Pohlcla Coslelanos Anthony Plrozzl, Jr. Edward R. Renwick. Vice President

Similar documents
Architectural Design Process

CONVEYANCE PIPELINE AND PUMP STATION

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION

Certificate of Appropriateness (CoA) Checklist

Major Site Plan Application

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST

RFQ No. 19-C668 for On-Call Consulting Services for the Capital Projects Program Addendum No. 04

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

SCULPTURE WALK - HARBORPARK

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

SIGN PERMIT APPLICATION

Architectural Review Application

DESIGN REVIEW COMMITTEE AGENDA ITEM

PROCEDURE FOR PROCESSING WORKING DRAWINGS

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

APPLICATION FORM FOR INFRASTRUCTURE NOC

MnDOT Contract Exhibit A- Scope of Services. Project Information -

CHAPTER 2 SUBMITTAL AND REVIEW PROCEDURES TABLE OF CONTENTS

SECTION 2 GENERAL REQUIREMENTS

Working Drawing Manual

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Call for Clallam County Professional Artists Port Angeles Waterfront Design Team Artist Opportunity

Bestall Collaborative Limited Planning Environment Construction Management Development

BIM/VDC on TAA Projects:

TECHNICAL MEMORANDUM

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

SECTION 3 SUBMISSION REQUIREMENTS

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

Developer Design Review Submittal Requirements - SECTION 5

REGIONAL TRANSIT AUTHORITY RESOLUTION NO BACKGROUND AND COMMENTS. Agenda Item: No. 4. No. 7C-1

This Call for Qualifications does not require the preparation of a design proposal.

BAY MEADOWS SPECIFIC PLAN

Wireless Telecommunications Facilities Meeting. Neighborhood Leaders Meeting May 8, 2014

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

TAB B-9 RECORD DRAWINGS

Site Plan/Building Permit Review

I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Specification For. Asset Information Pr8701

Radiocommunication Facility Review Protocol

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

ADMINISTRATIVE DESIGN REVIEW Information

APPLICATION DESIGN REVIEW Please Print or Type

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

PUBLIC ART PROCUREMENT GUIDELINES

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

Working Drawing Procedure

MnDOT Contract Exhibit A - Scope of Services

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

Detail Design for State Project

CAB APPLICATION FOR MASTER SIGNAGE PLAN

Exhibit A Project Identification. Exhibit B Project Charter / Project Intent. Exhibit C Project Scope. Exhibit C Project Schedule

Checklist for Minor Plan Modification

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

SITE PLAN AMENDMENT POLICY 04/20/2016

INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION

Maintenance of Traffic sequence of operations including any phasing and detour maps;

PLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS

Design Deliverables. Summary. A. Expectations for Design Deliverables:

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

CONSTRUCTION PERMIT APPLICATION

TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

REQUEST FOR PROPOSAL

Checklist for Tentative Subdivision Map

CALL TO ARTISTS DC PUBLIC LIBRARY REQUEST FOR QUALIFICATIONS PUBLIC ART COMMISSION - VESTIBULE OF THE MLK LIBRARY

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations

SITE PLAN APPLICATION

SECTION SUBMITTAL PROCEDURES

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

Village of Glenview Appearance Commission

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

Merrick Pet Care New Distribution Center Hereford, Texas

Pismo Beach Public Art Program Outline

Section Meetings Section Material and Equipment. None Required

STANDARD PROCEDURE Number: S410.15

CALL TO ARTISTS DC PUBLIC LIBRARY REQUEST FOR QUALIFICATIONS PUBLIC ART COMMISSION - VESTIBULE OF THE MLK LIBRARY

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Electrical Overcurrent Studies

CITY OF LOS ANGELES CALIFORNIA

FIT-OUT PERMIT REQUEST (GENERAL WORKS)

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

ADDENDUM 1 and 2 September 29, 2017 Request for Proposals: Wi-Fi and Wireless Backhaul Replacement

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

Architectural Review Application New Application Processing Improvements

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

DOUGLAS COUNTY SUBDIVISION RESOLUTION Table of Contents 10/29/91 TABLE OF CONTENTS

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

1st Review of Submittal Materials for Willow Bend Development; CSP (Hansen #1734) Comment Responses

Village of Glenview Appearance Commission

Efficient Tactics of Project Management

Transcription:

