TSA Surveying Course

Similar documents
Suveying Lectures for CE 498

Department of Civil and Environmental Engineering

Hours / 100 Marks Seat No.

CHAPTER 7 Total Station Surveying. CE 316 March 2012

Option 1. Design Options are diverse e.g. new route alignments covering a wide area. Option 2. Design Options are restricted

Technology Accreditation Canada (TAC) SURVEY/GEOMATICS TECHNOLOGY TECHNOLOGIST Canadian Technology Accreditation Criteria (CTAC)

Construction Surveying and Layout

PART XII: TOPOGRAPHIC SURVEYS

CLIENT GUIDE TO MEASURED BUILDING SURVEYS

n 4ce Professional Module

COURSE SYLLABUS SURVEYING I

S.E. (Civil) (Second Semester) EXAMINATION, 2012 SURVEYING (2008 PATTERN) Time : Three Hours Maximum Marks : 100

IAN HUMBY TEACHING. List of Hand-Outs. Levelling

S u r v e y i n g f o r M i n i n g E n g i n e e r i n g ( 1 1 B ) 30S/30E/30M

Question bank. Unit 1: Introduction

CHAPTER 3 MARGINAL INFORMATION AND SYMBOLS

AREA MEASUREMENT REPORT (RICS Code of Measuring Practice) 1 BERRY PLACE LONDON EC1V

Hours / 100 Marks Seat No.

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

SURVEYING I CENG 383

Shoe Box Activity Constructing a Topographic Map

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

COSC 301 Construction Surveying & Layout Activity VI Transit; Existing Building (As built) and Vertical Angles

Introduction to Site Layout Annotated Instructor s Guide. Module PREREQUISITES MODULE OVERVIEW OBJECTIVES PERFORMANCE TASKS

Advanced Computer Aided Design COURSE OUTLINE

84 part video tutorial training course. The course is 100% free with no catches or exclusions. You don

Lecture 8: GIS Data Error & GPS Technology

GEOSPATIAL ENGINEERING COMPETENCIES. Engineering Surveying

SURVEYORS BOARD OF QUEENSLAND. RTK GNSS for Cadastral Surveys. Guideline

What makes the positioning infrastructure work. Simon Kwok Chairman, Land Surveying Division Hong Kong Institute of Surveyors

ENVI.2030L Topographic Maps and Profiles

Introduction to Total Station and GPS

Lecture # 7 Coordinate systems and georeferencing

ENGINEERING. Unit 10 Computer Aided Design (CAD) 2016 Suite. Cambridge TECHNICALS LEVEL 3

NJDEP GPS Data Collection Standards for GIS Data Development

AutoCAD 2016 for Civil Engineering Applications

Land Navigation / Map Reading

Appendix III Graphs in the Introductory Physics Laboratory

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

1. Land survey Work. 2. Civil and Structural engineering services.

Estimating Tolerance Accuracy (Rounding, including sig. fig.) Scientific notation

GUIDANCE NOTES FOR GNSS NETWORK RTK SURVEYING IN GREAT BRITAIN

Legal Description & Site Plan Requirements and Layouts

AREA MEASUREMENT REPORT (RICS Code of Measuring Practice) 6 MARKET ROAD LONDON N7

The Design and Philosophy of the Tunneling Survey for the Klang Valley Underground Mass Rapid Transit Project

HYDROGRAPHIC SURVEY STANDARDS AND DELIVERABLES

Automated Machine Guidance

TOTAL STATION WORKSHOP

Developments in BIM Infrastructure Design. Barry Blake 3 rd June 2014

CHAPTER 11 SURVEY CADD

Introduction to Datums James R. Clynch February 2006

Alabama Standards of Practice for Surveying

Project Planning and Cost Estimating

Surveying & Measurement. Detail Survey Topographic Surveying

SECTION SITE SURVEYS

Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour.

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

Work Experience Pack. Prepared by LMP Architectural Consultants. LMP Architectural Consultants Work Experience Pack

Beach monitoring with GPS William F Price Department of Civil Engineering, University of Brighton, BRIGHTON, BN1 4GJ, UK

High Precision Positioning Unit 1: Accuracy, Precision, and Error Student Exercise

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

City of Keizer Floodplain/Greenway Development Application

Cleveland State University

STARBASE Minnesota Duluth Grade 5 Program Description & Standards Alignment

BASIC TERMS OF ROAD GEOMETRY

PHOTOGRAMMETRY STEREOSCOPY FLIGHT PLANNING PHOTOGRAMMETRIC DEFINITIONS GROUND CONTROL INTRODUCTION

DOUBLE PROPORTION MADE COMPLEX

Basics of Photogrammetry Note#6

1.1 GENERAL RECORD DRAWING REQUIREMENTS

What is Meant by Level of Accuracy? As a service provider who. By John M. Russo, AIA. room width = 10'-0' building length = 100'-0' x = 1/4"

