GAZEBO STRUCTURAL SYSTEM SERIES VKE- 14B MODEL (14 x 19, Double-Tier)

Similar documents
Modular Gazebo Kit Series Victorian / Queen Anne 9

Modular Gazebo Kit Series Victorian or Queen Anne 12

Modular Gazebo Kit Series GardenHouse 12

12ft Octagon Bayside Gazebo Assembly Manual

SECTION METAL FABRICATIONS

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

10ft Octagon Bayside Gazebo Assembly Manual

MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA

Installation of Balustrade Systems

WALL TO FABRICATED FLOOR

Vinyl Gazebo Instructions

INSTALLATION GUIDE. 5" Balustrade System

The following instructions will guide you through the installation of your new vinyl railing stair kit.

SECTION FINISH CARPENTRY PART 1 GENERAL. 1.1 SECTION INCLUDES A. Interior Finish Carpentry Work: 1. Refer to schedule at end of Section.

Deck Evaluation Checklist

Vertical Offset Base and Safety Rail System Installation Instructions

10, 12 &14 Oval Gazebo Floor

Country Cabin. Assembly Manual. HomePlace Structures

KIT ASSEMBLY INSTRUCTIONS

10 Octagon Cedar Gazebo Assembly Instructions

eb^sv=qfj_bo UNIVERSITY OF WISCONSIN - STOUT COLLEGE OF SCIENCE TECHNOLOGY ENGINEERING & MATHEMATICS Architectural Technology AEC 233

Collins Engineers Palmetto Islands County Park Boardwalk Repairs 03/28/2014 SECTION ROUGH CARPENTRY

V nyl Gazebo truct c it Assembly Instr ons

The following instructions will guide you through the installation of your new vinyl railing.

Assembly Instructions

Installation Instructions for Siding

GENERAL INSTALLATION GUIDE: WARRANTY: PRODUCT INFORMATION T F

Dave's Glossary of Construction Terms. by Dave Osborne (

SECTION SHEET METAL FLASHING AND TRIM

SECTION ROUGH CARPENTRY

Salter Industries Spiral Stair

Lateral Support. Decks over 24 above grade require lateral support* *Exceptions to be discussed later

SECTION CARPENTRY

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

CertainTeed Panorama Composite Railing System. Sturdy good looks that offer lasting beauty.

eco-shake INSTALLATION INSTRUCTION

Value and Versatility in Engineered Wood Shelters, Buildings and Bridges

TREX PERGOLA INSTALLATION INSTRUCTIONS

A. All trim that has been damages, broken, or missing shall be repaired or replaced with material of the same size, shape, and type.

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Pacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation

AMISHGAZEBOSHOP.COM VINYL GAZEBO KIT CONTENTS

Table and Furniture Base Fittings Plinth Adjusting Fittings

FASTENERS BUILDING DEPARTMENT

PREPARATION & TOOL CHECK LIST

Parts list continues on Page 2 HOUSE PARTS PACKED IN HOUSE BOX PARTS IN SMALL PLASTIC BAG (HARDWARE) POST PARTS PACKED IN THIS BOX (LARGE PLASTIC BAG)

Installation Guide. Resysta Flooring. 15 Years Guarantee. swell-free crack-free splinter-free rot-free. Version 1 / July 2010 / English.

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

DIVISION 6 WOOD AND PLASTICS

APPLICATION FOR A BUILDING PERMIT

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

Steel Strong-Wall Shearwall Installations

Attachment of Residential Deck Ledger to Side of Metal Plate Connected Wood Truss Floor Ladder. Installation Instructions Revised 9/2/2016

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

Deck Designer Specification Kit For AZEK. All rights reserved copyright 2015 AZEK Building Products

4. Metal roof jacks at penetrations and attachments

STRATUS SHELTER. Take bike parking to new heights

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015

Installation Instructions. 45 and 60-Minute Positive Pressure Fire-Rated Veneered Door Frame UBC & UL-10C

ALUMINUM PIPE GUIDERAIL 01/01/

Tools Needed. 8 per column: stainless steel or hot-dipped galvanized bolts. Mallet

STEEL PIPE GUIDERAIL 01/01/

A. Provide all finish carpentry needed for a complete and proper installation.

6X3 Patio Garden Shed Assembly Manual

Double Beam Freestanding Pergola Installation Guide

AMPCO PRODUCTS, INC. TECHNICAL SPECIFICATIONS SOLID PHENOLIC CORE TOILET COMPARTMENTS

Grand Garden Chalet 6X3 Assembly Manual - Costco

Octagon Vinyl Gazebo Assembly Instructions

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

MTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1.

