Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY Brick Chimney - Concrete/ Mortar Liner CORNICE Cornice - Terra Cotta 1 2 3 4 5 6 1 91 1 2 3 4 5 6 GRE 6 323 7 7 102 LF $65,208 $65,208 323 LF $9,908 $9,908 Assessment Date: 3/21/2013 Page 1 of 16
DOORS Exterior Steel Door Overhead Rolling / Garage Door Store Front Door Transom Lite 1 2 3 4 5 6 3 7 13 EA $4,294 $1,027 $5,321 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio and Video Power Door Operator and Controls Ramp Handrails Stair Handrails Stone Stairs 1 2 3 4 5 6 54 38 7 21 GRE 6 67 GRE 6 46 254 LF $27,242 138 LF $19,241 $2,860 121 LF 67 LF 46 LF $8,223 $57,565 FOUNDATION Concrete Foundation 1 2 3 4 5 6 7,198 1,198 LF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 1 2 3 4 5 6 0 5 7 10 EA $5,005 15 EA $3,218 $8,223 Assessment Date: 3/21/2013 Page 2 of 16
LINTELS Lintels - Steel PARAPET 1 2 3 4 5 6 GRE 6 977 7 977 LF $36,884 $36,884 Coping - Metal Coping - Stone Coping - Terra Cotta Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height 1 2 3 4 5 6 GRE 6 362 7 GRE 6 4 89,604 GRE 6 492 81 GRE 6 773 362 LF 93 LF $349 1,604 LF 492 LF $76,618 281 LF $72,932 773 LF $160,503 $310,401 ROOF SYSTEM Asphalt Shingle Roof Exterior Downspouts Interior Downspouts Metal Roof Modified Bitumen Roof Roof Structure: Concrete 1 2 3 4 5 6 GRE 6 4,640 66 16 GRE 6 75 7 6,802 GRE 7 31,262 4,640 SF $18,380 166 LF $3,086 216 LF 75 SF $566 26,802 SF 31,262 SF $22,032 SUPERSTRUCTURE Concrete 1 2 3 4 5 6 7 GRE 7 85,205 85,205 SF Assessment Date: 3/21/2013 Page 3 of 16
WALLS Brick Stone - Cast Terra Cotta WINDOWS Skylite - Glass Double-Pane Window - Guards perforated Windows - Decorative Windows - Sash Aluminum Double-pane EXTERIOR ELECTRICAL EMERGENCY SYSTEM 1 2 3 4 5 6 GRE 6 32,786,955,943 1 2 3 4 5 6 GRE 6 91 GRE 6 3,928 GRE 6 338 GRE 6 7,354 7 7 32,786 SF $216,604 2,955 SF $42,257 1,943 SF $55,570 $314,430 91 SF $859 3,928 SF 338 SF $1,933 7,354 SF $63,097 $65,890 $895,860 Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency generator 150 KW -200 KW diesel - Outdoor Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Public Announcement System Security System - Intrusion detection 1 2 3 4 5 6 7 GRE 7 3,303 0,724 GRE 7 4,189,244 BLU 5 5 BLU 5 22 YEL 4 3 2 GRE 6 85,205 GRE 6 85,205 3 EA 2,303 SF 10,724 SF 4,189 SF 2,244 SF $215 $13,299 5 EA $2,324 2 $10,225 5 EA $2,789 85,205 SF $51,174 85,205 SF $79,198 Assessment Date: 3/21/2013 Page 4 of 16