Republic of Mauritius Technical Assistance for Grand Baie Sewerage Project Phase 1-B. Final Report Volume2: Report of Topographic Survey

TECHNICAL DESIGN II (546)

10/9/2018. Introduction to Surveying. Chapter -One-

Introduction to Surveying. Chapter -One-

1 Higher National Unit credit at SCQF level 7: (8 SCQF credit points at SCQF level 7)

COURSE TITLE: ENGINEERING DRAWING 2 GRADES LENGTH: FULL YEAR SCHOOLS: RUTHERFORD HIGH SCHOOL RUTHERFORD, NEW JERSEY DATE:

Important Questions. Surveying Unit-II. Surveying & Leveling. Syllabus

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

Title: How steep are those hills? Engineering Grade: Estimated Time: 3 hours (2 days) Groups: 3 to 4 students

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

PROPOSED CURRICULAR STRUCTURE AND SYLLABI OF FULL-TIME DIPLOMA COURSE IN SURVEY ENGINEERING

This experiment is under development and thus we appreciate any and all comments as we design an interesting and achievable set of goals.

Locating the House on the Building Site

Porter County Plan Commission

Mathematics Essential General Course Year 12. Selected Unit 3 syllabus content for the. Externally set task 2017

Position Announcement

Figure 8-1 Layout equipment and tools. Tape measure. String line level. Eyepiece level. Laser plane level Delmar/Cengage Learning.

SPIRIT 2.0 Lesson: How Far Am I Traveling?

NATIONAL CERTIFICATE (VOCATIONAL)

Future City s 2018 Eye on Engineering Webinar October 24 th, The webinar will begin in a moment

Chapter 6 GPS Relative Positioning Determination Concepts

GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM. Course Title: Surveying (Code: )

- 9_12TI7962-QUIZ2 - Print Test

CHAPTER 2 GEODESY AND DATUMS IN NAVIGATION

47 CFR Ch. I ( Edition)

Leica SmartStation Total Station with integrated GNSS

8/17/2014. Process of directly or indirectly measuring vertical distances to determine the elevation of points or their differences in elevation

PRELIMINARY PLAT CHECK LIST

Surveying for Engineers

Transcription:

TSA Surveying Course with ProQual Level 3 in Engineering Surveying A block by block outline Preamble The TSA Surveying Course comprises six study periods of two weeks each spread over a period of two years and is held in Worcester. Graduation (passing all six blocks) from the course will fulfil 100% of the academic requirement for those wishing to upgrade from Student to Technical membership of Chartered ICES. The student also requires 3 years relevant experience, a detailed CV, detailed experience report, 1 years worth of CPD reports and a completed Principal Sponsor Form. The TSA Surveying Course provides 50% of the points required for the RICS Associate (AssocRICS) qualification. The TSA Course is now run alongside the ProQual Level 3 Diploma in Engineering Surveying. This provides a successful candidate with a recognised qualification and standard which is recognised by CSCS. Although this will be billed and registered separately, it will require minimal additional effort for a candidate completing all six blocks. The course is an introduction to all the topics listed below giving an insight to each. Further study and practice is needed to become competent. The course will provide an understanding of what experience and previous study is required to gain full benefit from the course. Competency in Maths and English is recommended although not compulsory. There is no minimum age although it is recommended that the student is at least eighteen years old. Likewise it is not necessary to have experience of surveying although the ability to set up a tripod correctly would be an advantage. Each Block includes assessed class work that is undertaken during the block and a formal written exam at the end of the block. Blocks 1 to 5 also require the student to undertake a written assignment which is an integral part of the overall marks. Employers/Sponsors receive a written report on their student s performance after each block. A Graduation day is held at the completion of the course where students will receive their certificates. TSA Surveying Course Outline 2019 v1.0 20181213 1

