System FS Duo Mounting Instruction. 1 General 2. 2 Pile driving 3. 3 Mounting the individual assembly groups 4. 4 Torque specifications 7

Similar documents
System FS Uno Mounting Instruction. 1 General 2. 2 Pile driving 3. 3 Mounting the individual assembly groups 4. 4 Torque specifications 6

FS Uno mounting instructions. 2 Pile driving (Ramming) 5. 6 Components list Torque specifications 15

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

Rayport G Eco Dealer Kit

- B1 - B2

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26

Assembly instruction. Counter-weight covering

Rayport G Eco Ballasted

Rayport G Eco Dealer Kit

On-roof system Alpha + Product catalogue

Mounting systems for solar technology

Simotec. 13.i

ALUMINIUM SOLAR MOUNTING SYSTEM. Components catalogue FOR ALL TYPES OF ROOFS AND SITES

PUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG

Fixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i

Roof fastener. Perfectly thought out for every roof

Tree protection systems 2.0

Lab Style Table Frame Part No Assembly Guide Automation Technology

Pole Mount Installation Manual

Clamping devices 521

Piazzola Pergola Awning Manufacturing and installation guide

Installation Manual for The Asphalt/Bitumen Shingle Roof Hook System

1 of 6 SITE PLAN MW. Sample GAMECHANGE SOLAR. Sample. Sample AERIAL VIEW. Array Information. Design Information. Racking.

RIDGE MAST MOUNT (RMM)

adaptivemechanical adaptive

Installation instructions. Novotegra for Corrugated Fibre Cement / Sandwich Roofs

MEFA mounting accessories

ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS TRI-ROOF. energy for a better world

Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs

Heavy duty profiles. Heavy loads with maximum stability. Profile general overview... p Heavy duty profiles... S Load data... p.

DUTCH GABLE FREESTANDING CARPORT

GMS FLEX. / Versatile mounting system for open-terrain PV power plants / Adaptable to terrain: Variable module tilt angle and lateral tilt, various

Variable Pitch Collector Frame

Installation Manual FLUSH MOUNT - Shingle, Slate,etc. Questions? Call Us! +1 (800)

Installation Instructions for Solar Snow Pad (SSP-T-3)

NEWS Part. N /0 MINITEC NEWS

A Shell construction

On-Roof Mounting Sets for Flat-Plate Collectors

Mounting systems for solar technology

Always be your solar support

for HACA stationary fixed two rail ladders with / without safety cage

Alpha + On-Roof System Installation manual

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

Snow Scale SSG. Snow measurement system. Assembly instructions Sommer GmbH. All rights reserved.

Pole Mounting System Installation Manual

APPLICATION NOTE. Mounting instructions for EasyPIM / EasyPACK modules with screw clamps. 1. General information

HEICO FASTENING SYSTEMS. Simple Fast Reliable HEICO-TEC TENSION NUT

ASSEMBLY INSTRUCTIONS. Construction type approved Reg. no S819 F ENERGY AND SANITARY SYSTEMS

Cable trays Assembling instruction

USER MANUAL Nord-Lock X-series washers

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

Track Rack. * Track Racks are not lockable

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

February 2004 RONDA. Circular Formwork Instructions for assembly and use

SPIETH Locknuts. Series MSW. Works Standard SN 04.03

DRAWINGS LIST TERMINAL TABLE TENSION GUARDRAIL X-TENSION G END OF CONTENTS

Installation Instructions - Model V4JSD 1

Assembly instructions for cable termination frame (2-5 bays)

Next Level Security. This 2-tier locker ships flat to save on freight, comes in galvanized and powder coat finish options, and has a modular design.

3.1 General Provisions

Fastening Technology. The Strong

Zero Point Clamping System. ZERO lock BALL lock

Installation Instructions for Solar SnowMax (SSM) Series of Snow Retention Products

INSTALLATION INSTRUCTIONS TRI-VENT. energy for a better world

CSS Central Mount System

INDEX PAGE RELEASE SECTION NUMBER DATE

MevaDec. Contents. Ref. No. Description / Application Product m² list kg

Wooden Frame Type Instruction Manual

Testing of friction properties of fasteners

One Piece LSD/Vector Pads from TIE DOWN ENGINEERING Easier installation with 70% fewer parts Lower cost with competitive pricing

ASSEMBLY AND ADJUSTMENT

Umbrella Inserts and Stubby Screens

VarioSole SE. Installation instructions

6.1. PUSH-PULL-PROPS and accessories

POWER PEAK TM ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D P/N

Façade Solution. Produces façade & cassette solutions

TITGEMEYER Tf1663GB(0514)1. GETO Megaport II flush rear doors Assembly Instructions

