Installation Manual for M4-Exterior Sheathing

Similar documents
Installation Manual for Thermo Panel

COMPOSITE SIDING INSTALLATION GUIDE

ForceField Air & Water Barrier System. installation instructions

LAP SIDING INSTALLATION GUIDE

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

MULTISHAKE LAP SIDING INSTALLATION GUIDE STORAGE AND HANDLING: PACKAGING:

Installation Instructions for Panel Siding and Soffit

MAXISHINGLE LAP SIDING INSTALLATION GUIDE

LAP SIDING INSTALLATION GUIDE

VERSAROC CEMENT BONDED PARTICLE BOARD ROOF SHEATHING VERSAROC CEMENT BONDED PARTICLE BOARD ROOF SHEATHING

KuraStone TM Installation Guide

Five Star Panel Installation Instructions

Section Section Section

PANEL INSTALLATION GUIDE

PRIMED STRAND REVERSIBLE SHAKE

ESR-2648 Reissued May 1, 2012 This report is subject to renewal June 1, 2013.

ICC-ES Evaluation Report Reissued June 1, 2010 This report is subject to re-examination in one year.

Load Tables, Technical Data and Installation Instructions

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.

INSTALLATION INSTRUCTIONS

Effective April 1, 2013

Tools required by installer: Materials required by installer:

SECTION CARPENTRY

Fir and pine wood (52 %) Portland cement (38 %) made by firing limestone and clay Water (9 %) Wood mineralisation substances (1 %)

Product Information & Installation Instructions

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

LAP SIDING INSTALLATION GUIDE

PANELTEK ENGINEERED SIDING/PANELLING INSTRUCTIONS

ICC-ES Evaluation Report

Trusted ICC ES PASLODE, Evaluation. report, or as to any. ICC-ES Evaluation

Flashing Materials. Rough Opening Preparation

ESR-1254 * DELETED BY CITY OF LOS ANGELES. Reissued April 1, 2006 This report is subject to re-examination in one year.

Effective February, 2015

DIVISION 6 WOOD AND PLASTICS

KEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

How To Install Windows: Nail-Fin Application

Featuring TJ Rim Board and TimberStrand LSL

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Engineered Hardwood Flooring Installation Instructions

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Installation Instructions for TruWood Reversible Trim

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

Introducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA

Beam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Window Frame Installation Instructions For Nail-on and Block Frames

SDWH TIMBER-HEX Screw

Installation Guidelines

A. Boards or Strips: Lumber of less than 2 inches nominal size in least dimension.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: IKO INDUSTRIES LIMITED

FT DIX ELEMENTARY SCHOOL PHASE VII, CLASSROOM ADDITION PEMBERTON TOWNSHIP REGAN YOUNG ENGLAND BUTERA, PC PROJECT #5349A

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

Installation Guide Classic Series Wood Siding

SUBMITTAL SHEET. Project Submittals by

GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE

pacific build supply ltd

application instructions

Installation Instructions

Eagle clad double-hung window installation instructions

SCREW FASTENER SELECTION FOR COLD-FORMED STEEL FRAME CONSTRUCTION

SECTION ROUGH CARPENTRY

BARRELL VAULT BATTENLESS

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

CONTENTS OVERVIEW. For a complete set of CAD drawing details, please visit LaminatorsInc.com. 1 Essential Equipment. 1 Essential Supplies

1. Section : Rough Carpentry 2. Section : Exterior Insulation and Finishing Systems 3. Section : Metal Roof Panels

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Shapes Siding. Perfection Shingles. Chalk Line

ESR-2403 Reissued October 1, 2009 This report is subject to re-examination in one year.

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING

Re-Roofing Policy SPECIAL REQUIREMENTS AND NOTES

A. Rough carpentry includes but is not limited to the following:

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

Installation Guide: NC 25 System

INSTALLATION GUIDE SAVANNAH SMOOTH & SIERRA PREMIUM SHAKE

Installation Guide (888)

Technical Note No. 026

ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years.

