Drawings or Data are Submitted: For Approval For Information B Training Plan Polymer Make Down Units 01820

Similar documents
LETTER OF TRANSMITTAL

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Section Meetings Section Material and Equipment. None Required

Working Drawing Manual

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SUBMITTAL PROCEDURES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

Working Drawing Procedure

PROCEDURE FOR PROCESSING WORKING DRAWINGS

SEI Certification Program Manual

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

East Central College

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SUBMITTAL REVIEW COVERSHEET

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

Jacksonville District Master

SECTION III SUBMITTALS AND APPROVALS

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

LETTER OF TRANSMITTAL

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION OPERATION AND MAINTENANCE DATA

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

SECTION SUBMITTAL PROCEDURES

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

SECTION 2 GENERAL REQUIREMENTS

IMPERIAL VALLEY COLLEGE. Hazard Communication Program

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

Answer: Qualification statement should be provided with the bid.

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

Voltage Reducing Devices Pre-Start and Routine Performance Verification Checks

SUBMITTAL PROCEDURES

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

PLOT PLAN INSTRUCTIONS ROOF MOUNT SOLAR AN ACCURATE PLOT PLAN IS NECESSARY TO PROCESS YOUR PERMIT

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION PANELBOARDS

MT-4E Analog and P25 Digital Training Course Outline

course as CEU credit 5 hrs Location: Dane Dane Madison, WI building. Made in the USA 58 th Place Fax: (262) Phone: (262)

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

LETTER OF TRANSMITTAL

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

PEAK VIEW RANCH HOMEOWNERS ASSOCIATION Architectural & Design Review Request Form

Submittal Packages Detailed with Items and Reviewers

MATERIALS DIVISION MEMORANDUM

LETTER OF TRANSMITTAL

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

Heat Exchanger Construction Checklist

SECTION SUBMITTAL PROCEDURES

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Company Profile. Industry Leader in Design and Manufacture of Filtration Equipment.

PLAN SUBMITTAL REQUIREMENTS

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

SECTION ADMINISTRATIVE REQUIREMENTS

MT-4E P25 Voting / Simulcast Training Course Outline

DEPARTMENT OF THE ARMY TECHNICAL BULLETIN

This specification describes the general requirements for Engineering Services provided to Vale.

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

Electronic Document Review (EDR)

Air Monitoring Directive Chapter 9: Reporting

Cloud Based Plan Review Process (Applicant)

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

Dewatering Case Study Rotary Press Versus Screw Press

CHAPTER 2 SUBMITTAL AND REVIEW PROCEDURES TABLE OF CONTENTS

CURRICULUM ASSESSMENT CHECKLIST

Chapter 1 General Design Information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SECTION SUBMITTALS

Submittal Review Form

Transcription:

Date: 2/1/18 P1-101 Submittal Transmittal Project Name: P1-101 Sludge Dewatering and Odor Control at Plant 1 To: Orange County Sanitation District 10844 Ellis Avenue Fountain Valley, CA 92708 Attn: Plant #1 Submittal Group, Division 760 From: Brenda Shanholtzer W.M. Lyles Co. 42142 Roick Drive Temecula, CA 92590 Phone: (951) 973-7393 Drawings or Data are Submitted: For Approval For Information Submittal Copies Submittal Title Number Spec. Section(s) 0 01820.011.B Training Plan Polymer Make Down Units 01820 1 Electronic Copy of Submittal 01820.011.B Manufacturer / Sub: Complete either (a) or (b): VeloDyne Check One Check One (a) (b) We have verified that the material or equipment contained in this submittal meets all the requirements specified or shown (no exceptions). We have verified that the material or equipment contained in this submittal meets all the requirements specified or shown, except for the following deviations (Listed Below): This is: Original Submittal: Resubmittal: Supplemental Submittal: Remarks / Deviations: This submittal includes VeloDyne s training plan, trainer resume, and evaluation form. Certification Statement: FOR OCSD USE ONLY By this Submittal, I hereby represent that I have determined and verified all field measurements, field construction criteria, materials, dimensions, catalog numbers, and similar data and I have checked and coordinated each item with other applicable approved Shop Drawings and all Contract Requirements. Brenda Shanholtzer 2/1/18 Contractor's Authorized Signature Date

