Trim type: Shadow gap. Fire rating: FD30. Enigma. Pocket sliding door systems. Installation instructions FD30 S

Similar documents
Arriva. Concealed frame doorsets. Installation instructions

Fire rating: NFR/FD30. Una. Riser door systems. Installation instructions

Innova. Concealed frame doorsets. Installation instructions

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

ROOM FOLD SLIDING FOLDING INTERNAL DOORSET FITTING & FIXING GUIDELINES

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height

x2 1/4 (6mm) Floor Anchor

INTRODUCTION Tools Required Laminate Washroom Products... 4 DUCT PANELS Fixing the Frame: Fixing the Shadow Panels...

BARN DOOR HARDWARE KIT

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

x2 1/4 (6mm) Floor Anchor

Installation Instructions

Installation Instructions

EMAC 001 ACCESS PANEL

ASS 70 FD folding / sliding door. Installation Guide

Side Light Frame Pack Assembly Instructions

Side Light Frame Pack Assembly Instructions

Installation Guide. Bi-fold Doors

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT

Stage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).

Before fitting door, check opening size and squareness of timber frame. The door is made smaller to give correct clearance within the frame.

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

ASS 70 FD folding/sliding door installation guide

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

INSTALLATION INSTRUCTIONS

B A T H R O O M G L A S S

BD101K / BD101K INSTALLATION GUIDE BARN DOOR HARDWARE TOP OF DOOR STRAP KIT

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

How To Measure Your Finished Opening

TIP FOR GETTING STARTED

Sliding Door Kit

Method of Build 1. Fire. Sound

Installation Guide Contemporary Alfresco V1.3 LU

Step by Step Installation Instructions. Poly Shutters. Customer Service or visit us online at smithandnoble.com

LEGENDS RETRACTABLE DOOR SCREENS

Privacy Wall Glass Selections - Polished Edge Slider Door

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Oxford Stalls Installation Instructions

Thank you for your order

Installation Guide Simplicity Alfresco. V1.9 Lu070318

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

HIDEAWAY SERIES POCKET DOOR SYSTEM ASSEMBLY INSTRUCTIONS

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun

INSTALLATION INSTRUCTIONS

MIRAGE-X / BELLA. Shower Door Installation Instructions

Shed Assembly Instructions

Assembly Instructions 10 X 10 Aluminum Frame Building

INSTALLATION INSTRUCTIONS

Portofino Installation Guide

* * 98/9950WDC. Fire-Rated Devices include these. additional components. 1-Point Latch (LBL)

Deauville Installation Guide

Portofino Case2 Installation Guide

Section 1. Kitchen installation. Base cabinets

Revision Date: April 01, Paramount Enclosure

Sectional Door Installation Instructions

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Blokes Shed INSTALLATION INSTRUCTIONS Custom Design & Build. Nationwide Delivery

Installation Instructions

Method of Build 1. General

Deauville Installation Guide

ASSEMBLY INSTRUCTIONS

Chapter 20. Exterior Finish Work

Fire Door Maintenance Scheme Accepted Repair Techniques

Dubnium 11 Installation Instructions & Parts List

S T A I R B A L U S T R A D E E L E M E N T S P R E - D R I L L E D R A I L S Y S T E M

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

INSTALLATION INSTRUCTIONS

PATIO INSTALLATION MANUAL

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

Curium 19H Installation Instructions & Parts List

Radon 07 Installation Instructions & Parts List

INSTALLATION INSTRUCTIONS

Dura-Lock Roof System

Sauna & Steam. Vision Sauna Manual Wall Hung Heater Version (Covers all models)

Deluxe Cabana INSTALLATION INSTRUCTIONS. INSTALLATION Deluxe INSTRUCTIONS Cabana

Installation Operation Care

UNIT No FRAMELESS PIVOT SHOWER DOOR

Garage. Door. Unframed Tracked Fitting Instructions V2.2. fitting instructions. Warning!

