भ रत य ब ध स थ न क षक ड़ आई आई एम क षक ड़ क पस - प ओ IIM KOZHIKODE CAMPUS P.O., KOZHIKODE-673 570, KERALA PHONE: (0495) 2809195, 2809217, 2809214 FAX: (0495) 2803010-11 Website: www.iimk.ac.in NOTICE INVITING QUOTATION FOR MODIFICATION OF DIRECTOR S OFFICE AND PROVIDING CABIN IN THE EPGP OFFICE Issued to: Date of Issue of NIQ : 26.05.2017 Issue of Quotation Form : 26.05.2017 to 16.06.2017 Last date for submission of Quotation : 19.06.2017 up to 03.00 p.m. Date & Time of opening of Quotation : 19.06.2017 at 04.00 p.m. Cost of Quotation Form : ` 525 [Including 5% VAT] Probable Amount of Contract : ` 4, 55, 000/- Earnest Money Deposit : ` 11,000/Page 1 of 21
NOTICE INVITING QUOTATION No: IIMK/CIVIL/273/2017-18 dt. 26.05.2017 Sealed Quotations are invited by the Director, Indian Institute of Management, Kozhikode, Kerala, from experienced Civil contractors for Modification of Director s Office and providing cabin in the EPGP office 1. Quotationers should quote their rates for each item. 2. Quotations not properly filled, mutilated, with incorrect calculations or generally not complying with the conditions are liable to be rejected. 3. Each page of the Quotation should be serially numbered and signed. The covering letter should clearly specify the total number of pages in the Quotation submitted by the Quotationer. 4. Quotation is to be signed by the authorized signatory. Unsigned Quotations will summarily be rejected and no correspondence shall be entertained. 5. The Quotation shall remain valid for acceptance for a period of 90 days from the date of opening of Quotation. 6. The rates quoted shall be inclusive of cost of materials, labour & hire charges of equipment, taxes (Sales tax, service tax, etc) & duties, handling, transporting and other incidentals for proper completion of the work. 7. The rates have to be quoted in the prescribed form issued from the Institute. 8. E M D amounting to ` 11,000/- should be furnished while submitting the Quotation in the form of Demand Draft / Deposit at call receipt / Fixed Deposit (beneficiary being IIMK), etc. of a scheduled bank. Quotations received without E M D or with E M D in any other form than stated above are liable to be rejected. The EMD will be refunded to the unsuccessful Quotationers within one month of the acceptance of the quotation. 9. Performance guarantee (Security Deposit): Within Seven days of the award of the contract, the Contractor shall furnish to the Institute a bank guarantee / Demand Draft / Deposit at call receipt Fixed Deposit (beneficiary being IIMK) for a sum equivalent to 7% of contract value as Performance guarantee (Security Deposit) valid for the duration of the contract period. 10. After acceptance of the Quotation, the Quotationer shall sign the necessary contract agreement in non-judicial stamp paper worth Rs 200/within five days of intimation in the prescribed form. Expenses for the agreement including cost of stamp papers etc. shall be borne by the Contractor. 11. Retention money: Retention money @ 5% of the bill amount shall be deducted from payment. Page 2 of 21
12. The Retention money / Security Deposit shall not bear any interest. 13. The Security deposit shall be returned after virtual completion of the work and the retention money shall be refunded after the defect liability period of One year. 14. The work shall be taken up immediately on receipt of Work Order and completed within 45 (Forty five) days. For any delay in completion, penalty will be imposed @ 0.5% of the quoted amount per week subject to a maximum of 2.5 % of the quoted amount. 15. All Safety measures should be taken while carrying of the work at site. 16. All materials used shall be ISI or approved equivalent. 17. The contractor, during execution of work shall ensure that they shall not cause any damages to the structure where the work is under taken. Any damage caused to the building has to be made good at the contractors own cost. 18. During execution of the work the contractor shall ensure the work will not be effected the working office. 19. Upon Completion of the work all the areas (All floors, doors, windows, surface, etc) should be cleaned. 20. The payment shall be effected for the bill submitted, after satisfactory completion of the work, on the basis of actual quantity of work carried out. 21. The Contractor shall observe all the existing rules and regulations regarding labour employment and shall indemnify and keep the Institute indemnified from all the claims in this respect. 