Block 1. Level and Total Station Learn how to use a level and a total station. Find a bench mark and transfer levels onto site. Carry out a two peg test to check a level. Adjust your levelling. Write a spreadsheet to calculate your own levelling. Use a tape to measure distances and know how to correct for slope and temperature. Solve a right angle triangle. Be able to compute bearings and distances from coordinates. Observe and book rounds of horizontal angles vertical angles and slope distances and know what to do with them. Compute a traverse from your observations. Find out about the history of surveying and units of measurement and how the equipment works. Learn about care of equipment and health and safety when surveying. See the latest total stations demonstrated. Assignment to be undertaken between Block 1 and Block 2 Survey a short control traverse, and to provide a full written report of the work. The report should include a description of the work, a risk assessment for the site, traverse diagrams, station descriptions, observations, and calculations for plan and height. A separate level run loop around the stations tied to a local benchmark or TBM should be observed. The report should include a two peg test and a table to compare the results for levelling against the Trig heighting. The survey should be on a local grid. TSA Surveying Course Outline 2019 v1.0 20181213 2

Block 2. Topo Survey and Monitoring Learn how to apply atmospheric and prism corrections to a total station and be able to determine the correct prism offset. Survey an area by chain and offset using tapes and draw it up. Solve a non right angled triangle using the sine and the cosine rules. Observe and compute a trilateration network. Use a digital level for precise monitoring observations and write a spread sheet to present your results. Get the most from your calculator how to use the Polar and rectangular functions to compute bearings and distances or co-ordinate differences in one go. Adjust a traverse using the Bowditch and transit methods and understand the differences from the equal shifts method of adjustment. Observe and plot radial (Stadia) detail taken with a level and staff. Find out about how height is represented on a map and interpolate your own contours and long section from field observations then process the data on computer. Observe radial detail with a total station compute and plot it by hand before processing it on the computer. See how well you have done! See the latest robotic total stations demonstrated. Assignment to be undertaken between Block 2 and Block 3 Conduct and report on a small topographic survey based on a trilateration, cross-braced triangle. Detail surveyed using, total station, chain survey and stadia survey methods, contoured and with a long section through the site. The combined plot to be drawn by hand or in CAD. TSA Surveying Course Outline 2019 v1.0 20181213 3

Block 3. Advanced fixation, GNSS, the National Grid, Photogrammetry +. Learn how the curvature of the earth and refraction affect observations. Be able to observe and calculate a 3D intersection from angle observations only and how to get the best from your calculator. Be able to observe and calculate a resection from angle observations only and compare your results with the free station program on the total station. A chance also to brush up on your Geek letters and maths symbols. Have an appreciation of GNSS (GPS) theory and good practice when observing. Use GNSS receivers to locate your position in static control and RTK modes. Occupy an EA passive station and be able to find OS Passive & Active station data. See how to process your GNSS results and how OS Active stations and Network GNSS are used. See a demonstration of Network GNSS Capability. Learn why we have map projections and different survey grids and how to calculate and use scale factor for OSGB 36 co-ordinates. Be able to use software to convert from latitude and longitude co-ordinates to OSGB36. Be able to calculate by hand approximate distances down a meridian of longitude or along a parallel of latitude using a circular earth model. Learn about the relation between longitude and time and its importance in early navigation and Time zones. Learn about the development of stereo photogrammetry and how ortho-photos images are made. Be aware of how Lidar and satellite images can be used in Survey. Learn about the latest developments in SUAV s for photogrammetry. Plan coverage and chose suitable locations for ground controlling in air photography. Assignment to be undertaken between Block 3 and Block 4 Establish two new stations, one inside and one outside a rectangle of known control. Fix each using both intersection and resection. Compute by hand with a number of different station combinations and compare against a direct radial or GNSS position of the points. Write a report describing the work and a comparison of the results obtained. TSA Surveying Course Outline 2019 v1.0 20181213 4

Block 4. Measured building surveys, underground utilities and hydrography Survey and draw up a room plan with a tape and Disto. Survey a building footprint and internal rooms with a total station and process this on the computer. Calculate the net internal area for the part of the building you surveyed. Calculate by hand a coordinate transformation from a topographic grid to a building grid. Survey a building elevation by different methods and draw it up. Draw a building cross section from points you have previously surveyed See a demonstration of scanning and discover what can be done with scanned data including that from mobile scanners. Learn how surveys are conducted underground and how to survey underground utilities. Hear how PAS128 is improving good practice in the way Utility surveys are conducted. Do your own drainage invert survey and have the opportunity to use a radio detection device and GPR for utility tracing. Learn how to survey a river cross section and long section to meet the requirement of the Environment Agency Be able to make simple tidal predictions and tidal offset calculations for surveys Be aware and be instructed on the additional health and safety and environmental risks when working on or in buildings, Surveying Utilities (Safe manhole Lifting) and when undertaking hydrographic surveys. Assignment to be undertaken between Block 4 and Block 5 A practical measured building survey consisting of two floor plans with area calculation, a related cross section and an elevation of the building. Students may choose whichever method of survey and drawing they have access to. TSA Surveying Course Outline 2019 v1.0 20181213 5

