FITTING INSTRUCTIONS FOR THE NOVA LIFT TM FIRST, PLEASE READ THESE INSTRUCTIONS CAREFULLY!

Similar documents
MODEL 83 Pail Handler

SERIES M MIXER MASTS

Installation and Assembly: Articulating Swivel Arm for 37" - 60" Flat Panel Displays

OPERATORS MANUAL WEEKENDER STEEL LADDER RACK

PATRIOT DOCKS ASSEMBLY INSTRUCTIONS

Electric Skein Winder

Ford Pick Up Rear leaf Spring Kit Installation Instructions

Hardware and Components:

WARNING. Read and become familiar with this manual BEFORE operating unit.

INSTALLATION INSTRUCTIONS

Models 2230 and 2240

Shrinker and stretcher

M ACS Instructions

Hardware and Components:

Tilting, Swiveling & Rotating Flat Panel Wall Mount

Installation Manual Roof Zone Ladder Rack

installation guide 1 GUIDE#: PWB-wwpontoon-pol-004

Installation Procedures For 2013 Mustang V-6 and 5.0

25-A Shawnee Way Bozeman, MT Fed ID PH FAX

Installation Procedures For Corvette Basic/C-6 SNS 28

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

FSCTD Dual Back to Back Flat Screen Ceiling Mount

INSTRUCTION SHEET. PIECE INVENTORY - MOBILE BASES Refer to the diagram for part identification.

Save time! Read the entire manual before beginning Hoister installation.

Hollywood Swing Away 2 and 4 Bike Racks Assembly and Installation Guide

INSTALLATION INSTRUCTIONS

MANUAL METAL SHRINKER/STRETCHER

Installation Procedures Maserati Gran Turismo Sport SNS 85

GroundControl. Follow instructions contained in this manual. Incorrect installation could result in serious injury or damage to property.

Welded screw eye HCP1443. (G1) Cleat 7757ASSY. (G1) Cleat 7753ASSY. Webbing straps with buckles HCP1459.SET (G1) Cleat 7754ASSY DO NOT UNTIE

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Models 2030 and 2040

Solar Panel Top-of-Pole Mounting Kit For Panels Over 100 Watts Including CMP Panels

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Tilting & Swiveling Plasma/LCD Flat Panel Wall Mount Installation Guide Model: A380SM

Tilting Flat Panel Wall Mount Installation Guide

INSTALLATION INSTRUCTIONS

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

Check us out on-line! Installation Instructions

Welded screw eye HCP ASSY 7753ASSY. Webbing straps with buckles HCP1459.SET (G1) Cleat 7754ASSY DO NOT UNTIE

Welded screw eye HCP1443. D Pulleys. Webbing straps with buckles HCP1459.SET DO NOT UNTIE. Single black/red hoisting rope HCP1483**

6-CYLINDER TORNADO LIFT INSTALLATION MANUAL

Required and optional* components/fastener torque spec

Flat Panel Stand FPZ-655. for 32" to 55" Flat Panel Screens FEATURES. Reinforced universal adapter plate for a strong hold

IMPORTANT SAFETY INFORMATION. KIT INCLUDES A 1 welded screw eye B 4 pigtail lag screws C 1 shackle

Save time! Read the entire manual before beginning Hoister installation.

OWNER'S MANUAL. Please Do Not Return This Product To The Store!

00108/00110 INSTRUCTION MANUAL

25000 Series Lo-T TM Butterfly Control Valve Instructions

ASSEMBLY AND OPERATING INSTRUCTIONS FOR MODELS SD1200 AND SD2000

INSTALLATION INSTRUCTIONS

BY ALIEN TECHNOLOGIES CORP

Stand Aid User Manual REF: 1914

Installation Procedures 2018 Mustang GT & EcoBoost SNS 135

Installation Procedures 2015 Roush Mustang Stage 1 & 2. SNS 62b

Installation Procedures Dodge Challenger SXT, R/T, Scat Pak, SRT & Hellcat SNS 1a

!ATTENTION: READ BEFORE ASSEMBLING/OPERATING! ASSEMBLY & PACKING INSTRUCTIONS FOR THE MULTICHAIR 4000tx

Installation for Full Size Polaris Ranger Crew Doors

Instruction Sheet D-CPU. Secure CPU Holder

Installation Instructions Hard Top Part # , Wrangler 2 & 4 Door

pneumatic c-ring tool

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

Sea Doo Spark Engine Access Kit

RIPPER PEDAL. Bearing / Axle Replacement. ( Disassembly )

User Manual. Where Imagination Meets Innovation. FRESH AERO Easy Seat Tool For Grumman AA1 & AA5 Series Aircraft

Installation Procedures Jaguar XF SNS 92

Installation Procedures Dodge Charger R/T Scat Pak, SRT/Hellcat. SNS 66a

MODEL T28000 HEAVY-DUTY MOBILE BASE INSTRUCTIONS

Models 2130 and 2140

Models 2130 and 2140

Save time! Read the entire manual before beginning Hoister installation.

installation guide 1 GUIDE#: pwb-assault-001

- INSTALLATION INSTRUCTIONS -

SAFETY INSTRUCTIONS. WARNINGS Always read tool manual before operating.