Orange County Sanitation District 10844 Ellis Avenue E&C Trailer A Fountain Valley, CA 92708 TRANSMITTAL No. 02272 PROJECT: P1-101 Sludge Dewatering and Odor DATE: 8/18/2016 TO: WM Lyles Company REF: Submittal: 01820-011-A 42142 Roick Drive Temecula, CA 92590 ATTN: Mike Munden WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: Shop Drawings Approval Resubmittal Not Required ü Letter Transmittal Only (For Your Information) ü Your Use As Requested ü Resubmittal Required, as Noted Revise and Resubmit Change Order Review and Comment Not Acceptable Plans Submit Samples SENT VIA: No Action Required Specifications ü Attached Returned for Corrections ü Other: Made from Submittal Separate Cover Via: Mail Due Date: ITEM NO. COPIES DATE 0 8/18/2016 ITEM NUMBER REV. NO. DESCRIPTION SUT 01820-011 A Training Plan Polymer Make Down Units STATUS RRN Remarks: 1. Training outline shall include a time allocation for each topic per 01820-2.1. 2. Training sessions shall include information on parts, such as ordering information, and local representative contact information per 01820-3.2.J & K. 3. Verify that all required training is included in the training outline. Per Attachment A of Specification Section 01820, there shall be three sessions of operations training and two sessions for electrical maintenance. CC:Sharepoint Transmittal to: OCSD; HDR Signed: Mike DiNapoli Expedition â

February 1, 2018 Customer: Mike Munden V.M. Lyles & Company P.O. Box 4377 Fresno, CA 92590 P: 951.693.0700 F: 951.693.0777 Equipment: VeloBlend Model VMT-210P-30000-X (4) - Thickening Polymer Feed Systems (2) - Dewatering Polymer Feed Systems (2) VeloDyne SO #: 1157 Specifications Section: Application Engineer: VeloDyne Contacts: Manufacturer s Representative: 15122 - Polymer High Energy Make-Down Units Dave Purcell Project Manager: Carolyn Heusel 303.530.3298 x 209 Fax 303-530-3368 cheusel@polymersolution.com Tarn Victor JBI

INSTRUCTOR LESSON PLAN Equipment Reference: VeloBlend - Liquid Polymer Blending System Project: OCSD Dewatering, P1-101 Equipment Model: Serial Numbers: Specification Section: VeloBlend Model: (4) VMT-210P-30000-X TBD 15100 - Polymer High Energy Make-Down Units Target Audience: Objectives: Total Time & Site: Reference Materials: All active Treatment Plant Facility personnel that will interact specifically with the VMT-210P-30000-X VeloBlend System. After completion of the VeloBlend VMT-210P-30000-X training, the student will: understand the safety precautions when working with polymer. understand the system safety precautions. understand the VeloBlend System and its components. understand routine operation, maintenance, and troubleshooting procedures. 240 minutes: 120 minutes clasroom lecture/discussion and 120 minutes hands-on field demonstration. Class time, date and location TBD Training Manual, OCSD Dewatering, P1-101 Operation & Maintenance Manual (Participant responsible for Operation & Maintenance Manual) Student Training Agenda: Introduction--22.5 minutes Part 1--Equipment Overview--45 minutes Part 2--Operating Procedures--25 minutes Part 3--Maintenance & Lubrication--7.5 minutes Part 4--Troubleshooting--7.5 minutes Part 5--Parts Ordering & Rep ontact--5 minutes Part 6--Questions and Answers--7.5 minutes Page 2

Introduction - Location: Classroom Participants: All Electrical/Instrumentation Staff Instructor's Background - 7.5 Minutes The instructor makes an introduction and presents his qualifications. Handouts - Training Manual - 7.5 Minutes The instructor distributes copies of the training manual. Agenda - 7.5 Minutes The instructor outlines the training agenda. Page 3

Part 1 Equipment Overview Location: Classroom Participants: All Electrical/Instrumentation Staff 1.A System Overview - 30 Minutes The instructor presents a system overview. Operation & Maintenance Manual reference: Section 1 System Information/Specifications, pages 1-1 and 1-3. Page 4

1.B Mechanical Drawings Review - 7.5 Minutes Participants: Only if applicable to Electrical/Instrumentation Staff The instructor reviews the mechanical drawings and presents hands-on knowledge of each component. Operation & Maintenance Manual reference: Section 2 Mechanical. Section 8 of the Operation & Maintenance Manual contains detailed installation, operation and maintenance information on the system s components. Page 5