Block 5. Setting out and engineering surveys Set out drainage run with a tape, level and staff. Be able to calculate gradients, batters and cross-falls. Set out a house foundation by angles and distances and check by tape and the tie distance program on the total station. Set out profiles for level by total station. Up load coordinates into a total station, set out the points by co-ordinates and check the set position against the design by downloading the surveyed points into a spreadsheet you have made. Use the reference line program to set out a structure. Learn how to compute points for a circular curve. Practice the setting out of curves from chords, by coordinates and by the reference arc program Use the free station program and height transfer programs to help setting out. Learn how to calculate vertical curves for a road and set out a vertical curve Calculate the location of cross section points to set out a road centre line channel and embankment / cutting batter rails with horizontal and vertical curves and super elevation. See how lasers and total stations are used in construction to give grade, level, or alignment. Find out how to transfer levels on high buildings. Awareness of how to plumb up control in a building. Learn about the importance of good record keeping and document control. Compute if a point is inside or outside a set tolerance. Learn how developments in Machine Control are changing setting out on site and the Surveyors changing role on site to service this. Appreciate the special health and safety risks likely to be encountered on a construction site. Assignment to be undertaken between Block 5 and Block 6 A theoretical report on the setting out of a small housing estate from initial topo survey to completion. Including houses, a road and a drainage run with sample calculations and illustrative plan. TSA Surveying Course Outline 2019 v1.0 20181213 6

Block 6. Survey management, areas and volumes, legal surveys GIS +. Learn how to plan and manage surveys and make your own survey plan. Learn the considerations for business costs, insurances, risk and making a profit Produce a quotation a survey with specification method statement and risk assessment. Understand how the RICS Specification deals with survey accuracy. Learn about quality assurance and quality control and the difference between accuracy and precision. Calculate the RMSE (Root mean Square Error) of a set of data and the acceptance or rejection of observations. Carry out a spot height survey by different methods to achieve a given RMSE and compare results. Learn how to and practice computing an area from simple shapes and by the cross coordinate method. Carry out the survey of a simple area and portion it into plots of a specific size on a computerset it out. Check the work with the total station area function. Learn how to calculate volumes from cross sections. Survey an area and use the computer to produce a digital ground model and volume calculation. Use the alignment and cross section routines on the survey processing software. Write a spreadsheet program to calculate bearings and distances from co-ordinates. Write a spreadsheet program to calculate and adjust a traverse. Learn what you must do in a determined boundary survey for the Land Registry. Learn what is expected of an expert witness for a legal boundary dispute. See how GIS systems work and how to survey the asset data. Learn about how BIM is changing the way work is undertaken collaboratively on projects and what the Surveyors role in providing information is. Find out about industrial metrology and how high precision scanning is used. Be aware of the importance of continued personal development in your career. TSA Surveying Course Outline 2019 v1.0 20181213 7

Graduation after completion of Block 6 Successful students graduate with an award ceremony at the end of the last block 6 for that academic year. (There is no assignment for block 6.) The ProQual Level 3 Diploma in Engineering Surveying will be assessed as the student progress during the course. Completion of this will be in step with completion of the TSA Course. Assessment This course will recognise the importance of continued professional development. During each block, the students undertake a number of class and practical exercises. Some of these will have a formal assessment. In addition, at the end of each block students sit a written examination that covers both the theoretical and mathematical aspects of the subjects taught in that block which will accurately chart their achievement against the block aims. These assessments including the instructors or tutors comment will highlight both the student s strengths and limitations, and are provided to the employer as a written report at the end of each block. At the end of each block, the student will be set a work experience assignment tasks. This will also be marked and reported on. Students should complete these assignments prior to commencing the next block. The marked assignments are an integral part of the course that reinforce what has been learnt and lead to further development. It is important that students are encouraged and assisted, where necessary, to do this work. The assessments and assignments will also be discussed with the students. At the end of the course, there will be a Graduation Ceremony and presentation of awards for the year group. Course Material The material produced is intended for course use and as an aide memoir to the subjects covered. It is also a reference for general surveying; it is not meant to be a substitute textbook or an exhaustive coverage of the subject. Use is also made of Client Guides and publications issued by the TSA, RICS, CICES and others. Students have a copy of those that are relevant either in their manual or digitally. They are also referred to the relevant web sites for further information. TSA Surveying Course Outline 2019 v1.0 20181213 8