Inspire Aledora Slate Application Guidelines

Exterior Wall Fastener Schedule

GlasRoc Sheathing Type X

Vinyl Windows and Doors Manufactured by VPI Quality Windows

WoodTrac Direct Mount Ceiling System

Installation Guide - Evolution Series Wood Siding

Joint Evaluation Report

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

REPORT HOLDER: JAACO CORPORATION NORTHEAST 68 TH STREET, SUITE C-130 REDMOND, WASHINGTON EVALUATION SUBJECT:

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Ash Brook Golf Course Scotch Plains, New Jersey

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

NATURA PRO Product Information Leaflet 1

Sun Windows General Information New Construction Hinged Door Installation Instructions

Transcription:

Installation Manual for M4-Exterior Sheathing 1

Application Area - Testing M4 complying with: 2015 and 2012 International Building Code (IBC) and 2015 and 2012 International Residential Code (IRC). The M4 Exterior Sheathing is tested in accordance with ICC-ES AC 269.2, AC 386 and AC 376 and the M4 panel is suitable without limitations for use in interior or exterior sheathing applications of approximately 1/2" thickness used as shear walls, which refers to section 14 of ASTM E 72. The M4 Panel is the perfect substrate for today s building environment because of its durability, performance and inherent characteristics which include: structural strength, fire protection, mold resistance, and being impervious to both water and termites. The M4 Panel is the only MgO panel to pass the ASTM E 119 load bearing fire test for 1 hour on 2 x 4 wood studs. The M4 is a perfect substrate under brick, stone, stucco, EIFS and siding because it will not rot, warp, delaminate, or deteriorate in any climate (hot, cold, humid or wet) OR when exposed directly to water (it can release moisture an unlimited number of times). Furthermore, it is impervious to termites, non-combustible, mold resistant and it is easy to cut and fasten. The panel is an Environmentally sustainable Green panel and the lower weight reduces embodied energy and forces. The M4 panel is Mold-resistant earning the highest score of 10 according ASTM D3273 and a perfect substrate for high-moisture areas and it is noncombustible according ASTM E 136. The panel is air permeable and cannot be used as a Siding panel. Load Bearing Fire Resistance (ASTM E119 and CAN/ULC S101-07) The M4 panel was tested for a 1-hour load bearing fire resistance rating at 100% design load, determined in accordance with the NDS. ASTM E 119 Testing components for the 1-hour fire tested load bearing shear wall: Component Description Details Framing Wood Studs Wood studs with minimum specific gravity 0.42. Stud cavity insulation Mineral wool Mineral wool of minimum 3 1/2 thickness that complies with ASTM C612, or minimum density 2.8 lbs/ft3. Interior Sheathing Gypsum Board Minimum 5/8 thickness Type X gypsum wall board complying with ASTM C1396 Exterior Sheathing M4 M4 Multi-Panels ½ thick, mounted horizontally with 1 ½ long 16-gauge crown staples spaced 4 o.c. at perimeter and 8 o.c. in the field 2

Fig 1. ASTM E 119 one hour fire tested as load bearing wall for 2 x 4 wood stud construction Racking Shear Resistance The M4 exterior sheathing can be specified for any project where there is a high demand for structural strength and a need for flexibility and easy sheathing and installation, thus avoiding the headaches and expense of delamination, deterioration, sagging and warping. (ASTM E 72) Wood Frame: Design capacity of wall diaphragms of the plate in lbs/ft for M4-Exterior sheathing 1/2 installed 2"x4" wood framing with a maximum joist spacing of 16" o.c. U Staple Fasteners: 16 gauge galvanized with glue, size 1 1/2, crown 1/2, ESR-1539 compliant Edge spacing Center Spacing Ultimate Load Allowable Racking Shear One side M4 panel 4 8 6236 lbs 186 plf 3

