NATIONAL GOVERNMENT CONSTITUENCIES DEVELOPMENT FUND BOARD KITUI WEST CONSTITUENCY PROJECT PROPOSAL FINANCIAL YEAR 2017/2018

Similar documents
5 Committee Expenses Payment of committee sitting allowances, transport, conferences

Committee expenses Committee expenses 1,482, On going. CDFC/ PMC Capacity building CDFC/ PMC Capacity building 1,000,000.

Deck Tutorial. Decks and Porches. Drawing Decks

Deck Tutorial. Decks and Porches. Drawing Decks

REVENUE MOBLISATION, ALLOCATION & FISCAL COMMISSION

Deck Tutorial. Chapter 8: Decks and Porches

Marcus Moziah Garvey Elementary School

OCPS Submittal Register for Product Data and Shop Drawing Reviews

Malle classroom furniture

Everett McKinley Dirksen Elementary School

DESIGN INSTRUCTIONS TO ARCHITECTS AND ENGINEERS [ ] SCHEMATICS [ ] DESIGN [ ] CONSTRUCTION

Beit Hanina School. Remarks: Work Plan. Basement floor Plan. Scale: 1:50 Sheet name: A1

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

A1.1 FOX GARAGE VAN VAN VAN VAN 11/16/ WASHINGTON BLVD ST. LOUIS, MO REVISIONS FLOOR PLAN - LEVEL /01/14

ADMINISTRATION DEPARTMENT Plant Management Division. An Inventory of Its State Office Building Drawings

Amos Alonzo Stagg Elementary School

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

My CDM Visit: A Social Story. We Find the Museum We might drive to the event. We might park the car and walk over to the Museum.

St. John s United Methodist Church Facility Stewardship Plan Last update: 9 May 2011

3D Weaving Innovation Centre Disruption to Clothworker South

Example Macro WTS Facility

Deck Tutorial. Chapter 8: Decks and Porches

AUCTION CATALOGUE 10H00

BUILDING REGISTER AND SUMMARY OF RESULTS

Wendell Smith Elementary School

WINTER 15 EXAMINATIONS Subject Code: Model Answer- Building Drawing Page No- 01 /15

Deck Tutorial. Chapter 6: Decks and Porches

EPIC Academy High School

Residential Construction Checklist Single and Two Family Construction

Architecture, Construction, and Engineering Technical Charter

Shades of blinds for greenhouses A01G 9/22 Shop furniture Picture frames

Jackie Robinson Elementary School

RUDRAKSH RUDRAKSH. Key Plan 2,3 & 4 BHK LUXURIOUS APARTMENTS. Developers: Trisha Infrastructure Ltd. Architect: Foram Architect & Engineers

Andrew Carnegie Elementary School

FACTORY. Presentation sketches Actual Site photographs Drawings

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

DPTI.UNLEY HS STEMWORK Sheet No Sheet Size Sheet Name

ADDENDUM #2 September 12, 2018

East African Roofing Systems Ltd.

MIDDLE SCHOOL EXPLORING TECHNOLOGY (ONE PERSON LAB) New Construction

S T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD

Boom Concrete, Inc. Clovermist Precast Vault Toilets

Morton School of Excellence

Alexander Graham Bell Elementary School

A Buyers Premium of 11% inclusive of GST is payable by the purchaser on top of the hammer price on all lots sold.

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

The TRADITIONS Collection

How to measure guide

Celestial. Celestial C

Lists of Products FERRÁLIA 2012 DOOR AND FURNITURE FITTINGS AND HARDWARE. pág. 1 de 8 mod. 093b

Typical Drawings for Schools

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

Right On Replicas, LLC Step-by-Step Review * 1959 Chevy Impala Hard Top 2 n 1 1:25 Scale Revell Model Kit # Review

No 6 Guest House, Church Walks, Llandudno, LL30 2HD

Solutions AGRICULTURAL LABORATORY & CLASSROOM FURNITURE. Education to Industry. Solutions for Your Workspace & Storage Needs

SYSTEMS+ ACOUSTIC REQUIREMENTS INNOVATIVE SYSTEMS SOLUTIONS USGBORAL.COM

Walt Disney Magnet Elementary School

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

Contents. Technical Metal Industrial Co. L.L.C.

