CLARIFICATIONS 1. See attached meeting minutes from the Pre-Bid meeting on June 14, 2017.

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

Company. Signed: Date:

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

ADDENDUM #1. April 29, 2009

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

1. Land survey Work. 2. Civil and Structural engineering services.

05BDB ADDENDUM 002. Thomas W. Wathen Business Division Building Renovation GENERAL ITEMS:

JUNE 27, 2016 ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS SYRACUSE HANCOCK INTERNATIONAL AIRPORT CULVERT REPLACEMENT FOR RUNWAY 28 APPROACH ACCESS ROAD

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Bid No. B14-02 Building 100 HVAC Improvements

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

CITY OF WATERTOWN INVITATION TO BID PRINTING OF GENERAL OFFICE PAPER SUPPLIES WATERTOWN, WI. ADVERTISE: July 31 & August 7, 2015

SECTION PROJECT MANAGEMENT AND COORDINATION

FAB GSE Remodel ITB Solicitation #1538 Invitation to Bid (ITB) for General Contracting Services. ADDENDUM #4 December 5, 2014

IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT NORTH PLANT SALVAGE AND DEMOLITION PHASE CITY OF IOWA CITY FEBRUARY, 2015

Addendum. Windsor Hall Renovations Date: October 12, 2017 Addendum No: 3 GENERAL. 1! Addendum #4 will be issued 2:00 PM Tuesday October 17, 2017.

BID TABULATION SUMMARY Project: CONTRACT 3 SANITARY SEWER REPLACEMENTS Bid Date: Wednesday, January 10, :00 PM

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

1.01 NOTICE TO BIDDERS

Addendum No. 4 page 1

Conceptual, Preliminary and Final Site Plan Review in Holladay City

(Larry D. Svitak, PE) License No

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

Bid Advertisement in The Wylie News and NTMWD.com Website INVITATION TO BID NORTH TEXAS MUNICIPAL WATER DISTRICT DIGITAL IMAGING SERVICES

PROCEEDINGS GRAND RAPIDS COMMUNITY COLLEGE BOARD OF TRUSTEES OFFICIAL REGULAR MEETING BOARD CHAMBERS MONDAY, APRIL 20, 2015 I.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

NOTICE TO BIDDERS PURCHASE OF PORTABLE FORENSIC LASER SCANNING TECHONOLGY

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

RE: City of Summersville, Glade Creek Phase llb

ADDENDUM TO RFP DOCUMENTS

first year review Individual project overview Charette overview Attendance at the charette is mandatory.

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE

State College of Florida, Manatee-Sarasota

ADDENDUM NO. 2. Furnace Bridge - Installation. Essex County, NY. July 29, 2015

ADDENDUM NO. TWO. To the Plans and Specifications for: PALM COAST READINESS CENTER PALM COAST, FL For FLORIDA DEPT. OF MILITARY AFFAIRS

BID ADDENDUM NO. 4 ITB/004/16/KL CITY OF WINTER SPRINGS WTP NO. 1 WATER QUALITY IMPROVEMENTS

HAMMEL ASSOCIATES ARCHITECTS, LLC 2 5 E A S T G R A N T S T R E E T, S U I T E L A N C A S T E R, P E N N S Y L V A N I A

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

June 10, 2014 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

SCHOOL BOARD OF BREVARD COUNTY OFFICE OF PURCHASING SERVICES 2700 JUDGE FRAN JAMIESON WAY VIERA, FL

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

ADDENDUM TO RFQ/P DOCUMENTS PROJECT # ADDENDUM: #01

Montclair, NJ ADDENDUM NO. 2. Request for Proposal # 1144 Digital Printing Services and Photocopying June 17, 2014

UNIFIED FACILITIES GUIDE SPECIFICATIONS

The Corporation of the City of Nelson Office of the Finance and Purchasing Manager Telephone : (250) Fax : (250)

SPECIFICATION FOR RUBBER INSULATING GLOVES FOR LOW VOLTAGE 500V

NON-EXHIBITOR/Business MEMBERSHIP

ADDENDUM #2 September 12, 2018

REQUEST FOR QUOTATION INVITATION

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

World Trade Center Memorial and Redevelopment Plan Historic Resources Report July PROJECT SITE DOCUMENTATION UNDER STIPULATIONS 1 AND 5

MSU Barnard Hall 105 Cleanroom Installation PPA # Page 1

Chuck Caesar. VIA: /Webposting April 27, 2017

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Addendum to Description of Services for Building and Planning, Digital Design. The Association of of Consulting Engineers

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

INVITATION FOR BID (IFB) IFB NO. GSWA

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Merrick Pet Care New Distribution Center Hereford, Texas

Lincoln County Tax Appraisal Office Project No. RFB

Montclair, NJ ADDENDUM NO. 1 Issue Date: May 15, 2017

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV

State College Area School District

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO

July 10, Page 5705

4.0 Communications (BOARD POLICY: GOVERNANCE PROCESS: Governing Style)

9. Pay for the power consumed until the project has been accepted as substantially complete.

TOWN OF GRAND FALLS-WINDSOR TENDER FOR SUPPLY OF BRONZE PLAQUES MEMORIAL GROUNDS CENOTAPH TENDER #

MPA Project No. M545-C2 Project Title: New Berth 10 Project - Phase II Location: Conley Terminal, South Boston, Massachusetts

Proposal PROJECT MANUAL P R O P E R T Y M A N A G E M E N T F A L L O N C O U N T Y. Baker, MT P.O. Box 846

Answer: Only to ChurchWoods, LLC.