22. No alternations in Quotation forms shall be made by the Quotationer and if any such alteration is made, the Quotation is liable to be rejected. 23. The acceptance of Quotation will rest with the Institute, which does not bind itself to accept the lowest Quotation and reserve to itself the authority to reject any or all of the Quotations received, without assigning any reasons. 24. Normal payment terms acceptable to the Institute shall be 30 days of satisfactory completion of the entire works. 25. During the warranty/defects liability period, the contractor shall be responsible for attending to all defects pointed out by the institute, and shall replace the defective parts/items at no extra cost. 26. Demurrages and penalty, if any, paid by the supplier due to his/her fault shall not be borne by the Institute. Page 3 of 21
27. The Quotations submitted shall clearly mention the name of the firm/person in whose favor the Work order is to be placed. Any request made after submitting the Quotation for changing the name of the firm in whose favor the purchase order is to be placed shall not ordinarily be entertained. 28. The Quotationer shall attach catalogues and other details of the products quoted. 29. The Contractor should have his/her own capability for repair and maintenance of the item quoted locally. 30. IIMK reserves the right to alter and revise the technical specifications or the required quantity of the items at any point of time. In case of such alteration, the Quotationers shall be duly notified. 31. Quotationers are to abide by all the Terms and Conditions detailed above. In case these terms and conditions are not acceptable to any Quotationer, he/she should clearly specify the deviations in his/her Quotation. IIMK reserves the right to accept or to reject them. 32. Every Quotationer is expected to inspect the site of the proposed work at his own cost before quoting his rates. He must also go through all the drawings and documents. It will be construed that the contractor has inspected the site and satisfied himself about site conditions, nature of work, availability of labour and materials and other relevant matters, before quoting his rates. 33. In case of any dispute, the decision of the Director of the Institute shall be final and binding on both the parties. 34. Approved make of Materials Plywood : Archid ply/century ply/ approved equivalent. Distemper : Asian/Berger/Nerolac Glass : Saint Gobain/Modifloat/approved equivalent Aluminium sections : Hindalco/Jindal/approved equivalent. 35. The Quotations along with all necessary documents in sealed envelopes should be sent to the following address, super scribing the name of work and Quotation number. Alternatively, the contractors can drop the Quotation in the Box, entitled Engineering Section kept near Reception Counter in Administrative Block. THE CHIEF MANAGER (INFRASTRUCTURE) IIM KOZHIKODE CAMPUS P.O. KOZHIKODE 673 570 KERALA 36. IIMK is not liable for non-receipt of the Quotation forms in time due to change in address on the envelope. Page 4 of 21
37. Quotation documents received after the last date and time for receiving Quotations will be summarily rejected and no correspondence shall be entertained in this regard. 38. Quotation Document can either be obtained from the office of the Engineering (Civil) from 26.05.2017 to 16.06.2017, up to 5.00 pm on payment of Rs 525/- by Demand Draft/Bankers Cheque/Pay Order drawn in favour of Indian Institute of Management Kozhikode payable at Kozhikode or the Quotation Document can be down loaded directly from the web site of the Institute. In case the Quotation Document is down loaded from the Institute s web site, the cost towards Quotation Document and the proof for having carried out similar works as stipulated should be enclosed while submitting the bid. Quotations received without requisite papers/documents including cost of Quotation Document, EMD, proof for having completed similar works (as mentioned above), etc. will be summarily rejected. Chief Manager (Infrastructure) Page 5 of 21
Page 6 of 21
Page 7 of 21
Page 8 of 21
Page 9 of 21
Page 10 of 21
TYPICAL IMAGE OF WORK STATIONS Page 11 of 21
TYPICAL IMAGE OF PARTITION WALL Page 12 of 21
TYPICAL IMAGE OF WORK STATION. Page 13 of 21
