2 days course 2 days course 2 days course 3 days course 5 days course Knowledge of SCG Roof Installation SCG Terracotta Thai Fish Scale SCG Roman tile SCG Curve LON SCG Prima 2 day course for 1 product 3 day course for 2 product 5 day course for 3 product
Tools for installation SCG Concrete Roof Roof tiles Equipment Accessories SCG Aluminium Tape SCG Reflective Insulation SCG Galvanized Batten SCG Batten Screws SCG Extra Cool Insulation SCG Roof Seal SCG Cooling system tile SCG Roof Tile Screws/ 2.25 inch needle point screw SCG Roof Tile Screws/ 2.5 inch self drilling SCG Roof Tile Screws/ 4 inch self drilling SCG Galvanize Tile Clip SCG Wall Flashing Set SCG DryTech System SCG Flashing SCG Flashing for Hip SCG Roof Seal SCG Roof Seal for eaves SCG Ribbon sealer SCG Trough SCG Eave filler SCG Tile Clip Crystal Tile SCG Pipe Vent Roof Tile Pipe Vent Round Ridge SCG Tile for Satellite dish SCG Mortar Paint SCG Eave Clip SCG Decorative set SCG Mortar
Specification of SCG Concrete Roof Size 33 x 42 cm. (30x33 cm.) Weight ~ 4 kg./tile ~ 10 tiles/sq.m. (~ 45 kg./sq.m.) Pitched Roof Min. Pitch = 17 ๐ Max. Pitch = 90 ๐ Significant pitched = 30 o - 35 o Batten Space For Main tiles 32-34 cm. For Eaves tiles 34 cm. For Ridge 4-6 cm. (Wet Tech), 8 cm. (Dry Tech)
Table of Batten for using each type of Screw ชน ดแป ตะป เกล ยวย ดกระเบ Type of Screw อง 1. แปไม ตะป เกล ยวย ดกระเบ 2.25 inches needle อง 2.25 point น ว _ปลายแหลม screw Wood Batten 2. แปเหล ก ความหนาไม เก น 3.2 มม. (Light Gauge) แปเหล กกล อง แปเหล กต ว C แปเหล กต วฉาก ความล กของขาฉากไม เก น 30 มม. แปเหล กต วฉาก ความล กของขาฉากไม เก น 50 มม. 3. แปเหล กก ลวาไนส Galvanized Steel Batten ความหนาไม เก น 0.55 มม. ความหนาไม เก น 1 มม. Type of Batten 2. -Steel Batten thickness less than 3.2 mm. (Light Gauge) -Steel Square Tube Batten -C Channel Steel -Angles Steel Batten Height less than 30 mm. -Angles Steel Batten Height less than 50 mm. Thickness less than 0.55 mm. Thickness less than 1 mm. ตะป เกล ยวย ดกระเบ 2 inches self drilling อง 2 น ว screw _ปลายสว าน ตะป เกล ยวย ดกระเบ อง 3 น ว ปลายสว าน 3 inches self drilling screw ตะป เกล ยวย ดกระเบ อง 4 น ว ปลายสว าน 4 inches self drilling screw ตะป เกล ยวย ดกระเบ 2 inches self drilling อง 2 น ว screw _ปลายสว าน If do not recommendation : Should fix every tiles on each batten and fix the last row on Eave batten by clip lock.
SCG Concrete Roof System 1.Ridge Installed in line of roof ridge. (3.3 tiles/m) 5.Hip End Ridge Installed at end of Hip ridge. 2.End Ridge Installed at both ends of roof ridge. 3.Verge Installed as gable end of gable form roof. (3 tiles/m) 4.Verge End Installed at the lowest end of gable end. 6. Two ways Ridge Installed in roof ridge line for reversal ofridge cover direction 7. Three ways Apex Installed as closure at connecting point of 2 hip ridge lines jointing with a roof ridge line in Y shape of Hip from roof. 8.Four ways Apex Installed as closure at connecting point of 4 hip ridge lines jointing together of Hip form roof.
7 Things you should Check before Roofing 1. Checking Pitched roof 2. Checking the Squareness 3. Checking Rafter level 4. Checking Strength of roof structure 5. Checking Fascia level 6. Checking 3 points of Batten Space 7. Checking reinforced concrete wing
1. Checking Pitched roof 35 30 θ 17 Minimum 31 cm. 60 cm. Significant 70 cm. 100 cm. Note : In case of pitched roof less than 22 o, should checking maximum length of Rafter. (For decrease leaked area)
1. Checking Pitched roof Criteria for Maximum length of Rafter Degree Length of Rafter (m.) Example 17 5.5 18 6.0 19 6.5 20 7.0 21 7.5 22 8.0
Maximum length of Rafter Pitched Roof 18 O, Length of Rafter15 m. 10 m. 6 m. 9 m. Leaked * For the example, should install Roof Sarking along the leaked section, Install should overlap leaked section around 1 m.( total length is 10 m.)