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

Dodecagon Gazebo. Assembly Manual. If you are in the middle of your project and you need assistance Call (717)

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

12ft Octagon (Precut) Creekside Gazebo Assembly Manual

MTS-ZB. RENOGY Photovoltaic Module Z-Bracket Mounting System E Philadelphia St, Ontario, CA Version: 1.

Cable Hanging Instruction Manual

GLOSSARY OF TERMS SECTION 8

3.1 General Provisions

Balustrade Systems / Installation Instructions

Endura-Stone Installation Instructions

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JÉRÔME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450) INSTALLATION AND OPERATION INSTRUCTIONS

Installation Guide - Evolution Series Wood Siding

A - Railing Frame Material Specifications

Dura-Lock Roof System

VPN: ISBXLR. Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS

6X3 Oscar Shed Assembly Manual

Grand Garden Chalet 6X3 Assembly Manual

LK Wall Box AX16. Design

Ready To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call

A Step-by-Step How To Guide

PART MATERIALS. Section Fencing Materials. Description

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

A Shell construction

A. Columns: Worthington Millwork; Cellular Polyvinyl Chloride (PVC) columns; decorative, weatherproof, insect-proof, and highly durable.

SECTION ARCHITECTURAL WOOD CASEWORK

Shed Assembly Instructions

24" max from each end of the ledger. See detail 6A & 6B, typ. both ends IRC R Ledger R507.2

Transcription:

Elongated CUPOLA solid base (electrical optional) GAZEBO STRUCTURAL SYSTEM SERIES VKE- 14B MODEL (14 x 19, Double-Tier) Lumber: Western Red CEDAR #1 (Cabinet) or #D and Better (Carpentry) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper Optional Newel Set Without Cedar Floor Drawing: 1 of 9 Created by: Andrea Beringer Date: Jan 2015 Model: VKE-14B no floor

A B K C J (2) J D SIZE & DIMENSIONS Key: Based on roof type 14' x 19' B *A: Height, Overall 168" B: Height, Grade/peak 158" C: Height, Entrance Max. 79" D: Height, Railing 30" F: Height, grade/floor 8" J: Width, Entrance ( with newel post) 45" J (2): Entrance (without newel post) 57 K: Width, Interior Min. 146 1/2" Drawing: 2 of 9 Created by: Andrea Beringer Date: Jan 2015 Model: VKE-14B without floor

FRET MODULE CONSTRUCTION 2" STEEL SCREWS 6" THREADED ROD LONG SIDE 2 x 58 1/2" SHORT SIDE 58 1/2" FRET RAIL CUT LENGTH FRET & RAIL CONNECTION 1 1/8" X 2 1/4" TOP AND BOTTOM RAIL 5/4 X 5/4" SPINDLE 12 1/4" 2 X 6 X 18" CURVE BRACKET 5/4 X 4" FRET FRAME 30" 4 X 4" POST TOTAL HEIGHT 95" LONG SIDE 2 x 58 1/2" SHORT SIDE 58 1/2" 31 1/2" POST FACIA 5/4 X 6" 4X4 NEWEL POST HEIGHT 34 1/8 1X4 POST CAPPING WOODEN or BRASS BALL 5/4 X4" RAIL FRAME RAIL MODULE CONSTRUCTION RAIL CUT LENGTH 6" THREADED ROD 5/4 X 4" COMPRESSION STUFFER BLOCK 33" 30" 1 3/8" X 1 3/8" X 23 1/2 VICTORIAN BALUSTER 5/4 X 4 END STUFFER BOARD 3" 2 X 4"TOP & BOTTOM RAIL 3" CENTERS STEEL ANCHOR TAB (see detail on pg #8) 2 1/2" SS SCREWS Drawing: 3 of 9 Created by: Andrea Beringer Date: Jan 2015 Model: 14 x 19