SCHEDULE OF QUANTITIES Item No. Qty Description Rate (`) / Unit Amount(`) Modular Work stations (Linear) OF Size 1800 x 600 mm 1 2.00 Nos Providing and fixing modular work stations of Size 1800 mm x 600 mm, as per drawing and specifications as given below. 1) 600 mm width work top shall be made out of 25 mm thick exterior grade pre laminated particle board of approved make and shade as shown in drawings. The edge of the work top shall be covered with 3 mm thick PVC edge band matching to the table top laminate. The work top supported by 2nos of powder coated MS legs of appropriate size as shown in the drawing. 2) Providing and fixing 1 No powder coated metal key board tray of size 530 (W) x 350 (D) x 40 mm (H) with telescopic drawer slides. 3) Providing and fixing 1 No powder coated CPU trolley made of CRC steel. 4) Providing 2nos of metal race ways for UPS/Raw Power and Data/Telephone 1 No race way shall be provided beneath the work top and the other one shall be provided at floor/ skirting level. 5) The partition shall be made out of aluminium sections of appropriate size as shown in the drawing with approved colour powder coating. Panels will be covered with approved colour laminated board with combination of white board and soft board and finished with fabric of approved shade and make, including Page 14 of 21
Item No. Qty Description Rate (`) / Unit Amount(`) perforated metallic modesty panel with powder coated finish of approved shade all as per drawing. The thickness of partition shall be 60 mm as per drawing and the height shall be of upto 1200 mm. The partition shall have level adjusting arrangement. 8mm thick laminated glass screen should be provided as privacy screen between the work stations. 6) The end trims, top runners shall be aluminium powder coated and sharp corners shall be avoided. The Contractors are expected to visit the site and see the model work station put up at site prior to submit their offer. For easy reference photographs of the work station is attached in the quotation. 2 2.00 Nos Modular Work station (L Type) of size 1500 x 1500 Providing and fixing modular work stations of size 1500 mm x1500 mm, as per drawing and specifications as given below: 1) 600 mm width work top shall be made out of 25 mm thick exterior grade pre laminated particle board of approved make and shade as shown in drawings. The edge of the work top shall be covered with 3 mm thick PVC edge band matching to the table top laminate. The top supported by 2nos of powder coated MS brackets of appropriate size as shown in the drawing. 2) Providing and fixing 1 No powder coated metal key board tray of size 530 (W) x 350 (D) x 40 mm (H) with telescopic drawer slides. Page 15 of 21
Item No. Qty Description Rate (`) / Unit Amount(`) 3) Providing and fixing 1No powder coated CPU trolley made of CRC steel. 4) Providing 2nos of metal raceways for UPS/Raw Power and Data/Telephone 1 No race way shall be provided beneath the work top and the other one shall be provided at floor skirting level. 5) The partition shall be made out of aluminium sections of appropriate size as shown in the drawing with approved colour powder coating. Panel will be covered with approved colour laminated board with combination of white board and soft board and finished with fabric of approved shade and make as per drawing. The thickness of partition shall be 60 mm as per drawing and the height shall be of upto 1200 mm. The partition shall have level adjusting arrangement. 6) The end trims, top runners shall be aluminium powder coated and sharp corners shall be avoided. The Contractors are expected to visit the site and see the model work station put up at site prior to submit their offer. For easy reference photographs of the work station is attached in the quotation. 3 Middle storage unit 1.0 No Providing and fixing middle storage unit of size 900 (W) x 600 (D) x 1200 (H) with three horizontal partitions, one vertical partition and lockable double door, as per the drawing, made up of marine plywood (IS 710),of 18 mm thick for Sides, door, racks and backing. 1.5 mm thick laminate of approved Page 16 of 21
Item No. Qty Description Rate (`) / Unit Amount(`) make and colour should be fixed on all the exposed edges (external and internal portions) and synthetic enamel paint of two or more coats over a coat of primer should be applied on the back side of the storage unit. Rate quoted shall include all hardware items such as multipurpose lock, handles, auto closing hinges etc. of approved make. Shop Drawings to be approved by the Engineer in charge/ Institute. The storage shall be fixed between the Work stations as per the attached Drawing. 4 Partition wall 10.00 m2 Providing and fixing portion wall as per the available sample in the office and as per the specifications given below. The partition shall be made of aluminium frame with approved colour powder coating, panel covered with approved colour laminated board with combination of white board and soft board and is finished with fabric of approved shade and make, including perforated metallic modesty panel with powder coated finish of approved shade all as per drawing. The thickness of partition shall be 60 mm as per drawing and the height shall be of 1200 mm. The partition shall have level adjusting arrangement. The end trims, top runners shall be aluminium powder coated and sharp corners shall be avoided. Page 17 of 21