1.C Electrical Drawings Review - 7.5 Minutes The instructor reviews the electrical drawings and presents hands-on knowledge of each component. Operation & Maintenance Manual reference: Section 3 Electrical. Section 8 of the Operation & Maintenance Manual contains detailed installation, operation and maintenance information on the system s components. Page 6

Part 2 Operating Procedures Location: Classroom & Field Installation Location Participants: Only if applicable to Electrical/Instrumentation Staff 2.A Safety Practices / Housekeeping 2.5 Minutes The instructor reviews the safety warnings and discusses why these are important. The instructor also reviews housekeeping procedures to keep the area surrounding the equipment clean. Operation & Maintenance Manual reference: Section 5 Operation, subsection 5.1. Page 7

2.B Initial Start-Up - 7.5 Minutes Participants: Only if applicable to Electrical/Instrumentation Staff The instructor reviews system pre start-up and start-up checklists and presents a hands-on tutorial. Operation & Maintenance Manual reference: Section 5 Operation, subsection 5.2. Page 8

2.C System Operating Procedures - 15 Minutes Participants: Only if applicable to Electrical/Instrumentation Staff The instructor reviews the system operation procedure including shutdown procedures and presents a hands-on tutorial. Operation & Maintenance Manual reference: Section 1 System Information/Specifications page 1-2 and Section 5 Operation, subsection 5.4. Page 9

Part 3 Maintenance & Lubrication Location: Classroom & Installation Location Participants: Only if applicable to Electrical/Instrumentation Staff 3.A Maintenance Summary 7.5 Minutes The instructor reviews the maintenance procedures including inspection and lubrication and presents a handson demonstration Operation & Maintenance Manual reference: Section 6 Maintenance & Troubleshooting, subsections 6.1 through 6.7. Page 10

Part 4 Troubleshooting Location: Classroom & Installation Location Participants: Only if applicable to Electrical/Instrumentation Staff 4.A Troubleshooting Chart 7.5 Minutes The instructor reviews the system troubleshooting guidelines chart and presents a hands-on demonstration. Operation & Maintenance Manual reference: Section 6 Maintenance & Troubleshooting, subsection 6.8. Page 11

Part 5 Parts Ordering & Rep Contact Location: Classroom 5 Minutes Participants: All Electrical/Instrumentation Staff Part Ordering Process & Rep Contact Information The instructor fields questions and responds accordingly. Page 12

Part 6 Questions & Answers Location: Classroom & Installation Location 7.5 Minutes Participants: All Electrical/Instrumentation Staff Training Agenda Feedback The instructor fields questions and responds accordingly. Page 13

TRAINING CERTIFICATION & PARTICIPANT ACCEPTANCE The training participant for the VeloBlend system VMT-210P-30000-X understands: (with 5=strongly agree & 1=strongly disagrees) 5 The safety precautions when working with polymer. 4 3 2 1 5 The system safety precautions. 4 3 2 1 5 The VeloBlend System and its components. 4 3 2 1 5 The routine operation, maintenance, and troubleshooting procedures. 4 3 2 1

Jon Dean VeloDyne, Inc. PH (303) 530-3298 ext. 227 FX (303) 530-3368 Jdean@polymersolution.com Experience: VeloDyne, Inc. Louisville, CO. Service Technician May 2013 to Present Manufacture, Installation, Calibration and maintenance of chemical metering and blending electrical control systems Manufacture, Installation, Calibration and maintenance of chemical metering and blending mechanical systems Quality control and troubleshooting of chemical blending and metering systems for the water and wastewater treatment industry Instrument installation, calibration and maintenance Start up, Calibrate and certify proper installation of Liquid and Dry Polymer blending and feed systems nationwide Operator training and customer service in house and field Completed Start up and Training New Broadway WWTP, Corpus Christi, TX New Rochelle WWTP, New Rochelle, NY Quantico WWTP, Quantico, VA St Charles WWTP, St. Charles, IL Sugar Land SWTP, Sugar Land, TX Yonkers WWTP, Yonkers, NY East Vincent, PA East Helena WWTP, East Helena, MT Horsehead Arc Furnace, Mooresboro, NC High Sierra WTP, Platteville, CO Climax Mine, Loveland, CO Monroe WWTP, Monroe, WI CoorsTek, Golden, CO San Clemente WWTP, San Clemente, CA