FORMWALL Ceiling Plank / Board Installation Guide

Similar documents
Fitting Guide For Altro P250 PVCu Ceiling Boards (Direct Fixing Method)

Fitting Guide For Altro P250 PVCu Ceiling Boards (Suspended Ceiling System)

Method of Build 1. General

Brick, blockwork and concrete walls are also suitable providing the surfaces are flush without excessively wide mortar joints.

Dubnium 11 Installation Instructions & Parts List

Linda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Method of Build 1. Fire. Sound

Radon 07 Installation Instructions & Parts List

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

Curium 19.4H Installation Instructions & Parts List

INSTALLATION MANUAL STORAGE

CLASSIC RANGE PLUS RANGE PHOTO WALL. Pre-installation check-list

Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE

Gallium 03 Installation Instructions & Parts List

Xenon 05 Installation Instructions & Parts List

WET AREA PANELLING. Designer Walls. Fast

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height

Installation guide. Step-by-step instructions

Curium 19H Installation Instructions & Parts List

Wet Area Panelling. Linear Series

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

Installation Instructions

modular/panel-built sauna kit

Hinge Door + Side Panel

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

Metro Series Sauna. installation instructions

Cabonyx Installation Manual

INSTALLATION MANUAL STOREFRONT DOORS

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Liniar Window. installation guide

Argon 02 Installation Instructions & Parts List

CLASSIC RANGE PLUS RANGE CREATE RANGE - PHOTO WALL

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT

Dura-Lock Roof System

Installation Instructions. This leaflet must be read thoroughly before commencing installation. 1 P a g e. Version 2.

Solutions. Installation Instructions. Ref Description Illustration Qty. A Shower Tray* mm Radius Curved Panel* Universal. Curved Quad Panel*

Wilks and Dek-King are registered trade marks of Wilks (Rubber Plastics) Mfgs Co Ltd.

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

modular/panel-built sauna kit

PVCu FOLD & SLIDE DOOR OUTWARD OPENING

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Vinyl Windows Manufactured by VPI Quality Windows

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Panel Installation Instructions

EASY INSTALLATION GUIDE WPC DECKING.

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

multipanel Installation (panels) CONTENTS

TECHNICAL FILE FOR THE STIRLING ENGINE

Panel Installation Instructions

Hinge Door + One Inline Panel

Panel Riser Kit Option 1. Installation Instructions 226BEE 0117CH

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

PATIO INSTALLATION MANUAL

Side Light Frame Pack Assembly Instructions

Steel Sound Enclosure

Hinge Door + Inline Panel + Return Panel

Side Light Frame Pack Assembly Instructions

Installation Guidelines

WoodWORKS Channeled Plank

Before you Begin... 3 Storage and preparation... 3 Tools & Materials You may Need... 4

Mermaid Laminate Installation Guide

Tools for Plumbing. Introduction

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun

The Leka System Installation Guide

Acrylic Claw Foot Tub

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

INSTALLATION INSTRUCTIONS

Storing, Handling, and Cleaning dekō Markerboards Storing Markerboards. Handling. Cleaning

The quick and simple way to create chimney breasts and install inset stoves

Installation Guidelines

Installation manual. For setting in concrete/on base plates - Panel height 1830

Make every component count.

PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Installation Guide. Deckorum. Composite Decking

CELLBOARD DECK CLIP FIXING INSTALLATION MANUAL CBWD14525

Wave Profile Installation Guide

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

INSTALLATION GUIDE. Biowood Outdoor Wall Panel BWWPO20018 Shiplap 8x6 Deep. Green Resources Material Australia Pty Ltd

SHOWER DOORS INSTALLATION INSTRUCTIONS SHOWER DOORS: LBSDD Version 4.0

Vanity Installation Instructions

Titan - Double Skin Steel Partitioning. Installation Pack

modular/panel-built sauna kit

Installation Guide. deckorum Composite Decking

Installation Instructions

NEW equinox INSTALLATION GUIDE Issue

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Vinyl Windows and Doors

INSTALLATION INSTRUCTIONS

Installation Site Preparation - Site Preparation

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Installation Instructions

NEW equinox INSTALLATION GUIDE Issue

Transcription:

FORMWALL Ceiling Plank / Board Installation Guide Nuplex Ceiling Plank Installation Guide This fitting guide is for guidance only. Refer to the installing contractor and/or builder for the exact job process. Formwall Ceiling is a twin wall, tongue and grooved PVC system which is extruded from high grade PVC in double skin profiles linked with PVC fins to form a rigid, durable board. It is an economical ceiling system for general purpose use and is suitable where boards may come into contact with food. It is ideal for hygienic and wet environments. Formwall Ceiling ceiling system is easy to clean and is almost maintenance free. It is one of the few ceiling systems which can be hosed down in-situ. The white, satin finish ceiling system incorporates colour coordinated PVC internal / external corner profiles, a PVC jointing strip, PVC start & edge perimeter trim and a PVC pliable joint trim for obtuse angles. DESCRIPTION Ceiling boards are 10mm thickness 3000mm, 4000mm, 5000mm (referred to as widths) and 250mm long. The effective cover is 250mm. Weight: 2.2kg / m². Formwall Ceiling PVC boards have a maximum service temperature of 60ºC. Although the boards can be applied in most areas, they should never be installed near to a direct heat source (cookers, oven ranges, wall mounted griddles etc) where naked flame or severe heat would cause distortion or damage to the surface. For these situations, Nuplex recommends using stainless steel panels. FIXING METHOD Ceiling boards can be mechanically fixed with 16mm bevel point SS staples that prevent withdrawal. ( may be fixed with 13mm self-tapping wafer head screws). Install to any substrate which provides a fixing point at a maximum of 600mm centres, e.g. timber joists, timber battens, PVC battens, galvanised steel battens, or direct to plywood. SURFACE PREPARATION All ceiling structures must be sound and generally level. The substrate must be of adequate strength to support mechanical fixings, especially when installing battens. Typical substrates are concrete, timber, steel or plaster finishes. With certain concrete substrates, check to find out if the structure is constructed with hollow beams. All electrical fittings should be in a first fix stage where possible. Electrical equipment should only be moved or altered by a qualified electrician. All plumbing should be at first fix stage and pipe tails left protruding from the substrate. The ceiling boards can then be drilled and slid over the pipe tails. All holes should be drilled 3mm oversize to allow for expansion. Plumbing should always be carried out by a qualified plumber. Hot pipes and steam pipes should be insulated and a 3-5mm expansion gap should be created when installing FORMWALL PLANKS ceiling boards around these pipes. All pipes, screw fixings, bolts etc. fixed through the FORMWALL PLANKS ceiling board should have a minimum 3mm expansion gaps and be sealed using Nuplex silicone sealant. INSTALLATION TEMPERATURES Nuplex Walls recommends the PVC ceiling boards are installed at approximately the same ambient service temperature at which the area will be used when commissioned.