STUDY SESSION COURTESY NOTICE

Request for Quotation (RFQ)

ADDENDUM NO. 3. Ellis County Elections Building

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

Request for Proposals: Beacon Hill Pump House Mural Project

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced

Residential Room Additions

Answer: Qualification statement should be provided with the bid.

CONSULTANT ACCREDITATION SCHEME SEWER DESIGN

RFQ No. 19-C668 for On-Call Consulting Services for the Capital Projects Program Addendum No. 04

CITY OF RICHMOND Notice of Public Opening. Contract: Richmond Speed Skating Oval Interior/ Exterior Signage Package

MINUTES METROPOLITAN TRANSIT AUTHORITY BOARD OF DIRECTORS REGULAR BOARD MEETING FEBRUARY 21, 2008

COMMONWEALTH OF KENTUCKY DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

Valley Road Main Replacement

Transcription:

March 19, 2008 ADDENDUM 1 TO ALL BIDDERS: Reference: Invitation for Bids: IFB#214-08-Heating Plant Commodity: Construction of Replacement Heating Plant Dated: February 25, 2008 For Delivery To: Longwood University Materiel Management Office Farmville, Virginia 23909 Bid Due: April 8, 2008-2:00 local time and read aloud at 2:00 p.m. April 9, 2008 RE: Addendum to the project bid documents dated March 5, 2008 The following addendum changes have been issued to represent the topic of the project pre-bid meeting on March 13, 2008. These addendum changes will be issued to all parties which have purchased plans and specifications or have attended the Pre-Bid conference. This document is also posted on the University s material management website, (http://www2.longwood.edu/ifbrfp/ifb.asp?ifb=214%2d08%2dheatingplant) Project administration documents Pre-Bid Meeting Minutes and attendance sheet, included with this cover sheet. specification changes Not Used drawing changes Not Used NOTE: A signed acknowledgment of this addendum must be received at the location indicated on the IFB either prior to the proposal due date and hour or attached to your proposal. Signature on this addendum does not substitute for your signature on the original proposal document. The original proposal document must be signed. Very truly yours, James E. Simpson, CPPB, VCO Director Materiel Management

Name of Firm Signature/Title Date:

CONSTRUCT REPLACEMENT HEATING PLANT PROJECT NO 214-17017 DOCUMENT CHANGES NARRATIVE ADDENDUM NO. 1 DOCUMENT CHANGES NARRATIVE ISSUED: 3/18/2008 Longwood University Farmville, Virginia Construct Replacement Heating Plant Project Code: 214-17017 RE: Addendum to the project bid documents dated March 5, 2008 PART 1 - GENERAL A. The following addendum changes have been issued to represent the topic of the project pre-bid meeting on March 13, 2008. B. These addendem changes will be issued to all parties which have purchased plans and specifications or have attended the Pre-Bid conference. This document is also posted on the University s material management website, (http://www2.longwood.edu/ifbrfp/ifb.asp?ifb=214%2d08%2dheatingplant) PART 2 - PROJECT ADMINISTRATION DOCUMENTS A. Pre-Bid Meeting Minutes and attendance sheet, included with this cover sheet. PART 3 - SPECIFICATION CHANGES A. Not Used PART 4 - DRAWING CHANGES A. Not Used RMF NO.: 105015.A0 PBA-1 ADDENDUM NO. 1 3/18/2008

CONSTRUCT REPLACEMENT HEATING PLANT PROJECT No 214-17017 & PRE-BID MEETING MINUTES 03/13/2008 Attendees Company Telephone/Fax Geoff Chenoweth RMF Engineering, Inc. (410) 576-0505 Ed Stewart RMF Engineering, Inc. (410) 576-0505 Jim Simpson Longwood University David Pletcher Longwood University Bob Chambers Longwood University (434) 395-2090 Tommy Boschen A.D. Whittaker Construction, Inc. (804) 798-3259 John Bowman W.M. Schlosser Co., Inc. (757) 312-0649 Thomas McKelvey Frank Lill & Son, Inc. (610) 497-6320 Jim Carroll Heat Product Sales, Inc. (540) 774-4727 Doug Patterson Johnson Control, Inc. (804) 565-2517 Amanda Harris Harold Collins Clearing & (434) 392-6010 Grading R. Baxter Gordon English Construction Co., Inc. (434) 845-0301 Ray Jones English Construction Co., Inc. (434) 845-0301 Sid Davis J.E. Jamersion & Sons, Inc. (434) 352-8227 Dan Lamberson Harlan Construction (804) 458-6712 Jerry Drew Atlantic Constructors (804) 523-8822 DeSean McDowell Daniel & Company, Inc. (804) 213-0400 Jameson English Branch & Associates, Inc. (540) 989-5215 Jason Crawford Welding Processes & Mechanical (804) 598-9994 Inc. Carl Massie Southern Air, Inc. (434) 385-4071 Joe Hubble Waco, Inc. (540) 473-2891 Date Issued: 03/18/2008 Issues Covered: Bid Document introduction for the project listed above, Schedule, Processes, General Construction Overview, Site walk-through, and responses to attendees questions. Item No. Description Status 1 1.1 Mr Jim Simpson, University Material Management, provided an overview of the prpject Invitation For Bids. The IFB was discussed paragraph by paragraph. 1.2 Upon completetion of Mr. Simpsons overview he iquired if any one present requested a bid extention. No requests were made. Mr. Simpson indicated that the bid date will remain on April 8, 2008 at 2:00pm sharp. MINUTES OF MEETING March 18, 2008 CA-6 RMF No. 105015.A0 Page 1 of 4

