Haukaas Bale Rack Kit

Similar documents
Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

ASSEMBLY INSTRUCTIONS FOR MAR-K BEDSIDES AND GM FLUSH TAILGATE WITH HANDLE

Ford Pick Up Rear leaf Spring Kit Installation Instructions

The Festival Assembly Instructions

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

May 14, Installation Manual

6625 WEST WILSHIRE BLVD. OKLAHOMA CITY, OK (405) FAX (405)

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel

Installation Instructions

ASSEMBLY INSTRUCTIONS FOR HAULER II SERVICE BODY A RACK

Installation Instructions

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

Installation for Full Size Polaris Ranger Crew Doors

ASSEMBLY INSTRUCTIONS FOR HAULER II UNIVERSAL CAMPER SERIES RACKS

MobileTrak5 Installation Instructions

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Q-Zone Hoop-Frame. Assembly Instructions. Copyright July 11, 2018 Grace Company (Reproduction Prohibited) Version 1.8

Installation Instructions

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel

TITAN INDUSTRIAL RACK 4-FOOT TALL / 3-SHELF

ULTRA SPACE SAVER SQUARED Installation Instructions

PRORAC CONTRACTOR SERIES UNIVERSIAL STEEL TRUCK / CAP RACK INSTALLATION INSTRUCTIONS

Installation Instructions

Installation Instructions - Model V4JSD 1

Desk/Wall-Mount Rack

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Installation Instructions

ULTRA SPACE SAVER Installation Instructions

Precision Steel Car s 100 T Steel Coil Car

Clayton Off Road COR COR COR

JK Crusher Corners. *Includes ONE of the Hardware Kits (not both)

INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER:

1: profile cross section. FD- profile. for sidewalls + backwalls. eaves profile. curved roof profile. Z - profile (alongside frame) L 60 x 60

ASSEMBLY INSTRUCTIONS FOR SERVICE BODY A MOUNT RACKS

CHEVY/GMC SuperRail Mounting Kit #3117

RLP Flat Track Hardware sliding door hardware/ barn door track

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

FORD #2228. Gross Trailer Weight (Maximum)...24,000 lbs. Vertical Load Weight (Max. Pin Weight)...6,000 lbs. SYSTEM TOW CAPACITY

installation guide 1 GUIDE#: pwb-assault-004

MPA-9000 Universal Ceiling Projector Mount Kit

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

ASSEMBLY INSTRUCTIONS FOR T-10, T-11 & T-12 SERIES RACKS

Installation Instructions

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

10x10 Trellis Pergola

Spiral Slide

RLP Mini Low Profile V Track Hardware sliding door hardware/ barn door track

Installation Instructions

Contractors Rack Assembly and Installation Instructions

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

Assembly Instructions. Table of Contents

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

10x10 Trellis Pergola

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Important Note: Why this guidebook is FREE?

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

Assembly Instructions

TABLE OF CONTENTS REQUIRED TOOLS

Assembly Instructions 10 X 10 Aluminum Roof Support

Installation Instructions

Pickup Box Utility Rack Package Installation (Instruction ID: )

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

CHEVY/GMC SuperRail Mounting Kit #4423

Installation Manual Flat Track Series

Vinyl Gazebo Instructions

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

10 x 10 Flat Top Two Tone Pergola

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

Roll In W/L Dock PAGE 1

Why are we giving this guidebook as a FREE download?

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

PRO - III & IV K M K N H A D J M J 1/2", 9/16", & 3/4" 2004 KargoMaster-'Pro 3' _2.1. com

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Treviso POCKET BILLIARD TABLE INSTALLATION MANUAL. SERVICE DEPARTMENT P.O. BOX 68 BRISTOL, WI 53104

Privacy Wall Glass Selections - Polished Edge Slider Door

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

Assembly Instructions

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

installation guide 1 GUIDE#: pwb-assault-001

TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.