INSTALLATION INSTRUCTIONS

Installation Instructions TrekStep Side Mount

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

ASPEN OUTDOOR TABLE TENNIS

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

20 Ton HYDRAULIC SHOP PRESS

Installation Instructions:

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set #

COMPETITOR CB-610 STANDARD BENCH

Due to possible damage in shipping, the vertical stop assembly has been removed from this machine.

FP-4855 Flat Panel Television Stand ASSEMBLY INSTRUCTIONS

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

1-CYLINDER TORNADO LIFT INSTALLATION MANUAL

BEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches

INSTALLATION INSTRUCTIONS Y-Connector Accessory (For Multi-Dual Arm Mounting Systems) Model: KSA-1011

COMPETITOR WM-203 COMBO BENCH

Loading Dock Safety Gate

9 QUICK RELEASE WOODWORKING VISE

Parts list Instruction guide Warnings Please read carefully before assembling and using product.

INSTALLATION INSTRUCTIONS Small Flat Panel Height-Adjustable, Extended Pitch Swing Arm Wall Mount Model KWE-110

Please read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.

Please Do Not Return This Product To The Store!

WEAR SAFETY GLASSES WHEN INSTALLING THIS KIT.

Please Do Not Return This Product To The Store!

Transcription:

Forespar Products Corp. 22322 Gilberto Rancho Santa Margarita, CA 92688 Phone 949-858-8820 Fax 949-858-0505 Email sales at forespar.com www.forespar.com FITTING INSTRUCTIONS FOR THE NOVA LIFT TM FIRST, PLEASE READ THESE INSTRUCTIONS CAREFULLY! Picking the best location for your NOVA LIFT TM Location is everything when it comes to positioning your NOVA LIFT TM. The correct positioning will give you the greatest benefit from NOVA LIFT TM and allow it to operate smoothly and reliably with freedom from snags. Assessing your existing stern rail Very important! You should carefully inspect your rails for secure mounting to the vessel, and their overall strength and suitability to stabilize NOVA LIFT TM. Obviously, rails that rock about, move or distort when leaned on are not suitable and would require appropriate attention. Please pay particular attention to the base fittings of your rails. If you have the push in type socket you must be very sure your rails are securely fastened within these sockets. Replace the set screws or through bolt if necessary. Rail faults must be repaired for safety. 1. The best mounting position is inboard of the stern rail and generally close to a corner on your vessel s rails where the greatest stability can be gained. 2. For best reach outboard, you should be on the side portion of the stern rail and in a position that when your outboard is lifted and swung inboard it can be lowered directly onto its rail mounting pad. 3. You should also note that the load line which exits the mount tube six inches from the deck should have a clear run to the chosen cockpit winch. 021106 02.07.04 The turning radius of NOVA LIFT TM the reach of the arm is 20 1

FITTING THE NOVA LIFT TM RAIL CLAMP Mount Tube Portion TOP VIEW SIDE VIEW STERN RAIL VERTICAL Your NOVA LIFT TM comes with a stern rail clamp assembled on the mount tube. Hold the unit against your rail to sight its intended location. This clamp has two basic components, one the mount tube portion and the other is the rail tube portion. The rail tube portion must be disassembled so the stainless steel strap can be placed on the stern rail as shown in diagram 1. Please note the order in which the clamp is assembled. Note that the white plastic spacer components can allow rotation for mounting on rails at various angles. Once the location for installing your NOVA LIFT TM has been carefully established, assemble the stern rail clamp onto the rail. Do not fully tighten the bolt at this point to allow for adjustment. NOVA LIFT TM MOUNT White Plastic Spacer Stainless Steel Strap Rail Tube Portion DIAGRAM 1 Bolt the two part of the deck socket assembly together with the 3/8-16 X 1 bolt and nylock nut. Do not fully tighten. Slip the deck socket onto the base of the mount tube and rotate the deck socket assembly unit until it suits the deck angle when the mount tube is in its correct perpendicular position. The mount tube can be twisted at this stage to align the line outlet sheave with the chosen cockpit winch. At this point the entire assembly will be positioned correctly and hanging loosely on you stern rail. Now is the time to stand back and assess proper positioning. Q: Will the load line have a clear run to the winch? A simple rail mounted turning block can be used here to facilitate line run. Q: Will the arm swing the outboard motor to its rail storage position? Q: Is the mount tube assembly positioned as perpendicular as possible? Q: Is the deck socket twisted to correctly accommodate deck angle? The deck socket assembly must sit squarely on the deck surface to bear the load. 2