An ambient temperature of 14ºC/57ºF is recommended for all installation areas. Boards should stored flat and be pre-conditioned for up to 24 hours to attain the ambient room temperature prior to the installation. The boards should be stored on a level flat surface. Storage on un-even surfaces could cause the boards to distort prior to installation. TOOLS AND EQUIPMENT In general, the main tools required are similar to carpentry hand tools. Below is a list of tools that you may find an advantage to have for the installation. 1m spirit level tenon saw stanley knife square chalk line adjustable block plane tape measure hammer cold chisel carpenters bevel carpenters 19/25mm wood chisels screwdrivers files (round & square) hole cutters hacksaw sharpening stone 4 scrapers good quality mastic gun pens and pencils water based markers mitre block electric Jigsaw (with fine tooth cutting blades) electric drill cordless drill and bits 16mm bevel point SS staples Safety equipment: Use appropriate safety and PPE gear. Other essential equipment: You will also need a 2.5m x 1.22m workbench made from 15mm MDF board (or similar), with support bearers to prevent the MDF from bowing in the middle. The bench provides an excellent work surface for the PVC ceiling boards. 15mm MDF bench with Timber bearers.rmation WORKSTATION Set up a workstation in close proximity to the area to be boarded. A minimum area of 7m x 3m may be required to set up an adequate working area, *(depending on the length of boards being used). PLANNING AND SETTING OUT Consideration 1.0 The first consideration before commencing an installation of the Formwall Ceiling direct fix ceiling system must be that of access to services. Due to the construction of the ceiling system, once installed it provides an impervious barrier, therefore access to services and the running in of cables and pipe work must be taken into account. These must be installed prior to the boards being fitted. If access is required for maintenance to services above, the inclusion of access hatches should be considered. Establish where light fittings are to be positioned and if sprinkler systems are to be incorporated. Consideration 2 If battens are to be installed, establish which way the PVC ceiling boards are to run. This determines the width

of board to purchase. IMPORTANT. Consideration 3 Establish where access ports and lights, etc are to be placed. IMPORTANT. Plan the layout of the PVC ceiling boards across the ceiling structure. Each board is 250mm in width. Therefore, four boards locked together will equal 1 metre. Measure the complete distance across the room to establish that the last board to be fitted in the ceiling system will be of a suitable width. If necessary, the first ceiling board may need to be pre-cut before fitting. INSTALLATION PROCEDURE (WITH BATTENS) If battens are to be used, Nuplex recommends using galvanised steel battens for this work. They are readily available, low cost and will not deteriorate over the life. However staples will not work with this material. time of the installation. Before commencing construction, check to see if the surface to be fixed to is level and within standard building regulation guidelines. If found to be uneven packers may have to be inserted. Firstly, butt up to the perimeter of the ceiling, and fix Nuplex Outside corner or edge trim perimeter channel to the wall substrate. Fix in position (with the longer edge on the underside) using suitable screw fixings, at a maximum of 600mm centres around the wall perimeter. Determine the direction of the FORMWALL PLANKS ceiling boards. Onto battens, install using appropriate fastenings to the substrate above (with the longer edge at the top). Fix in the opposite direction to the way your ceiling boards are to be installed. Space out the battens across the ceiling structure at a maximum of 600mm centres. Prior to installing the FORMWALL PLANKS ceiling boards, ensure that all first fix services are installed, and any extra batten sections have been fitted where lighting units etc. will require an anchored fixing point. Following completion of the outside corner trim, the FORMWALL PLANKS ceiling boards are now ready for installation. Formwall BOARDS Outside Perimeter channel Division bar ( joiner) Edge trim perimeter trim Silicon sealant INSTALLATION PROCEDURE FOR FORMWALL PLANKS CEILING Firstly, fix Nuplex outside corner perimeter trim around the room, using staples or 13mm wafer head screws, ensuring that no kinks appear in the trim as it is installed. The longer edge is to be fixed upper most to the perimeter channel. Internal angles can either be interlocked or mitred. However, external corners must be mitred to suit the correct angle. Take measurements from the ceiling structure, and then transfer these to the ceiling board. Cut the board using a jigsaw (or hand saw) with a fine tooth blade, making sure the board is well supported to reduce any risk of stress in the material when being cut. After cutting, plane the edges with your adjustable block plane to remove burrs and to leave a clean smooth finish. Cut the first FORMWALL PLANKS ceiling board to length allowing for approximately 10mm reduction in the overall length for expansion. Fit the ceiling board into the trim and then stretch a string line from both ends. With the first board it is vital that it is installed straight and true along its length, as a hollow or curvature will not allow future boards to butt tight into the full length of the board. When the first board is fully in position, fix through the tongue of the board into the batten (or substrate) above, using the staples or 13mm wafer head screws. Fit the subsequent ceiling boards, ensuring they are butted tightly up to the previous board, until the whole area has been completed. With the last board to be fitted (usually a part-width board), you need to slot this carefully