12'W x 10'H RoundTop Frame Assembly Please read and understand instructions completely before assembly.

General Prisoner Transport Install Instructions PT-2-INST

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

3,500/4,500lb. Vertical Cable Feighner Lift

ULT R A S PACE SAV E R SQ UA R E D

INSTALLATION INSTRUCTIONS 3"/4 BENT END SIDEBARS FORD F-150 SUPERCREW PART # DZ /DZ

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

US RACK, Inc Falcon Drive, Madera, CA

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE

Aluminum Frame Type Instruction Manual

S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM

Installation Instructions

Wooden Frame Type Instruction Manual

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

In-Wall Pool Step Assembly Instructions

WPS crew Doors Installation instructions

Transcription:

Page 1 Haukaas Bale Rack Kit For hauling large round bales "Pipe Style". C D Pocket Reinforcement Plates 10" 11" A: Pocket Side Plate B: Pocket Top Plate C: Side Stake D: End Stake E: Floor Plate B A F: Under Floor Plate G: T-Connector Plate H: Flag Plate I: Sign Plate J: End Cap E F I J Kit requires 2-7/8" OD pipe and some welding. Stake size 3"x 1-1/2" - sign and flag holders. G H Haukaas Mfg. Ltd. Mortlach, SK. Canada (306) 355-2718 www.haukaas.com These instructions can be found on line at www.haukaas.com

Side Rails SR - 1 Bulkheads BP - 1 BP - 2 BP - 3 BP - 4 Page 2

Haukaas Bale Rack Instructions We would like to thank you for purchasing the Haukaas Bale Rack Kit. Due to the many different trailers available, we feel that the best way to provide well designed Bale Racks to the market place is to provide the components that required designing and could be mass produced leaving the 2-7/8 OD pipe and the final welding to the end user. The person(s) welding and installing the racks for the end user will be responsible for the completed rack system to ensure that the racks are properly welded and installed. We recommend the 2-7/8 OD pipe has a wall thickness of.203 or heavier. (Schedule 40) All welding is to be done in accordance with CSA Standard W59-03 (2008) Welded Steel Construction (Metal Arc Welding) or American Standard AWS D1.1:2004 Structural Welding Code Steel. 1/4 fillet welds or greater should be used throughout. Installation Time We expect that it will take approximately 8 hours for a welder and welder s helper to weld and install a complete system (Side Rails and Bulkheads). Cutting time for the pipe and painting is not included in this time. Side Rails In designing the racks we planned for there to be two side stakes per side rail. We want the side rails to be easily removed by two people. We feel that more than two stakes per rail would cause for more binding. Due to the varying of the trailers these kits are used on it will be the end users responsibility to determine the number of stakes and their locations on the trailer and the pipe lengths that will be used. (See SR-1 page 2). Stake Pockets In this kit we have provided Pocket Top Plates and Pocket Side Plates. We strongly recommend that they be welded to the trailer to provide re-enforcement to the trailer s stake pockets. We believe that many of the trailers receiving this kit will be older and these plates will better ensure a safer bale hauling trailer. Pay close attention to the welding instruction given regarding the welding of the plates to the trailer. Improper welding on the trailer can compromise the integrity of the trailer itself. Rail End Caps The Rail End Caps welded to the rails serve 3 purposes. There is a safety issue for those walking by the trailer and it will reduce the likelihood of snagging the bales and damaging the net wrap. The Rail End Caps also make the whole rack look better! They can be welded to the rails before or after the rails are welded to the stakes. Please Read and Understand these Entire Instructions Before Starting!! Page 3