THE PORT OF LOS ANGELES 425 S. Palos Verdes street Post Office Box 151 San Pedro, CA 90733-0151 TEL/TDD 310 SEA-PORT www.porloflosangeles.org Eric Garcelll Mayor, City of Los Ange,.s Board ol Harbor Ambassador Vilma s. MarHnez David Arian Commissioners President Vice President Eugene D. Seroka Executive Director Pohlcla Coslelanos Anthony Plrozzl, Jr. Edward R. Renwick DATE: August 26, 2016 SUBJECT: ADDENDUM #1 TO REQUEST FOR PROPOSALS (RFP) THE WILMINGTON WATERFRONT PEDESTRIAN BRIDGE The Port of Los Angeles' Wilmington Waterfront Pedestrian Bridge RFP is amended through this notification as described below: Page 6, Consultant Design Services for Element A, is amended to add the language in bold and shall read in its entirety as follows: Consultant shall develop an architectural and engineering vision and plan for the project as described above. Consultant shall design the bridge as a signature structure while also carefully integrating it into the surrounding development. The design items identified by the Harbor Department for this task include, but are not limited to, the following: (1) alignment of the pedestrian bridge and integration with the Wilmington Waterfront Promenade, (2) architectural design, (3) structural design, (4) geotechnical design, (5) civil design, (6) electrical design, (7) mechanical design, (8) landscape architecture design, (9) design of lighting, railing, and fencing integrated with the project, (10) design of furnishings that will accent the bridge as well as the Wilmington Waterfront Promenade, (11) provisions for public art, (12) design and coordination of communications infrastructure, including security, Wi-Fi, CA TV and/or CCTV, as required, (13) substructure research, (14) coordination with the design of the Wilmington Waterfront Promenade, (15) ground penetration radar (GPR) survey, (16) utility modification and relocation, including water and power, and~ (17) other related work. AN EQUAL EMPLOYMENT OPPORTUNITY - AFFIRMATIVE ACTION EMPLOYER P!lnted on recycled paper @

Page 7, Consultant Design Services for Element B, is amended to add the language in bold and shall read in its entirety as follows: Consultant shall develop an architectural and engineering vision and plan for the project as described above. The design items identified by the Harbor Department for this task include, but are not limited to, the following: (1) landscape architecture, (2) civil design, (3) structural design, (4) geotechnical design, (5) electrical design, (6) mechanical design, (7) design of lighting, (8) design of furnishings that will accent the Entry Plaza as well as the Wilmington Waterfront Pedestrian Bridge and Promenade, (9) emergency access and general parking, (10) provisions for public art, (11) design and coordination of communications infrastructure, including security, Wi-Fi, CA TV and/or CCTV, as required, (12) substructure research, (13) coordinate with City of Los Angeles Department of Water and Power (DWP) for the removal of the tanks, (14) coordinate with the California Public Utilities Commission (CPUC), (15) street vacations and realignments, (16) gateway feature design, (17) coordination with the design of the Wilmington Waterfront Promenade, (18) ground penetration radar (GPR), (19) utility modification and relocation, including water and power, and ft9t (20) other related work. Page 15, Task 3 Deliverables, bullet item one (1) and seven (7) are amended to add the language in bold and shall read in its entirety as follows: TASK 3 DELIVERABLES Two (2) Four (4) conceptual alternatives with one (1) being a refinement of the existing concepts; Preliminary project cost estimates; Design and construction schedule; Architectural exhibits/artist renderings for all concepts; Landscape, hardscape, material and site furnishing exhibits; Construction phasing ; Presentation boards identifying project site, proposed improvements and renderings for all alternatives; One (1) public presentation and minor and support f.or other and support for Port sponsored public meetings; Microsoft Power Point presentation for each concept alternative; and Draft and Final Conceptual Design Reports;

Pages 16 and 17, Task 4 Deliverables, is amended to add bullet item four (4) and fourteen (14) in bold and shall read in its entirety as follows: TASK 4 DELIVERABLES Preliminary architectural plans; Preliminary structural plans; Preliminary foundation plans; Preliminary civil plans; Preliminary site plan; Preliminary construction phasing plans; Preliminary mechanical plans; Preliminary irrigation plans; Preliminary landscape and hardscape plan; Preliminary site/area lighting plans; Preliminary electrical plans; Preliminary Wi-Fi and security plans; Preliminary signage; Preliminary utility plans; Preliminary construction cost estimate and quantity takeoff; Preliminary construction sequencing and schedule; Associated reports and analysis work, including basis of design report; GRP Survey Report; Preliminary of outline of specifications (in Speclink format); PowerPoint presentations, artist renderings, and presentations boards; ready to print PDFs and hard copies; Spreadsheet summarizing comments and responses on 40% submittal; and Five (5) CDs or USB flash drives containing electronic copies of all the Pages 18 and 19, Task 5 Deliverables, is amended to add bullet item four (4), five (5), six (6) and eleven (11) in bold and shall read in its entirety as follows: TASK 5 DELIVERABLES An 80% version of the following shall be provided to the Harbor Department at the end of this design phase, including: Architectural plans; Structural plans; Foundation plans; Civil plans;