Steel Frame: Design capacity of wall diaphragms of the plate in lbs/ft for M4-Exterior sheathing 1/2 installed on 1 5/8 x 3.5 18 Gauge Galvanized Steel Framing. Max framing spacing of 16 o.c. High-speed self-drilling building screws: S-12 Rock-On Fasteners (Part Number 6310) 8-18 x 1 ¼ Head Style # 2 PW ITW Edge spacing Center Spacing Ultimate Load Allowable Racking Shear One side M4 panel 4 8 10,030 lbs 243 plf Installation M4 exterior sheathing must be installed in accordance with the instructions in this installation manual.the panel can be attached horizontal or vertical to wood or metal framing. The fastening surface shall not be less than 2 x 4 studs for wood framing and No. 18 Gauge for steel framing. Framing members shall not vary more than 1/8" from the plane of the faces of adjacent framing. For steel framing, to allow for thermal expansion, a panel must never be fastened to metal studs across expansion joints. Install the panels with no gapping (ends and edges of the sheathing should fit tightly). The panels shall not be less than 6" from the finish grade in weather proof and water-protected siding systems, and not less than 12" from the ground for properly drained and ventilated crawl spaces. Fig 2. E72 M4-Exterior sheathing 1/2 installed on 1 5/8 x 3.5 18 Gauge Galvanized Steel Framing. Max framing spacing of 16 o.c. 4

Staples, Nails, or Screws as listed below, may be used to attach the M4 exterior sheathing to the framing. The fasteners length must be 3 times (i.e. 3x) the thickness of the board. Fasteners should be driven flush with the panel surface (not countersunk) into the framing system. Locate fasteners at least 1/2" or 5 times (5x) the diameter of the fasteners from edges and 2 from the end of the panel. The panels are not to be used alone as a base for nailing or Siding (fasteners must go through board and into framing system). For Racking Shear Resistance (Fig 1.), the Fasteners must be spaced 4 on center around the perimeter and 8 on center in the field and joist spacing 16 o.c. See Fig 3 for how Staples must be mounted and Fig 4 for how screws must be mounted. Fig 3. Mounting with Staples 5

Fig 4. Mounting with Screws U Staples for wood framing: Staples must be installed on vertical sides of the panel parallel with the perimeter. The Field and top and bottom ends of the panel must be stapled using between a 15-30 degree left/right alternating angle pattern from the perimeter. Use 16 gauge galvanized staples with glue, size 1 1/2", crown 1/2", ESR-1539 compliant 6

Nails for wood framing: Full head nails DUO fast, galvanized: 0.098 x 1.97 or 10d Common Nails manufactured by Grip Rite (Part Number GR3148), compliant with ICC-ES ESR-3543 Screws (www.itwbuildex.com) High-speed self-drilling building screws S-12 Rock-On Fasteners Part Number 6310 for steel size 8-18 x 1 ¼ and for wood BX23202 size 9-15 x 1-1/4 Head Style # 2 PW ITW minimum length 3 x board thickness. Water proof sealing tape for over boards connection If water restrictive barrier is NOT used on the M4 boards, exterior board connections must be sealed, so water can not enter into the construction. Item No. Width x Length x Thickness Unit/packing MP100 10-1 3.94 x 32.5 x.04 10 pcs (100 mm x 10 m x 1 mm) For waterproof connection between Board Cutting: Simply score and snap the panel on smaller thicknesses up to 3/8, or alternatively all M4 Panels may be cut with a circular saw or a jigsaw equipped with a diamond tipped blade. Sharp edges are made with fast running diamond tipped tools. Cutting to size may be done with normal slow or fast running hand tools or stationary equipment. When using fast running tools, dust exhaustion must be employed. Note: When using hand tools, cut the panels backside up. When using stationary saw equipment, cut the panels front-side up (the saw blade must always attack the board from the front-side). The periphery speed of the circular saw should be within the below parameters. Cutting depth 3/8 5/8 (10-15 mm) beyond the board. 7

