VIA: Email/Webposting April 27, 2017 O Haver Contractors 12831 O Connor Road San Antonio, TX 78233 Telephone 210-590-2889 Fax 210/657-5888 Attn: John Zamoyski, Project Manager Email johnz@ohcltd.net John Salmon, Project Superintendent Email johns@ohcltd.net Re: 3120 I-35 NORTH Changes have been made to the Contract Documents as indicated by Change Bulletin No. Two. Unless notified otherwise, in writing, by the Owner, this Change Bulletin shall become a Construction Change Directive in accordance with Article 7 of the General Conditions of the Contract Agreement ten (10) calendar days from the date of issuance noted above. The proposed basis for adjustment shall be mutual acceptance of a lump sum properly itemized and supported by sufficient substantiating data to permit evaluation or other previously agreed method for adjustment. Should you have any questions, please feel free to contact our office. Regards, CASCO Chuck Caesar Chuck Caesar Project Manager (w/1 half sized bond each) Enclosures: - pdf of Change Bulletin - pdfs of revised drawings - pdfs of revised List of Drawings cc: (all w/enclosures) Harmon Jones - RTG Franklin, TN (w/1 set PDF) via Email Steve Raccuglia, Sr. - RTG Franklin, TN (w/1 set PDF) via Email Daniel Stewart Cates-Clark (w/1 set PDF) via Email dstewart@cates-clark.com ACT K:\RTG\Projects\Denton TX (Rayzor Ranch) 916560\WP\Bid\CB Two 170426\CB Two 170427.doc CASCO DIVERSIFIED CORPORATION 10877 Watson Road Portland, OR St. Louis, MO 63127 Edison, NJ 314.821.1100
APRIL 27, 2017 CASCO CORPORATION Project Managers St. Louis, Missouri CHANGE BULLETIN TWO To Plans and Specifications for This Change Bulletin to the Contract Documents for the above captioned project is for work requested by the Owner and shall become a modification to the Contract Documents via Construction Change Directive in accordance with Article 7 of the General Conditions of the Contract Agreement ten (10) calendar days from the date of issuance noted above. CHANGES TO THE DRAWINGS: Incorporate the following Drawings, with revisions including, but not necessarily limited to, those listed below: 1. Sheet S1.0 Revision No. 1: Revised Foundation Plan: Revised pilaster section reference 4/S1.1 to 10/S1.1 to coordinate with Civil grades. Revised Foundation Plan Notes: Revised Foundation Plan Note 4 to clarify top of grade beam elevations. Revised Pier Cap Schedule: Revised pier cap PC3 and PC4 depths to coordinate with Civil grades; Revised Pier Cap Schedule notes to clarify the top of pile cap elevations, depths, and reinforcing. 2. Sheet S1.1 Revision No. 1: Revised Section 4/S1.1: Revised pile cap reinforcing note to reference extension into adjacent grade beam. Added Section 10/S1.1 to address pile cap detail at stepped grade beam condition. CHANGES TO SPECIFICATIONS 1. Incorporate revised Specification Section 00004, List of Drawings, Pages 00004-1 and 00004-4 dated April 27, 2017. END OF CHANGE BULLETIN K:\RTG\Projects\Denton TX (Rayzor Ranch) 916560\WP\Bid\CB Two 170426\CB Two 170427.doc CASCO DIVERSIFIED CORPORATION 10877 Watson Road Portland, OR St. Louis, MO 63127 Edison, NJ 314.821.1100