FITTING THE NOVA LIFT TM You can now drill the holes into or through the deck. Use either (3) #14 X 1-1/4 long stainless steel screws or stainless steel through bolts with large backing washers and nylock nuts. These fasteners are not provided. NOTE: The deck socket plate must be completely secure as it will come under a lot of load both downward and sideways. When the deck socket assembly is secure, push down on the top of the mount tube to inure that it is seated in the deck socket. When you are sure the mount tube is seated, and the outlet sheave is aligned with the cockpit winch, drill the holes in the mount tube through the side of the deck socket and secure the mount tube using the (2) 5/32 rivets provided. Drilling the stainless steel mount tube is easy if you do the following: Use a new, good quality, 5/32 drill bit. A slow drilling speed and plenty of continuous pressure is important. If insufficient pressure is used, the metal surface will harden and become almost impossible to drill. Ease up on the pressure as you feel it going through the tube wall. Keep cooling lubricant such as a light cutting oil or kerosene on the drill bit as necessary. You can now tighten the bolts in the rail clamp to keep your NOVA LIFT TM from sliding when the load is swung around parallel to the rail. Keep an eye on this as it may need to be retightened from time to time. Never let the clamp slip back and forth on the rail, as it can severely load and damage the deck socket assembly. When the rail clamp is secure, place the lift arm into the mount tube. Make sure it passes through the bottom bushings and comes to rest on its base bearing. It will make a metallic clunk when it is properly seated. You will probably feel it bump past the lower bushing before it reaches its correct position. It is important to always install the lift arm completely into the mount tube before reeving the load line Tie one end of the load line onto the shackle at the head of the lift arm and reeve the swivel block and hook onto the line. Now reeve the load line over the sheave in the lift arm head. Your NOVA LIFT TM is designed internally to always automatically direct the load line to the outlet sheave, so just keep feeding the load line into the lift arm head until its end comes out of the outlet. The line can now be taken to your winch and is ready to use. This method facilitates easy installation and removal of the lift arm when required or desired - it should only take around 20 seconds. It does, however, take a bit of time to get the hang of it. UNIT WEIGHTS AND CAPACITIES STATIC TESTS USING DILLAN FORCE GAUGE NOVA LIFT TM Full Unit Weight Lift Arm with Block Weight Safe MAX Working Load Maximum Load at Distortion Full Collapse of Lift Arm 16 Lbs. 9.5 lbs. 220 lbs. 420 lbs. 480 lbs. 3

IMPORTANT SAFETY INFORMATION FOR THE NOVA LIFT TM SKIPPERS: PLEASE READ THIS SAFETY INFORMATION THOROUGHLY! The skipper must make sure all crew members operating NOVA LIFT TM have been instructed in the safe use of this device, and are competent to perform the pre-use safety check. As heavy and potentially dangerous loads are lifted by NOVA LIFT TM, it is important that the skipper frequently inspect the unit for secure mounting. The vessel s existing railings which form the main support for the NOVA LIFT TM should also be frequently checked with particular attention being paid to the rail s bases. It should be understood that NOVA LIFT TM exerts side loads on the vessel s supporting rails equivalent to 50% of the load being lifted. NOTE: If the existing rails have the push in socket style bases, special attention must be paid to them. Be very sure that your rails are well secured within these base sockets. Replace set screws or through bolt as necessary. DO NOT USE NOVA LIFT TM UNTIL THESE MODIFICATIONS HAVE BEEN PERFORMED. DO NOT EXCEED THE STATED LOAD CAPACITY OF THE UNIT. Forces on the NOVA LIFT TM and the supporting rails are greatly increased by shock loads resulting from bouncing the load particularly in a rolling sea condition. Pay attention to maintaining the load in a controlled lifting state, and constrain the load from swinging about freely. NOVA LIFT TM is designed for vertical lifting only! DO NOT attempt to drag in objects for lifting that are not directly below the lift arm. This would greatly increase the load on the NOVA LIFT TM and the vessel s rails. Only crew members competent in the use of and regular and self-tailing winches should be allowed to operate NOVA LIFT TM. REMEMBER: Operate this device with the same care and caution one should use when hoisting a man aloft. 4