1.3 Mr. Simpson indicated that all proposals must be in his possession no later than 2:00pm sharp by strict adherance to his offical time. 1.4 Mr. Simpson handed to meeting to RMF Engineering, Inc. RMF provided a general overview of the Summary of Work provided with the project documents. 1.5 RMF Requested that all Pre-Bid RFIs be submitted by no later than the close of business, March 18, 2008. In order to provide responses to all Pre-Bid RFI s no later than 10 days before bid date, this request must be followed. Please use DGS form DGS-30-272 Pre-Bid RFI Form and submit RFI s in writing to RMF Engineering, Inc. Email and Fax submissions are acceptable. 1.6 Work Hours were generally described. Normal hours should be from 7am to 6pm M-F, Extended work hours, 6pm to 7am, and weekend work hours, Friday 6pm to Monday 7am, require advanced authorization and must be coordinated with the University. 1.7 RMF indicated that the Venable and Madison streets are city streets and should remian open during construction. Madison Street is particularly important in that the University s food service uses the street to deliver to the student dining hall. It also serves as the sawdust and fuel oil delivery path for the central heating plant. Construction phasing has been provided in the contract documents. Coordination with the University is required and is described in Division 1 of the specifcations. 1.8 RMF indicated that the relocation work associated with Boiler No. 6 needs to be phased. The two new boilers must be in operation and accepted by the University before the work inclusive of relocation of Boiler No 6 is started. The University must not be without steam service to the campus. 1.9 A site walk-through was preformed during Pre-Bid meeting. The group visited the location of the proposed new heating plant, the existing Boiler No. 6 building, the existing heating plant, and the steam manhole across Madison Street. MINUTES OF MEETING March 18, 2008 CA-6 RMF No. 105015.A0 Page 2 of 4

1.10 A question was ask during the walk-through regarding the relocation of existing Boiler No. 6. Generally, the question regarded the removal of the boiler from the building and what was allowed. The building serves the boiler and only the boiler. All plumbing, electrical, and mechanical services present can be moved to allow the exit of the boiler. In general the walls must be cut and patched for boiler removal. The boiler is able to be deparated into two parts, the pressure vessel and the gasification section. Coordinate with Hurst regarding methods to separate the boiler. Refer to specificaiton section 15030 for detailed demolition and relocation requirements. The University asked that currting and patching work be performed to re-enclose the building for use by the University. The contractor shall restore lighting in the building to meet or exceed the existing lighting condition. All cutting and patching work shall be performed without permanent damage to the building structure or services. 1.11 A questions was asked during the walk-through regarding the trenches and the manhole across Madision Street. Generally, clarification was requested regarding the location of the new steam trench. The new steam trench routin is shown in the contract drawings. The trench exits the new plant on the west wall and turns south toward Madison. The trench changes elevation to go under Madison Street and then returns to an elevation to connect to the existing manhole on the east side of its structure. An existing tranch travels from the existing plants southeast corner and enters the manhole on the north side. Another trench exits the existing manhole and travel south to campus distribution. A direct-buried, pre-insulated piping system exits the manhole to the west for campus distrbution. 1.12 The following items were distributed at the Pre-Bid meeting location: A photocopy of the attendance sign-in sheet 1 Status column shall indicate Action Item Number and responsible party, or Comment for Record (). These minutes are a summary and the writer s interpretation of the proceeding and are not a transcript. Any changes or clarifications shall be forwarded to the writer within five (5) days of issue. Unless changes are forwarded, we must assume that all participants are in basic agreement with the above minutes and they will be recorded in the official project record. MINUTES OF MEETING March 18, 2008 CA-6 RMF No. 105015.A0 Page 3 of 4

Respectfully submitted, RMF ENGINEERING, INC. Geoffrey Chenoweth, P.E. Project Engineer GSC Distribution: JW Wood, Longwood Univ. Bob Chambers, Longwood Univ. Dave Pletcher, Longwood Univ. All plan holders and attendees Bob Smith, RMF Ed Stewart, RMF MINUTES OF MEETING March 18, 2008 CA-6 RMF No. 105015.A0 Page 4 of 4