Understanding These Instructions The information given in these instructions is laid out in step by step order. Page 1 shows the overall cad picture of the bale rack system, the names of the components and their general locations. Page 2 shows the general instructions for the side rails, bulkheads and under floor plates. Page 3 and on are the step by step instructions written and with pictures. If you have any questions please call us at (306) 355-2718. Before You Begin You will have to determine the locations for the stake pockets on the trailer both for the side stakes and the end stakes that make up the bulkhead. We used a 53 highboy trailer to make these instructions. We placed the side stakes 72 (6ft) apart and cut the 2-7/8 OD pipe 108 (9 ) for eight of the ten rails. We cut the pipe 120 (10ft) long to get the coverage we wanted for the front two rails. It will be up to the end user to decide what works best for your trailer. The number of side stakes sent with this kit is only a suggestion for your trailer. It will be up to you to decide the location on your trailer as to where you place them. The number of side and end stakes used and their spacing/locations will be the full responsibility of the end user. For the bulkhead end stakes we used the center 2 stake pockets at the front of the trailer. At the rear of the trailer we used the 2 stake pockets that were on each side of the center pocket. You will have to determine the appropriate locations for the end stakes and the number required for the bulkheads for your trailer. On the trailer (53 highboy) that these instructions were made from the Lower Rails were cut 84 long, the Upright Pipes were cut at 80 and the Top Rails at 72. The length of the Angle Pipe and Center Pipe will be determined by your trailer. (See BP-1 page 2). For the bulkhead floor plates we feel that the best location is right over a steel crossbeam and clamp using the Under Floor Plates. The Under Floor Plates can be used two different ways on your trailer. (See BP-4 page 2). The fasteners for the Floor Plates are not included in this kit. Step 1 Lay out the Pocket Top Plates for the side rails and end stake/bulkheads in the locations that you have chosen for them. Step 2, 3 & 4 Using a marker, mark out the areas where the stake pocket re-enforcement plates will need to be welded. Step 5 Remove all paint or rust in the marked areas to prepare for welding. Step 6 With the Pocket Top Plate properly aligned directly over the stake pocket tack weld. Page 4

Step 7 Use a Side Stake to check the alignment. Step 8 Position and tack weld the Pocket Side Plate in the proper location. (We left a 1/16 gap between the Pocket Top Plate and Side Plate to make for a better, easier weld). Step 9 Weld the Pocket Side Plate as shown. Step 10 Weld the Pocket Top Plate as shown (there are grooves provided in the Pocket Top Plate to serve as weld guides). It is VERY IMPORTANT that you DO NOT WELD to the sides of the Pocket Top Plates. Welding in these locations may weaken your trailer! Step 11 & 12 Insert and align the Side Stakes. Proper alignment of the Side Stake will ensure straighter rails from the front to the back of the trailer. Centering of the Side Stakes (side to side) in the stake pocket is a good idea. It will make getting the side rails off and on the trailer easier. Step 13 Center the Rail Pipes on the Side Stakes. You can decide whether you weld the End Caps on the Rail Pipes before or after welding the Side Rails to the Side Stakes. Side Rails we suggest welding them before. (See SR-1 page 2) [Note: See Step 19] Step 14 &15 We tacked welded the Side Stakes to the Rail on the bottom and then fully welded along the top of the Side Stake and then fully welded the bottom as shown. Step 16 Once all the Side Rails are welded to the Side Stakes, weld the Flag Holder Plates to the bottom of the rail at each corner of the trailer as shown. (See Step 53-55) Step 17 & 18 We suggest that you number stamp each Side Rail to identify its location. This may greatly reduce any frustrations when installing the Side Rails in the future. Step 19 We suggest that you begin with the front bulkhead. Insert the End Stakes in the predetermined stake pockets on the front of the trailer and slide the Lower Rail into place and center. (On the Lower Rail you may want to weld the End Caps on afterwards). Step 20 Weld the Lower Rail to End Stakes as shown. They need to be welded well enough to be removed from the stake pockets without coming loose. Page 5

