RECOMMENDED METHOD OF INSTALLATION

Similar documents
SUPA-LOCK TILE. BS EN to 9.24mm +/- 0.15mm BS EN / En Wear Group T (<0.1mm /100 revs)

Install your floor between 18 and 30 C.

INSTALLATION INSTRUCTIONS FOR ELKALAMINATE. IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS CAREFULLY.

Laying and maintenance of cement tiles

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE

Installation Instructions

For ANGLE-DROP Styles

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE.

Loose Lay Luxury Vinyl Plank

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

HOW TO TILE A SPLASHBACK

Columbia Laminate Installation Instructions

Industry Trend. Ceramic Tile And Stone Consultants (CTaSC) provides ceramic tile research and marketing services.

TORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

MATERIALS FORMAT CODE NOTES

AquaGuard - Water Resistant Flooring Installation guidelines

Step-by-step Installation Guide

General Installation Instructions

INSTALLATION GUIDE DUOFUSE SLAT WALL SYSTEM

The Laneway collection contains 15 authentic timber designs, hand selected for you by a team of experts in Interior Design. Each plank feature knot

INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes

Kraus Engineered Luxury Vinyl Plank 5G Insta-Loc Click Installation Instructions

TILING GUIDE. What you need: Tiles - Pliers and standard screwdriver

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

Wilkhahn. Care & Maintenance

Step-by-step Installation Guide

Alterna Grouting Tiles & Planks

English Professional Installation Guidelines

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

MAINTENANCE OF MIKASA FLOORS

Laying instructions Installation of multilayer Herringbone / Basket-weave with tongue and groove joint.

C O M P A N Y C O M P A N Y

For best results, it is essential that you follow the installation instructions exactly.

Vinyl is an extremely durable material that is not affected by water, and that requires little maintenance. Our wide planks

Installation Instructions

installation guide TASMANIAN HARDWOOD OVERLAY FLOORING

Exterra Installation Guide

SlipGrip Data Sheet & Installation Guide

QWALL 5.2 (2 Back Panels)

NOTE: This product can be used externally if UV Guard is added (BY REQUEST ONLY).

Conversion, Application and Maintenance of the Avery Dennison Floor Marking System Instructional Bulletin #6.30

I N S TA L L AT I O N & M A I N T E N A N C E G U I D E

Esthec. Terrace. Manual for Assembly and Installation

maintenance guide For more details about Blanchon products and the maintenance of wood floors, please contact your specialist.

EDGE SERIES PAD INFORMATION

APPLICATION OF JAC FILMS

Magnetpaint & Sketchpaint

How to operate (folding)

FLOORING CLEANING/CARE RENOVATION

Basic Assembly For Conventional Series 9000 Structural Panels

Repairs. Chapter 10 Repairs 10. 1

Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE

Hinge Door + Side Panel

Galaxy SPC RIGID-CORE UNICLIC HYBRID PLANK. Installation Guidelines

EASY APPLICATION. Furniture Linoleum

LUXURY VINYL FLOORING INSTALL INSTRUCTIONS

APPLICATION INSTRUCTIONS

Radon 07 Installation Instructions & Parts List

Curium 19H Installation Instructions & Parts List

Required Tools. Installation of Hook Plates & Discs. Professional Installation Guidelines for Engineered Wood & Hardwood with LocPlate Products

GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

Dubnium 11 Installation Instructions & Parts List

INSTALLATION INSTRUCTIONS

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Arla WOODEN CARE GUIDE BY DIRECT OUTDOOR LIVING

WETFLOR INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS

TONGUE & GROOVE NAIL-DOWN INSTALLATION INSTRUCTIONS

Zenterra TM Installation Guide

INSTALLATION GUIDE.

Sketchpaint. Ideal for turning any smooth surface into a whiteboard. Ready to use in 5 days

How to repair a wall or ceiling FREE

VITREO X SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

WEAR SAFETY GLASSES WHEN INSTALLING THIS KIT.