Guideline operation parameters for Multi-Panels saw blades Saw blade thickness inch: 0.09 (2.4 mm) 0.09 (2.4 mm) 0.1 (2.6mm) 0.1 (2.6mm) 0.11 (2.8 mm) Saw blade Ø inch: 5.9 (150 mm) 9.05 (230 mm) 9.84 (250mm) 10.23 (260mm) 13.78 (350 mm) Rpm: 3800 2500 2300 2200 1650 Cutouts Cutouts may be made with a jigsaw, a keyhole saw equipped with bi-metal, or diamond tipped blade. It is recommended to drill a min 7/16 (8 mm) hole before cutting in the inside corner. In order to avoid creating a notch at the inside corner, cut edges should be sanded. General Information Safety As with all other building materials, safety precautions must be taken into account and local laws and regulations must be observed. Cutting and drilling are subject to dust development, and proper precautions must be taken by using appropriate dust extraction equipment. Dust from the panel is characterized as mineral dust and a prolonged exposure to this may cause lung disease. Fast running electrical equipment such as hand held circular saws leave a fine and sharp edge on the panels and create fine dust. Due to the speed of the blade the dust can be dispersed over a larger area. Therefore, it is necessary to establish sufficient exhaustion and it is recommended the operator carry personal safety equipment (for further information please check the MSDS for the M4 product). Service If you have any questions regarding the Multi-Panels panels, our dedicated service team is ready to assist you with advice and guidance. Please visit our website for more information. Application conditions The panel temperature and ambient temperature should be + 44 F (+7 C) - 86 F (+30 C) and relative humidity <85 % (optimally 60 %). Process temperature must be min +44 F (+7 C). Storing and proper handling Multi-Panels products are delivered with plastic protection cover on the pallet. When undamaged, the plastic cover protects against weather conditions during transportation. The pallets should be kept under a roof, leaving the possibility of ventilation around the panels. Multi-Panels must be stored on a flat, dry and level surface on pallets or sleepers with a min. distance of 12 between the stacks on all sides. Note: Max. 5 pallets in a stack at the warehouse and on the building side max. 2 pallets in a stack. The panels must be lifted up and off the pallet and not drawn over the next board, as this will cause scratches and damage on the surface. Lift pallet crosswise and set forks apart to minimize bending of pallet. Fork length must support pallet entirely; if required, use fork extensions. 8

Impact by Pollution and Nature Weather and nearby vegetation may affect the appearance of the panels. Take caution to avoid pollution, dust and leaves from trees, bushes, and flowers to not impact the integrity of the panels. Warranty This warranty covers: The M4 panel fulfills ICC-ES AC 269.2, AC386 and AC 376 and the warranty covers the certification scope. Multi-Panels Corporation offers a warranty for a period of 10 years, beginning on date of delivery, provided that, the panels were cut/drilled/stored/installed/used per the prescribed system components etc. according to the Installation Manual. The warranty does not cover: color fading, environment impact on the panels such as pollution, etc. Replacement: Any panels which do not comply with these quality standards according the ICC-ES AC 386, AC 269.2 and AC 376 scope, will be replaced free of charge, from our Los Angeles warehouse, on condition that Multi-Panels Corporation is notified within a period of 4 weeks of delivery and the claim is accepted by Multi-Panels Corporation. In particular, the warranty covers neither the transport costs nor labor expenses for dismantling and dumping defective panels and installing new panels. Multi-Panels Corporation shall not be liable for failure of performance hereunder due to force majeure. Disclaimer The information contained in this manual is based on Multi-Panels general experience, best knowledge and belief, however because of factors that fall beyond Multi-Panels knowledge and control, which can affect the use and function of the products, no warranty is given or implied with respect to the information. Multi-Panels policy is one of continuous improvement and therefore reserves the right to alter specifications at any time and without notice. In case of doubt, please contact your local Multi-Panels representative. 9