Electrical Post Option (standard for VK / QA Cabinet Grade, optional for all others) Light Fixture (max. 500W) Grooved Roof Section Electrical Grooved Riser Upper Fret Groove Roof Section Additional Options: Outlet posts (dual) Fan Control post (fan/light) Channel Posts (for custom wiring) 14-2 UF/B with ground Hidden Wire through Channeled Post Electric Outlet w/switch & receptacle (GFI) Floor Board w/pre-drilled hole Note: For concrete slab use conduit through void (see slab instructions) Drawing: 4 of 9 Created by: Andrea Beringer Date: Jan 2015 Model: B-Roof

4" 1X6 TOP SOFFIT #10 X 2" SCREWS (4 PER LATH) UPPER TIER ROOF CONSTRUCTION 58" 5/4" X 4" ROOF LATH 1 3/4" SPACING 70 10" 67 1/2" 2 X 4" ROOF JOIST THE CUPOLA IS CONNECTED WITH STAINLESS STEEL SCREW FROM THE UNDER SIDE OF THE ROOF LATH. CEDAR SHINGLE OR 16 OZ. COPPER 5/4" X 7/16" STAINLESS STEEL STAPLES ELONGATED UPPER ROOF MODULE 65 1/4 " 1X6 TOP SOFFIT 5" SHINGLE REVEAL 46 1/8" 5/4X4 FACIA BOARD UPPER FRET (4 X 4") RISER 67 1/2" 2 X 4" ROOF JOIST 58" 31 5/8" SHORT SIDE (5/4 X 5/4") SPINDLE (2 X 3") RAIL (5/4 X 4") FRET FRAME #10 X 2" SCREWS 93 LONG SIDE 109 3/8" 5/4X4 FACIA BOARD Drawing: 5 of 9 Created by: Andrea Beringer Date: Jan 2015 Model: VKE-14B

32 1/2" 2X6" TOP SOFFIT LOWER TIER ROOF CONSTRUCTION 56" 2X3 CENTER SUPPORT JOIST 52 3/4" 72 1/2" 1X6 FACIA BOARD #10 X 2" SCREWS (8 PER LATH) 5/4" X 4" ROOF LATH 2 X 6" ROOF JOIST 2X6" TOP SOFFIT 93 3/4" 56" 2x 2 X 6" MID JOIST 2X3 CENTER SUPPORT JOIST 52 3/4" 133 3/4" 1X6 FACIA BOARD Drawing: 6 of 9 Created by: Andrea Beringer Date: Jan 2015 Model: VKE-14B

ROOF ATTACHMENT ROOF TO POST MORTICE CONNECTION ROOF LATH ROOF JOIST 3 X 1/2 HOLES APPROX. 20 APART FOR 3/8 SS RODS 1 X 5/8 HOLE 1/2 HOLE for 3 7/8 x 3/8 SS ROD 5/8 HOLE for 5 3/8 x 3/8 SS ROD LOAD (4 X 4") RISER METAL ANCHOR TAB ALL ROOF SECTIONS ARE PRE-SHINGLED 1/2 HOLE for 5 3/8 x 3/8 SS ROD FRET FRAME POST 4 X 1/2 HOLES APPROX. 20 APART FOR 3/8 SS RODS 1 X 5/8 HOLE ROOF SYSTEM RIDGED TRIANGULAR MODULES CONNECT TO FORM A CONIC ROOF SYSTEM. THE COMPRESSION RING IS INTEGRAL TO THE CONIC DESIGN AND ALLOWS RESULTANT FORCES TO BE PERPENDICULAR TO GRADE. ROOF LOAD 4 X 4" POST 95" TOTAL HEIGHT Drawing: 7 of 9 Created by: Andrea Beringer Date: Jan 2015 Model: VKE-14B