6400, 8400 and 9400 Series Sliding Patio Door

Curium 19.4H Installation Instructions & Parts List

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

15mm Solid European Droploc Oak Fitting Guide & Warranty Information

Contemporary 3 Panel Classic 5 Panel French Panel

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

INSTALLATION MANUAL STORAGE

INSTALLATION INSTRUCTIONS

General Installation Instructions. Laminate Drop & Lock installation - 2G

Mold Release, Break-In, Maintenance and Storage. Linda Bergstrom

Gallium 03 Installation Instructions & Parts List

INSTALLATION INSTRUCTIONS

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE

Installation Guide. Aspect Stone Peel & Stick Tile. proper surface preparation is essential for a successful project. Installations Methods

Installation Instructions

Compare SWISSTRAX with any other tile on the market and you should notice:

Frameless Bypass Slider

1 SELECT suitable material. It takes time to cut a cab. Don t waste it on rubbish.

Please read through the entire document before starting your installation process to better understand what is required.

Hinge Door + One Inline Panel

Installation Site Preparation - Site Preparation

INSTRUCTION MANUAL ASTRID SOFA TABLE ITEM CODE: 13AST10SC

All aspects of the installation of maia are also covered in a DVD that is available to view on-line at

Grand Garden Chalet 6X3 Assembly Manual

Transcription:

Installation Guide RECOMMENDED METHOD OF INSTALLATION: These notes have been prepared as a guide only, the information is supplied in good faith but without guarantee as site conditions vary and are beyond our control. 1. POINTS TO CONSIDER BEFORE YOU START YOUR INSTALLTION: LOOSE LAY OR GLUE? R-Tile can be installed over any hard surface and in most situations will not require gluing. We recommended gluing the tiles in the following situations. DIRECT SUNLIGHT It is advisable to glue the tiles in areas subject to direct sunlight such as glass fronted entrance foyers, shop fronts, south facing loading bay doors etc. It is possible that the tiles in direct sunlight will get very hot and expand at a faster and higher rate than the remainder of the floor. HEAVY TRUCKS AND/OR TIGHT TURNING CIRCLES Certain fork lift and pallet truck designs can cause a problem, heavy trucks with small wheels, especially electric trucks where the battery is located over the main drive wheel. If you use this type of vehicle we strongly advise you to test the tiles with the trucks before making a decision on which thickness to use. EXTERNAL HEAT SOURCES / CATALTIC CONVERTERS Ovens, furnaces and catalytic converters can make the floor extremely hot and may cause the tiles to expand. To avoid this problem, glue the tiles in the area in front of the oven or where the catalytic converter will sit when the car is parked. STAINING / DISCOLOURING STAINING FROM RUBBER TYRES It is possible that certain rubber tyres and wheels may stain the tile, this is a result of a chemical reaction that occurs between the anti oxidant that is used in some rubbers and the plasticizer used in vinyl. The reaction is brown in colour so is less visible in certain colours of the tile (dark grey, terracotta and black). R-Tile recommends that if your application is susceptible to staining from tyres, hair dyes and other harsh chemicals, to consider the application of our anticolour/anti-stain two-part solvent free waterborne polyurethane sealer. We recommend using Dr Schultz products. UV STABILITY R-Tile is not recommended for external use and the colours are not UV stable. BATCH CONTROL We are unable to guarantee 100% colour consistency between individual production batches. Each individual order will be supplied from a single batch but in the event, that you need additional tiles or wish to extend the area we cannot guarantee subsequent orders will be supplied from the same batch.