MEAstep Staircase construction kit

Tools. T h e l e a d i n g s u p p l i e r o f c o m p l e t e t i m b e r c o n n e c t i o n s y s t e m s

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

Cone. Bolt. Rubber Washer. Rubber Washer. compressed / increased clamping force

Swifts cable ladder supports

CAM SYSTEM. Eccentric self-locking clamping devices. Set. CAM SYSTEM t. CAM SYSTEM t. Set. CAM SYSTEM s pag CAM SYSTEM s pag.

INDEX SUPER4-5-6 CALCULATION ASSUMPTIONS... 4 SUPER4-5-6 FRAMES... 7

Wide-span cable trays WPR Assembly instruction

incorrect use or handling that exceeds normal operating limits.

Installation Instructions

Installation manual. novotegra for tiled roofs

AWNING SYSTEM INSTALLATION INSTRUCTIONS ALL VERTICAL WALLS

MANUAL MOUNTING SYSTEM FOR CORRUGATED ROOF

Hoop House Plans By Steve Robinson

Hoesch Arched Roof Installation guide

Sigma II Installation manual

A E D X E X C A C B A L B E L E T R T A R Y

Instruction Manual. Manual Furniture Mover. Note: Owner/Operator must read and understand this instruction manual before using the furniture mover.

Selection BASIC LINE BASIC LINE PLUS VARIO LINE SERIES TUBE LINE STEEL LINE

Components Catalog. Mounting Systems. Version 18.01, updated: 05/25/2018

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

Transcription:

System FS Duo Mounting instructions CONTENTS Page 1 General 2 2 Pile driving 3 3 Mounting the individual assembly groups 4 4 Torque specifications 7 5 Module mounting 8 6 Tolerances 8 1 / 8

1 General 1.1 Information The FS open area system is customized to each individual location. A corresponding detailed structural analysis must be carried out to determine the cross section, as well as a geotechnical report to identify the depth required for pile driving. 1.2 Planning A general layout drawing and a screw layout plan are drawn up for each system prior to delivery. Defi ned measurements and the position of individual components and connecting materials must all be discernible on these drawings. The respective torques are also listed on the plans. In the overview drawing, the cross sections of the components must be displayed and defi ned by name. A parts list is supplied with the drawing. Items, quantities and article numbers can therefore be referenced both on the delivery note and on the detail drawing. Example parts list Example general layout drawing 2 / 8

2 Pile driving 2.1 Positioning Pile driving work must be undertaken by specialist companies. In order to ensure a smooth workflow, pile-driving plans must be generated by the client based on our rack drawings. These plans must be available at least one week prior to the beginning of the pile-driving operations. These plans must include the positions of the piles and their corresponding dimensions. The position of the first and last pile of each row must be marked on the terrain with a wooden stake. If a row length exceeds 50 meters, additional stakes must be used to mark out the row. Height Inclination (East-West) Inclination (North-South) + 20 mm + 3 + 3 2.2 Pile-driving on difficult subsoil Irregular pile-driven profi les must be clearly identifi ed and documented in a pile driving plan. Inconsistencies in the terrain which could hinder pile driving efforts must be documented, (e.g. slant position, deceleration and subsequent sudden acceleration of the penetration speed, swift penetration of the pile while pile-driving etc.). All pile-driving procedures derogating from the specifi cations must be approved by Schletter GmbH. If pile-driving operations are impeded by unexpected obstacles (blocks, solid rock on the site), the following procedure must be implemented: 1. Pre-drill to the target pile-driving depth. 2. Clear the borehole. Alternatively, the remaining cuttings should be compacted. 3. The borehole must be filled in layers with compressed concrete of strength C16/20 then compacted. 4. The pile should then be driven without delay. 3 / 8

3 Mounting the individual assembly groups 1. Drive the U-profiles and coat with a zinc dust primer Verify stability of the piles prior to mounting the racks! A zinc dust primer is required despite hot-dip galvanisation! The zinc coating may have chipped away at the upper foundation end during ramming! Please use exclusively the designated special coating (Zinc Dust Primer). Basic zinc spray coatings do not provide long-term protection. Tolerance of N-S and O-W inclination +-3 Tolerance of the pile height in accordance with terrain topography +-100mm A zinc dust primer should be used to coat the top 3cm of the profi le, inside and out Ram schematic for two-support design without diagonal struts Ram schematic for two-support design with diagonal struts 2. Girder mounting The FS Duo is available in two different variants (with or without diagonal strut). The mounting of girders is therefore detailed in two corresponding sub-points below! A. Girder mounting without diagonal strut As standard, the middle holes should be used for the bolts. Other holes should be used only for high tolerance compensation. (See detailed view A) Foundation collar Washer M12x30 A Nut M12 Pile-driven foundation Connect the foundation collar to the piledriven profi le using two M12x30 screws, washers and nuts (position washers on the side of the foundation collar!) View from above. 4 / 8