CHECK LIST FOR SAFE OPERATION OF THE NOVA LIFT TM 1. Frequently check the load line for chafe and for secure fastening to the shackle on the head of the lift arm. All blocks, sheaves and pins should be inspected for wear periodically and replaced prior to further use if seen to be worn. Severe and rapid line chafe will occur if the sheaves wear and become misaligned. Washing the entire unit out with fresh water and keeping sand form entering the bearings is important to the life of the unit. 2. Never allow or cause a crew member to be in a position beneath a lifted load. 3. Prior to lifting an outboard motor from a dinghy transom, be sure the motors clamping screws are fully unscrewed and that their metal clamping disks will clear the transom completely. 4. Never leave a load hanging from your NOVA LIFT TM. 5. When a load is in the fully lifted position prior to the arm being swung inboard, it advisable to cleat the load line rather than relying entirely on the self-tailing part of the winch. We believe that NOVA LIFT TM is a quality product and we want you, the customer, to be completely satisfied. If you feel for any reason that NOVA LIFT TM will not perform the tasks that you require of it, or if you are unhappy with it in any way, on return of the unit we will refund your purchase price up to sixty (60) days from date of purchase. We will happily repair or replace this product within one year of purchase date if any fault or problem occurs due to manufacture. Forespar Products Corp. shall in no event be liable for any damages or injuries of any kind resulting from neglect or otherwise use of NOVA LIFT TM. 5

LIMITED WARRANTY FOR NOVA LIFT TM We are proud of NOVA LIFT TM and the benefits it brings to yachtsman and we want you, the purchaser, to be completely satisfied with your new NOVA LIFT TM. If you are not completely satisfied with the quality or performance of NOVA LIFT TM we will gladly repair or replace it within one year for the original purchaser. Forespar Products Corp. 22322 Gilberto Rancho Santa Margarita, CA 92688 THE FOREGOING WARRANTY IS IN LIEU OF ALL OTHER EXPRESS WARRANTIES, AND NO PERSON (INCLUDING ANY AGENT, DEALER OR REPRESENTATIVE OF FORESPAR PRODUCTS CORPORATION) IS AUTHORIZED TO MAKE ANY REPRESENTATION OR WARRANTY CONCERNING THIS PRODUCT, EXCEPT TO REFER PURCHASERS TO THIS WARRANTY. ANY IMPLIED WARRANTIES (INCLUDING, WITH- OUT LIMITATION, ANY IMPLIED WARRANTIES OF MERCHANTABIL- ITY OR FITNESS FOR PARTICULAR PURPOSE) ARE LIMITED TO THE DURATION OF THIS WRITTEN WARRANTY. SOME STATES DO NOT ALLOW THIS LIMITATION SO THIS LIMITATION MAY NOT APPLY TO YOU. YOUR EXCLUSIVE REMEDY WITH RESPECT TO ANY AND ALL LOSSES OR DAMAGES RESULTING FROM ANY CAUSE WHATSO- EVER EVER SHALL BE AS SPECIFIED ABOVE. WE SHALL IN NO EVENT BE LIABLE FOR ANY CONSEQUENTIAL OR INCIDENTAL DAM- AGE OF ANY KIND, HOWEVER OCCASIONED, WHETHER BY NEGLI- GENCE OR OTHERWISE. SOME STATES DO NOT ALLOW THE EX- CLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAM- AGES SO THIS LIMITATION MAY NOT APPLY TO YOU. THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE. 6

FITTING THE NOVA LIFT TM WINCH RAIL CLAMP When installing the winch on your NOVA LIFT TM (power boat option), it is critical that the winch mounting plate be installed with the stainless steel saddle BELOW the winch plate clamp as shown in Diagram 2. As the load is applied to the line on the winch, the stainless steel saddle below the winch provides the necessary support. If this assembly is installed on your NOVA LIFT TM upside down (with the stainless steel saddle above the winch), the winch plate clamp will fail. This failure could result in property damage and bodily injury. Study Diagram 2 to ensure that you install the winch correctly. SIDE VIEW DIAGRAM 2 NOVA LIFT TM MOUNT STERN RAIL VERTICAL Winch Plate Clamp Stainless Steel Strap DOWN FORCE LOAD PATH Stainless Steel Saddle 7