Item No. Qty 5 Description Rate (`) / Unit Amount(`) Storage unit 10.50 m2 Providing and fixing storage units (including overhead storage unit) using marine plywood (IS 710), of 18 mm thick for Sides, door, racks and backing. Vertical and horizontal shelves/ partitions should be provided at a distance of 400/500 mm or required available sizes. 1.5 mm thick laminate should fixed on all the exposed edges (external and internal portions) and synthetic enamel paint of two or more coats over a coat of primer should be applied on the back side of the storage unit. Cost shall include all hardware items required like multipurpose lock, SS handles, Hinges, magnetic catchers, etc. of approved brand (Hettich or approved equivalent) and manufacture. Measurement shall be taken in squire meters of front face area of the storage unit (i.e. length of storage X height of storage unit). Necessary anchor fasters should also be provided for overhead Shelves. 6 Replacing ACP sheets 7.00 m2 Removing the existing lamination from the partition board and replacing the same with aluminium composite panel of 4 mm (total) thick, with required colour conforming to ASTM standards, including cost of C.P. brass/stainless steel screws, rubber gasket, Applying sealant, etc. complete as per drawings and directions of engineer-in-charge. Page 18 of 21
Item No. Qty 7 Description Rate (`) / Unit Amount(`) Dismantling Aluminium partition 18.00 m2 Dismantling the existing aluminium partitions including doors and stacking the serviceable materials in to the store within a lead of 200 mtrs. 8 Internal painting 250.00 m2 Distempering with 1st quality acrylic washable distemper (readymade) of approved manufacturer and of required shade and colour complete as per manufacturer's specification including cost and conveyance of all materials and labour charges, etc. complete. two or more coats Supplying Unskilled Labours 9 5.00 Nos Supplying of Un-skilled laborers for cleaning floor/fabricated Aluminium windows/ ventilators / doors with glass, cudappa / etc. Partition Wall 9.00 m2 Increasing the height of the existing partition up to required height (2.10m) as per the details given below. The partition shall be made of aluminium frame with approved colour powder coating, panel covered with approved colour laminated board with combination of white board and soft board and is finished with fabric of approved shade and make, including perforated metallic modesty panel with powder coated finish of approved shade all as per drawing. 12 mm thick toughened glasses of 3 Nos ( 2 nos of 2.00 mtr x.060 mtr and. 10 Page 19 of 21
Item No. Qty Description Rate (`) / Unit Amount(`) One number of 1.00 mtr x 0.60 mtr) should be provided in the partition. The thickness of partition shall be 60 mm as per drawing and the height shall be of upto 2100 mm. The partition shall have level adjusting arrangement. The end trims, top runners shall be aluminium powder coated and sharp corners shall be avoided. 11 Aluminium door 1.00 No Providing and fixing Double skin Door of size 1.00 x 2.10 mtr. with extruded Aluminium sections of approved and established manufacturers (conforming to IS 733 of 1948) anodized (anodizing to be as per grade AC25 & not less than 15 microns thick and electro colored to required colour with fasteners in accordance with IS 1868 / IS 6057 using (63 X 38 X 2 mm Aluminum outer frame, vertical frame size 47.62x44.45x1.55 mm., bottom frame size 114.30x44.45x1.40 mm., top frame size 47.62x44.45x1.40 mm., locking rail (central horizontal member) size 49.90x44.45x1.18 mm. with 6 mm. thick float glass over 900 mm. height bottom using Aluminium composite panel sheets as per approved colour and finish including 20X28X1.2mm Aluminium door clips, 38X25X3mm Page 20 of 21
Item No. Qty Description Rate (`) / Unit Amount(`) Aluminium cleat angles, EPDM gasket, locking arrangement with key, tower bolts, Door closer, etc. as per instructions of the Engineer- in charge. TOTAL (Total Rupees....Only) Signature of the Contractor Name & Address Page 21 of 21