Step 21 If the Stakes are difficult to remove grinding the edges as shown may help when reinstalling. Step 22 Remove from the trailer and lay the subassembly out on the floor as shown. Step 23 & 24 Measure the inside dimension of the top holes in the End Stakes and cut the Center Pipe to that size as shown. Step 25 Welding the Top Rail: Set out the enclosed T-Plates in line with the End Stake top holes as shown. Step 26, 27 & 28 Welding the Top Rail: Center the Top Rail with the T-Plates and weld as shown. Step 29 Install the bulkhead Upright Pipes (verticals) as shown with top rails. Step 30 Square the Upright Pipes with the Lower Rail as shown. Step 31, 32, 33 & 34 Weld all the components together top side and bottom side as shown. Step 35 Rear Bulkhead: Weld the rear bulkhead together the same as the front. The difference between the front and rear bulkhead are the Sign Holder Plates on the rear bulkhead. Do not forget to install the center Sign Holder Plates when sliding the Lower Rail into place. (See BP-1 & BP-2 page 2) Square the Sign Holder Plates as shown. We used a short length of flat bar running across to square up the holder plates. Step 36 Square Upright Pipes to the Lower Rail as shown. Step 37 Weld the Sign Holder Plates to the Lower Rail as shown. Page 6

Step 38 Locate the Floor Plates and drill holes for fasteners. The Floor Plate is designed to receive the 2-7/8 OD pipe at 45 degrees. When possible locate the Floor Plate directly over a metal crossbeam and clamp it using the enclosed Under Floor Plates. On the trailer (53 highboy) we used lag bolts to secure the front bulkhead s Floor Plate as it was directly over the King Pin plate. If you do the same make sure that you use long 1/2 diameter lag bolts and that they are securely attached to the front bulkhead of the trailer. It is the installer s responsibility to make sure that racking system is secure and safe! Step 39 This picture is of the rear bulkhead and how we fastened the bulkhead to the trailer floor using the Under Floor Plates. We clamped directly to the trailers metal crossbeam. The Floor Plates are designed to use four 1/2 bolts (not included). Step 40 Locating the bulkhead s Center Pipe: Using the diagram BP-1 on page 2 determines the height at which the T-plate should be located. X = the distance from the back of the Floor Plate to the inside edge of the stake pocket. Perhaps the easiest place to measure is from the top of the End Stake. From the top of the End Stake to the bottom of the T-plate is X minus 11. (For example if X on your trailer = 40 then you would measure up 29 [40-11=29] and make a mark to locate the T-plate). Do this (make a mark) on both Upright Pipes. Step 41 Tack weld one T-plate to one of the Upright Pipes in the proper location as shown. Step 42 & 43 Slide the Center Pipe into the T-plate welded to the Upright Pipe. Slide the T-plate for the opposite Upright Pipe (not shown) onto the Center Pipe and swing into place. Locate the T-plate to the proper place (the mark that was made) on the Upright Pipe and weld the subassembly securely. Step 44 The next step is to square the bulkhead (rack) with the deck of the trailer itself. The bulkhead looks far better if it is straight up and down! Step 45, 46, 47 & 48 Measure to determine the length of the Angle Pipe. (See BP-1 page 2) We suggest that the measured length have 3/8 sticking through the T-plate on the Center Pipe. The Angle Pipe will need to have the bottom end cut at a 45 degree angle to fit properly. Step 49 On the trailer (53 highboy) that these instruction were made from the Floor Plate was located a little off center to properly fit the floor boards on the trailer. To compensate so that the Angle Pipe ran straight the T-plate on the Center Pipe was moved a little to the right of center before welding. Page 7