2. TOOLS AND EQUIPMENT: All you need is a non-marking rubber mallet or engineering hammer, chalk line or another method of keeping the tiles square and a way to cut the tiles. R-Tile can be cut using several methods, a lot will depend on personal preference, experience and the tolls you have on hand but we recommend the following: Magnum shear / guillotine Stanley / utility knife with a concave blade Always use a straight edge and wear cut proof gloves Electric jig saw with a medium or rough wood blade Table saw or band saw with a medium or rough wood blade. Guillotine Electric Jigsaw Stanley knife with conclave blade 3. INSTALLATION: KEY SUMMARY Let the tiles acclimatise, the minimum recommended installation temperature is 15 C. Split the pallet and spread the tiles across the floor prior to starting installation. Start from the centre and create your square using a chalk line or laser line. Don t force the tiles, offer up the corner of the tile and gently hammer the joints together. Allow the floor to settle before measuring and cutting up against walls and fixed points. Leave a minimum of 5mm gap between the tiles and any fixed point. Create a template for difficult/complicated cuts.

STEP 1 TEMPERATURE ALLOW THE TILES TO ACCLIMATISE Installation should not take place at temperatures below 15 C. Do not try and install the tiles straight after delivery, the tiles must be allowed to acclimatise to the ambient room temperature prior to installation. We recommend you allow 24 hours but this will be dependent on temperature, the warmer it is the quicker the tiles will acclimatise. If time is short we recommend you breakdown the pallet of tiles into small packs to help them acclimatise and settle. If installation has to take place at a temperature below 15 C leave a larger expansion gap between the tiles and any fixed point and/or incorporate an expansion gap every 8 to 10 meters. STEP 2 PREPARATION Sweep or vacuum the floor to remove any loose impediments. Remove any high points in the floor. Fill any holes with a rapid setting floor repair compound such as Ardurapid A46 or similar. For uneven surfaces that require smoothing use a soothing compound such as Ardex Feather Finish. STEP 3 SETTING OUT Setting out/the starting point is different for the open join and hidden join tiles. Important: It is essential for both that the tiles are kept square to each other at all times. We strongly recommend that you use a chalk line; laser line or carpenters square to set out the site and ensure you keep the tiles right angled to each other. STEP 4 INSTALLATION METHOD Once you have identified your starting point and created your straight lines, it s time to start fitting the tiles. Our first recommendation is to lay the tiles out on the floor; this will allow them to settle. Next, connect the tiles together by offering up the tile and lining up the corner, ensuring the joints are in line. Starting from the corner, use a rubber mallet to gently tap the joints together. Hint R-Tile installations are as simple as putting together a jigsaw puzzle, if the joints don t fit together without you having to force them, chances are you are doing something wrong. The first sign of trouble will always be if the tiles do not connect together with a simple tap of the hammer, this will indicate that the tiles are not lined correctly.

HERE TO START: The starting point for the open joint tiles should always be as close to the centre of the room as possible. The hidden joint tile should start from one corner of the room. INSTALLATION INSTRUCTIONS FOR R-TILE OPEN JOIN TILES: 1. Start from as close to the centre of the room as possible. 2. Use a chalk or laser to create lines A-A and B-B. Make sure these lines are at right angles. 3. Using the rubber mallet, tap the line together, starting at the corner of the tile & working your way outwards towards the edge of the tile. 4. Work out in a circular pattern filling in the corners. 5. Once all full tiles have been installed allow the floor to settle before measuring and fitting finishing cuts. 6. Ensure that you allow at least 5mm expansion gap between the tiles and any fixed point. INSTALLATION INSTRUCTIONS FOR R-TILE HIDDEN JOINT TILES 1. Carefully measure 20cms out at each end of wall and use a chalk or laser to create lines A-A & B-B. Make sure the lines are at 90 degrees to each other. 2. Lay the tiles with the hidden join to the walls and the exposed joins on the left. Very important lay the first few rows perfectly straight, any mistake will impact the entire installation. 3. Lay the tiles from right to left always placing the hidden edge on top of the exposed. Line up the tabs at the corner to help align tiles. Install one row at a time, completing each row before beginning the next. 4. Cut in perimeter tiles allowing at least a 5mm expansion gap between the tile and any fixed point.