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

North Lawndale College Prep Charter - Collins

Charles N Holden Elementary School

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

John Milton Gregory Elementary School

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

Registered Workshops

Langston Hughes Elementary School

The Old Police House Hinwick Road Podington NN29 7HU

SKY LIVING COSMOPOLITAN. Start a brand new sky-high chapter of your life in luxury.

University of Houston Master Construction Specifications Insert Project Name SECTION MECHANICAL SCOPE OF WORK PART 1 - GENERAL

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

SCHEDULE OF RATES FOR EXTERNAL REDECORATION AND PRE-DECORATION REPAIRS

Exhibit Display Rules and Regulations

Perkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet

Huntington Beach City School District. M e a s u r e Q B o n d I m p l e m e n t a t i o n S i t e C o m m i t t e e M e e t i n g M a y

SCHEDULE 1 OFFICERS TO WHICH THE POWERS AND FUNCTIONS ARE DELEGATED

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:

Reuse Inventory: 309 W. Wash, Version 1. Legend. Building Materials. July 26, 2005

Revised April Unit/Standard Number. Proficiency Level Achieved: (X) Indicates Competency Achieved to Industry Proficiency Level

Sauna Barrel 2.5 M. health, beauty, peace of mind

SLIDING SYSTEMS. Product catalog 2017

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

DETAILED ESTIMATES OF INCOME Revised Estimates

The Mayberry. Bayfront Single - Family Homes OPTIONAL ELEVATION B. *Rendering is Artist s Conception.

Once you select a model from the model list you will see the following index.

EVACUATION PLAN E G A C H J. Sligo I.T Campus Layout. Evacuation Plan Assembly Points. Assembly. Point 7. Assembly. Point 8. Assembly.

John Spry Elementary Community School

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Robert Fulton Elementary School

40' - 8" x 18' - 0" PROPOSED ONE STORY ADDITION 9' - 0" 22' - 8" 9' - 0" ELEV. -0'-7" ELEV. 0'-0" NEW SUNROOM 22'0 x 17'0 COFFERED CEILING

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

Section 7 - Price Schedule

James Shields Middle School 2611 W 48th St Chicago, IL 60632

APPLICATION NOTE. Using Oberon's 1020 Series Indoor/Outdoor Enclosures in Stadiums and other High Density Venues

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

PROJECT PEGASUS TEMPORARY BUILDINGS EXHIBITION

Rwabushenyi Memorial Open Chess Championships th November to 3 rd December 2017 Kampala, Uganda

Transcription:

S/NO PROJECT NAME PROJECT ACTIVITY AMOUNT STATUS ADMINISTRATION AND RECURRENT EXPENDITURE 1 Employee Payment of NG-CDFC staff salaries and Gratuity 1,650,000.00 On-going salaries 2 NSSF Payment of NSSF Deductions 28,800.00 On-going 3 NHIF Payment of NHIF Deductions 49,800.00 On-going 5 Goods and Services 6 Committee Expenses Payment of Committee Sitting allowances, Transport, fuel, conferences, Stationery, Printing, Rent Payment of committee Sitting allowances, Facilitation, Transport, fuel, conferences and Seminars 1,980,020.76 On-going 500,000.00 On-going MONITORING EVALUATION AND CAPACITY BUILDING 7 Goods and Purchase of fuel, Printing, stationery, airtime, travel and 484,310.34 On-going Services Subsistence 8 Committee Payment of committee Allowances, Facilitation, Transport, 620,000.00 On-going Expenses Conferences and Seminars 9 NG- Training of NG-CDFC, PMCs and NG- NG-CDFC Staff on NG- 1,500,000.00 On-going OTHER PROJECTS 10 Kitui West NG- CDF Office Construction (Phase II) Completion of NG-CDFC Office: - Chain-Link Fencing and a Gate, 5 Door Pit Latrine with Urinal, Car Parking, Paving Slab, 2 Water Tank Bases, 2 Plastic Tanks (10,000 Liters), Grillage, Others: - Walling, Doors, Windows, Ramp and Stairs. 5,000,000.00 On-going Page 1 of 12

