CONSTRUCTION PRODUCT TECHNICAL CARD

Similar documents
CONSTRUCTION PRODUCT TECHNICAL CARD

CONSTRUCTION PRODUCT TECHNICAL CARD

thoroughly tried and tested! EWE Tapping Valves A single system for all types of pipes

Door Hinges Drill-in Hinges

[ ] kvs theor.: Theoretical kvs value for pressure drop calculation Vmax low-n: Vmax for low-noise operation

gabotherm Skirting Board Systems gabotherm Comfort (Heating Skirting Board) 58 Comfort E (Heating and Electric Skirting Board) 59

Products catalogue (I-P Edition)

RELINER INSIDE DROP SYSTEM SPECIFICATIONS

SECTION FUEL OIL SYSTEM (PLUMBING)

Size : Connection End : Min Temperature : Max Temperature : Materials : Cast iron body

Mould Precision Co., Ltd

MJK Expert 700 / 800 / 900 / 1100 / 2100 MJK Expert 1400 / 3400

CONTENTS TABLE OF. Introduction. Company Details. Organization Chart. Certificates & Insurances. Our Products. List of machineries and Equipment

Ltd.) is India s leading manufacturer of PVC-U Pipes & Fittings. Our pipes & fittings are available in a vast range of sizes.

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. Hand or power. kpa/34.

FUEL GAS PIPING SECTION A. The provisions of SECTION 15010, MECHANICAL GENERAL REQUIREMENTS, apply to this section.

Installation Tools. Pipe Cutters for steel and cast iron pipes 598. Deburring Reamer / for stainless steel pipes 600. for copper pipes 602

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. The main is drilled out under pressure.

Expansion vessels for solar systems

.1 Materials and installation for steel piping, valves and fittings for hydronic systems in building services piping..2 Related Sections.

The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.

Waynetown Water Systems Improvements. Division A -New Water Treatment Plant Town of Waynetown, IN. Submittal Review Sheet

Chapter 3. Experimental set up. 3.1 General

Assembly instructions

MEFA mounting accessories

WATERFLUX 3000 Quick Start

ITB TECHNICAL APPROVAL AT /2011

Size : Connection Ends : Min Temperature : Max Temperature : Materials : Cast iron body

25 TONNE HYDRAULIC PRESS MODEL NO: AHP 26

Insertion Transducer On-line Install Instruction

WATERFLUX 3000 Quick Start

Tooling Approving Report

Mould Precision Co., Ltd

ph or ORP Transmitter

SECTION BASIC MATERIALS AND METHODS

Solar Collector. (Evacuated Tube) Installation Guide, Operation & Maintenance Manual. Working towards a cleaner future

FLOWave SAW-Flowmeter

Technical specification FLUXUS F401 H2O

Laser Diode Bar Assemblies

High-efficiency Circulator Pump. Rio-Eco N / Rio-Eco Z N. Type Series Booklet

RISONIC Ultrasonic Transit Time Flow Measurement For Filled/Partially Filled Pipes For Open Channels. Supply Disposal Hydraulic Power Station

This is trial version

Digital flow ELEMENT transmitter for continuous flow measurement

A. This Section includes plumbing fixtures and related components.

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

Repair Manual 12 PL PILOT

Leading in drainage. Made in Germany

Standards Manager Web Standards List PPI-Plastic Pipe Institute

M1 series 2 way ball valve with integrated Praher Labeling System

TPV 1200 BTB. Variable Displacement Closed Loop System Axial Piston Compact Tandem Pump THE PRODUCTION LINE OF HANSA-TMP HT 16 / M / 160 / 0516 / E

OPTIFLUX 5000 Technical Datasheet

Gujarat Green Revolution Company Limited P. O. Fertilizernagar , Dist: Vadodara. Price List w.e.f. 06/02/2015

Digital flowmeter for continuous flow measurement

Copper Tube L AIR CONDITIONING & REFRIGERATION COPPER TUBE AS/NZS 1571 ASTM B280 BSEN

A Full Line of Pipe Products for Any Application

Gujarat Green Revolution Company Limited P. O. Fertilizernagar , Dist: Vadodara.

Gujarat Green Revolution Company Limited P. O. Fertilizernagar , Dist: Vadodara.

THERMOWELLS CONSTRUCTION FROM BARSTOCK OR FABRICATED

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

ANSI ORIFICE FLANGES METAL-KOREA

INLINE flowmeter for continuous flow measurement

Aronde range. Development. Modular assembly of rotomoulded tanks. Balance-float automatic closing device. Extension of the modular range

WATERFLUX 3070 Technical Datasheet

Automatic hardness testing devices

...thoroughly tried and tested!