Step 50 Weld Angle Pipe to Floor Plate all around and secure. (Weld the connection while fastened to the trailer.) Step 51& 52 We suggest attaching a piece of 5/8 plywood (3/4 if using only 2 Sign Holder Plates) 13 wide and 96 long to hold the D sign. (Plywood not included in this kit.) Included in this kit are 3/8 x 1-1/4 carriage bolts and regular 3/8 nuts to fasten the plywood to the Sign Holder Plates. (See BP-1 page 2) Step 53-55 Attach the corner flags to the Flag Holder Plates at each of the four corners of the trailer using enclosed 3/8 x 1-1/4 hex bolts and Stover nuts (locknuts). Step 56-59 Install D-Sign onto the plywood using enclosed 3/8 x 1-1/4 carriage bolts, regular nuts and flat washer Step 60 Install the enclosed 3/8 x 3/4 Hex bolts with the 3/8 Stover nuts into the Side Stakes to ensure that the Side Rails do not come out of the stake pockets accidently. Disclaimer: It is the responsibility of the owner of the trailer to ensure that these instructions are followed and that the bale rack system is properly fabricated and installed. The end user is liable for any damages or harm that may result from the use of these bale racks. We recommend the 2-7/8 OD pipe has a wall thickness of.203 or heavier. (Schedule 40) All welding is to be done in accordance with CSA Standard W59-03 (2008) Welded Steel Construction (Metal Arc Welding) or American Standard AWS D1.1:2004 Structural Welding Code Steel. 1/4 fillet welds or greater should be used throughout. Page 8

Mark out the areas that need to be ground before welding. Lay pocket top plates out in their proper locations on the trailer. Mark out the areas that need to be ground before welding. Step - 1 Step - 2 Step - 3 Mark out the areas that need to be ground before welding. Grind clean before welding. Align plate over pocket and tack weld. Step - 4 Step - 5 Step - 6 Check alignment with side stake. Position side plate and tack weld. Weld three sides as shown. Step - 7 Step - 8 Step - 9 Weld as shown. Do Not Weld Here!! Set side stakes in pockets. Make sure stakes fit flush to the trailer here. Step - 10 Step - 11 Step - 12 Center rail pipes on stakes. Weld top as shown. Weld bottom as shown. Step - 13 Step - 14 Page 9 Step - 15

Weld flag holder plates on the bottom outside corners. Number stamp stakes and pockets to identify location. Side Stake Complete Step - 16 Step - 17 Step - 18 Bulkheads Insert end stakes and center lower rail. Weld lower rail to end stakes. If stakes are tight in pockets grind edges. Step - 19 Step - 20 Step - 21 Layout on flat floor. Measure inside measurement. Cut center pipe to size. Step - 22 Step - 23 Step - 24 Set out T-plates for top rail. Center top rail with T-plates. Weld T-plates to top rail. Step - 25 Step - 26 Step - 27 Weld top side as shown. Install uprights and top rail. Square uprights with lower rail. Step - 28 Step - 29 Page 10 Step - 30

Weld as shown both top and bottom. Weld as shown both top and bottom. Weld as shown both top and bottom. Step - 31 Step - 32 Step - 33 Square sign holder plates. Flat bar Squaring upright with lower rail. Weld as shown both top and bottom. Step - 34 Step - 35 Step - 36 Weld sign plate as shown. Locate bulkhead floor plate. Best location for under floor plates. Step - 37 Step - 38 Step - 39 Measure to locate T- plate for center pipe. Tack weld one T-plate first. Slide center pipe in T-plate. Step - 40 Step - 41 Step - 42 Measure to find measurement. Weld T-plate in proper location. Square bulkhead with floor. Step - 43 Step - 44 Page 11 Step - 45

Measure to find measurement. Measure to find measurement. Have angle pipe stick through. Step - 46 Step - 47 Step - 48 Weld when aligned. Weld all around as shown. Attach plywood as shown. Step - 49 Step - 50 Step - 51 Attach plywood as shown. Attach flags as shown. Attach flags as shown. Step - 52 Step - 53 Step - 54 Attach flags as shown. Attach sign as shown. Attach sign as shown. Step - 55 Step - 56 Step - 57 Attach sign as shown. Attach sign as shown. Insert fasteners into Side Stakes. Step - 58 Step - 59 Page 12 Step - 60