into the side and end section of the trim. Starting at one side and then easing it into the end trim as you move along the full length of the trim. This can be helped by using flat scrapers to ease the trim down. Once the last board has been fitted and butted tightly to the previous board, apply a bead of silicone inside the perimeter trim to keep the last board in position. Ensure all boards have at least 5mm clearance at each end to allow for expansion and contraction. Simplified installation 1.0 A framework of PVC battens must first be fastened to the existing ceiling or suspended from purlins at 40-60cm intervals. Battens must also be run around the perimeter of the ceiling area. NB Battens must run at right angles to the desired direction of your ceiling planks. 2.0 Using 16 mm stainless steel staples, fix the edge trim around the perimeter batten as close as possible to the walls. Calculate the length of plank required by measuring from edge trim on to edge trim on wall 3.0 Deduct 2cm from this length and cut your plank to this size. Insert plank with the tongue into edge trim and push into position. Now staple plank into place at each batten by fastening through the planks fixing edge. 4.0 Screw fix the first plank into place, then simply push the remaining planks into the groove of the preceding plank and staple into position as before. Before installing final plank, ensure you trim the plank to the desired width, then work into the edge trim with a pallet knife. FIXING AROUND BEAMS, BULKHEADS OR DOWNSTANDS Bulkheads / Access ports / lights If the ceiling structure has beams, bulkheads, lights incorporated in the room, the Fomwall Ceiling PVC ceiling system can be constructed around these details. Use plywood as a prefixed substrate before the FORMWALL plank to create a solid base for the access port, lights etc. Where the internal and external angles are formed, you will need to couple together two sections of edge trim section (with wafer head screws, pop rivets or nuts and bolts) at right angles to each other to create a right angled section to fix the FORMWALL PLANKS boards and trim angle sections to. Once the trim is in place, fix Nuplex outside corner sections with staples or 13mm wafer head screws to all internal angles. Repeat the process with outside corner sections with wafer head screws to all external angles. Once these corner sections have been fitted, install the Fomwall Ceiling boards as described previously. Ensure the last board is sealed into position with silicone sealant. ACCESS HATCH PANELS Access panels can be fitted into the FORMWALL PLANKS ceiling system if required. They are made to order and can be produced in almost any size, (contact Nuplex Walls for further details). Traditional stock size available is 600mm x 600mm. The perimeter of the access opening must be lined out with Nuplex perimeter channel on all four sides. The Nuplex access hatch framework kit (ref: A626K) is supplied pre-made (size to order) with a powder coated aluminium frame and plywood removable panel. The plywood panel may be finished ceiling boards (cut and fitted to suit on site) or Formwall wall lining may be glued to the hatch for a smooth finish.. Please note: Access panels can only be used in this type of situation if there is sufficient height (void) above the hatch to allow the removable plywood panel section to be lifted up and angled outwards. A minimum of 200mm clearance is required to achieve this. COMPLETION Once the boards have been installed and silicone has been completed, clean all surfaces down with a cleaning solution or even alcohol (meths) for a hygienic result. EANING

MAINTENANCE Regular cleaning using a soft cloth and suitably diluted mild detergent is all that is normally required. For heavy grease contamination use a gentle alkaline cleaner (or similar). Stubborn marks can be removed with a nonabrasive domestic type cream bath cleaner. When cleaning the FORMWALL PLANKS surface, we recommend the temperature of water does not exceed 60º Centigrade. If cleaning with hot water lance, temperatures must be regulated to a maximum of 60º Centigrade and not to be localised. Do not use cleaning materials of an abrasive nature. PRODUCT REFERENCE CONTACT Contact Nuplex Walls technical services department for any query regarding materials, installation or cleaning and maintenance instructions: Visit the Nuplex website at www.nuplexconstruction.com for technical data sheets and technical drawings in pdf format for downloading. Details : http://www.nuplexconstruction.com/pdf/formwall_ceiling_systems.pdf?v=1.2