TIE-ROD AND PIPE JOINTS

CBI Cooling - Temperature regulation

Posiflow Proportional Solenoid Valves % ^ ) 2/2. Brass or Stainless Steel Bodies 1/8" to 1/2" NPT. Proportional Valves. Features.

Magnetic-Inductive flow Meter fmi

Coriolis Massflowmeter

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

Welding and cutting torches - light version page 2. Welding and cutting torches - standard version page 4

Check valve type RK and RB

International Tube & Conduit Company Ltd. BRITISH STANDARD STEEL CONDUITS & FITTINGS

This specification describes the minimum requirements for piping systems for the following service:

Twin screw and barrel are the heart of extruders and play very crucial role in extruder.

QUALITY ASSURANCE SPECIFICATION

Job no. 5241_Accessories Brochure_Size: 8.2 x 8.2 _ KOHLER Genuine Accessories

MODEL 1500, 2500 & 2700 MANUAL CONTROLS. Service Manual

FSM4000 Electromagnetic Flowmeter. Measurement made easy. The all-purpose flowmeter for conductive fluids

Digital flow ELEMENT transmitter for continuous flow measurement

OPTIFLUX 1000 Technical Datasheet

Electromagnetic flowmeters and switches DWM 1000/2000

FUJI METAL LOCATOR F-90M INSTRUCTION MANUAL

Lift-off hinge. Rising hinge. Standard hinge. Heavy duty hinge. Parliament hinge. Spring hinge. Double action spring hinge. Concealed mortise hinge

SECTION MANHOLES

Digital flowmeter for continuous flow measurement

Operating Instructions for Flow Indicator. Model: DAZ

ma output signal with transmitter module. - Adjustable frequency output signal with pulse divider module

INSERTION paddle wheel flowmeter for continuous flow measurement

Original operating instructions Fail-safe inductive sensor GG507S / / 2013

Heat meter Q heat 5 US

MIG/MAG Welding Torch System ROBO WH 455 D ROBO WHPP 455 D liquid cooled

SECTION SWINGING AUTOMATIC ENTRANCES IN-GROUND, AUTOMATIC SWING DOOR OPERATOR CONVERTER ADAPTED TO BROOKFIELD NB-500 EXTREME DUTY OPERATOR

KRF. Backflush Filter DN (ANSI 1 1 / 2 32") PN Applications. Brief description and operation. The cleaning effect

INLINE flowmeter for continuous flow measurement

HELCOR druk_geosyntetyki II.qxd :22 Strona 2 HELICALLY CORRUGATED STEEL PIPES. HelCor & HelCor PA

Shell & Tube Heat-Exchangers

Transcription:

CONSTRUCTION PRODUCT TECHNICAL CARD Product feature: Manufacturer: Flowmeter included ASPOL-FV Łódź, ul. Helska 39/45 www.aspol.com.pl Energeo product: SPIDER R Distributor well with multi-sectional manifolds Sgn:EN.OZE.20-13.SP ENERGEO GEOTHERMAL TECHNOLOGY FOR GROUND SOURCE HEAT PUMPS RENEWABLE ENERGY SOURCES Legally protected brand according to the decision of the Polish Republic Patent Office EN.OZE.20-13.SP Uniform text dated 08. October 2013 1. List of standards / legislation and other documents related to the product: PN-EN 10226-1:2006; PN-EN ISO 228-1:2005 PN-EN ISO 228-2:2005 PN-EN 12201-1:2012, PN-EN 12201-2:2012, PN- EN 12201-3:2012, PN-EN 12201-4:2013; PN-EN 805:2002; PN-EN 805:2002/Ap1:2006; PN-EN ISO 1167-1:2007, PN-EN ISO 1167-2:2007, PN-EN ISO 1167-3:2008, PN-EN ISO 1167-4:2008; PN-EN 1074-5:2002; PN-EN 1267:2012; PN-ISO 9624:2001; PN-ISO 9623:2001; PN-B-02481:1998; PN-C-88012:1999; PN-C-88013-3:1999; VDI 4640; DIN 8075:1999; EN.OZE-PS:20-14.01; Distributor well assembly guidelines; EN.OZE-WW:20-12.1; Ground source for heat pumps assembly guidelines. 2. SPIDER-R distributor well a component of the Energeo* system The New SPIDER-R distributor well is an element of ground source system for heat pumps. It consists of a manifold (collector) in-built into a plastic chamber (well). SPIDER-R is a well manhole (allows maintenance operations). 2.1 Manifold an element of the hydraulic system consisting of two cylindrical collector bars with radial collector (SK) flow sections. Material: HDPE- 100/HDPE- 100RC. Manifold flow line flowmeter with flow guard is mounted on each antifreeze circuit in order to provide proper hydraulic balance and adjustment. Every circuit is controlled, with the option of cutting-off (closing). Manifold return line cut-off ball valve for each antifreeze circuit. The manifold main functions are as follows: Divide antifreeze liquid flowing from the heat pump through the manifold return line to the underground and transfer it back through the manifold flow line to the heat pump; Ensure hydraulic control, filling-up, cutting-off and venting. Outlet section with nickel plated brass internal thread socket for air vent valve is equipped with cut-off valve as standard Collector pipes (SK) and connection pipes (RD) are intended for both: electro-fusion and socket-welding techniques. Leak tightness is guaranteed by polyfusion welding method. * ENERGEO is a balanced hydraulic system developed to transfer geothermal energy from the ground, watercourses and water areas to the heat pump which provides energy for heating, cooling and hot water for dwellings, residential buildings and commercial facilities 1 1 5 A l l r i g h t s r e s e r v e d