INSTALLATION INSTRUCTIONS

Thermally Broken Framing and Door Installation

Chapter 9. Windows and Exterior Doors

CORNER ENTRY ENCLOSURE

LEGENDS RETRACTABLE DOOR SCREENS

ENIGMA AIR ENCLOSURE

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

Assembly and Installation Guide

HOW TO INSTALL YOUR DIY SHUTTERS

Closet System Installation Manual

Frameless Fixed Panel Slider

patio door installation guide

Curium 19.4H Installation Instructions & Parts List

mistley PELE Installation Guide vapr16 Mistley Bathroom Glass Limited No 4 One Mistley Quayside, High Street, Mistley, Essex CO11 1AL England

INSTALLATION INSTRUCTIONS

Murphy Door DIY Hardware Installation Manual

Transcription:

Trim type: Shadow gap Fire rating: FD0 Enigma Pocket sliding door systems 1 2 FD0 S Installation instructions

Thank you for choosing Enigma To ensure the installation process is simple and efficient we recommended you read this guide in full before you begin. Getting started Before you start installation ensure you have read and understood the instructions. Tools required Delivery The Enigma pocket door system will be delivered in two boxes. One is the pocket frame and the other is the trim surround. If a door leaf has been ordered this will Pencil Spirit level Cordless screwdriver Tape measure Tin snips or hacksaw come separately. Set square Knife Power chop saw Allen keys (metric) Pin hammer Fire certifi cation guidance If using a lock on a fire rated doorset the lock must be lined with a 1mm intumescent pad. Flush door handles - Based on the test evidence cited within FEA/F97097 Revision G which permits the machining of the Halspan 0 Prima/Optima door core to a minimum thickness of 26mm in order to achieve a paneled door appearance, fl ush door handles may be fi tted subject to the restrictions below: 1. Where handles are fi tted back to back, handle thickness is limited to 9mm. 2. Where handles are staggered between the two leaf faces a maximum handle thickness of 15mm is permitted, the handle pockets must be separated by a minimum of 100mm of leaf core material.. Handle dimensions are limited to a maximum of 200mm in height and width at the thicknesses shown above. 4. Handles must be fi tted a minimum of 125mm from leaf edges. 5. The pocket formed to receive the handles must be lined with 1mm thick Interdens or MAP paper from Dufaylite Developments or Lorient Polyproducts Ltd. Scan to watch the installation video. www.selo-uk.com/video

Enigma Kit contents 5 Trim components Enigma FD0 Shadow gap frame kit Trim fixings 1 Head trim 2 Leading edge trim Strike trim part 2 (Single door x1, Double door x2) (Single door x2, Double door x4) (Single door x2, Double door n/a) 1 Type-5 25mm self drilling screws 2 Type-7 5mm self drilling drywall screws Type-8 42mm self drilling drywall screws 4 Strike trim part 1 5 Shadow gap cover trim (Single door x1, Double door n/a) (Single door x5, Double door x6) 6 Shadow gap plaster bead 4 Type-9 50mm gold screws 5 0mm Panel pins 7 Intumescent seals 8 Strike jamb seals (20x4mm, 15x4mm) www.selo-uk.com Enigma Pocket sliding door systems

Enigma Door leaf installation 7 A) Door leaf installation With the FD0 concealed system the door leaf needs to be hung before the frame is fitted. 1 Fit brush strip Fit the guide channel Cut the brush strip to length and fit to the Tap the black nylon door guide channel into leading edge aluminium profile. the groove in the bottom of the door. If you are using the simultaneous opening mechanism then it needs to be installed before you fit the frame. 2 Fit head brackets 4 Assemble gear Fit the head brackets 150mm from edge of the door Insert trolley s into track and adjust the bolts leaf to centre of the bracket. Use screws provided. so it sits 20-25mm beneath the track. 1. If you are using the simultaneous opening mechanism then it needs to be installed now. If using a simultaneous opening the door leaf height needs to be reduced by an extra 5mm. 2. If you are using a touch latch mechanism then fit plasterboard to one side of the wall only until the touch latch is fitted and working correctly.. If using a self closer then please refer to the self closer installation instructions.

