allow the sealant to cure for a minimum of 24hrs before use.

Door / Drawer Alignment & Removal Doors The cabinet doors are factory set but should your installation require further adjustment, use the adjustment screws provided on the hinge mechanism. A No.2 Pozi Drive Screwdriver will be required. 1. To adjust the doors vertically loosen the two hinge mounting screws on both sets of door hinges. Lift or lower the door as required, then lightly retighten. 1 2. To adjust the doors left or right simply rotate the front adjustment screw clockwise or anticlockwise until the desired position is achieved. 2 3. To adjust the doors in or out loosen the rear adjustment screw and slide the door into desired position, then retighten screw. 3 4. To remove the door from the cabinet press the lug at the rear of the hinge and pivot the rear of the hinge outwards. 4 5. To re-attach, position the front of the hinge so the two front lugs fit into the rebates on the base plate, press the rear of the hinge until it clicks back into place. 5

Door / Drawer Alignment & Removal Soft Drawer Closing - Type A (Classic Floor and Classic Wall Hung Vanities) 1 1. To remove the draw simply pull tt out to the maximum opening. 2. Lift the front of the drawer box and remove. Note: When removing drawers ensure their positions are recorded as they are not interchangeable 2 3 3. To reinsert simply reverse the procedure. The soft close mechanisms are factory set on a level surface, if your cabinet has not been installed to these conditions the soft close mechanism may require adjusting 4. If the drawer becomes detached from the soft close mechanism, simply close the drawer and it will reattach itself, if it fails to do so follow the instructions below. If for any reason the soft closer requires adjusting or stops working it may be due to the catch on the side of the drawer being out of position and is not connecting with the soft close mechanism attached to the inside of the cabinet 4a Adjusting the Soft closer catch a. Open the drawer to expose the soft close catch on the side of the drawer. Using a Philips head Screw driver loosen the two screws. b. Move the catch upwards so the gap between the top of the drawer runner and the bottom of the catch measures 14mm. Retighten the catch firmly to the drawer side ensuring it will not move 4b c. Check soft closer for operation, make further adjustments if necessary

Door / Drawer Alignment & Removal Soft Drawer Closing - Type B (Classic Floor and Classic Wall Hung Vanities) 1 1. To remove the draw simply pull the drawer out its maximum opening. 2. Lift the front of the drawer box and remove. Note: When removing drawers ensure their positions are recorded as they are not interchangeable 2 3 3. To reinsert simply reverse the procedure. 4. The Soft Drawer closer mechanism must be extended before reinstalling the drawer. If it is not extended, please follow the steps below 4a Resetting the Soft closer a. If the Soft drawer mechanism is not extended at the time of reinstalling the drawer 4b b. Take hold of the front white tab on the mechanism and carefully pull forward 4c c. The white tab will automatically engage into the slot of the main body. Once in this position the soft closer is ready to accept the drawer for reinstallation

Door / Drawer Alignment & Removal Soft Drawer Closing - Type C (2 styles) IMPORTANT: The vanity must remain true when fixed to the wall for the soft closing drawer mechanisms to operate. If the wall is bowed it must either be straightened or packers placed behind the vanity to ensure to remove any twist or bow Ensure any debris that may have been left during the installation is removed from the cabinet and the soft close runner mechanisms. Failure to remove any debris may cause ineffective operation of the soft drawer closers and possible failure Maximum working load per drawer = 9kg Type A Type B To Remove the Drawer 1. To remove the drawer simply open to its full extent and depress the levers on each side of the drawer. Slide the drawer forward and remove 1 To Reinstall the Drawer 2. Extend the drawer runners to their maximum opening position 2 3. Place the drawer onto the runners until the locking tab locates into the rear of the drawer. 4. While holding the drawer pull the runner forward until it engages the clip and locks into place. 3 4 CLICK! 5. When the runner it is located correctly it will click into position. And it will now be held in the slots SLOT CLICK! 5 6. Close the drawer and check alignment. The front of the drawers may be marginally raised or lowered by depressing and rotating the other blue lever (type A ) or rolling the wheel left or right (type B) 6 SLOT