2.2 Well plastic manifold chamber which protects against soil pressure and enables service procedures. Installation Outside buildings, in the ground. - See Distributor well assembly guidelines EN.OZE-PS:20-14.01. Drawing 1. SPIDER-R Distributor well Cross-section Drawing 2. SPIDER-R. Distributor Well. Side view. Heat Pump Room Inside The Building Drawing 3. Sample location of the SPIDER-R distributor well 2 1 5 A l l r i g h t s r e s e r v e d

3. Technical parameters of the SPIDER-R distribution well: PARAMETER SPIDER - R Number of sections (SK) 15-25 [pairs] Material of chamber/manifold HDPE/HDPE Chamber wall thickness >=8 mm Manifold pressure class PN16 Standard collector pipe diameter (SK) 32, 40 [mm] SK pipe welding method Polyfusion Standard connection tube diameter (RD) 63,75,90,110,125 [mm] RD pipe welding method Polyfusion Diameter of manifold main supply 400 [mm] Internal thread socket for air vent valve ½ Internal thread socket for filling ¾ A flowmeters range 2 12 [dm 3 /min] B flowmeters range 8 38[dm 3 /min] C flowmeters range 20 70 [dm 3 /min] Angle flowmeters range 5 50 [dm 3 /min] Dimensions: Height/diameter 1640/1000 [mm] Maximum foundation depth 2140 [mm] 3.1. The SPIDER weight, pressure losses and capacity: Sections SPIDER Weight Capacity Manifold pressure drop for a flow of 0.5 m 3 /h per section Ethylene glycol water solution 20E15 (-15 O C) Antifreeze liquid Propylene glycol water solution 20P15 (-15 O C) Manifold pressure drop for a flow of 1.5 m 3 /h per section Ethylene glycol water solution 20E15 (-15 O C) Propylene glycol water solution 20P15 (-15 O C) - [kg] [dm 3 ] [kpa] [kpa] [kpa] [kpa] 15 162 50,6 2,16 2,26 19,27 19,72 16 164 50,9 2,18 2,29 19,54 19,98 17 165 51,2 2,22 2,32 19,83 20,28 18 167 51,5 2,25 2,35 20,13 20,58 19 169 51,9 2,29 2,39 20,45 20,90 20 172 52,2 2,32 2,42 20,78 21,24 21 174 52,5 2,37 2,47 21,14 21,59 22 176 52,8 2,41 2,51 21,50 21,96 23 178 53,1 2,45 2,55 21,90 22,35 24 180 53,5 2,50 2,60 22,30 22,75 25 182 53,8 2,55 2,64 22,71 23,17 Approximate values. Calculation condition: Operating temperature :O O C, Linear Flowmeter, RD- diameter: 110 mm, length: 50 cm, SK- diameter:32 mm, length 40 cm. 4. Load-capacity, thermal insulation, foundation depth The depth of wells Spider is 1640 mm. Each distributor well is equipped with a HDPE cover (load capacity of 10 kn). The cover may be additionally equipped with a closing mechanism and/ or thermal insulation. If it is required that the distribution well carry larger loads, it can be additionally equipped with: 3 1 5 A l l r i g h t s r e s e r v e d