11 Furnishing and Equipping of NG-CDF Office Purchase of office furniture and equipment - Office tables and Chairs, Conference tables and Chairs, Waiting benches, Work station, Coat hangers, Steel cabinets, Padlocks, Curtains (Assorted), Laptops, Desktops, Printers, Photocopier, Water dispensers, Refrigerator, Power UPS. 3,000,000.00 New 12 Constituency Innovation Hubs Project Installation of Satelite antenna, Router, Digital access kit, Digital ruggedized Tablet, WI-FI with outdoor wireless device complete with 12U cabinet with installation accessories by Telkom Kenya Ltd - in Mutonguni, Matinyani, Kauwi and Kithumula / Mutonga Wards @Kshs 1,169,256.80 each 4,677,027.20 New 13 Constituency Strategic Plan 2017-2022 Consultative and Validation forums, Consultancy fee, Fact sheet data collection, Printing and Launching of the Strategic Plan. 3,200,000.00 New 14 Kwa Mutonga Completion of Social Hall:- riddles, roofing, shuttering, 800,000.00 On-going EMERGENCY Emergency To cater for emergency needs in the constituency 4,568,965.52 On-going BURSARY 15 Bursary - s Payment of bursary to needy students in secondary s 9,702,586.00 On-going 16 Bursary - Payment of bursary to needy students in Tertiary Institutions 7,500,000.00 On-going EDUCATION PRIMARY SCHOOLS Page 2 of 12

17 A.I.C Kiuwani 18 Kaanzoni 19 Kakumi Primary 20 Kalimani Completion of 1 classroom: - Plastering, flooring. Completion of 1 classroom:- Plastering, Flooring, Window panes 300,000.00 On-going 21 Kangungi Completion of Fencing the school Compound (chain-link) 22 Katheuni 23 Kathuma 24 Kauma Primary 25 Kavoo Primary Completion of 1 classroom:- Plastering, Window panes and Painting. Completion of 1 classroom:- Plastering, flooring, shatters and Painting. Completion of an Administration Block:- Plastering, Flooring, Painting and Partition. 300,000.00 On-going 500,000.00 On-going Page 3 of 12

26 Kiseveni Plastering, flooring, shutters and painting of 6 classrooms. 696,421.00 New 27 Kunikila 250,000.00 On-going 28 Kwa Mukoo Completion of 1 Classroom:- Shuttering 29 Kwa Silu 30 Kyambevo 31 Maaini Primary 32 Malatani 33 Manzi-Itumo 34 Mumbuni Completion of An Administration Block: - Plastering, Flooring, Painting and Partition. Completion of 1 classroom:-roofing, Plastering, Flooring, shuttering 300,000.00 On-going 300,000.00 On-going Page 4 of 12

35 Mwatate Completion of 1 classroom:- Plastering, Flooring, Window Panes 36 Ndiuni Primary 37 Nzemeli 38 Syomuitu Completion of 2 classrooms:- Shuttering and painting Completion of 1 Classroom:-Plastering, Flooring, Shutters and Flooring 300,000.00 On-going EDUCATION SECONDARY SCHOOLS 39 Iiani Construction of a Science Laboratory:- Flooring, Plastering, Shuttering, piping system and painting. 1,000,000.00 New 40 Ilako Mututa 41 Katheuni 42 Kithumula 43 Kitunduni Completion of a Library: - Roofing, Shuttering, flooring, Painting and Electrical wiring. Equipping of Science Laboratory:-Tables, Sinks, Gas and Water piping. 700,000.00 On-going 1,000,000.00 New Completion of Multipurpose Hall:- Walling and Roofing 1,500,000.00 On-going Completion of 2 classrooms:- plastering, flooring, shuttering 1,000,000.00 On-going Page 5 of 12

44 Kivani Mixed Day Sec. Completion of Science Laboratory:- Walling, roofing, plastering, flooring and painting. 1,000,000.00 On-going 45 Kwa Mwambi 46 Kyeni Mixed Day Sec. Completion of Science Laboratory:- Roofing, Plastering, Flooring, shuttering Completion of 1 classroom:- Plastering, Flooring 1,000,000.00 On-going 47 Matinyani Boys' Sec. 48 Mikuyu Mikya Mixed Day Sec. Completion of Dormitory:- Roofing, Flooring, Plastering, Plumbing, electrical wiring and painting. Completion of a Dormitory:-Roofing, Flooring, Plastering, Shuttering 1,400,000.00 On-going 1,500,000.00 On-going 49 Mithiikwani 50 Mutonguni Girls' Sec. 51 Mutulu Sec. 52 St. Benedict Kwa Mutonga Sec. Completion of Administration Block:- Raising of walls, roofing, flooring and painting Completion of Fencing of school Compound (chain-link) and Ceiling of Science Laboratory Completion of 2 Staff houses:- Flooring, shuttering, Plumbing, electrification, Security Grills Completion of a Multi-Purpose Hall:- Shuttering, plastering, Flooring and painting. 1,000,000.00 On-going 700,000.00 On-going 1,000,000.00 On-going 1,000,000.00 On-going Page 6 of 12

