T H E 2 N D I N T E R N A T I O N A L DEEPWATER CONFERENCE AND EXHIBITIO MARCH 22-25, 1999 HILTON RIVERSIDE HOTEL NEW ORLEANS ORGANIZED BY CLARION TECHNICAL CONFERENCES PIPES & PIPELINES INTERNATIONAL SUPPORTED BY OFFSHORE TECHNOLOGY RESEARCH CENTER Pipeline & Gas Journal UB/TIB Hannover 117 022 233
Deepwater Pipeline Technology Conference March 22-25, 1999, Hilton Riverside Hotel, New Orleans Conference Program Monday, March 22 5.30-6.30PM Reception & Exhibition Tuesday, March 23 7.30-8.00AM Regstmtion, Coffee 8.00AM Welcome and Introduction DEEPWATER PIPELINE DESIGN Keynote Presentation: 8.15 [1] Pipeline Design Strategies for Deep Water Andrew Palmer, University of Cambridge and SAIC/Andrew Palmer & Associates, UK 9.00 [2] Limit State Design to Tackle Geo-Morpho Hazards in Deep Waters Roberto Bruschi, Luigino Vitali, Enrico Torselletti, and Furio Marchesani Snamprogetti, Italy 9.40 [3] Pipe-in-Pipe System for Deepwater Developments Robert Carmichael, Jie Fang, and Christophe KW. Tarn INTEC Engineering, USA 10.20 Coffee <& Exhibition 11.00 [4] Strength Design of Deepwater Pipelines Yong Bai, Per Damsleth, Gawain Langford, J.P. Kenny, Norway 11.40 [5] Deepwater Export Systems: Design and Installation Aspects of Steel Pipelines and Risers Antonio Critsinelis and Vinicius Braga, Petrobras, Brazil 12.20 Lunch, exhibition REGULATIONS 1.45 [6] Regulatory Aspects of Deepwater Pipeline Operations Chris Oynes, Director, Minerals Management Service, Gulf of Mexico/OCS Region, USA
Tuesday, March 23 (continued) INTEGRITY AND RISK ASSESSMENT 2.25 [7] Integrity Assessment of Deepwater Pipelines Majid Al-Sharif, Aker Maritime, USA 3.00 [8] On the Collapse Performance of U-O-E pipe Stelios Kyriakides, Research Center for Mechanics of Solids, Structures & Materials, University of Texas, USA 3.40 Coffee & Exhibition 4.20 [9] Risk Assessment of Deepwater Gas Trunklines Peter Carr and Robert Preston, J.P. Kenny, UK 5.00 [10] External Corrosion Control and Corrosion Inspection of Deepwater Pipelines Jim Britton, Deepwater Corrosion Services, USA 5.30 Reception in Exhibition Hall Wednesday, March 24 INSTALLATION 8.00 [11] Lay Challenges in Deep Waters: Technologies and Criteria Enrico Torselletti, Roberto Bruschi, Luigino Vitali, and Furio Marchesani Snamprogetti, Italy 8.35 [12] Application of Limit State Assessment to Pipeline Installation Alastair Walker, Finite Element Analysis Ltd., UK Christophe KW. Tarn, INTEC Engineering, USA 9.15 [13] Analysis of Submerged Pipelines at the Installation Stage: Effects of Ovalization Federico Guarracino and V. Mallardo, University of Naples, Italy 9.50 Coffee & 1 Exhibition 10.30 [14] How to Design Pipe Bundles to Minimize Installation Cost: Lessons from Experience R.J. Brown, Kvaemer RJ Brown, USA 11.05 [15] An Economical Fast-Track Method for Installation of Flowlines for Infield and Tieback Applications in Deepwater Utilizing a DP Vessel Paul Byington and Skipper Strong, Cal Dive International, USA
Wednesday, March 24 (continued) 11.40 [16] New & Recent Developments in Deepwater Pipeline Installation Robert Malahy, Global Industries, USA 12.15 Lunch &> Exhibition 1.30 [17] Deepwater Pipeline Routing Henry Chang, MPC International, USA Stephen Fournet, C&C Technologies, USA Bart Heijermans, Leviathan Gas Pipeline Partners, USA 2.05 [18] Installation of the Macaroni Export Pipeline: Use of the J-lay Technique with a Pipe-in-Pipe System Robert Gilchrist, Shell Deepwater Development Systems, USA REPAIR 2.40 [19] Shell's Deepwater Pipeline Repair Program Mike Coyne, Shell Deepwater Development Systems, USA 3.55 [20] The ARCOS Connection and Repair System for Deepwater Pipelines Adalberto Colombo and Arrigo Vienna, Snam SpA, Italy FLOWLINE CONNECTIONS 4.30 [21] An Overview of Deepwater Flowline Connection Techniques Mike Speiring, Big Inch Marine Systems, USA 5.05 End ofday Thursday, March 25 RISERS 8.00 [22] Deepwater Risers - Evaluation of Six Options, Review of SSIV Locations, and Design of Tethered Buoyant Supports Keith Shotbolt, Foster Wheeler Petroleum Development, UK 8.35 [23] Integrating Risers and Pipelines: Issues and Challenges in Deepwater Norman Sanderson, Gary Harrison, and Thanos Moros BP Amoco, UK and USA 9.10 [24] Rigid Risers for Floating Production Systems in Deepwater Field Developments Brian McShane, INTEC Engineering, USA David Bruton, Andrew Palmer & Associates, UK
Thursday, March 25 (continued) 9.45 [25] Flexible Risers: A Proven Technology for Ultra Deepwater Developments Elie Kodaissi, Coflexip Stena Offshore, France 10.20 Coffee &> Exhibition 11.00 [26] The Effect of Plastic Deformation on the Fatigue Performance of Steel Catenary Risers Graham Hurt and Ian Frazer, Stolt Comex Seaway, UK 11.35 [27] Complexities of Fatigue Analysis for Deepwater Risers Mike Campbell, 2H Offshore Engineering, UK 12.10 [28] Development of Fatigue and Inspection Criteria for Steel Catenary Risers Robert Carnes, ARDAMA, USA 12.45 Adjourn