Polyester manhole cover with a conical load ring made of resin-cement. Load capacity up to 125 kn; Cast iron manhole, class D400, with loading concrete plate to carry loads up to 400 kn. NOTE! The well capping method used should be based on a technical and construction design that takes into consideration all relevant water and ground conditions, the well s size and expected loads in accordance with the following standards: PN-EN 1991-2:2007 and PN-EN 1990:2004. 5. Equivalent products see technical card ALTRA Divider well in terms of 14 section EN.OZE.20-13.AL; SPIDER MAXI Divider well in terms of 20-25 section EN.OZE.20-13.SPM; Wall divider type RS, full range in accordance with EN.OZE.20-13;RS. 6. Information Technology The SPIDER-R is available in the "ENERGEO SOFT computer program (design/selection of ground sources for heat pumps). The SPIDER-R is designed to be compatible with Electronic Diagnostic System for GSHP (EDS) to facilitate electronic diagnostics and archiving of working parameters of ground source in accordance with EN.EDS.20-13;01 7. Supplementary components Connection pipes (in accordance with EN.OZE.20-13;RD); Distribution pipes (in accordance with EN.OZE.20-13;RR); exchangers (in accordance with EN.OZE.20-13;WG); Pipeway through wall barriers (in accordance with EN.OZE.20-13;PB); Heat pump engine room equipment; Antifreeze liquids: glycols and glycol water solutions (in accordance with EN.OZE.20-13;GH); Marking accessories; 8. Classification, training, qualifications and certification Qualifications to install the system of ground source heat pumps, including the SPIDER-R well, should be gained through participation in training courses organized by the producer or by training institutions authorised by them. 9. The product is characterised by the following features: Material uniformity for all plastic hydraulic elements: HDPE-100/HDPE-100RC Transitions section of the collector through the wall of the chamber (well), which is the case are made by polyfusion welding method; All plastic connections base on polyfusion welding method It has a manhole structure equipped with stairs permitting inspection service operations; It is equipped with a cylindrical divider consists of two separate chambers: the supply and return of the collector sections derived; Collector sections (inflow and return) are grouped in pairs (don t cross); Easy accesses to vents and filling up; A regular system of training courses available to ensure professional installation; IT design tools available to enable correct selection and product configuration for any system of ground sources; Certified technical service is provided. 4 1 5 A l l r i g h t s r e s e r v e d

10. 15-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 4. SPIDER-R. 15-section Distribution well. Side view. Drawing 5. SPIDER-R. 15-section Distribution Well.Cross-section. * Changes in technical solutions may cause differences between the drawings and the product 5 1 5 A l l r i g h t s r e s e r v e d

11. 16-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 6. SPIDER R. 16-section Distribution well. Side view. Drawing 7. SPIDER R. 16-section Distribution Well.Cross-section. 6 1 5 A l l r i g h t s r e s e r v e d

12. 17-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 8. SPIDER R. 17-section Distribution well. Side view. Drawing 9. SPIDER R. 17-section Distribution Well.Cross-section. 7 1 5 A l l r i g h t s r e s e r v e d

13. 18-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 10. SPIDER R. 18-section Distribution well. Side view Drawing 11. SPIDER R. 18-section Distribution Well.Cross-section. 8 15 A l l r i g h t s r e s e r v e d

14. 19-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 12. SPIDER R. 19-section Distribution well. Side view. Drawing 13. SPIDER R. 19-section Distribution Well.Cross-section. 9 1 5 A l l r i g h t s r e s e r v e d

15. 20-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 14. SPIDER R. 20-section Distribution well. Side view. Drawing 15. SPIDER R. 20-section Distribution Well.Cross-section. 10 1 5 A l l r i g h t s r e s e r v e d

16. 21-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 16. SPIDER R. 21-section Distribution well. Side view. Drawing 17. SPIDER R. 21-section Distribution Well.Cross-section. 11 1 5 A l l r i g h t s r e s e r v e d

17. 22-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 18. SPIDER R. 22-section Distribution well. Side view.. Drawing 19. SPIDER R. 22-section Distribution Well.Cross-section. 12 1 5 A l l r i g h t s r e s e r v e d

18. 23-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 20. SPIDER R. 23-section Distribution well. Side view.. Drawing 21. SPIDER R. 23-section Distribution Well.Cross-section. 13 1 5 A l l r i g h t s r e s e r v e d

19. 24-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 22. SPIDER R. 24-section Distribution well. Side view. Drawing 23. SPIDER R. 24-section Distribution Well.Cross-section. 14 1 5 A l l r i g h t s r e s e r v e d

20. 25-section distribution well: SPIDER-R flowmeters included technical drawings*. Drawing 24. SPIDER R. 25-section Distribution well. Side view. Drawing 25. SPIDER R. 25-section Distribution Well.Cross-section. 15 1 5 A l l r i g h t s r e s e r v e d