2. Checking the Squareness 80 60 100
3. Checking Rafter level Stretch string above the roof 1-3 cm. Tolerance of Rafter Level ± 1.5 mm.
3. Checking Rafter level 3 2 2 5 1 4 1 4 3 5.In case of Rafter have a support (purlin) that string stretched at - The edge of rafter (away from beam 0.5-1.0 m - Middle point between beam and rafter support (Purlin) - Between rafter support (Purlin) and ridge board - Diagonal 6. In case of Rafter have no support (purlin) that string stretched at - The edge of rafter (away from beam 0.5-1.0 m.) - Middle point between beam and ridge board - Diagonal Each subtopic, the length of string should be equal
4. Checking Strength of Roof Structure X X
5. Checking Eaves liner and Fascia Batten Top of Fascia and Top of Batten should be installed at same level. Batten SCG Fascia 6 inches Rafter Fascia Rafter SCG Fascia 8 inches Fascia
6. ตรวจสอบระยะแป 3 จ ด 3 4-6 cm. 2 1 Rafter Ridge board Batten Eaves Filler Fascia * Note : Batten Space about 4-6 cm. for wet Tech Batten Space about 8 cm. for dry Tech
Table of Length, Range of Batten, No. Batten for SCG Concrete Batten Space Roof No.Batten Length (Meter)
Batten Space on one section of Rafter
Batten Space on one section of Rafter
Batten Space on Several section of Rafter 1 2 3 2 1
Batten Space on Several section of Rafter 1 2 3 2 1
Connecting Rafter 5 cm. 20 cm. Connecting on rafter line Connecting between rafter line * Note : Should not connect batten on the same line.
7. Checking reinforced concrete Abutment The reinforced concrete should cover roof tiles at least 20 cm. 20 cm. 20 cm. The reinforced concrete should cover roof tiles at least 20 cm. > SCG Concrete Roof SCG Concrete Roof Batten Level 8 cm. Rafter Batten Wall Batten Wall For cover head of tiles For cover lateral of tile
Installation SCG Concrete Roof
Installation Reflective Insulation Under Batten 15 cm. 15 cm. 15 cm.
Installation Reflective Insulation Under Batten 15 cm.
Installation Reflective Insulation Under Batten 14 cm. 20 cm.
Installation Reflective Insulation Above Batten 15 cm. 15 cm. 15 cm. 15 cm.
Installation Reflective Insulation Above Batten 15 cm. 14 cm. 20 cm.
Installation of SCG Valley Trough 2.5 cm. In case of one way Valley. Fold the Valley trough head up to the height of 2.5 cm. for make a water barrier. Fix both sides of trough flanges to upper pair of batten by 32 mm. self drilling screw. In case of 2-ways Valley. Joining both sides of valley must be connected completely then fix by screw after that paste SCG Flashing on the joint and fold the edge of SCG Flashing for make a water barrier.
Stacking Roof Tiles on Roof Structure
Installation SCG Concrete Roof. 3 cm. 3 cm.
Installation SCG Concrete Roof
Installation SCG Concrete Roof 5 cm.
Installation SCG Concrete Roof The center line of valley trough 1.5 cm. 1.5 cm. 3 cm. Paint
Installation SCG Concrete Roof At the end of the trough at the eave, cut the eave cornice board to match the size of the trough groove and make both wings of the trough line up with the edge of the eave board to be certain it does not protrude too far from the eaves. In cases where the trough ends on the roof, allow the end of the trough to cover approximately half of the tile below or no less than 15cm. Flatten the end of the trough on the supporting tile to prevent the tile from buckling up. Be careful not to crack the tiles while flattening the end of the trough.
Verge Installation 1.5 cm.
Ridge Installation
Ridge Installation on Wet Tech Proportion of Cement : Sand = 1:1.5
Ridge Installation on Wet Tech 2.5 cm.
Ridge Installation on Dry Tech 1 Meter. 1 Meter. 8 cm. 2 cm.
Ridge Installation on Dry Tech Pressure Point 1 Pressure Point 2
Installation Hip Ridge Wet Tech Proportion Cement : Sand = 1:1.5
Installation Hip Ridge Wet Tech 2.5 cm.
Installation Hip Ridge Dry Tech 2 cm. 2 cm. Pressure Point 1 Pressure Point 2
Installation Angle Hip Ridge Dry Tech
Q&A"