LIST OF DRAWINGS BID: JANUARY 5, 2017 ADDENDUM ONE: JANUARY 16, 2017 ADDENDUM FOUR - POST BID: FEBRUARY 1, 2017 ADDENDUM FIVE: FEBRUARY 28, 2017 CHANGE BULLETIN ONE: APRIL 10, 2017 CHANGE BULLETIN TWO: APRIL 27, 2017 DRAWING TITLE ISSUE TYPE DATE A0.0 COVER SHEET 1 ADD #1 01/16/17 CIVIL/LANDSCAPE/IRRIGATION --- COVER SHEET 3 CB #1 04/04/17 C0.1 PLAT 0 BID 10/2016 C1.1 GENERAL NOTES, LEGEND & ABBREVIATIONS 0 BID 11/21/16 C2.1 SITE PLAN 3 CB #1 04/04/17 C3.1 PAVING PLAN 3 CB #1 04/04/17 C3.2 PAVING 0 BID 11/21/16 C3.3 PAVING 0 BID 11/21/16 C3.4 SITE ACCESSIBILITY 2 ADD #4 PB 01/26/17 C4.1 GRADING PLAN 3 CB #1 04/04/17 C5.1 DRAINAGE AREA MAP 3 CB #1 04/04/17 C5.2 OVERALL DRAINAGE AREA MAP 0 BID 10/24/16 C6.1 STORM DRAIN PLAN 3 CB #1 04/04/17 C6.2 STORM DRAIN PROFILE 0 BID 11/21/16 C7.1 WATER & SANITARY SEWER PLAN 3 CB #1 04/04/17 C8.1 EROSION CONTROL PLAN 3 CB #1 04/04/17 C8.2 EROSION CONTROL 0 BID 11/21/16 C8.3 EROSION CONTROL 0 BID 11/21/16 MEP1 SITE MEP PLAN 0 BID 11/21/16 L1.1 LANDSCAPE PLAN 5 CB #1 04/10/17 L1.2 LANDSCAPE SPECIFICATIONS 0 BID 09/14/16 L2.1 IRRIGATION PLAN 3 CB #1 04/10/17 L2.2 IRRIGATION SPECIFICATIONS 0 BID 12/09/16 1 OF 1 SIDEWALK (FOR REFERENCE) 0 ADD #4 PB 01/2013 25 DUNAWAY DRAINAGE AREA MAP (FOR REFERENCE) 0 ADD #4 PB 01/2017 1 OF 2 FINAL PLAT (FOR REFERENCE) 0 ADD #4 PB 01/2017 2 OF 2 FINAL PLAT (FOR REFERENCE) 0 ADD #4 PB 01/2017 LIST OF DRAWINGS 00004-1
LIST OF DRAWINGS BID: JANUARY 5, 2017 ADDENDUM ONE: JANUARY 16, 2017 ADDENDUM FOUR - POST BID: FEBRUARY 1, 2017 ADDENDUM FIVE: FEBRUARY 28, 2017 CHANGE BULLETIN ONE: APRIL 10, 2017 CHANGE BULLETIN TWO: APRIL 27, 2017 DRAWING ARCHITECTURAL TITLE ISSUE TYPE DATE A0.1 LIFE SAFETY PLAN A1.0 FLOOR PLAN 3 CB #1 04/05/17 A1.1 FLOOR FINISH PLAN 1 ADD #1 01/16/17 A1.2 PARTITION FINISH PLAN 1 CB #1 04/05/17 A1.3 ROOF PLAN A2.0 ENLARGED PLANS AND ELEVATIONS 2 CB #1 04/05/17 A2.1 ENLARGED FLOOR FINISH PLANS 1 ADD #1 01/16/17 A3.0 EXTERIOR ELEVATIONS 3 CB #1 04/05/17 A4.0 WALL SECTIONS 1 ADD #1 01/16/17 A4.1 ADULT FRONT ENTRY SECTIONS AND 1 ADD #1 01/16/17 A4.2 ADULT REAR ENTRY SECTIONS AND 1 ADD #4 PB 02/01/17 A4.3 KIDS ENTRY SECTIONS 1 ADD #1 01/16/17 A5.0 PARTITION TYPES AND A5.1 MILLWORK A5.2 CANOPY SECTIONS 1 ADD #1 01/16/17 A5.3 CURTAIN WALL A5.4 ROOF 1 ADD #1 01/16/17 A5.5 MISCELLANEOUS 1 ADD #1 01/16/17 A5.6 MISCELLANEOUS A6.0 ADULTS SALES INTERIOR ELEVATIONS AND A6.1 ADULTS SALES INTERIOR ELEVATIONS AND A6.2 ADULTS SALES INTERIOR ELEVATIONS AND A6.3 ADULTS SALES INTERIOR ELEVATIONS AND A6.4 ADULTS SALES INTERIOR ELEVATIONS AND A6.5 KIDS SALES INTERIOR ELEVATIONS AND A6.6 KIDS SALES INTERIOR ELEVATIONS AND 1 ADD #4 PB 02/01/17 1 ADD #4 PB 02/01/17 A7.0 TYPICAL INTERIOR. LIST OF DRAWINGS 00004-2
LIST OF DRAWINGS BID: JANUARY 5, 2017 ADDENDUM ONE: JANUARY 16, 2017 ADDENDUM FOUR - POST BID: FEBRUARY 1, 2017 ADDENDUM FIVE: FEBRUARY 28, 2017 CHANGE BULLETIN ONE: APRIL 10, 2017 CHANGE BULLETIN TWO: APRIL 27, 2017 DRAWING TITLE ISSUE TYPE DATE A7.1 TYPICAL INTERIOR. 1 ADD #4 PB 02/01/17 A8.0 SCHEDULES AND 2 ADD #4 PB 02/01/17 STRUCTURAL S0.1 GENERAL STRUCTURAL NOTES S0.2 TYPICAL S1.0 FOUNDATION PLAN 1 CB #2 04/27/17 S1.1 FOUNDATION 1 CB #2 04/27/17 S2.0 ROOF FRAMING PLAN S2.1 ENLARGED FRAMING PLANS AND FRAME ELEVATIONS S2.2 FRAMING 1 ADD #1 01/16/17 S2.3 CANOPY FRAME ELEVATIONS AND S2.4 CANOPY SECTIONS AND S2.5 CANOPY SECTIONS AND 1 ADD #1 01/16/17 SPRINKLER COORDINATION F0.0 SPRINKLER PIPE ROUTING COORDINATION MECHANICAL/PLUMBING M1.0 HVAC SCHEDULES AND M2.0 HVAC PLAN P1.0 PLUMBING SCHEDULES AND ENLARGED PLANS 2 ADD #4 PB 02/01/17 P2.0 PLUMBING PLAN 2 ADD #4 PB 02/01/17 ELECTRICAL E0.1 ELECTRICAL SITE PLAN 2 CB #1 04/15/17 E0.2 SITE LIGHTING PHOTOMETRICS 2 CB #1 04/15/17 E1.0 NOTES, SYMBOLS AND E2.0 POWER PLAN 1 ADD #4 PB 02/01/17 E2.1 POWER PLAN E2.2 POWER PLAN 1 ADD #4 PB 02/01/17 E3.0 LIGHTING PLAN LIST OF DRAWINGS 00004-3
LIST OF DRAWINGS BID: JANUARY 5, 2017 ADDENDUM ONE: JANUARY 16, 2017 ADDENDUM FOUR - POST BID: FEBRUARY 1, 2017 ADDENDUM FIVE: FEBRUARY 28, 2017 CHANGE BULLETIN ONE: APRIL 10, 2017 CHANGE BULLETIN TWO: APRIL 27, 2017 DRAWING TITLE ISSUE TYPE DATE E3.1 LIGHTING PLAN E4.0 RISER DIAGRAM AND SCHEDULES E4.1 PANEL SCHEDULES E4.2 SCHEDULES AND LIST OF DRAWINGS 00004-4