Enigma Door leaf installation 9 5 Hang the door 7 Fit track end block Hang the rear door bracket onto the trolley bolt. The track end block fits at the end of the track for a single door and in the middle of the two tracks for a double door. First drill a pilot hole and fix the block into place using the type 10 screw. 5.1 The bracket fits onto the bolt as shown 5.2 Feed the rest of the door at least halfway into the pocket and hang the front bracket onto the trolley bolt 5. Ensure the door is plumb and level. Bolts in the roller trolley can be used for adjustment 5.1 5.2 6 Fit the front door stop Slide the white nylon door stop into the track and fix into place by tightening the grub screw. If using a soft closer follow the specific soft closer instructions. Visit our website, loaded with the content and features you want to see. www.selo-uk.com Enigma Pocket sliding door systems

Enigma Trim installation 11 B) Trim installation Now the door leaf is hung you are ready to install the concealed frame. Install strike trim part 2 Cut the strike trim part 2 to the opening height. Fit either side of the strike trim part 1 as shown and fix into place using Type-6 screws. 1 Install leading edge trim Cut the leading edge trim to the height of the opening and fix into the aluminium profile flange using Type-5 screws. 4 Install head trim Cut the head trim to the distance between the two timber side jambs. Slot into place in the head. 2 Install strike trim part 1 Cut the strike trim part 1 to the opening height (underside of the head profile to floor) + 10mm. Notch the top of EN0 so it fits centrally in the head channel. When installing double doors the strike jamb will not be used. 5 2nd layer of plasterboard Clad the pocket with a second layer of plasterboard over the timber frame. Using Type-7 screws.

Enigma Trim installation 1 5a 2nd layer of plasterboard 8 Fix remote stop into place The second layer of plasterboard needs to stop short of the timber frame edge by 40mm. Adjust the remote stop so it holds the door flush with the pocket end and fix into place with the self drilling screw provided. This allows for the shadow gap and trims. Once you have done this make sure you clear away any swarf that has dropped down from fixing the screw onto the track. If left there the swarf will stick to the trolley wheels and caused the wheels to rumble as it opens and closes. 6 Fit the shadow gap trim 9 Final adjustment to front door stop Cut the timber shadow gap trim to height and Make final adjustment to the plastic to width. It will need to be mitred at 45 degrees in stop so that it stops and holds the door the corners. in its correct position. Fix the trim into place using pins. 7 Fit the shadow gap plaster bead 10 Plaster/tape joint and paint Cut the shadow gap plaster bead to length Now the wall can be plastered or tape and mitring it at the corners. jointed up to the plasterboard shadow gap trim. Fix into place using Type-8 screws. Once the plaster/jointing compound has dried the walls and trims can be decorated. Before plastering in the trims, using a laser level ensure that they are straight and true.

Enigma Trim installation 11 Fit seals Intumescent seals Fit the intumescent seals supplied into the grooves in the timber trims as per the drawings below. Strike seals The strike jamb seals are self adhesive and are fitted to the corner of the strike jamb. Find out more For help and advice with your installation contact our experienced team. call 020 880 09 / email sales@selo-uk.com Visit our website, loaded with the content and features you want to see. www.selo-uk.com 11a Intumescent seal placement Head detail Leading edge detail Closing edge detail Double door meeting stile In order to achieve a FD0 fire rating, intumescent seals must be fitted as shown. If you have double doors the meeting stile of one door leaf needs the seals fitted as shown. These will be specifically labelled in the pack you receive. 2015 by Selo. All rights reserved. No part of this publication may be reproduced in any material form (including photocopying or storing it in any medium by electronic means and whether or not transiently, or incidentally to some other use of this publication) without the written permission of the copyright owner. Application for the copyright owner s permission to reproduce any part of this publication should be addressed to Selo. Where colour and finish samples are shown within this document limitations in the reprographics process mean absolute colour accuracy cannot be guaranteed. Where colour matching is critical, a sample of the material can be provided on request. Selo reserves the right to alter specification and designs without prior notice. Revised - September 2018

For help and advice with any Selo product, call the support team on: 020 880 09 call 020 880 09 email sales@selo-uk.com www.selo-uk.com Selo K2 Kents Hill Business Park Timbold Drive Milton Keynes MK7 6TT Connect @selosimplicity