$159,222 MAIN SERVICE Main Electrical service - Live Front - 1500 A 277/480/3PH Main Electrical service 1600 A 120/208/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 277/480-120/208 ELECTRICAL FIRE PROTECTION FIRE ALARM 1 2 3 4 5 6 1 2 3 4 5 6 BLU 5 7 9 GRE 6 3 GRE 6 5 7 7 $11,619 $9,295 $20,914 16 EA $44,473 3 EA $4,290 5 EA $10,725 $2,431 $1,144 $63,063 $243,199 Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION 1 2 3 4 5 6 7 GRE 7 85,205 GRE 7 85,205 85,205 SF 85,205 SF MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Rotary/Screw type - Ground Mounted 100 to 200 tons Condensing - Ground Mounted less than 5 tons 1 2 3 4 5 6 7 Assessment Date: 3/21/2013 Page 5 of 16
Window A/C AIR HANDLING SYSTEMS BLU 5 5 5 EA $5,363 $5,363 Air Intake - Built Up Air Handling Fan Coil - Hot Water and Chilled Water Multi Zone Built Up Air Handling - Hot Water or Dual Temperature Water 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Hot Water 15,000 to 25,000 cfm Reheat Boxes With Hot Water Coils Return Duct Work - Sheet Metal - Exterior Vertical Shaft and Ducts Return Fans - Indoor 5,000 to 10,000 CFM Return Fans - Indoor less than 5,000 CFM Single Zone Built Up Air Handling - Hot Water or Dual Temperature Water 4,000 to 8,000 cfm Single Zone Built Up Air Handling Auxiliaries - Hot Water or Dual Temperature Water 4,000 to 8,000 cfm 1 2 3 4 5 6 7 5 3 GRE 7 400 BLU 5 2 25 EA $35,750 13 EA 400 LF $11,440 $47,190 BOILER SYSTEMS Boiler Assembly - Condensing Hot Water Boiler 2,001MBH-3,000 MBH Boiler Auxiliary - Condensing Hot Water Boiler 2,001MBH-3,000 MBH Chemical Pot Feeder - Hot Water Glycol Feed System 1 2 3 4 5 6 7 $11,154 $300 $1,087 $12,541 HEATING DEVICES Cabinet Heaters With Hot Water Coils Fin Tube Electric Heater - Electric Heater - Hot Water 1 2 3 4 5 6 7 GRE 7 5 GRE 7 6 1 5 EA 6 LF $2,574 Assessment Date: 3/21/2013 Page 6 of 16
Wall Heater - Electric MECHANICAL PLUMBING 1 2 $2,574 Piping - Hydronic Supply and Return - Steel or Galvanized Pumps - Chilled Water 10 to 20 HP Pumps - Hot Water 5 to 10 HP Pumps - Hot Water less than 5 HP 1 2 3 4 5 6 7,000 GRE 7 4 1,000 LF $5,148 4 EA $5,148 TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) Zone Dampers 1 2 3 4 5 6 7 GRE 7 85,205 GRE 7 32 GRE 7 32 85,205 SF 3 3 VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof mounted less than 500 CFM MECHANICAL PLUMBING HOT WATER 1 2 3 4 5 6 GRE 6 3 7 $1,001 3 EA $1,287 $315 $2,603 $75,418 Hot Water Heater - Gas 150,000-300,000 BTU/HR 1 2 3 4 5 6 7 Assessment Date: 3/21/2013 Page 7 of 16
PIPING Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping 1 2 3 4 YEL 4 85,205 YEL 4 85,205 YEL 4 85,205 YEL 4 85,205 YEL 4 85,205 5 6 7 GRE 7 85,205 GRE 7 85,205 YEL 4 85,205 BLU 5 85,205 BLU 5 85,205 85,205 SF $28,024 85,205 SF $54,829 85,205 SF $18,276 85,205 SF $38,990 85,205 SF $46,300 85,205 SF 85,205 SF 85,205 SF $81,635 85,205 SF $40,208 85,205 SF $30,461 $338,724 PUMPS Domestic Booster Pump duplex Ejector Pump Sump Pump PLUMBING 1 2 3 4 5 6 7 BLU 5 1 $11,440 $1,359 $12,799 $351,522 INTERIOR ADMINISTRATIVE SUITES Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Flooring - Wood Lighting - Pendant/Surface 1 2 3 4 5 6,127 7 GRE 7 968 46 GRE 6 464 GRE 6 449 16 8 2,127 SF $6,022 968 SF 246 SF $626 464 SF $664 449 SF $3,390 25 SF $18 Assessment Date: 3/21/2013 Page 8 of 16
Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile AUDITORIUM - DEDICATED 12 GRE 6 4,614 GRE 6 393 112 SF $320 4,614 SF $10,887 393 SF $2,810 $24,737 Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System 1 2 3 4 5 6 GRE 6 93 88 7 GRE 7 6 93 EA $3,423 288 EA $10,601 6 EA $14,024 DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Transom Window 1 2 3 4 5 6 7 8 7 65 GRE 7 410 18 EA 9 $7,645 410 SF $7,645 DRINKING FOUNTAINS Double Fountain 1 2 3 4 5 6 7 GRE 7 4 4 EA GYMNASIUM / AUDITORIUM Ceiling - Plaster/Drywall Flooring - Wood Lighting - Pendant/Surface Walls - Plaster/Drywall Walls - Structural Glazed Tile 1 2 3 4 5 6,781,781 6 GRE 6 3,954,538 7 2,781 SF $23,781 2,781 SF $20,998 16 EA $1,945 3,954 SF $33,925 1,538 SF $10,997 Assessment Date: 3/21/2013 Page 9 of 16
$91,646 LIBRARY Casework Flooring Carpet Lighting - Lay-In Lighting - Pendant/ Surface 1 2 3 4 5 6 00 7,164 GRE 7 4 4 100 LF $3,067 1,164 SF 4 SF 14 SF $3,067 LOCKER/SHOWER ROOM 1 2 3 4 5 6 7 Showers BLU 5 1 $1,216 $1,216 LUNCHROOM Ceiling - Plaster/Drywall Flooring - Wood Lighting - Pendant/Surface Serving Line Wall - Plaster/Drywall 1 2 3 4 5 6,408,408 4 7 0,118 1,408 SF $3,987 1,408 SF $10,631 24 SF $17 10 LF 2,118 SF $4,997 $19,632 MDF/IDF Finishes Ventilation and Cooling MECHANICAL/SERVICE ROOMS Air Intake Plenums 1 2 3 4 5 6 04 YEL 4 1 1 2 3 4 5 6 GRE 6 800 7 7 104 SF $354 $14,014 $14,368 800 SF $3,775 Assessment Date: 3/21/2013 Page 10 of 16
Air Tunnels Auditorium Plenums Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room STAFF RESTROOM GRE 6 3,672 GRE 6 400,550,364 35,236 104 3,672 SF $34,656 400 SF $3,775 2,550 SF $12,033 2 SF $9 2,399 SF $11,156 2,340 SF $10,552 $75,957 Accessories Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Lavatory Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Water Closet 1 2 3 4 5 6 7 93 2,332 GRE 6 76 217 2,332 8 GRE 6 76,495 GRE 6 54 20 GRE 6 4 36 GRE 6 4 28 16,728 880 GRE 6 360 4,985 GRE 6 630 GRE 6 6 29 2,625 SF $2,263 2,625 SF $1,045 10 EA $601 76 SF $359 2,495 SF $6,351 54 SF $77 2 $744 40 SF $17 3 $717 17 EA $372 3,608 SF $7,802 5,345 SF $13,461 630 SF $4,505 35 EA $2,231 $40,543 THEATER Ceiling - Plaster/Drywall Flooring - Carpet Lighting - Pendant/ Surface Stage 1 2 3 4 5 6,303,303 7 GRE 7 32 GRE 6 553 2,303 SF $19,694 2,303 SF $3,293 32 SF 553 SF $2,349 Assessment Date: 3/21/2013 Page 11 of 16