Mechanical plans; Landscape and hardscape plans; Site plans; Construction phasing plans; Irrigation plans; Signage plans; Utility plans; Site/Area lighting; Electrical plans; Wi-Fi, security, CATV and CCTV design; Site Furnishing plans; Updated construction cost estimates; Updated construction schedule; Associated reports and analysis work; Calculations; Specifications (in Speclink); PowerPoint presentations, artist renderings, presentation boards; ready to print PDFs and hard copies; Spreadsheet summarizing and responses on 80% submittal; and Pages 19 and 20, Task 6 Deliverables, is amended to add bullet item four (4), five (5), fifteen (15), nineteen (19), and twenty (20) in bold and shall read in its entirety as follows: TASK 6 DELIVERABLES Final architectural plans; Final structural plans; Final foundations plans; Final civil plans; Final mechanical plans; Final site plans; Final construction phasing plan; Final landscape and hardscape plans; Final irrigation plans; Final signage plans; Final site/area lighting; Final electrical plans; Final Wi-Fi, security, CATV and CCTV design; Final site furnishing plans;

Final utility plans; Final specifications (in Speclink format); Final construction cost estimate and quantity takeoff; Final construction sequencing and schedule; Final reports and analysis work; Final calculations; All plan check approvals and permits from appropriate agencies; PowerPoint presentations, artist renderings, and presentation boards; Spreadsheet summarizing comments and responses on 100% submittal; ready to print PDFs and hard copies; and Pages 20 and 21, Task 7 Deliverables, is amended to add bullet item four (4), five (5), fifteen (15), and nineteen (19), and amend bullet items seventeen (17), eighteen (18), and twenty (20) to add language in bold and shall read in its entirety as follows: TASK 7 DELIVERABLES Signature submittal architectural plans (full size vellum, stamped and signed); Signature submittal structural plans (full size vellum, stamped and signed); Signature submittal foundation plans (full size vellum, stamped and signed); Signature submittal civil plans (full size vellum, stamped and signed); Signature submittal mechanical plans (full size vellum, stamped and signed); Signature submittal site plans (full size vellum, stamped and signed); Signature submittal construction phasing plan (full size vellum, stamped and signed; Signature submittal final landscape and hardscape plan (full size vellum, stamped and signed; Signature submittal irrigation plans (full size vellum, stamped and signed); Signature submittal signage plans (full size vellum, stamped and signed); Signature submittal site/area lighting (full size vellum, stamped and signed); Signature submittal electrical plans (full size vellum, stamped and signed); Signature submittal WiFi, security, CATV and CCTV plans (full size vellum, stamped and signed); Signature submittal site furnishing plans (full size vellum, stamped and signed); Signature submittal utility plans (full size vellum, stamped and signed); Signature submittal specs (in Speclink format), and an unbound original set; Final cost estimate construction cost and quantity takeoff;

Final schedule construction sequence and schedule; Final reports and analysis; Final quantities and calculations; All plan check approvals and permits from appropriate agencies; and Specs (in Speclink format) ; ready to print PDFs and hard copies; and Page 23, Task 14 Scope of Services, is amended to add the language in bold and shall read in its entirety as follows: TASK 14 -AS NEEDED ENGINEERING DESIGN SERVICES DESIGN WORKSHOPS AND PUBLIC OUTREACH: This work may include, but is not limited to, technical studies, analysis, conceptual and final designs, and other engineering services as directed by the Engineer. These optional tasks, including PS&E, may be awarded by the Board of Harbor Commissioners upon further definition of project elements. After written NTP, Consultant shall perform public outreach. Work shall include, but not be limited to: A. Conduct design workshops with the general public and affected tenants. It is anticipated that up to three workshops may be conducted based on the following: Initial kick-off workshop to solicit design for the specific waterfront project; Workshop to present design alternatives based on the feedback from the kick-off meeting; A public presentation on the preferred design. Work shall be performed in accordance with the Communication Protocol For Public Meetings as described in the LA Waterfront Implementation Guidelines (2010).

Page 23, Task 15 Scope of Services, is added and shall read in its entirety as follows: I TASK 15-AS - NEEDED ENGINEERING DESIGN SERVICES This work may include, but is not limited to, technical studies, analysis, conceptual and final designs, and other engineering services as directed by the Engineer. These optional tasks, including PS&E, may be awarded by the Board of Harbor Commissioners upon further definition of project elements. Attachment- 1, Task 14 is amended to add the language in bold and shall read in its entirety as follows: TASK 14 -AS NEEDED ENGINEERING DESIGN SERVICES DESIGN WORKSHOPS AND PUBLIC OUTREACH: Lump Sum $ Task 44 14 Sub-Total $ Attachment - 1, Task 15, is added and shall read in its entirety as follows: I TASK 15-AS - NEEDED ENGINEERING DESIGN SERVICES Not to Exceed $ Task 15 Sub-Total $ Sincerely, S» 4-.. ~ ~ CJ'\ Tricia J. Carey Director, Contracts and Purchasing Division