Components must be accurately adjusted to avoid cumulative tension in the module. Position the girder and, using M12x30 bolts, washers and nuts secure above to the foundation collar and below to the pile-driven foundation The girders must be bolted with the closed side to the foundation collar and lower pile-driven foundation! (See detailed view B) B B. Girder mounting with diagonal strut Position the nuts M12 on the exterior side of the junction plate! Junction plate Bolt junction plate to foundation collar with two M12x30 bolts, 2 washers and 2 nuts Foundation collar mounted to junction plate Do not fully tighten the bolt connecting the diagonal strut and the junction plate. The diagonal strut must be loose enough to adjust and bolt to the girder! adjustable Fasten junction plate loosely to the diagonal strut using an M12x30 bolt, washer and nut Diagonal strut mounted to junction plate 5 / 8

The girders must be bolted with the closed side to the foundation collar and diagonal strut! Bolt the girder to the foundation collar and diagonal strut using two M12x30 bolts, 2 washers and 2 nuts Always observe the torque specifi cations as given in 4. when tightening bolts! Then tighten the bolts connecting the diagonal strut to the junction plate Please bolt through the middle borehole! Other holes should be used only for high tolerance compensation. Position bolt for connecting the junction plate to the pile-driven foundation centrally in the slotted hole (See detailed view D) D Verify the angle of the girder to the horizontal after mounting! Place the mounted girder assembly on the pile-driven foundation and bolt together with two M12x30 bolts, 2 washers and 2 nuts 6 / 8

3. Mount purlins Please note that the purlin must be mounted at a 90 -angle to the girder! Set the fastening device with the notch on the corrugation and hammer in from the side! Insert purlins into the pre-assembled connector hooks Hammer in the fastening device 4. Mount connectors (optional) Mount all connectors on the same side! The open side of the connector must face upwards! Secure the connectors with 12 EJOT bolts (6 bolts per purlin) Side view 5. Module mounting Please observe the manufacturer stipulations regarding clamping points when mounting modules! Verify stability of all mounted module clamps! Secure the module clamps with EJOT bolts 4 Torque specifications Image Name Tightening torque (MA-Nm) Hexagon head bolt DIN 933 - M12x30 Hexagon nut DIN6923 - M12 Washer DIN125 - M12 93 Nm When checking preload of the bolts, care must be taken that constraints and frictional forces cannot lead to a loss of tension. This is taken into account when drawing up the tightening torque specifi cation. When tested, the nut must retain it's scheduled torque to 50% if the connection is twisted. 7 / 8

5 Module mounting Modules are mounted according to the drawing, using the supplied module clamps. Modules are fastened to the module-bearing profi le using end- and middle clamps. Position the module clamps at the clamping point and secure with Ejot bolts. E Afix the bolt at the purlin corrugation! (See detailed view E) 23 mm 5 mm The distance between modules can deviate from the standard value. Tolerated variance is 23 mm on the clamped side and 5 mm on the unclamped side. Potential variance from the standard is outlined with a detail drawing in the overview plan. When mounting modules, please observe the clamping points specified by the module manufacturer! 1.5 mm 1.5 mm Please ensure a joint clearance of 1.5 mm! 6 Tolerances Schletter mounting racks for open area plants are always explicitly dimensioned for the wind and snow loads at the target location. In the interest of economic effi ciency, the maximum capacity potential of individual components is generally exploited. To achieve this, however, the racks must be mounted with the utmost precision. Signifi cant deviation from the mounting plans can lead to mechanical tension in the cells. Adherence to the specifi ed tolerances is therefore essential to the structural safety. Span between fi elds Lateral cantilever Span between fi elds Linear projection of purlins Lower girder connection Upper girder connection ± 150 mm ± 100 mm ± 100 mm ± 100 mm Lower girder connection Upper girder connection Schletter GmbH, 2012, I400224GB, V2 In the event of deviation, this must be communicated to Schletter immediately! 8 / 8