Wall - Plaster/Drywall VERTICAL CONVEYANCE GRE 6 5,066 5,066 SF $43,466 $68,802 Elevator - Roped Holeless Hydraulic 1 2 3 4 5 6 7 VOCATIONAL SHOP Work Sink INTERIOR ROOM CASEWORK Casework CEILING 1 2 3 4 5 6 1 2 3 4 5 6 GRE 6 320 7 7 $772 $772 $362,409 320 LF $11,440 $11,440 Plaster/Drywall 1 2 3 4 5 6 7 4,182 768 14,950 SF $40,155 $40,155 CHALK BOARD 1 2 3 4 5 6 7 Chalk Board YEL 4 795 795 LF $96,632 $96,632 Assessment Date: 3/21/2013 Page 12 of 16
CORRIDORS Pendant/Surface Plaster/Drywall Stair Handrails Student Lockers Terrazzo Tile/Sheet Flooring 1 2 3 4 5 6 7 GRE 6 6,398 5,050 2,676 GRE 6 482 GRE 6 479 GRE 6 3,348 GRE 6 7,579 11,448 EA $4,575 22,676 SF $53,504 482 LF 479 EA $68,497 3,348 SF $18,959 7,579 SF $10,838 $156,373 CORRIDORS CEILING Plaster/Drywall FLOOR Carpet Concrete Tile/Sheet Wood LIBRARY_CEILING 1 2 3 4 5 6 1,448 1 2 3 4 5 6 GRE 6 720 GRE 6 473,355 2,402 7 7 11,448 SF $32,414 $32,414 720 SF $1,030 473 SF $2,232 1,355 SF $1,938 12,402 SF $93,640 $98,839 Drop/Lay-In Plaster/Drywall 1 2 3 4 5 6 7 70 GRE 6 894 270 SF 894 SF $2,531 $2,531 LIBRARY_WALL Plaster/Drywall,450 1,450 $3,421 1 2 3 4 5 6 7 Assessment Date: 3/21/2013 Page 13 of 16
$3,421 LIGHTING Pendant/Surface 1 2 3 4 5 6 7 GRE 6 78 171 249 EA $5,577 $5,577 MARKER BOARD Marker Board 1 2 3 4 5 6 7 GRE 6 62 62 124 LF $1,773 $1,773 STAIRS Asphalt Terrazzo Wood WALL Masonry Plaster/Drywall Wall ROOM SITE CIVIL/DRAINAGE 1 2 3 4 5 6 GRE 6 35 38 GRE 6 50 1 2 3 4 5 6 GRE 6 300,298 23,304,266 7 7 35 SF $250 138 SF $1,563 50 SF $930 $2,743 300 SF $3,861 24,602 SF $61,111 1,266 SF $2,987 $67,959 $519,858 Catch Basin Site Manhole 1 2 3 4 5 6 GRE 6 8 7 GRE 7 5 8 EA $4,347 5 EA Assessment Date: 3/21/2013 Page 14 of 16
$4,347 FENCING Chain Link Ornamental Iron LANDSCAPE Asphalt Play Area/Hardscape Benches Grass Irrigation Parkway trees Planting Beds/ Areas Retaining Wall - Masonry Trash Receptacles Walking Path - Crushed Stone PARKING LOT Asphalt Concrete Concrete Curbs Lights, Pole Mounted PLAYGROUND Playground Equipment - School Age 5-12 Playground Surfacing - Poured Surface 1 2 3 4 5 BLU 5 20 6,032 1 2 3 4 5 6 0,265 1 GRE 6 57,668 GRE 6 68,938 GRE 6 49 1,028 GRE 6 412 GRE 6 5 YEL 4 6,255 1 2 3 4 5 BLU 5 18,048 6 GRE 6 824 GRE 6 557 6 1 2 3 4 5 6 BLU 5 6,765 7 7 7 7 20 LF $715 2,032 LF $38,356 $39,071 20,265 SF $17,387 1 $2,595 57,668 SF $23,090 68,938 SF $39,433 49 EA $14,014 11,028 SF 412 SF $5,833 5 EA $1,038 6,255 SF $38,015 $141,405 18,048 SF $51,101 824 SF 557 LF $3,361 16 EA $18,304 $72,766 6,765 SF $59,011 Assessment Date: 3/21/2013 Page 15 of 16
$59,011 SIDEWALKS Perimeter Sidewalks SIGNAGE Flag Pole Marquee - Free Standing Back Lighted SITE Campus Need ² ³ 1 2 3 4 5 6 9,803 1 2 3 4 5 6 7 7 19,803 SF $37,380 $37,380 $353,981 $2,802,248 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 3/21/2013 Page 16 of 16