166 7/8" 69" FLOOR DIMENSIONS 227 1/4" 81" 31" 31" To CENTER 105 1/2" 81" 62" ANCHORING HARDWARE DIMENSIONS 3/8 thick Rod 5 square Plastic Post Base Plate 130 1/4" 81" 81" 61 5/8" 1/8 thick 1 1/2 wide SS Anchor Tab w/ 1/2" Bend 6" Anchor Tab 3 1/2 into Hydrolytic Grout 2 1/2 inside post 30 5/8" CENTER 74 7/8" POST ANCHORING ON CONCRETE SLAB 61 5/8" Post Base 5 1/4 x 5 1/4 3/8" SS all Threaded Rod 5 Square Plastic Post Base Angle Anchor Tab 3 1/2" Reveal 2 Core Drill Void CONCRETE SLAB Drawing: 9 of 10 Created by: Andrea Beringer Date: Jan 2015 Model: 14 x 19

Specifications for the CARPENTRY & CABINET models (8 x 11, 11 x 15 x 14 x 19 ) Part 1 General 1.1 Scope. The contractor shall furnish and install a wooden gazebo as shown on plans and herein specified as supplied by Vixen Hill Mfg. Co. Inc., of Elverson, PA 19520. Part 2 Product 2.1 Wood Materials. Gazebos for CARPENTRY shall be fabricated from air-dried, sound tight-knot (STK) or better and for CABINET shall be fabricated from Air-Dried, #1 old growth & rot resistant western red cedar. All wood shall be grain selected during in-house milling for best application and safe use. Wood for CARPENTRY shall contain loose or open knots limited to less than 25% of material used. 2.2 Roofing System. Shingles shall be of or equal to #1 perfection clear heart cedar and per the following specifications 5X, 16" long, 1/2" thick, tapered. Roof lath shall be of no less than net finished size 1x3 with a 5 spacing. Roof sections shall be completely pre-assembled and pre-cut, and joints between roof sections shall be self-sealing to preclude capping. Caulk is recommended to be used at the roof joist. 2.3 Surface Finish. All wood members shall be surfaced four sides. Surfaces displaying planer skips or saw marks after dressing shall be limited to less than 25% of shown faces. Hand contact edges may be rounded, chamfered, or edge-shaped free of splinters and smooth to the touch. All exposed surfaces shall be prepared for maximum acceptance of oil-based finishes (optional with additional cost). 2.4 Hardware. All assembly & Anchoring hardware shall be provided. All assembly hardware in view shall be of Stainless Steel (cap nuts & washers) and of a finish type to conceal all threads. Concealed assembly hardware shall be of galvanized steel for CARPENTRY and stainless steel for CABINET grade (threaded rods). All hardware in ground contact shall be of galvanized steel for CARPENTRY and stainless steel for CABI- NET grade. No nails shall be required or provided. 2.5 Electrical. Standard for CABINET and optional for CARPENTRY grade. The pre-wired post provides 110V electrical service through wire (14-2 UF/B with ground). The post has an electrical box with (GFI) receptacle and light switch. The light fixture is screwed inside the cupola for up to 500W strength. Wires shall be hidden within the component parts through grooved roof section and channeled post. All electrical components shall be UL approved. 2.6 Connections & Anchoring. Factory module construction shall include pocket joints and stainless steel threaded fasteners. On-site interconnection of modules shall be achieved using threaded rods and stainless or brass cap nuts and washers. Anchoring shall be concealed and appropriate to the surface mounting material. Only simple hand tools shall be required for assembly. 2.7 Engineering. Design of connections and materials used shall be such as to adhere to structural requirements of major building codes. Drawings and representative engineering shall be available from the manufacturer for the purpose of permits or architectural review. Part 3 Execution 3.1 Prefabrication. All component parts shall be pre-assembled to the fullest extent possible, to preclude any on-site drilling, cutting, filling, nailing or sanding. All prefabrication fasteners shall be hidden from view or channeled and stripped with matching wood where visible. 3.2 Installation. The gazebo kit shall be supplied with all necessary hardware, shop drawings and complete instructions to provide for efficient on-site assembly. Average assembly time on a prepared foundation shall not exceed 15 man-hours. Drawing #: Created by: Andrea Beringer Date: Jan 2015 Model: Elongated Gazebos