53 St. Michael Kavumbu Sec. 54 St. Pauls Kalinditi Completion of 2 classrooms:- Plastering, Flooring, shuttering 400,000.00 On-going 55 St. Peters Construction of 1 classroom to completion 1,000,000.00 New Ngengekani Sec. 56 St. Philips Mutini Completion of a Dining Hall:- Roofing, window panes, plastering, Flooring and painting. 1, 57 Utoo Mixed Day Completion of 2 classrooms:- Plastering, Flooring, shuttering 500,000.00 On-going TERTIARY INSTITUTIONS 58 Kauwi Resource Completion of Resource Centre:- Flooring, Plastering, ceiling, 500,000.00 On-going SECURITY PROJECTS 59 Kalimbevo Assistant Chiefs Office 60 Kasakini Assistant Chief Office Construction of office to completion @ Kshs. 800,000 and furnishing @ Kshs. 300,000 ( Chairs, tables, Waiting benches and curtains) 1,100,000.00 New Completion of Office:- Plastering, Flooring. 100,000.00 On-going Page 7 of 12

61 Katheuni Assistant Chiefs Office 62 Kiseveni Assistant Chiefs office 63 Kithuiani Assistant Chief Office 64 Kyondoni Admistration Police- line 65 Matinyani Police Head Quarters 66 Mutonguni Chiefs Office 67 Mutulu Admistration Police- Line 68 Nzakame Assistant Chiefs Office 69 Nzinia Assistant Chief office Construction of office to completion @ Kshs. 800,000 and furnishing @ Kshs. 300,000 ( Chairs, tables, Waiting benches and curtains) Construction of office to completion @ Kshs. 800,000 and furnishing @ Kshs. 300,000 ( Chairs, tables, Waiting benches and curtains) Construction of office to completion @ Kshs. 800,000 and furnishing @ Kshs. 300,000 ( Chairs, tables, Waiting benches and curtains) Completion of 4 Admistration Police Units: - Plastering, flooring, Shuttering and Verandah. Completion of the Administration Office:- Plastering, flooring, Shuttering, Partition Completion of Office:-Shutters, Plastering, Flooring, electrification Completion of 7 Admistration Police Houses:- Walling, Roofing, Plastering, flooring, Shuttering. Construction of office to completion @ Kshs. 800,000 and furnishing @ Kshs. 300,000 ( Chairs, tables, Waiting benches and curtains) Completion of the Office:-Partition, Plastering, Flooring and Painting. 1,100,000.00 New 1,100,000.00 New 1,100,000.00 New 250,000.00 On-going 1,180,000.00 On-going 300,000.00 On-going 1,500,000.00 On-going 1,100,000.00 New SPORTS 70 Constituency Constituency Sports Tournament: supply of balls, nets, 1,736,207.00 On-going Page 8 of 12

ENVIRONMENT 71 Mutulu 72 Kauma 73 Kyaani Girls 74 Matinyani Boys' 75 Kalimani 76 St. Johns Kwa Mulungu 77 St. Benedict Kwa Mutonga Page 9 of 12

78 St. Philips Mutini 79 Katutu Girls 80 Katheka Boys 81 Kasue 82 Ilako Mututa Sec. 83 Kakeani 84 Musengo 85 Mutonguni Girls' Page 10 of 12

86 Mutonguni Boys 87 Muthamo 88 Muthale Girls Sec. 89 Kauwi 90 Kyondoni Girls Sec. 91 Kwa Mutonga 92 Kathivo Primary 93 Kyondoni 94 Matinyani AIC Page 11 of 12

95 Mutonguni Supply and installation of 2 Litter bins and 2 Hand washing 56,207.00 New Page 12 of 12