ESD INSTALLATION ESD contains stainless steel fibres that may be visible on the surface of the tile. This is unavoidable and a fundamental part of the manufacturing process that ensures optimum ESD performance. Please check the tiles, if the marking is unacceptable do not continue with installation as we will not accept responsibility to replace or refund the cost of any goods after 10m² or more have been installed. To achieve a fully ESD flooring the tiles need to be grounded. This is achieved by laying a grid of black conductive tape under the dove tail joints of two tiles so that it is in contact with every tile in one direction and 5m centres in the opposite direction (see Picture). One grounding point is needed for every 60 to 80m² of R-Tile ESD and / or one grounding point for each separate section / room of R-TILE ESD installed. Place the grounding point in the corners of the room or along the wall to avoid creating a trip hazard.

4. FITTING AND FINISHING FOR THE PERFECT FINISH: Leave a minimum of a 5mm gap between the tiles and any fixed point (walls and machinery). Cover the 5mm expansion gap between the tiles and the walls with skirting profiles. Undercut wood doorjambs and slip the tiles underneath. With metal doorjambs cut the flooring material to within 5mm and then chalk around the jamb. Use R-Tile ramp and corner sections to create a mat area or provide safe access to wheeled traffic. The tiles may require gluing if they will be in direct sunlight. To keep your floor looking good give it a sweep on a regular basis and use a rotary scrubber dryer for routine maintenance. 5. HOW TO MAINTAIN YOUR R-TEK FLOOR: To keep your floor looking pristine it is important to put a simple cleaning and maintenance programme into place. This cleaning regime will depend on the usage that your floor will experience. It can be broken down into 3 different categories. 1. Protection As with any flooring product one of the first ways to protect the floor is to have a large entrance mat installed. This will prevent the majority of dirt, gravel and moisture spreading onto the floor. This mat should be cleaned or replaced at regular intervals. 2. Initial clean After the floor has been installed it needs to be thoroughly brushed or vacuumed to ensure that any dirt and residues are removed that might have occurred during the installation process. We would then recommend applying Evans Vanodine Highclass Neutral Cleaner but if this cannot be found a vinyl floor cleaner [available in most DIY stores] can be used. After allowing the cleaner to stand for 10-15 minutes, scrub the floor using a floor scrubber/polisher fitted with green pad. Then rinse the floor with warm clean water until all traces of dirt and floor cleaner have been removed. 3. Surface protection with polish It is not necessary to polish the tiles however this is down to customer choice. We recommend Evans Vanodine Enhance Polish, however any vinyl floor polish which can be bought in DIY stores can also be used.

4. The polish should be applied after the initial cleaning. Two three coats should be applied evenly to the dry floor with a mop. Between applications wait for the previous film to dry until firm enough to walk on. All coats should be applied on the same day. ON-GOING MAINTENANCE NON POLISHED FLOOR: SPRAY CLEANING AND BURNISHING: This is an ideal system for cleaning and maintaining light to medium soiled floors using a high speed floor machine/scrubber dryer. This method will improve gloss durability and slip retardancy. a. Sweep floor b. Add Evans Vanodine Highclass Neutral Cleaner or similar neutral detergent at the recommended dilution c. Burnish using scrubber dryer machine with proprietary red pad or similar brush head. For spot cleaning spray a fine mist onto the floor approximately 1m in front of the machine and burnish floor to obtain required finish MOP & DRY BURNISH: This system is better suited to heavily soiled floors and heavy traffic areas. Mopping to remove the soiling before burnishing ensures the soil does not act as an abrasive and contribute towards reducing the performance of the floor polish. a. Sweep floor b. Add Evans Vanodine Highclass Neutral Cleaner or similar neutral detergent to bucket of warm water at recommended dilution c. Damp mop floor with solution to remove soiling. Allow to dry. d. Affix suitable pad to floor machine e. Dry burnish to remove scuff marks and develop the surface finish ON-GOING MAINTENANCE - POLISHED FLOOR: Depending on the level of use and usage conditions, the sealer film should be checked at regular intervals for signs of wear and tear and a renewed sealer operation performed if required. For this purpose, after thoroughly removing dirt and other residues, apply sealer to the dry floor. It is possible to carry out repair and renewal of partial areas.